Control Road Amendment A002.pdf

PDF 691 KB Posted

Attached to
AZ PFH51-1(2), Control Road Design-Build
Solicitation number
DTFH68-11-R-00001
Issued by

About this file

Amendment A002

View the file

Other files

File Type Posted
AZPFH51_1_2AmendmentA001.pdf PDF
AZ PFH 51-1(2) RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

http://www.cflhd.gov/procurement/construction/advertised-projects.cfm

AZ PFH 51‐1(2)

Tonto National Forest Bridge Replacements

Design‐Build Solicitation

Request for Qualifications

3. Criteria 3: Quality Management Plan.

The Evaluation Board will review and evaluate each Proposer’s approach to quality control to assess the soundness and reasonableness of the Proposer's planned QA/QC for quality of design, materials, and construction products.

Submit an outline of the system to be used to manage the design and construction schedule, and the management system to control the cost and quality of materials and constructed products. Describe how the quality management system(s) will interact between the design and construction functions and how it will be updated and monitored. Also describe how the system will address non-compliance issues of design and construction and how the system will facilitate strategic interaction with the Project Owner.

Submit evidence of construction work in within the last five (5) years, indicating that quality work was completed on schedule and within budget. Provide a minimum of two

(2) current references, with contact information.

4. Criteria 4: Design and Construction Capability and Resources.

The Evaluation Board will review and evaluate information about the Proposer’s past performance in the design and construction of bridge and roadway projects based on the Project Organizational Structure, and on Design and Construction Performance for projects similar in size and scope.

PROJECT ORGANIZATIONAL STRUCTURE

Submit the proposed D-B team’s organizational structure. Identify major participants, their roles in the Project and their percentage of work hours committed to the Project.

Identify how each partner and subcontractor interacts and fits into the overall D-B team makeup and their experience working together on past projects. Submit documentation that shows the direct experience of the Proposer, joint venture partners, and/or firms/teams related by an ownership agreement. Also include experience of key subcontractors that the Proposer intends to utilize in the execution of this Project. The successful Proposer’s organizational structure will be incorporated into the awarded contract.

DESIGN PAST PERFORMANCE

Provide information on at least three (3), but no more than five (5), bridge and roadway projects performed in the past five (5) years. Identify projects where the lead construction firm and the lead design firm have worked together on the same project in a Design-Build relationship. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction firm, then the Proposer shall identify the construction entity with whom it was contracted for the design of each such project.

Amendment A002 November 3, 2010

Untitled
E Pages Amended.pdf
E-5.pdf
E-17
E-46
E-94 _95
Text1:
Text2:
0: 1
1: 2
Text3:
0: A002
1: November 3, 2010
2:
0:
1: AZ PFH 51-1(2)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: Aaron Sanford 1:

1:
0:
Text6:
0: DTFH68-11-R-00001
1: 11/03/2010
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Off
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 1*
Text11:
0:
1:
Text12: * See Item 11 Above
Text13: RFQ

Remove and Replace page 8 from the RFQ with the attached page 8. Change made as a result of inquiry.

Please refer to the Questions/Answers link relating to this project located on our website at www.cflhd/procurement/construction/advertised-projects.cfm.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .