AZ FLAP234(3), Lake Mary Road
Award Notice Posted
- Solicitation number
- AZ-FLAP-234(3)
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Stormwater Plans, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6817C00016 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Coconino County, Arizona 86004, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The project includes one schedule that consists of 4R improvement of portions of Forest Highway 3, also known as Lake Mary Road in Coconino County Arizona. The project is also within the Coconino National Forest. The project consists of minor shoulder widening, pulverizing of pavement, new pavement 4R work includes removal of Willow Creek Bridge deck and replacing with a widened bridge deck on existing substructure. The project includes new guardrail approaches, final signing and striping. There are minor culvert pipe extensions with the shoulder widening and one large box culvert replacement.
Significant quantities for Schedule A include:
- Total of 15,000 CY of Embankment
- 139,000 SY of Full Depth Reclamation, Method 2, 8 inch depth
- 145,000 SY of Prime Coat Method 1
- 102,000 LB of Reinforcing Steel
- 33,000 LB of Reinforcing Steel Epoxy
- 102,300 LB of Structural Steel Furnished, Fabricated and Erected
- 120,000 LF of Rumble Strip
- 8,000 CY of Conserved Topsoil
- 15,000 Tons of Roadway Aggregate Method 2
- 30,000 Tons of Asphalt Concrete Pavement
- 252 CY of Structural Concrete
- 85 LF of Reinforced 12 foot x 9 foot Precast Reinforced Box Culvert
201 LF of Guardrail System G4
The contracting range for this project is $8 to $12 million.
Update #1 ·
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT IS LATE FEBRUARY, 2017. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.
The project includes one schedule that consists of 4R improvement of portions of Forest Highway 3, also known as Lake Mary Road in Coconino County Arizona. The project is also within the Coconino National Forest. The project consists of minor shoulder widening, pulverizing of pavement, new pavement 4R work includes removal of Willow Creek Bridge deck and replacing with a widened bridge deck on existing substructure. The project includes new guardrail approaches, final signing and striping. There are minor culvert pipe extensions with the shoulder widening and one large box culvert replacement.
Significant quantities for Schedule A include:
- Total of 15,000 CY of Embankment
- 139,000 SY of Full Depth Reclamation, Method 2, 8 inch depth
- 145,000 SY of Prime Coat Method 1
- 102,000 LB of Reinforcing Steel
- 33,000 LB of Reinforcing Steel Epoxy
- 102,300 LB of Structural Steel Furnished, Fabricated and Erected
- 120,000 LF of Rumble Strip
- 8,000 CY of Conserved Topsoil
- 15,000 Tons of Roadway Aggregate Method 2
- 30,000 Tons of Asphalt Concrete Pavement
- 252 CY of Structural Concrete
- 85 LF of Reinforced 12 foot x 9 foot Precast Reinforced Box Culvert
201 LF of Guardrail System G4
The contracting range for this project is $8 to $12 million.
Files
| File | Type | Posted |
|---|---|---|
| HUBZone_Price_Evaluation.pdf | ||
| Bid_Opening_Summary_-_AZ_FLAP_234(3,_Lake_Mary_Road.pdf | ||
| QA.docx | DOCX document | |
| sample_subcontracting_plan.doc | DOC document | |
| Plans.pdf | ||
| AZ_FLAP_234(1)_Lake_Mary_SWPPP.pdf | ||
| AZ.FLAP.234(3).Lake_Mary_Road.Geotech.2016.Rev1.zip | ZIP file | |
| DTFH6817B00003.pdf | ||
| Cross_Sections.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| AZ FLAP 234(3), Lake Mary Road | Award Notice |