Aircraft Engine Trailers ETU-8/E and ETU-9/E

Awarded Award Notice Posted

Solicitation number
FA8533-13-R-00211
Agency
AFLCMC Robins AFB Lifecycle Management Center, Department of Defense
Awarded
to MCT Industries, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
FA8533-14-D-0006 Federal IDV award
NAICS code
336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

Added: Oct 15, 2013 8:28 am Modified: Jan 30, 2014 12:37 pmTrack Changes ***Amendment 0007 is now posted to incorporate a revised FACTS Sheet. Receipt of proposals date remains 21 February 2014 at 12:00 PM EST.***

***Amendment 0006 is now posted to restate the date for receipt of proposals to 21 February 2014 at 12:00 PM EST. Also a revised PD is incorporated along with a Q&A. This Q&A drove a full review of the PD to ensure all requirements were correct. This resulted in some other changes that are now reflected in the attached PD08WRGBGBEB16C. The sections that changed are highlight in yellow.***

*** Amendment 0005 is now posted to restate the date for receipt of proposals to INDEFINITE. The Government received some technical questions that need to be resolved. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

***Amendment 0004 is now posted to restate the date for receipt of proposals to 19 December 2013, at 12:00 PM EST. Also Amendment 0001 to the PD is attached. Question and Answers are attached as well.***

*** Amendment 0003 is now posted to extend the date for receipt of proposals to INDEFINITE. The Government has some technical questions to resolve. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

*** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #8 ·

Added: Oct 15, 2013 8:28 am Modified: Jan 21, 2014 2:08 pmTrack Changes ***Amendment 0006 is now posted to restate the date for receipt of proposals to 21 February 2014 at 12:00 PM EST. Also a revised PD is incorporated along with a Q&A. This Q&A drove a full review of the PD to ensure all requirements were correct. This resulted in some other changes that are now reflected in the attached PD08WRGBGBEB16C. The sections that changed are highlight in yellow.***

*** Amendment 0005 is now posted to restate the date for receipt of proposals to INDEFINITE. The Government received some technical questions that need to be resolved. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

***Amendment 0004 is now posted to restate the date for receipt of proposals to 19 December 2013, at 12:00 PM EST. Also Amendment 0001 to the PD is attached. Question and Answers are attached as well.***

*** Amendment 0003 is now posted to extend the date for receipt of proposals to INDEFINITE. The Government has some technical questions to resolve. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

*** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #7 ·

Added: Oct 15, 2013 8:28 am Modified: Dec 19, 2013 3:44 pmTrack Changes *** Amendment 0005 is now posted to restate the date for receipt of proposals to INDEFINITE. The Government received some technical questions that need to be resolved. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

***Amendment 0004 is now posted to restate the date for receipt of proposals to 19 December 2013, at 12:00 PM EST. Also Amendment 0001 to the PD is attached. Question and Answers are attached as well.***

*** Amendment 0003 is now posted to extend the date for receipt of proposals to INDEFINITE. The Government has some technical questions to resolve. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

*** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #6 ·

Added: Oct 15, 2013 8:28 am Modified: Dec 12, 2013 10:08 amTrack Changes ***Amendment 0004 is now posted to restate the date for receipt of proposals to 19 December 2013, at 12:00 PM EST. Also Amendment 0001 to the PD is attached. Question and Answers are attached as well.***

*** Amendment 0003 is now posted to extend the date for receipt of proposals to INDEFINITE. The Government has some technical questions to resolve. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

*** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #5 ·

Added: Oct 15, 2013 8:28 am Modified: Dec 10, 2013 9:00 amTrack Changes *** Amendment 0003 is now posted to extend the date for receipt of proposals to INDEFINITE. The Government has some technical questions to resolve. Once those questions are resolved, an amendment will be posted to set a new date for proposals.***

*** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #4 ·

Added: Oct 15, 2013 8:28 am Modified: Nov 12, 2013 9:02 amTrack Changes *** Amendment 0002 is now posted to extend the date for receipt of proposals. Proposals are now due on 13 December 2013, at 12:00 PM EST. ***

*** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #3 ·

Added: Oct 15, 2013 8:28 am Modified: Nov 12, 2013 7:49 amTrack Changes *** Amendment 0001 is now posted to add a revised SOW.***

***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #2 ·

Added: Oct 15, 2013 8:28 am Modified: Oct 31, 2013 8:28 amTrack Changes ***The solicitation is now posted with the attachments. Proposals are due on 02 December 2013, at 12:00 P.M. EST. ***

This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Update #1 ·

Added: Oct 15, 2013 8:28 am This is a pre-solicitation notice. Anticipated release of the RFP is 31 Oct 2013. The AFLCMC/WNKBBB Contracting Office at Robins AFB, GA, has a requirement for Aircraft Engine Trailers, NSN 1730-01-508-3156RN (ETU 8/E) and 1730-00-061-3403RN (ETU 9/E)(these are generic NSNs used for solicitation purposes only). These types of trailers are used for lifting and removing engines and are a more complex design than regular transportation trailers. They are mobile, hydraulically self-supporting trailers which are made up of a set of rails connected to an elevating main frame by a hydraulic control linkage system. The Government intends to award a six-year, firm fixed price, Requirements Contract with Best Estimated Quantities (BEQs). The RFP and resultant contract will be structured with one basic contract period of 24 months and four annual option periods and will be 100% small business set-aside. The best estimated quantities (BEQs) are as follows:
Basic Period: 15 of each NSN. One of each will be First Articles
Option I: 15 of each NSN
Option II: 15 of each NSN
Option III: 15 of each NSN
Option IV: 15 of each NSN
First Article units will be required for each NSN. A Product Description (PD) and Statement of Work will be provided as part of the RFP package along with various mandatory data deliverables such as First Article Test Plan and Test Reports. Foreign Companies will not be permitted to participate in the competition.
Delivery Requirements will be 535 calendar days after effective date of order for the first article units and 180 calendar days after effective date of order for the first 6 (six) production units with subsequent production unit orders delivering at a rate of 6 units per 30 day period, dependent upon the quantity ordered.
FAR Part 15 procedures will be utilized. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. This acquisition will utilize the tradeoff source selection process wherein a tradeoff between non-cost factors and cost/price is permitted in order for the Government to make a best value award decision. For those offerors whose proposals are found to be technically acceptable, tradeoffs will be made between past and present performance and cost/price. Past and present performance is considered to be approximately equal to cost/price. The Government will evaluate proposals and make award in accordance with the "Evaluation Basis of Award" provision in the RFP.
Interested offerors may notify the POCs listed below for any additional questions. NO TELEPHONE QUESTIONS. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check FEDBIZOPPS site prior to submission of their proposal.

Attachments

Files attached to this notice, newest first
File Type Posted
Q A_20_Feb_2014.pdf PDF
Q A_14_Feb_2014.pdf PDF
Q A_11_Feb_2014.pdf PDF
Attachment_1_-_FACTS_Sheet.doc DOC document
PD08WRGBGBEB16C.pdf PDF
FA853313R00211______0006.pdf PDF
FA853313R00211______0005.pdf PDF
Amendment_0001_to_PD08WRGBGBEB16B_-_12_Dec_2013.pdf PDF
FA853313R00211______0003.pdf PDF
Q A_09_Dec.pdf PDF
FA853313R00211______0002.pdf PDF
Q A_12_Nov.pdf PDF
FA853313R00211______0001.pdf PDF
B005NoticeofRevision.pdf PDF
C001CorrosionPreventinandControlPlan.pdf PDF
PD08WRGBGBEB16B.pdf PDF
Attachment4ClientAuthorizationLetter.pdf PDF
B008IntegratedMasterSchedule.pdf PDF
A002TestInspectionReport.pdf PDF
A005TechnicalReportStudyServices.pdf PDF
B003ConferenceMinutes.pdf PDF
D002TMCR.pdf PDF
AttachmentIIPastPerformanceQuestionnaire.pdf PDF
E006SERecommendationDataTypeII.pdf PDF
Attachment5TeamingPartnerConsentForm.pdf PDF
E005SupplementalDataProvisioingTypeII.pdf PDF
FA853313R00211.pdf PDF
B002ConferenceAgenda.pdf PDF
GeneralEngineeringNotes.pdf PDF
Attachment6QuantityRanges.pdf PDF
A003TechnicalReportStudyServices.pdf PDF
A004ProductBaselineIndex.pdf PDF
B004EngineeringChangeProposal.pdf PDF
StatementOfWork.pdf PDF
B009ContractorsProgressStatusManagement.pdf PDF
AFMC158.pdf PDF
EngineeringDataListTypeI.pdf PDF
E003SERecommendationData.pdf PDF
D001TMCR.pdf PDF
E001LogisticsManagementInformationTypeI.pdf PDF
B001ContractorsProgressStatusManagementReport.pdf PDF
B006RequestforDeviation.pdf PDF
E002SupplementalDataProvisioningTypeI.pdf PDF
EngineeringDataListTypeII.pdf PDF
C002SystemSafetyProgramPlan.pdf PDF
E004LogisticsManagementInformationTypeII.pdf PDF
Attachment3TransmittalLetter.pdf PDF
AttachmentIFACTSSheet.pdf PDF
Q A_21_Oct.pdf PDF
Q A_17_Oct.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity