Attachment_1_-_FACTS_Sheet.doc
DOC document 70 KB Posted
- Attached to
- Aircraft Engine Trailers ETU-8/E and ETU-9/E Federal contract opportunity
- Solicitation number
- FA8533-13-R-00211
About this file
Revised Attachment 1 - FACTS Sheet
View the file
Other files for this federal contract opportunity
Show all 50
Aircraft Engine Trailers ETU-8/E and ETU-9/E has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP FA8533-13-R-00211
ATTACHMENT 1
SOURCE SELECTION INFORMATION – See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
Past/Present Performance FACTS Sheet (To Be Completed By Offeror/Joint Venture Partner)
Request the offeror complete a separate FACTS Sheet for each relevant contract. See the provision titled, “L-900 Instructions to Offerors” of this RFP for detailed instructions and limits on number and recency of contracts. Offeror is requested to provide frank, concise comments regarding present/past performance on the program identified in paragraph 2. below.
1. Offeror.
Name (Company/Division)
Address
CAGE Code
2. Contract Number or Effort/Project Title.
3. Role of Offeror/Joint Venture Partner in Effort.
______ Prime Contractor ______Subcontractor
NOTE that the information provided in this FACTS Sheet shall reflect the role that the offeror performed in the effort, i.e. an offeror who performed as a subcontractor shall identify the contract type, dollar value, description, etc. of its subcontract with the prime contractor.
4. Name of Customer.
5. Customer Points of Contact
Name: ___________________________________ Telephone Number: ________________________ E-Mail Address: __________________________
Name: ___________________________________ Telephone Number: ________________________
E-Mail Address: __________________________
6. Contract Type(s). (Firm Fixed Price, Time & Materials, Cost Reimbursable, etc.)
7. Contract Dollar Value. (If you performed work as a subcontractor, identify your contract $ value and the PRIME’s contract $ value, if known. Describe any changes in dollar value that may have occurred from time of contract award to the conclusion of the effort or the present, whichever is applicable.)
Initial Dollar Value:
Present Dollar Value:
8. Period of Performance. Identify any changes that may have occurred from time of contract award to the conclusion of the contract or the present, whichever is applicable:
a. Original schedule:
b. Current Schedule (if changed):
c. Estimated percentage of completion:
d. How many times changed and primary cause of changes:
9. Quantities of items involved in the effort:
Quantities ordered:
Quantities delivered:
10. Brief Description of Work:
a. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph 2 above to the proposed effort. This is limited to three pages beyond the page limitation of the FACTS Sheet information.
b. This paragraph shall also include details to support the offeror’s record for on time delivery, technical quality and cost control for this effort identified in paragraph 2 above.
RELEVANCY TABLE
(Complete with each effort submitted for evaluation)
This table will assist the PCO in evaluating the relevancy of the proposed effort to the instant RFP FA8533-13-R-00211. Offerors shall only complete column three. Offerors answers are applicable only to the effort identified in paragraph 2 above, not the offeror’s proposed solutions to the instant effort. Also the responses should represent what was provided for the effort listed in paragraph 2 above, and not list general capabilities of the company. If additional space is needed, please attach a separate sheet to your response (limited to three pages). Please be as specific as possible with fill-in information provided.
| Category |
| Example |
| Fill-in for the Effort Identified in para. B above (Offeror completes) |
| 1. Nature of Business Area(s) involved |
| Design, Manufacturing, |
| Circle all that apply |
Design Manufacturing
2. Detailed Description of Item
| 3. Type of Trailer |
| Aircraft or Other than Aircraft |
| Circle One |
Aircraft Engine Lift Trailer
Engine Lift Trailer (Not Aircraft)
Non-Engine Trailer
4. Did it include an Hydraulic Lift System (if so describe the lift system)
Circle One
Yes No
| 5. Load Capacity (pounds) |
| 8,000; 6,000; 4,000; etc |
| List the load capacity of the trailer |
| 6. Control Mechanism Capability |
| Yaw, roll, lateral, tilt |
| Circle all that apply |
Yaw Roll Lateral Tilt
| 7. Quantities produced, number repaired or other quantitative data |
| 3 or more units per month |
| Provide quantity information |
Monthly qty Yearly qty Total qty
| 8. Program similarity |
| Yes or No |
| Circle Yes or No, provide brief explanation |
Yes No
| 9. Program Complexity |
| Complex, Non-Complex |
| Circle One, and explain |
Complex Non-complex
| 10. Extent of subcontractor involvement |
| Prototype, production, specific assembly/role |
| 11. Reports/Manuals/Plans/Data |
| Were Technical Reports, Safety Hazard Reports, Technical Manuals or other data required in this effort? Describe in detail. |
| Explain the types of data that was required by the effort |
10. Utilization of Small Business Concerns. If a small business, or, if a large business and a Small Business Subcontracting Plan per FAR 52.219-9 was NOT required by this effort, indicate the company’s compliance with FAR 52.219-8, Utilization of Small Business Concerns. Even if FAR 52.219-8 was NOT included in this effort, when subcontracting possibilities existed, did the company award subcontracts to small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance?
| Utilization of Small Business Concerns |
| Small Business |
| Large Business |
No subcontracting possibilities
In compliance
Not in compliance (address why)
11. Key Personnel. If the offeror/joint venture partner is a newly formed entity that either has no prior contracts or does not possess relevant corporate past performance, but does have key personnel with relevant past performance while employed by another company, specify by name, such key individual(s) who will participate in the proposed effort under this acquisition who also participated in the program identified in paragraph 2 above, and indicate their contract role. Describe how participation of these key personnel contributed to the success of the previous effort and how this indicates probability of success on the proposed effort.
12. Discrepancies. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in paragraph 2 above.
Additionally, for those efforts where you are cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. It is not presumed that performance has been perfect. Rather, the proposal should contain evidence of your ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.
13. Effort History. Was this contract effort (as identified in paragraph 2 above) submitted as a past performance source of data for a previous WR-ALC procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.
NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.
SOURCE SELECTION INFORMATION
FOR OFFICIAL USE ONLY 5
SEE FAR 2.101 AND 3.104
File details come from the government source that posted it. Updated .