This is an Invitation to Bid issued by the City of Clearwater, Florida for Wastewater Collections Point Repair and Improvements (Project Number 26-0060-UT). The contract encompasses six groups of work: Group A - Sanitary Sewer Trenchless Reconstruction; Group B - Sewer Cleaning and Televising Inspection; Group C - Wastewater Point Repair; Group D - Sanitary Cleanouts and Laterals; Group E - Manhole Surfacing - Polyurethane; and Group F - Smoke and Dye Testing. Bidders may submit proposals for one or all groups, with work to be assigned via individual work orders throughout the City of Clearwater jurisdiction. The contract has an initial term of 365 consecutive calendar days from Notice to Proceed, with the City reserving the right to renew for up to three additional one-year periods. All quantities in the bid schedule are estimates only; the City is not obligated to purchase any minimum or maximum quantity during the contract life. Work will be administered as unit price work in accordance with the General Conditions and Technical Specifications.
Bidders must pre-qualify with the City's Engineering Division at least two weeks prior to bid opening and submit current state and county licenses with their bid responses. Each bid must include bid security equal to 10 percent of the maximum bid price in the form of a certified check or bid bond. Bids must be submitted electronically through the City's e-Procurement Portal at https://procurement.opengov.com/portal/myclearwater or in sealed envelopes at the office specified in the advertisement. All bid items are inclusive of labor, materials, and complete installation. Unit prices for mobilization/demobilization shall not exceed $4,000 for non-emergency and $5,000 for emergency work. The City reserves the right to reject any bid that contains materially unbalanced pricing or nominal unit prices, and award will be made to the lowest responsible, responsive bidder whose evaluation indicates the award is in the City's best interest. Contractors must comply with state and federal requirements including the Florida Trench Safety Act, OSHA standards, EPA NPDES stormwater requirements, and maintain public records as required by Florida Statutes Section 119.0701.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v. 7.2024 Procurement Division PO Box 4748 33758-4748 Clearwater FL 727-562-4630
INVITATION TO BID
26-0060-UT
WASTEWATER COLLECTIONS POINT REPAIR AND IMPROVEMENTS
INSTRUCTIONS TO BIDDERS
SECTION II INSTRUCTIONS TO BIDDERS
1. COPIES OF BIDDING DOCUMENTS
1.1. Bid Documents, any attachments and addenda are available for download at: https://procurement.opengov.com/portal/myclearwater/projects/300132. Bidding Documents may include, but are not limited to, plans, specifications, bond forms, contract form, affidavits, bid/proposal form, and addendums.
1.2. Complete sets of Bidding Documents must be used in preparing bids. Neither the City nor the
Engineer shall be liable for errors or misinterpretations resulting from the use of incomplete sets of
Bidding Documents, by Bidders, sub-bidders, or others.
2. QUALIFICATION OF BIDDERS
2. 1 Each prospective Bidder must pre-qualify to demonstrate, to the complete satisfaction of the City of Clearwater, that the Bidder has the necessary facilities, equipment, ability, financial resources and experience to perform the work in a satisfactory manner. An application package for pre-qualification may be obtained by contacting the City of Clearwater, Engineering Division by phone at (727) 562-
4750. Pre-qualification requirement information is also available on the City of Clearwater Website at address:
www.myclearwater.com/government/city-departments/engineering/construction-management.
Contractors wanting to pre-qualify to bid on a project as a General Contractor must do so two weeks (ten workdays) prior to the bid opening date. Bidders currently pre-qualified by the City do not have to make reapplication. It is the Contractor’s responsibility to confirm pre-qualification status before a Bid Opening.
The Contractor shall include copies of their current license/registration with the State of Florida and Pinellas County (if applicable) with their bid response.
3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
3.1.It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract
Documents thoroughly; (b) visit the site to become familiar with local conditions that may in any manner affect cost, progress, performance or furnishing of the work; (c) consider and abide by all applicable https://procurement.opengov.com/portal/myclearwater/projects/300132 https://www.myclearwater.com/government/city-departments/engineering/construction-management https://www.myclearwater.com/government/city-departments/engineering/construction-management
v. 7.2024 2 federal, state and local laws, ordinances, rules and regulations; and (d) study and carefully correlate
Bidder's observations with the Contract Documents, and notify Engineer in writing of all conflicts, errors or discrepancies in the Contract Documents.
3.2.For the purposes of bidding or construction, bidder may rely upon the accuracy of the technical data contained in reports of explorations and tests of subsurface conditions at the site which have been utilized by the Engineer in the preparation of the Contract Documents, but not upon non-technical data, interpretations or opinions contained therein or for the completeness thereof. Drawings relating to physical conditions of existing surface and subsurface conditions (except Underground Facilities) which are at or contiguous to the site and which have been utilized by the Engineer in preparation of the Contract Documents, may be relied upon by Bidder for accuracy of the technical data contained in such drawings but not upon the completeness thereof for the purposes of bidding or construction.
3.3.Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site are based upon information and data furnished to the City and Engineer by owners of such Underground Facilities or others, and the City does not assume responsibility for the accuracy or completeness thereof unless expressly provided in the Contract Documents.
3.4.Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities, other physical conditions, possible conditions, and possible changes in the Contract Documents due to differing conditions appear in the General
Conditions.
3.5. Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents.
3.6. On request in advance, City will provide each Bidder access to the site to conduct such explorations and tests at Bidder's own expense as each Bidder deems necessary for submission of a
Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations and tests.
3.7. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by the Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by the Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the City unless otherwise provided in the Contract Documents.
3.8. The submission of a Bid will constitute an unequivocal representation by the Bidder that the Bidder has complied with every requirement of these Instructions to Bidders and that, without exception, the
Bid is premised upon performing and furnishing the Work required by the Contract Documents by such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions of performance and furnishing of the work.
4. INTERPRETATIONS AND ADDENDA
4.1. All questions as to the meaning or intent of the Contract Documents are to be directed in writing to the Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such
v. 7.2024 3 questions will be issued by Addenda, via OpenGov. Questions received after the time frame specified on the pre-bid meeting agenda, prior to the date for opening of Bids, may not be answered. Only information provided by formal written Addenda will be binding. Oral and other interpretations of clarifications will be without legal effect.
4.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the City or
Engineer.
5. BID SECURITY OR BID BOND
5.1. Each Bid must be accompanied by Bid Security made payable to the City of Clearwater in an amount equal to ten percent (10%) of the Bidder’s maximum Bid price and in the form of a certified or cashier’s check or a Proposal/Bid Bond (on form provided in Section V) issued by a surety meeting the requirements of the General Conditions.
5.2. The Bid Security of the Successful Bidder will be retained until such Bidder has executed the
Agreement and furnished the required Payment and Performance bonds, whereupon the Bid Security will be returned. If the Successful Bidder fails to execute, deliver the Agreement and furnish the required Bonds within ten (10) days after the award of contract by the City Council, the City may annul the bid and the Bid Security of the Bidder will be forfeited. The Bid Security of any Bidder whom the
City believes to have a reasonable chance of receiving the award may be retained by the City until the successful execution of the agreement with the successful Bidder or for a period up to ninety (90) days following bid opening. Security of other Bidders will be returned approximately fourteen (14) days after the Bid Opening.
5.3. The Bid Bond shall be issued in the favor of the City of Clearwater by a surety company qualified to do business in, and having a registered agent in, the State of Florida.
6. CONTRACT TIME
6.1. The number of consecutive calendar days within which the work is to be completed is set forth in the Technical Specifications.
7. LIQUIDATED DAMAGES
7.1. Provisions for liquidated damages are set forth in the Contract Agreement, Section V.
8. SUBSTITUTE MATERIAL AND EQUIPMENT
8.1. The contract, if awarded, will be on the basis of material and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items.
Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or equal" item may be furnished or used, application for its acceptance will not be considered by the Engineer until after the effective date of the Contract Agreement. The procedure for submittal of any such application is described in the General Conditions and as supplemented in the Technical
Specifications.
9. SUBCONTRACTORS
9.1. If requested by the City or Engineer, the Successful Bidder, and any other Bidder so requested, shall, within seven (7) days after the date of the request, submit to the Engineer an experience statement with pertinent information as to similar projects and other evidence of qualification for each
Subcontractor, supplier, person and organization to be used by the Contractor in the completion of the
Work. The amount of subcontract work shall not exceed fifty percent (50%) of the Work except as may
v. 7.2024 4 be specifically approved by the Engineer. If the Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, supplier, other person or organization, he may, before recommending award of the Contract to the City Council, request the Successful Bidder to submit an acceptable substitute without an increase in Contract Price or Contract Time. If the Successful Bidder declines to make any such substitution, the City may award the contract to the next lowest and most responsive Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the
Bid Security to the City of any Bidder. Any Subcontractor, supplier, other person or organization listed by the Contractor and to whom the Engineer does not make written objection prior to the recommendation of award to the City Council will be deemed acceptable to the City subject to revocation of such acceptance after the Effective Date of the Contract Agreement as provided in the
General Conditions.
9.2. No Contractor shall be required to employ any Subcontractor, supplier, person, or organization against whom he has reasonable objection.
10. BID/PROPOSAL FORM
10.1. The Bid/Proposal Form is included with the Contract Documents and shall be printed in ink or typewritten. All blanks on the Bid/Proposal Forms must be completed. Unit Prices shall be to no more than two decimal points in dollars and cents. The Bidder must state in the Bid/Proposal Form in words and numerals without delineation’s, alterations or erasures, the price for which they will perform the work as required by the Contract Documents. Bidders are required to bid on all items in the
Bid/Proposal form. The lump sum for each section or item shall be for furnishing all equipment, materials, and labor for completing the section or item as per the plans and contract specifications.
Should it be found that quantities or amounts shown on the plans or in the proposal, for any part of the work, are exceeded or should they be found to be less after the actual construction of the work, the amount bid for each section or item will be increased or decreased in direct proportion to the unit prices bid for the listed individual items.
10.2. Bids by corporations shall be executed in the corporate name by the president or a vice-president
(or other corporate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the Signature. If requested, the person signing a Bid for a corporation or partnership shall produce evidence satisfactory to the City of the person's authority to bind the corporation or partnership.
10.3. Bids by partnerships shall be executed in the partnership name and signed by a general partner, whose title shall appear under the signature and the official address of the partnership shall be shown below the signature.
10.4. All names shall be typed or printed below the signature.
11. SUBMISSION OF BIDS
11.1. It is recommended that bids are submitted electronically through the City's e-Procurement Portal located at https://procurement.opengov.com/portal/myclearwater. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.
Sealed Bids not submitted electronically shall be submitted at or before the time and at the place indicated in the Advertisement for Bids and shall be submitted in a sealed envelope with the project name and number on the bottom left-hand corner. If forwarded by mail, the Bid shall be enclosed in another envelope with the notation "Bid Enclosed" on the face thereof and addressed to the City of Clearwater, https://procurement.opengov.com/portal/myclearwater
v. 7.2024 5 attention Purchasing Manager. Bids will be received at the office indicated in the Advertisement until the time and date specified. Bids in any other form will not be accepted.
E-mail or fax submissions will not be accepted.
No responsibility will attach to the City of Clearwater, its employees or agents for premature opening of a bid that is not properly addressed and identified.
11.2. If submitting a hard copy, the sealed bid envelope shall contain, but not be limited to, the
Proposal/Bid Bond and corresponding Power of Attorney, Affidavit, Non-Collusion Affidavit, Proposal
(pages one and two), Addendum Sheet, Bidder’s Proposal, Scrutinized Companies and Business
Operations with Cuba and Syria Certification Form, and E-Verify form.
12. MODIFICATION AND WITHDRAWAL OF BIDS
12.1. For bids submitted electronically, vendors may use the "Unsubmit Response" button located on the
Response Details page of their submission. Responses may be resubmitted once they have been edited or modified as needed.
For mailed in or hand delivered bids, written requests to modify or withdraw the bid received by the City prior to the scheduled opening time will be accepted and will be corrected after opening. Written requests must be addressed and labeled in the same manner as the bid and marked as a MODIFICATION or
WITHDRAWAL of the bid.
No oral requests will be allowed.
Requests for withdrawal after the bid opening will only be granted upon proof of undue hardship and may result in the forfeiture of any bid security. Any withdrawal after the bid opening shall be allowed solely at the City’s discretion.
13. REJECTION OF BIDS
13.1. To the extent permitted by applicable State and Federal laws and regulations, the City reserves the right to reject any, and all Bids, and to waive any, and all informalities. Grounds for the rejection of a bid include but are not limited to a material omission, unauthorized alteration of form, unauthorized alternate bids, incomplete or unbalanced unit prices, or irregularities of any kind. Also, the City reserves the right to reject any Bid if the City believes that it would not be in the best interest of the public to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the City. The City reserves the right to decide which bid is deemed to be the lowest and best in the interest of the public.
14. DISQUALIFICATION OF BIDDER
14.1. Any or all bids will be rejected if there is any reason for believing that collusion exists among the bidders, the participants in such collusion will not be considered in future proposals for the same work.
Each bidder shall execute the Non-Collusion Affidavit contained in the Contract Documents.
15. OPENING OF BIDS
15.1. Bids will be opened and read publicly at the location and time stated in the Advertisement for
Bids. Bidders are invited to be present at the opening of bids.
16. LICENSES, PERMITS, ROYALTY FEES AND TAXES
v. 7.2024 6
16.1. The Contractor shall secure all licenses and permits (and shall pay all permit fees) except as specifically stated otherwise in the Technical Specifications. The Contractor shall comply with all
Federal and State Laws, County and Municipal Ordinances and regulations, which in any manner effect the prosecution of the work. City of Clearwater building permit fees and impact fees will be waived except as specifically stated otherwise in the Technical Specifications.
16.2. The Contractor shall assume all liability for the payment of royalty fees due to the use of any construction or operation process, which is protected by patent rights except as specifically stated otherwise in the Technical Specifications. The amount of royalty fee, if any, shall be stated by the
Contractor.
16.3. The Contractor shall pay all applicable sales, consumer, use, and other taxes required by law.
The Contractor is responsible for reviewing the pertinent State Statutes involving the sales tax and sales tax exemptions and complying with all requirements.
16.4. The City of Clearwater is exempt from state sales tax on materials purchased by the City and incorporated into the WORK. The City of Clearwater reserves the right to implement the Owner Direct
Purchase (ODP) Option, as may be indicated in the Scope of Work Description in Section IV –
Technical Specifications and as defined in Section III – General Conditions.
17. IDENTICAL TIE BIDS/VENDOR DRUG FREE WORKPLACE
17.1. In accordance with the requirements of Section 287.087 Florida Statutes regarding a Vendor
Drug Free Workplace, in the event of identical tie bids, preference shall be given to bidders with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quality, and service are received by the City for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none or all of the tied bidders have a drug-free workplace program. In order to have a drug-free workplace program, a contractor shall supply the City with a certificate containing the following six statements and the accompanying certification statement:
(1)Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
(2) Inform employees as to the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
(3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1).
(4) In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893, or of any controlled substance law, of the United States, or of any state, for a violation occurring in the workplace no later than five (5) days after such conviction.
(5) Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted.
v. 7.2024 7
(6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
I certify that this firm does/does not (select only one) fully comply with the above requirements.
18. AWARD OF CONTRACT
18.1. Discrepancies between words and figures will be resolved in favor of words. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
18.2. In evaluating the Bids, the City will consider the qualifications of the Bidders, whether the Bids comply or not with the prescribed requirements, unit prices, and other data as may be requested in the Bid/Proposal form. The City may consider the qualifications and experience of Subcontractors, suppliers and other persons and organizations proposed by the Contractor for the Work. The City may conduct such investigations as the City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons, and organizations to perform and furnish the Work in accordance with the Contract Documents to the City's satisfaction within the prescribed time.
18.3. If the Contract is to be awarded, it will be awarded to the lowest responsible, responsive Bidder whose evaluation by the City indicates to the City that the award will be in the best interest of the City.
18.4. Award of contract will be made for that combination of base bid and alternate bid items in the best interest of the City, however, unless otherwise specified all work awarded will be awarded to only one Contractor.
18.5. The successful bidder/contractor will be required to comply with Section 119.0701, Florida
Statutes, specifically to:
A. Keep and maintain public records that ordinarily and necessarily would be required by the City of Clearwater in order to perform the service;
B. Provide the public with access to public records on the same terms and conditions that the City of Clearwater would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law;
C. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; and
D. Meet all requirements for retaining public records and transfer, at no cost, to the City of Clearwater all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the City of
Clearwater.
19. BID PROTEST
19.1. RIGHT TO PROTEST:
Pursuant to Section 2.562(3), Clearwater Code of Ordinances, a bidder who submitted a response to a competitive solicitation and was not selected may appeal the decision through
v. 7.2024 8 the bid protest procedures, a copy of which shall be available in the Procurement Division. A protesting bidder must include a fee of one percent of the amount of the bid or proposed contract to offset the City’s additional expenses related to the protest. This fee shall not exceed
$5,000.00 nor be less than $50.00. Full refund will be provided should the protest be upheld. No partial refunds will be made.
20. TRENCH SAFETY ACT
20.1. The Bidder shall comply with the provisions of the City of Clearwater’s Ordinance related to trench digging (Ordinance No. 7918-08) along with the Florida Trench Safety Act (Sections 553.60-
553.64, Florida Statutes) and the provisions of the Occupational Safety and Health Administration's
(OSHA) excavation safety standards, 29 C.F.R.s 1926.650 Subparagraph P, or current revisions of these laws.
21. CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENT
MEASURES
21.1. The Bidder shall comply with the provisions of the Environmental Protection Agency (EPA)
National Pollution Discharge Elimination System (NPDES) stormwater permit and implement stormwater pollution prevention plans (SWPPP’s) or stormwater management programs (both using best management practices (BMPs) that effectively reduce or prevent the discharge of pollutants into receiving waters.
A. The control of construction-related sediment loadings is critical to maintaining water quality.
The implementation of proper erosion and sediment control practices during the construction stage can significantly reduce sediment loadings to surface waters.
B. Prior to land disturbance, prepare and implement an approved erosion and sediment control plan or similar administrative document that contains erosion and sediment control provisions.
NPDES Management Measures available at City of Clearwater Engineering Environmental
Division and EPA websites to help address construction-related Best Management Practices.
GENERAL CONDITIONS
Section III - General Conditions can be found on the City's website at:
https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-
Construction-Bid-Information/Contract-Specifications
TECHNICAL SPECIFICATIONS
3.1 SCOPE OF WORK
Project Name: Wastewater Collections Point Repair and Improvements
Project Number: 26-0060-UT
Scope of Work:
Work under this Contract shall be performed only when authorized by the City through individual Work
Orders and may include one or more of the following Groups of Work:
https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications
v. 7.2024 9
Group A – Sanitary Sewer Trenchless Reconstruction
Group B – Sewer Cleaning and Televising Inspection
Group C – Wastewater Point Repair
Group D – Sanitary Cleanouts and Laterals
Group E – Manhole Surfacing - Polyurethane
Group F – Smoke and Dye Testing
Bidders may bid on one or all Groups.
The work will be assigned at various locations within the limits of the City of Clearwater jurisdiction.
All quantities shown in the Bid Schedule are estimates only and are provided solely for bid evaluation purposes. The City is not obligated to purchase any minimum or maximum quantity of work during the life of the Contract.
All work shall be administered in accordance with Section III, Section 11.3 – Unit Price Work, of the
General Conditions and the applicable Technical Specifications.
Beyond the initial one-year term, the City reserves the right to renew the contract for up to three (3) additional years.
Contract Period: 365 Consecutive Calendar Days from Notice to Proceed.
3.2 Section IV - Technical Specifications
Section IV - Technical Specifications can be found on the City's website at:
https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-
Construction-Bid-Information/Contract-Specifications
3.3 Section V - Contract Documents
Section V - Contract Documents can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-
Construction-Bid-Information/Contract-Specifications
SUPPLEMENTAL TECHNICAL SPECIFICATIONS - Section IVA
4.1 4.1. Technical Specifications
4.1. Technical Specifications
Reference Attachment A 26-0060-UT WW PR Contrac Doc-Section IVa Supplemental Tech Specs
PRICING SHEET
All bid items, unless otherwise specified, shall be inclusive of furnishing all material and labor for the complete installation of the bid item, inclusive of any necessary removal. Installation shall be completed in accordance with the specifications. The quantities provided are estimated per year for bidding purposes and may vary based on the actual work throughout the duration of the contract. The City of Clearwater (City) is not obligated to purchase any minimum or maximum amount during the life of the contract. Unit costs for all bid items shall not be changed in the event of overruns or underruns.
The City reserves the right to reject any bid that, in the City’s sole judgment, contains materially unbalanced pricing, nominal unit prices, or pricing structures that do not reasonably reflect the cost of performing the Work.
https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications
v. 7.2024 10
GROUP A: SANITARY SEWER TRENCHLESS RECONSTRUCTION
Mobilization shall be per work order as defined by the City. Each work order may include more than one individual project. The unit price for mobilization shall not exceed $4,000 for non emergency mobilization and $5,000 for emergency mobilization. Emergency and non emergency mobilization are further defined in Section IV of the Contract Documents.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
General
1 Emergency
Mobilization/Demobilization including General Conditions and
Traffic Control1 (max $5,000)
30 EA
2 Non-Emergency
Mobilization/Demobilization including General Conditions and
Traffic Control1 (max $4,000)
75 EA
Trenchless Pipe Reconstruction System – CIPP
3a 6” Dia. Sanitary Sewer Mains 6.0 mm
500 LF
3b 8” Dia. Sanitary Sewer Mains 6.0 mm
20,000 LF
3c 10” Dia. Sanitary Sewer Mains 7.5 mm
5,000 LF
3d 12” Dia. Sanitary Sewer Mains 7.5 mm
1,000 LF
3e 15” Dia. Sanitary Sewer Mains 9.0 mm
100 LF
3f 18” Dia. Sanitary Sewer Mains 9.0 mm
2,000 LF
3g 20” Dia. Sanitary Sewer Mains
12.0 mm
100 LF
3h 24” Dia. Sanitary Sewer Mains
12.0 mm
3,000 LF
3i 30” Dia. Sanitary Sewer Mains
16.0 mm
150 LF
v. 7.2024 11
Line Item Description Quantity Unit of
Measure
Unit Cost Total
3j 36" Dia. Sanitary Sewer Mains
18.5 mm
50 LF
3k 42" Dia. Sanitary Sewer Mains
18.5 mm
50 LF
3l 48" Dia. Sanitary Sewer Mains
18.5 mm
50 LF
CIPP Sectional Repair
4. 6” Dia. Sanitary Sewer Mains
4a 0’-10’ 5 EA
4b 10.1’-20’ 2 EA
4c 20.1’-30’ 2 EA
5. 8" Dia. Sanitary Sewer Mains
5a 0’-10’ 5 EA
5b 10.1’-20’ 2 EA
5c 20.1’-30’ 2 EA
6 10" Dia. Sanitary Sewer Mains
6a 0’-10’ 5 EA
6b 10.1’-20’ 2 EA
6c 20.1’-30’ 2 EA
7 12" Dia. Sanitary Sewer Mains
7a 0’-10’ 5 EA
7b 10.1’-20’ 2 EA
7c 20.1’-30’ 2 EA
8 15”/16" Dia. Sanitary Sewer Mains
v. 7.2024 12
Measure
Unit Cost Total
8a 0’-10’ 5 EA
8b 10.1’-20’ 2 EA
8c 20.1’-30’ 2 EA
9. 18” Dia. Sanitary Sewer Mains
9a 0’-10’ 3 EA
9b 10.1’-20’ 1 EA
9c 20.1’-30’ 1 EA
10 20" Dia. Sanitary Sewer Mains
10a 0’-10’ 3 EA
10b 10.1’-20’ 1 EA
10c 20.1’-30’ 1 EA
11 24" Dia. Sanitary Sewer Mains
11a 0’-10’ 3 EA
11b 10.1’-20’ 1 EA
11c 20.1’-30’ 1 EA
12 30" Dia. Sanitary Sewer Mains
12a 0’-10’ 3 EA
12b 10.1’-20’ 1 EA
12c 20.1’-30’ 1 EA
13 36" Dia. Sanitary Sewer Mains
13a 0'-10' 3 EA
13b 10.1’-20’ 1 EA
13c 20.1’-30’ 1 EA
v. 7.2024 13
Measure
Unit Cost Total
14 42" Dia. Sanitary Sewer Mains
14a 0’-10’ 3 EA
14b 10.1’-20’ 1 EA
14c 20.1’-30’ 1 EA
15 48" Dia. Sanitary Sewer Mains
15a 0’-10’ 3 EA
15b 10.1’-20’ 1 EA
15c 20.1’-30’ 1 EA
Ancillary Services
16 Easement Access, Additional
16a ≤ 15” Diameter 250 LF
16b > 15” Diameter 500 LF
17 Sealing Leak Sealing
17 Service Leak Sealing with
Pressure Grouting
50 EA
18 Service Reconnection
18 Open Cut Service Reconnection 250 EA
19 Heavy Cleaning (6 Passes of the Cleaning Head)
19a 8”-10” Diameter 2,500 LF
19b 12”-15” Diameter 2,500 LF
19c 16”-24” Diameter 5,000 LF
19d 30”-36” Diameter 1,500 LF
19e 42”-48” Diameter 1,500 LF
v. 7.2024 14
Measure
Unit Cost Total
Root Removal
20a 8”-10” Diameter 100 LF
20b 12”-15” Diameter 50 LF
20c 16”-24” Diameter 25 LF
20d 30”-36” Diameter 25 LF
20e 42”-48” Diameter 25 LF
21 Tuberculation Cleaning
21a 8”-10” Diameter 250 LF
21b 12”-15” Diameter 250 LF
21c 16”-24” Diameter 750 LF
21d 30”-36” Diameter 500 LF
21e 42”-48” Diameter 500 LF
22 Bypass Pump Setup With Piping
22a 8”-12” Diameter 75 EA
22b 15”-18” Diameter 25 EA
22c 24-36” Diameter 25 EA
22d 42”-48” Diameter 10 EA
TOTAL
GROUP A CONTINGENCY
Measure
Unit Cost Total
23 Owners Contingency Charges
(10% maximum allowed markup)
1 LS
v. 7.2024 15
Measure
Unit Cost Total
GROUP B. SEWER CLEANING AND TELEVISING INSPECTION
Mobilization shall be per work order as defined by the City. Each work order may include more than one individual project. The unit price for mobilization shall not exceed $4,000 for non emergency mobilization and $5,000 for emergency mobilization. Emergency and non emergency mobilization are further defined in Section IV of the Contract Documents.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 Emergency
Mobilization/Demobilization &
General Conditions and Traffic
Control1 (max $5,000)
30 EA
2 Non-Emergency
Mobilization/Demobilization &
General Conditions and Traffic
Control1 (max $4,000)
75 EA
Sewer Line Cleaning
3a Heavy Cleaning from Right of Way
- 8”-10” Diameter
150,000 LF
3b Heavy Cleaning from Right of Way
- 12”-15” Diameter
25,000 LF
3c Heavy Cleaning from Right of Way
- 16”-24” Diameter
25,000 LF
3d Heavy Cleaning from Right of Way
- 30”-36” Diameter
50,000 LF
4a Root Removal - 8”-10” Diameter 200 LF
4b Root Removal - 12”-15” Diameter 25 LF
4c Root Removal - 16”-24” Diameter 25 LF
4d Root Removal - 30”-36” Diameter 10 LF
v. 7.2024 16
Measure
Unit Cost Total
5a Heavy Cleaning from Side and/or
Rear Easements - 8”-10” Diameter
150,000 LF
5b Heavy Cleaning from Side and/or
Rear Easements - 12”-15”
Diameter
25,000 LF
5c Heavy Cleaning from Side and/or
Rear Easements - 16”-24”
Diameter
25,000 LF
5d Heavy Cleaning from Side and/or
Rear Easements - 30”-36”
Diameter
50,000 LF
6a Tuberculation Cleaning - 8”-10”
Diameter
200 LF
6b Tuberculation Cleaning - 12”-15”
Diameter
200 LF
6c Tuberculation Cleaning - 16”-24”
Diameter
200 LF
6d Tuberculation Cleaning - 30”-36”
Diameter
200 LF
7 Manhole Clean/Jet-vac 5,000 EA
CCTV Pipe and Manhole Inspection with PACP/CUES Granite XP Compatibility
8a CCTV Pipe Inspection - includes light cleaning - 8”-10” Diameter
750,000 LF
8b CCTV Pipe Inspection - includes light cleaning - 12”-15” Diameter
50,000 LF
8c CCTV Pipe Inspection - includes light cleaning - 16”-24” Diameter
25,000 LF
8d CCTV Pipe Inspection - includes light cleaning - 30”-36” Diameter
50,000 LF
9 Manhole Inspection 100 EA
10 Smoke Testing 10,000 LF
v. 7.2024 17
Measure
Unit Cost Total
11 Dye Testing 5,000 LF
GROUP B CONTINGENCY
Measure
Unit Cost Total
12 Owners Contingency Charges
(10% maximum allowed markup)
GROUP C: WASTEWATER POINT REPAIR
1Mobilization shall be per work order as defined by the City. Each work order may include more than one individual project. The unit price for mobilization shall not exceed $4,000 for non emergency mobilization and $5,000 for emergency mobilization. Emergency and non emergency mobilization are further defined in Section IV of the Contract Documents.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 Emergency
Mobilization/Demobilization &
General Conditions1 (max $5,000)
30 EA
2 Non-Emergency
Mobilization/Demobilization &
General Conditions1 (max $4,000)
75 EA
Bypass Pump Mob/Demob. Set Up & Maintenance
3a 8”-12” Diameter 30 DAY
3b 15”-18” Diameter 30 DAY
3c 16” to 24” Diameter 8 WK
3d 30” to 36” Diameter 8 WK
v. 7.2024 18
Measure
Unit Cost Total
Maintenance of Traffic Bid Items 4a to 4i shall be fully inclusive of furnishing and installation all items to provide a complete maintenance of traffic installation including but not limited to signage, barricades, channelizing devices, flaggers, etc. Bid Items 4j-4s shall only be allowed where not included as part of a complete MOT bid item.
4a FDOT Index 102-601 - Work
Beyond the Shoulder
30 EA/DAY
4b FDOT Index 102-602 - Work on
Shoulder
30 EA/DAY
4c FDOT Index 102-603 - Two Lane
Two Way Work within Travel way
20 EA/DAY
4d FDOT Index 102-604 - Two Lane
Two Way - Intersection Work
20 EA/DAY
4e FDOT Index 102-613 - Multilane
Roadway - Lane Closures
20 EA/DAY
4f FDOT Index 102-615 - Multilane
Roadway - Intersection Work
200 EA/DAY
4g FDOT Index 102-620 - Multilane
Roadway - Temporary Diversion
200 EA/DAY
4h FDOT Index 102-625 - Temporary
Road Closure
200 EA/DAY
4i FDOT Index 102-628 - Two Way
Left Turn Lanes
200 EA/DAY
4j Flagman 200 HOUR
4k Arrow Board - 5' Minimum
Horizontal Size
30 EA/DAY
4l Variable Message Board 30 EA/DAY
4m Concrete Barrier (FDOT Index No.
415)
60 EA/DAY
4n Low Profile Barrier (FDOT Index
No. 412)
60 EA/DAY
4o Sign in Work Zone 100 EA/DAY
v. 7.2024 19
Measure
Unit Cost Total
4p FDOT Cone 100 EA/DAY
4q FDOT Channelizing Drum 100 EA/DAY
4r Barricade, Type III with Warning
Light
100 EA/DAY
4s Barricade, Type I or II with
Warning Light
100 EA/DAY
Labor and Equipment Bid Items 5a-l and 6a-v shall only be used at the approval of the City where other bid items are not fully inclusive or where applicable, at discretion of the City.
5a Forman regular time 2,500 HOUR
5b Forman overtime 500 HOUR
5c Operator regular time 4,000 HOUR
5d Operator overtime 500 HOUR
5e Truck Driver regular time 1,500 HOUR
5f Truck Driver overtime 150 HOUR
5g Pipe Layer regular time 4,000 HOUR
5h Pipe Layer overtime 400 HOUR
5i Laborer regular time 4,000 HOUR
5j Laborer overtime 550 HOUR
5k Preconstruction Video 30 DAY
5l Asbuilt Survey 80 DAY
Equipment
6a Foreman's pickup truck with hand tools
3,000 HOUR
6b Job truck with tools 3,500 HOUR
6c Tractor & Trailer (Transport) 200 HOUR
v. 7.2024 20
Measure
Unit Cost Total
6d Track Hoe (to 100 HP) 1,100 HOUR
6e Track Hoe (101 HP to 170 HP) 500 HOUR
6f Track Hoe (171 HP and up) 750 HOUR
6g Rubber Tired Backhoe 25 HOUR
6h Wheel Loader (to 150 HP) 2,000 HOUR
6i Wheel Loader (151 HP and up) 250 HOUR
6j Track Type Tractors (to 100 HP) 150 HOUR
6k Track Type Tractors (101 HP and up)
25 HOUR
6l Dump Truck (Tandem Axle) 750 HOUR
6m Plate Tamp 250 HOUR
6n 3” Trash Pump 250 HOUR
6o 4” Double Diaphragm Pump 2,000 HOUR
6p Air Compressor (125 CFM min.) 100 HOUR
6q 4” Jet Pump 25 DAY
6r Emergency Hauling up to 2500 gallons
25 HOUR
6s Emergency Hauling over 2500 gallons
25 HOUR
6t Street Sweeper 200 HOUR
6u Mobile Light Tower 40 DAY
6v Vactor Truck 250 HOUR
Stormwater
7a Adjust Storm Structures 10 EA
v. 7.2024 21
Measure
Unit Cost Total
7b Underdrains 200 LF
7c Build Up Type Structures 10 EA
7d Precast Type 10 EA
7e Gabions and Mattresses 10 CY
Landscaping/Restoration
8a Sodding 75,000 SF
8b Brush Removal 40 TON
8c Tree protection 250 EA
8d Tree Removal (<6" Trunk
Diameter)
5 EA
8e Tree Removal (6"-12" Trunk
Diameter)
3 EA
8f Tree Removal (13"-18" Trunk
Diameter)
3 EA
8g Tree Removal (>18" Trunk
Diameter)
3 EA
Materials
9a Remove and Replace Concrete
Sidewalk, (4" Min Thickness)
500 SF
9b Remove and Replace Concrete
Sidewalk, (6" Min Thickness)
500 SF
9c Remove and Replace Concrete
Driveway
250 SY
9d Full Width Milling (Up to 2") 7,500 SY
9e Full Width Milling (2" to 4") 7,500 SY
9f SP 12.5 Asphalt Resurfacing 500 TON
v. 7.2024 22
Measure
Unit Cost Total
9g SP 9.5 Asphalt Resurfacing 500 TON
9h Pavement Marking - Crosswalks
(Lane)
500 LF
9i Pavement Marking - Stop Bars
(Lane)
250 EA
9j Pavement Marking - School
Crossing/RR
50 EA
9k Pavement Marking - Turn, Straight, Combo Arrows
50 EA
9l Pavement Marking - Dashed
(White, Yellow, or Double Yellow)
500 LF
9m Pavement Marking - Solid White 250 LF
9n Pavement Marking - Solid Double
Yellow
250 LF
9o Pavement Marking - Solid Yellow 250 LF
9p Temporary Pavement Marking -
Turn, Straight, Combo Arrows
250 EA
9q Temporary Pavement Marking -
Dashed (White, Yellow, or Double
Yellow)
250 LF
9r Temporary Pavement Marking -
Solid White
250 LF
9s Temporary Pavement Marking -
Solid Double Yellow
250 LF
9t Temporary Pavement Marking -
Solid Yellow
250 LF
9u Remove and replace concrete curb and gutter (FDOT Type A)
750 LF
9v Remove and replace concrete curb and gutter (FDOT Type E)
750 LF
v. 7.2024 23
Measure
Unit Cost Total
9w Remove and replace concrete curb and gutter (FDOT Type F)
750 LF
9x 3000 psi Concrete 100 CY
9y Off Site Selected Fill 1,500 CY
9z Limerock Base Material 750 TON
9aa Crushed Concrete Base Material 750 TON
9bb Stabilized Subgrade 750 TON
9cc # 57 Washed Stone 750 TON
9dd Removal of Unsuitable Soil 300 TON
9ee Removal of Buried Concrete 50 CY
9ff Removal of Hazardous Materials 50 CY
9gg Rip Rap 300 TON
9hh Flowable Fill 100 CY
9ii Brick Pavers 100 SY
9jj Brick Paver Level Sand 10 CY
9kk Geogrid 80 SY
9ll Shoring (4' to 6' deep) 12 EA
9mm Shoring (6' to 10' deep) 12 EA
9nn Steel Road Plates 12 EA
9oo Bollard 30 EA
9pp Pipe Exterior Coating 100 SF
Well Point Dewatering
10 Well Point Dewatering 2,000 LF/DAY
v. 7.2024 24
Measure
Unit Cost Total
Manholes and Gravity Main Appurtenances
11a Built up Type Manhole-4' diameter
(Inclusive of lining, drops, ring, cover, etc.)
250 VF
11b Built up Type Manhole-5' diameter
(Inclusive of lining, drops, ring, cover, etc.)
25 VF
11c Built up Type Manhole-6' diameter
(Inclusive of lining, drops, ring, cover, etc.)
25 VF
11d Precast Type Manhole-4' diameter
(Inclusive of lining, drops, ring, cover, etc.)
250 VF
11e Precast Type Manhole-5' diameter
(Inclusive of lining, drops, ring, cover, etc.)
25 VF
11f Precast Type Manhole-6' diameter
(Inclusive of lining, drops, ring, cover, etc.)
25 VF
11g Manhole Drop 10 EA
11h HDPE Adjustment Ring 5 EA
11i City’s Standard Manhole Ring 30 EA
11j City’s Standard Manhole Cover 30 EA
11k Abatement Inserts (dish/pan) 100 EA
11l Furnish and Install Cleanout 500 EA
11m Furnish and Install Two-way
Cleanouts
10 EA
11n Bench/Invert Repair - Replacement 70 EA
11o Injection Grouting as required to stop infiltration and inflow
1,000 GAL
v. 7.2024 25
Measure
Unit Cost Total
11p Manhole Clean/Jet-Vac 40 EA
11q Remove existing liner for 4’ diameter manhole
750 VF
11r Remove existing liner for 5’ diameter manhole
750 VF
11s Remove existing liner for 6’ diameter manhole
750 VF
11t Reset/Adjust Frame and Cover 25 EA
11u Replace Frame and Cover 250 EA
11v Seal Manhole Frame to Corbel
Connection
250 EA
11w Rear Easement Access 30 EA
Manhole Surfacing (Epoxy) - Manhole Coating Product: Raven 405
12a Liner System for 4' diameter manhole-125 MILS
1,500 VF
12b Liner System for 4' diameter manhole-250 MILS
1,500 VF
12c Liner System for 5' diameter manhole-125 MILS
1,500 VF
12d Liner System for 5' diameter manhole-250 MILS
1,500 VF
12e Liner System for 6' diameter manhole-125 MILS
1,500 VF
12f Liner System for 6' diameter manhole-250 MILS
1,500 VF
Manhole Surfacing (Cementitious) - Manhole Coating Product: Strong Seal MS-2C Coating
System
13a Liner System for 4’ diameter manhole-1/2 inch
500 VF
v. 7.2024 26
Measure
Unit Cost Total
13b Liner System for 5’ diameter manhole-1/2 inch
300 VF
13c Liner System for 6’ diameter manhole-1/2 inch
200 VF
Manhole Surfacing (Polyurethane) - Manhole Coating Product: Spraywall
14a Liner System for 4’ diameter manhole-125 MILS
1,500 VF
14b Liner System for 4' diameter manhole-250 MILS
1,500 VF
14c Liner System for 5' diameter manhole-125 MILS
1,500 VF
14d Liner System for 5' diameter manhole-250 MILS
1,500 VF
14e Liner System for 6' diameter manhole-125 MILS
1,500 VF
14f Liner System for 6' diameter manhole-250 MILS
1,500 VF
Lateral Replacement and Lateral CIPP
15 Replace Existing Service Lateral from Sewer Main to New Cleanout Location (6"-8" Dia.)
15a Up to 5' deep 800 LF
15b More than 5' and up to 10' deep 500 LF
15c More than 10' and up to 15' deep 300 LF
15d More than 15' and up to 20' deep 200 LF
16 Trenchless (CIPP) Reconstruction of Sewer Lateral, CCTV and Cleaning
16a 4” Dia. Sanitary Sewer Lat. 4.0 mm 500 LF
16b 6” Dia. Sanitary Sewer Lat. 6.0 mm 300 LF
16c 8” Dia. Sanitary Sewer Lat. 6.0 mm 50 LF
v. 7.2024 27
Measure
Unit Cost Total
Grout Fill and Abandon Main
17a 2"-6" 7,500 LF
17b 8"-12" 7,500 LF
17c 16"-24" 5,000 LF
17d >30" 5,000 LF
Remove Abandoned Main (if not already removing for replacing)
18a 2"-6" 5,000 LF
18b 8"-12" 5,000 LF
18c 16"-24" 2,000 LF
18d >30" 500 LF
Gravity Mains
PVC Gravity Mains (Inclusive of all Labor, Material, and Associated Restraints)
19a 4” diameter (0' to 5') 5 LF
19b 4” diameter (5.1' to 10') 5 LF
19c 4” diameter (10.1' to 15') 5 LF
19d 4” diameter (15.1' to 20') 5 LF
19e 6” diameter (0' to 5') 25 LF
19f 6” diameter (5.1' to 10') 25 LF
19g 6” diameter (10.1' to 15') 5 LF
19h 6” diameter (15.1' to 20') 5 LF
19i 8” diameter (0' to 5') 1,000 LF
19j 8” diameter (5.1' to 10') 1,000 LF
19k 8” diameter (10.1' to 15') 500 LF
v. 7.2024 28
Measure
Unit Cost Total
19l 8” diameter (15.1' to 20') 500 LF
19m 10” diameter (0' to 5') 1,000 LF
19n 10” diameter (5.1' to 10') 1,000 LF
19o 10” diameter (10.1' to 15') 500 LF
19p 10” diameter (15.1' to 20') 500 LF
19q 12” diameter (0' to 5') 500 LF
19r 12” diameter (5.1' to 10') 500 LF
19s 12” diameter (10.1' to 15') 250 LF
19t 12” diameter (15.1' to 20') 100 LF
19u 14”/15" diameter (0' to 5') 5 LF
19v 14”/15" diameter (5.1' to 10') 5 LF
19w 14”/15" diameter (10.1' to 15') 5 LF
19x 14”/15" diameter (15.1' to 20') 5 LF
19y 16”/18" diameter (0' to 5') 5 LF
19z 16”/18" diameter (5.1' to 10') 5 LF
19aa 16”/18" diameter (10.1' to 15') 5 LF
19bb 16”/18" diameter (15.1' to 20') 5 LF
19cc 20”/21" diameter (0' to 5') 5 LF
19dd 20”/21" diameter (5.1' to 10') 5 LF
19ee 20”/21" diameter (10.1' to 15') 5 LF
19ff 20”/21" diameter (15.1' to 20') 5 LF
19gg 24” diameter (0' to 5') 5 LF
19hh 24” diameter (5.1' to 10') 5 LF
v. 7.2024 29
Measure
Unit Cost Total
19ii 24” diameter (10.1' to 15') 5 LF
19jj 24” diameter (15.1' to 20') 5 LF
19kk 30” diameter (0' to 5') 5 LF
19ll 30” diameter (5.1' to 10') 5 LF
19mm 30” diameter (10.1' to 15') 5 LF
19nn 30” diameter (15.1' to 20') 5 LF
19oo 36” diameter (0' to 5') 5 LF
19pp 36” diameter (5.1' to 10') 5 LF
19qq 36” diameter (10.1' to 15') 5 LF
19rr 36” diameter (15.1' to 20') 5 LF
19ss 42” diameter (0' to 5') 5 LF
19tt 42” diameter (5.1' to 10') 5 LF
19uu 42” diameter (10.1' to 15') 5 LF
19vv 42” diameter (15.1' to 20') 5 LF
19ww 48” diameter (0' to 5') 5 LF
19xx 48” diameter (5.1' to 10') 5 LF
19yy 48” diameter (10.1' to 15') 5 LF
19zz 48” diameter (15.1' to 20') 5 LF
19aaa 54” diameter (0' to 5') 5 LF
19bbb 54” diameter (5.1' to 10') 5 LF
19ccc 54” diameter (10.1' to 15') 5 LF
19ddd 54” diameter (15.1' to 20') 5 LF
HDPE Gravity Main (Inclusive of all Labor, Material, and Associated Restraints)
v. 7.2024 30
Measure
Unit Cost Total
20a 4” diameter (0' to 5') 5 LF
20b 4” diameter (5.1' to 10') 5 LF
20c 4” diameter (10.1' to 15') 5 LF
20d 4” diameter (15.1' to 20') 5 LF
20e 6” diameter (0' to 5') 25 LF
20f 6” diameter (5.1' to 10') 25 LF
20g 6” diameter (10.1' to 15') 5 LF
20h 6” diameter (15.1' to 20') 5 LF
20i 8” diameter (0' to 5') 50 LF
20j 8” diameter (5.1' to 10') 50 LF
20k 8” diameter (10.1' to 15') 10 LF
20l 8” diameter (15.1' to 20') 10 LF
20m 10” diameter (0' to 5') 100 LF
20n 10” diameter (5.1' to 10') 100 LF
20o 10” diameter (10.1' to 15') 5 LF
20p 10” diameter (15.1' to 20') 5 LF
20q 12” diameter (0' to 5') 500 LF
20r 12” diameter (5.1' to 10') 500 LF
20s 12” diameter (10.1' to 15') 250 LF
20t 12” diameter (15.1' to 20') 100 LF
20u 14”/15" diameter (0' to 5') 5 LF
20v 14”/15" diameter (5.1' to 10') 5 LF
20w 14”/15" diameter (10.1' to 15') 5 LF
v. 7.2024 31
Measure
Unit Cost Total
20x 14”/15" diameter (15.1' to 20') 5 LF
20y 16”/18" diameter (0' to 5') 5 LF
20z 16”/18" diameter (5.1' to 10') 5 LF
20aa 16”/18" diameter (10.1' to 15') 5 LF
20bb 16”/18" diameter (15.1' to 20') 5 LF
20cc 20”/21" diameter (0' to 5') 5 LF
20dd 20”/21" diameter (5.1' to 10') 5 LF
20ee 20”/21" diameter (10.1' to 15') 5 LF
20ff 20”/21" diameter (15.1' to 20') 5 LF
20gg 24” diameter (0' to 5') 5 LF
20hh 24” diameter (5.1' to 10') 5 LF
20ii 24” diameter (10.1' to 15') 5 LF
20jj 24” diameter (15.1' to 20') 5 LF
20kk 30” diameter (0' to 5') 5 LF
20ll 30” diameter (5.1' to 10') 5 LF
20mm 30” diameter (10.1' to 15') 5 LF
20nn 30” diameter (15.1' to 20') 5 LF
20oo 36” diameter (0' to 5') 5 LF
20pp 36” diameter (5.1' to 10') 5 LF
20qq 36” diameter (10.1' to 15') 5 LF
20rr 36” diameter (15.1' to 20') 5 LF
20ss 42” diameter (0' to 5') 5 LF
20tt 42” diameter (5.1' to 10') 5 LF
v. 7.2024 32
Measure
Unit Cost Total
20uu 42” diameter (10.1' to 15') 5 LF
20vv 42” diameter (15.1' to 20') 5 LF
20ww 48” diameter (0' to 5') 5 LF
20xx 48” diameter (5.1' to 10') 5 LF
20yy 48” diameter (10.1' to 15') 5 LF
20zz 48” diameter (15.1' to 20') 5 LF
20aaa 54” diameter (0' to 5') 5 LF
20bbb 54” diameter (5.1' to 10') 5 LF
20ccc 54” diameter (10.1' to 15') 5 LF
20ddd 54” diameter (15.1' to 20') 5 LF
Pressure Pipe (Open Cut)
PVC Force Main (Inclusive of all Labor, Material, and Associated Restraints)
21a 4” diameter (0' to 5') 25 LF
21b 4” diameter (5.1' to 10') 5 LF
21c 4” diameter (10.1' to 15') 5 LF
21d 4” diameter (15.1' to 20') 5 LF
21e 6” diameter (0' to 5') 25 LF
21f 6” diameter (5.1' to 10') 25 LF
21g 6” diameter (10.1' to 15') 5 LF
21h 6” diameter (15.1' to 20') 5 LF
21i 8” diameter (0' to 5') 50 LF
21j 8” diameter (5.1' to 10') 50 LF
21k 8” diameter (10.1' to 15') 10 LF
v. 7.2024 33
Measure
Unit Cost Total
21l 8” diameter (15.1' to 20') 10 LF
21m 10” diameter (0' to 5') 100 LF
21n 10” diameter (5.1' to 10') 100 LF
21o 10” diameter (10.1' to 15') 5 LF
21p 10” diameter (15.1' to 20') 5 LF
21q 12” diameter (0' to 5') 500 LF
21r 12” diameter (5.1' to 10') 500 LF
21s 12” diameter (10.1' to 15') 250 LF
21t 12” diameter (15.1' to 20') 100 LF
21u 14”/15" diameter (0' to 5') 5 LF
21v 14”/15" diameter (5.1' to 10') 5 LF
21w 14”/15" diameter (10.1' to 15') 5 LF
21x 14”/15" diameter (15.1' to 20') 5 LF
21y 16”/18" diameter (0' to 5') 5 LF
21z 16”/18" diameter (5.1' to 10') 5 LF
21aa 16”/18" diameter (10.1' to 15') 5 LF
21bb 16”/18" diameter (15.1' to 20') 5 LF
21cc 20”/21" diameter (0' to 5') 5 LF
21dd 20”/21" diameter (5.1' to 10') 5 LF
21ee 20”/21" diameter (10.1' to 15') 5 LF
21ff 20”/21" diameter (15.1' to 20') 5 LF
21gg 24” diameter (0' to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .