AZ PFH51-1(2), Control Road Design-Build

Award Notice Posted

Solicitation number
DTFH68-11-R-00001
Agency
Awarded
to Austin Bridge & Road, LP
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH68-11-C-00009 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Payson, Arizona 85541, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

REQUEST FOR QUALIFICATIONS (RFQ)
PHASE I OF DESIGN-BUILD SELECTION PROCESS

THIS PROCUREMENT IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). PROJECT DETAILS: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) is conducting a "two phased" Design-Build (D-B) selection process for the AZ PFH 51-1(2), Control Road Bridge Replacements Project within the Tonto National Forest near Payson, Arizona.

The RFQ document is attached to this notice.  Questions related to the RFQ must be submitted to CFLContracts@dot.gov or FAX to (720) 963-3360. 

Update #2 ·

THIS PROCUREMENT IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). PROJECT DETAILS: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) intends to conduct a "two phased" Design-Build (D-B) selection process for the Tonto National Forest Bridge Rehabilitation/Replacements Project in Payson, Arizona.


The Tonto National Forest Bridge Replacement Project is to design and rehabilitate/construct 7 new bridge replacements for the sub-standard geometric & structural deficient bridges and to hydraulically improve one at-grade stream crossing along Forest Highway 51 (also known as National Forest System Road 64) in Gila County, AZ.  The subject bridges and 1 low water crossing on Forest Highway 51 are listed below: 


Webber Creek Bridge, Milepost 5.7 , span length  =  110 feet


Lewis Creek Bridge, Milepost 16.8, span length = 30 feet


Bonita Creek Bridge, Milepost 13.8, span length - 30 feet


Ellison Creek Bridge, Milepost 17.4, span length = 45 feet


Perley Creek Bridge, Milepost 14.7, span length = 30 feet


Roberts Draw Bridge, Milepost 19.6, span length = 45 feet


Moore Creek Bridge, Milepost 15.4, span length = 30 feet


Tonto Village Low Water Crossing, Milepost 20.5, span length = 30 feet


Work on the 8 structures will involve hydraulic enhancements, roadway geometric improvements and updating Bridge design requirements to the AASHTO HL-93 load carrying criteria.  The existing seven bridges are either single or double span and had their wooden deck replaced with a concrete slab in the late 1950's.


Roadway/bridge quantities for the Design/Build project are expected to involve improvements to roadway approach's at all 7 bridge structures, bridge/drainage structure construction, guardrail replacement, retaining wall design, geo-technical investigations and recommendations, foundation design, placing embankment, stone masonry wingwalls, public co-ordination activities, minor asphalt paving and permit application.  


Estimated cost for the project is $3.5 to $8.5 million.

Tentative advertisement date for Phase I, Request for Qualifications (RFQ), is October 11, 2010. PLEASE NOTE: The RFQ will be available for download on or after October 11, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov.  Questions related to the RFQ must be submitted to CFLContracts@dot.gov or FAX to (720) 963-3360. 

Update #1 ·

THIS PROCUREMENT IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). PROJECT DETAILS: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) intends to conduct a "two phased" Design-Build (D-B) selection process for the Tonto National Forest Bridge Rehabilitation/Replacements Project in Payson, Arizona.


The Tonto National Forest Bridge Replacement Project is to design and rehabilitate/construct 7 new bridge replacements for the sub-standard geometric & structural deficient bridges and to hydraulically improve one at-grade stream crossing along Forest Highway 51 (also known as National Forest System Road 64) in Gila County, AZ.  The subject bridges and 1 low water crossing on Forest Highway 51 are listed below: 


Webber Creek Bridge, Milepost 5.7 , span length  =  110 feet


Lewis Creek Bridge, Milepost 16.8, span length = 30 feet


Bonita Creek Bridge, Milepost 13.8, span length - 30 feet


Ellison Creek Bridge, Milepost 17.4, span length = 45 feet


Perley Creek Bridge, Milepost 14.7, span length = 30 feet


Roberts Draw Bridge, Milepost 19.6, span length = 45 feet


Moore Creek Bridge, Milepost 15.4, span length = 30 feet


Tonto Village Low Water Crossing, Milepost 20.5, span length = 30 feet


Work on the 8 structures will involve hydraulic enhancements, roadway geometric improvements and updating Bridge design requirements to the AASHTO HL-93 load carrying criteria.  The existing seven bridges are either single or double span and had their wooden deck replaced with a concrete slab in the late 1950's.


Roadway/bridge quantities for the Design/Build project are expected to involve improvements to roadway approach's at all 7 bridge structures, bridge/drainage structure construction, guardrail replacement, retaining wall design, geo-technical investigations and recommendations, foundation design, placing embankment, stone masonry wingwalls, public co-ordination activities, minor asphalt paving and permit application.  


Estimated cost for the project is $3.5 to $5.5 million.

Tentative advertisement date for Phase I, Request for Qualifications (RFQ), is October 11, 2010. PLEASE NOTE: The RFQ will be available for download on or after October 11, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov.  Questions related to the RFQ must be submitted to CFLContracts@dot.gov or FAX to (720) 963-3360. 

Files

File Type Posted
Control Road Amendment A002.pdf PDF
AZPFH51_1_2AmendmentA001.pdf PDF
AZ PFH 51-1(2) RFQ.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity