FormSF30.pdf

PDF 1 MB Posted

Attached to
HVAC Preventative Maintenance, NWS Jackson, KY
Solicitation number
WE133W18RQ0155
Issued by

View the file

Other files

File Type Posted
FormSF1449_(1).pdf PDF
JKL-Revised_DG_FAC-2018_HVAC_PM_SOW-03_03_18.docx DOCX document
FormSF30-JKL_HVAC_A2.pdf PDF
FormSF1449_(1).pdf PDF
JKL-Revised_DG_FAC-2018_HVAC_PM_SOW_02_09.pdf PDF
FormSF1449_(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Attachment Page

February 09, 2018

National Weather Service (NWS) Statement of Work (SOW)

HVAC Preventive Maintenance Services

09FEB2018

Location address:

JKL Weather Forecast Office 1329 Airport Road Jackson, KY 41339

1. Scope The work to be provided consists of two visits to perform semi-annual (fall and spring) PM service for the first year, and then additional option period(s) will be sent in for CRH approval .

The PM services will include all heating, ventilation, air-conditioning (HVAC) system, and associated equipment listed in this statement of work (SOW).

All items listed on the “HVAC Inspection Report” shall be accomplished semi-annually, with exception of the annual belt replacement provision. All work shall be performed during normal business hours (8 AM–4 PM / M-F) and the contractor shall notify the local NWS staff in advance with schedule to perform this work. Contractor shall provide a minimum of five (5) business days advance notice before PM work is performed at the Weather Forecast Office (WFO), Radar Data Acquisition (RDA) facilities, NWR Building, Storage Building and Transitional Power Maintenance Shelter (TPMS) building.

The contract will not permit personnel, labor, materials, or refrigerant repairs outside the SOW.

No action to correct any discrepancies/repairs outside of the SOW shall be taken unless approved in advance and directed to proceed by the Contracting Officer.

2. Place of Performance The site of the work shall consist of one site: The Weather Forecast Office, the Radar Data Acquisition facilities, and Transitional Power Maintenance Shelter building. The RDA facilities and TPMS shelter building are located on the same property as the WFO. The location address of the WFO is:

National Weather Forecast Office 1329 Airport Road Jackson, KY 41339

PAGE 2 OF 6 WE133W18RQ0155A0001

3. Items of Work The work is to be performed only on the HVAC systems and equipment room HVAC units described on the Equipment Inventory List included in this document. The contractor shall:

a. Provide all materials, including belts, tools, test instruments, permits, and personnel required to perform preventive maintenance

b. Test and inspect as required herein to ascertain the general condition of the equipment and report results to the Government Contact Point (GCP).

c. Ensure work site is properly cleaned up when work is complete.

d. All waste materials shall be disposed of by the contractor in compliance with federal, state, and local laws and regulations.

e. Legible and permanently mark with the installation date any component that has been replaced.

f. Awarded Contractor to confirm and validate that all equipment listed within this

SOW is accurate and complete. Any discrepancies shall be alerted to the Government Contact Point assigned to this contract. This is required to be completed only on the first PM service

4. Inspections During performance of maintenance on each piece of equipment, the contractor shall complete the “HVAC Inspection Report” checklist, document the service performed, and include any discrepancies. The completed checklist and the noted discrepancies/needed repairs not within the scope of the SOW, along with estimated repair cost, shall be provided to the GCP.

The GCP shall make a full inspection to ensure the services are completed per the SOW before the contractor departs the place of performance.

5. Minimum Standards of Workmanship All work shall be performed in compliance with all federal, state and local laws. In addition, work shall meet equipment manufacturers’ and generally accepted industry standards of good workmanship. A licensed HVAC technician having EPA certification must be utilized to make any and all repairs to the HVAC equipment. Any repairs made to a Liebert unit shall be completed by an individual having a Liebert certification. Use of a HVAC certified technician to perform the preventative maintenance actions is a requirement of this SOW.

PAGE 3 OF 6 WE133W18RQ0155A0001

6. Equipment to be serviced:

The below list of equipment is representative of the equipment at this location.

NWS highly recommends a site visit to ensure the accuracy of this list.

Unit ID Manufacturer Model No. Serial No.

AHU-1 Carrier (Package unit with ACCU-1) AHU-2 Carrier (Package unit with ACCU-2)

AHU-3 Heat Pump

Lennox CBX32M060230604 5807F16473

ACCU-1 Carrier 50TC-E12A1A6-A0A0A0 4913P61010 ACCU-2 Carrier 50TC-E12A2M6-A0F0A0 4115P86558

ACCU-3

Heat Pump Lennox TPA060S4N434 5809L05323

HUMIDIFIER DriSteem VaporMist VM-10 1217784-01-01 Equipment

Rm. CRAC-1 Liebert DS035AMAOE1246A C07B8E0032

Equipment Rm. CRAC-2

Liebert DS035AMAOE1246A C07B8E0031

Equipment Rm. ACCU-1

CRAC 1

Liebert CDF165A 0707C94774

Equipment Rm. ACCU-2

CRAC 2

Liebert CDF165A 0706C94470

RDA-1 Lennox LCC120S2BG1Y 5603K09200 RDA-2 Lennox LCC120S2BG1Y 5603K09201 TPMS Marvair AVP24ACA05CD1000GI EN88526

NWR

Building Window Shaker

Storage Building

GE

Window shaker

Building Automation

System

Honeywell

JACE

7. Services to Be Performed

Air Handling Units: AHU-1, AHU-2, AHU-3, Equipment Room AHU/CRAC-1, Equipment Room AHU/CRAC-2, RDA–1 & RDA-2

a. Check fan operation.

b. Replace belts annually (Fall PM) (Contractor provided) and Leave an extra set of belts at each piece of equipment.

c. Replace filters semi-annually; NWS will provide filters

d. Check electrical connections, relays, contactors, operating and safety controls for proper operation and condition.

e. Check and clean drains, drain pans, and check condensate tray for corrosion.

PAGE 4 OF 6 WE133W18RQ0155A0001

f. Check and clean cooling coils.

g. Clean outside air intake screen(s) and economizers

h. Check compressor oil sight glass during compressor operation for appropriate oil level.

i. Check all refrigerant piping connections for damage and leaks.

Air-Cooled Condensing Units: ACCU-1, ACCU-2, ACCU-3, Equipment Room ACCU- CRAC-1, Equipment Room ACCU-CRAC-2, RDA-1, RDA-2 Check for proper operation and clean per manufacturer’s specifications.

a. Check for proper operation.

b. Clean condensing unit/coils. (Completely water flush coils from the inside out)

c. Check electrical connections.

d. Check all refrigerant piping connections for damage and leaks and insulation for damage/deterioration.

e. Check starter and contactor electrical connection terminals for pitting.

f. Check compressor oil sight glass for proper oil level during compressor operation. Adjust and correct oil level per manufacturer’s specification.

g. Check refrigerant charge record readings on Inspection Report.

Air conditioning units: Transitional Power Maintenance Shelter (TPMS) Thru Wall Units (TWU) and at the NWR & storage building.

a. Check for proper operation.

b. Replace Filters semi-annually; NWS to provide filters

c. Inspect electrical connections, relays, contactors, and operating and safety controls for proper operation.

d. Inspect and clean evaporator coil.

e. Inspect and clean condenser coil. (Completely water flush coils from the inside out)

Cabinet Unit Heaters (Fall PM only):

a. Check for proper operation.

b. Clean coils, fans and housings.

c. Inspect electrical connections, contactors and relays

Steam Generated Humidifier(s):

A. Check/ clean strainers; check steam trap and hand valves.

Clean tank thoroughly, all sensors and all limit sensors per manufacturer specification.

b. Clean dispersion tube, drains, drain pan, heating element and float assembly.

c. Inspect electrical connections, relays, contactors and operating safety controls.

d. Check unit for proper operating conditions.

e. At Fall PM; if the humidifier is shut down; check system and then turn on humidifier and set up for operation.

f. At the Spring PM, Perform (a through d) line items and shut down unit.

PAGE 5 OF 6 WE133W18RQ0155A0001

8. Repairs Major emergency repairs and/or additional work may be requested under this purchase order;

however NO work may be scheduled or performed without a modification to the current purchase order or a notice to proceed (NTP) is issued by the Contracting Officer in advance.

An on-site response time of not more than 4 hours is required for emergency services. The contractor shall be compensated for the additional work at a pre-determined hourly rate included in the purchase order through a modification to the purchase order. Materials shall be itemized on the invoice and not exceed published price listings, if applicable. The contractor may also be eligible for industry standard service call fees. This work shall be completed during normal work hours.

Government Contact Point The GCP for this site location is Tim Stanley at 606-666-2560 ext. 372 with email address timothy.stanley@noaa.gov .

END OF SOW

PAGE 6 OF 6 WE133W18RQ0155A0001

mailto:timothy.stanley@noaa.gov

File details come from the government source that posted it.