121 FS/OHWS Gym Flooring
Closed Solicitation Posted
- Solicitation number
- FA286023Q4029
- Agency
-
District Washington
Headquarters Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238330 Flooring Contractors
- PSC
- 7220 Floor Coverings
- Place of performance
- Maryland 20762, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contract opportunity involves the provision and installation of a heavy-duty, single-piece rubber gym floor mat for the 121st Fighter Squadron gym as part of the US Air Force's Optimizing the Human Weapon System. The mat must be thick enough to withstand weights dropped from five feet and must be a single piece to ensure longevity and minimize separation. The contractor must also provide a warranty on the installed flooring.
List of Products and Services:
- Heavy-duty, single-piece rubber gym floor mat.
- Delivery of the gym floor mat.
- Installation of the gym floor mat.
- Warranty on the installed flooring.
Notice text
3 versions
Update #3 · Latest ·
This is a full and open, unrestricted requirement for a heavy duty single-piece rubber gym floor mat to replace the existing gym floor tiles in the 121st Fighter Squadron (121 FS) gym as part of the US Air Force's Optimizing the Human Weapon System (OHWS). The floor mat must be an appropriate thickness to permit dropping weights from approximately five feet without damaging the floor or requiring a raised platform to minimize tripping hazards in the gym. The flooring must be one piece versus being comprised of multiple tiles to minimize separation and ensure long-term longevity. Prior to installation, the room will be prepared by members of the 121 FS. This will involve removing gym equipment, but installation will be performed by the company ultimately selected for the installation. The quote must include costs for delivery and installation. Additionally, the selected contractor must provide a warranty on the installed flooring to ensure longevity, safety, and thoughtful usage of funds. Please see attached salient characteristics for more details.
AMENDMENT 1: The purpose of this amendment is to attach Gym Picture 1 and Gym Picture 2 to this solicitation.
Update #2 ·
This is a full and open, unrestricted requirement for a heavy duty single-piece rubber gym floor mat to replace the existing gym floor tiles in the 121st Fighter Squadron (121 FS) gym as part of the US Air Force's Optimizing the Human Weapon System (OHWS). The floor mat must be an appropriate thickness to permit dropping weights from approximately five feet without damaging the floor or requiring a raised platform to minimize tripping hazards in the gym. The flooring must be one piece versus being comprised of multiple tiles to minimize separation and ensure long-term longevity. Prior to installation, the room will be prepared by members of the 121 FS. This will involve removing gym equipment, but installation will be performed by the company ultimately selected for the installation. The quote must include costs for delivery and installation. Additionally, the selected contractor must provide a warranty on the installed flooring to ensure longevity, safety, and thoughtful usage of funds. Please see attached salient characteristics for more details.
Update #1 ·
This is a full and open requirement for a heavy duty single-piece rubber gym floor mat to replace the existing gym floor tiles in the 121 Fighter Squadron gym. The floor mat must be an appropriate thickness to permit dropping weights from approximately five feet without damaging the floor or requiring a raised platform to minimize tripping hazards in the gym. The flooring must be one piece versus being comprised of multiple tiles to minimize separation and ensure long-term longevity. Prior to installation, the room will be prepared by members of the 121 FS. This will involve removing gym equipment, but installation will be performed by the company ultimately selected for the installation. The quote must include costs for delivery and installation. Additionally, the selected contractor must provide a warranty on the installed flooring to ensure longevity, safety, and thoughtful usage of funds. Please see attached salient characteristics for more details.
Files
| File | Type | Posted |
|---|---|---|
| Gym Picture 2.png | PNG image | |
| Gym Picture 1.png | PNG image | |
| 121 FS Gym Flooring Combo.pdf | ||
| Flooring Salient Characteristics Final.pdf | ||
| 121 FS Gym Flooring Combo.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| 121 FS/OHWS Gym Flooring | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity