Ex_H_GeneralDecision_CT20080004_20080606.doc
DOC document 134 KB Posted
- Attached to
- Design/Build closed loop geothermal heating and cooling HVAC system Federal contract opportunity
- Solicitation number
- W91ZRS-08-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ExhibitC.doc | DOC document | |
| ExhibitA.doc | DOC document | |
| ExhibitB.doc | DOC document | |
| ExhibitF.doc | DOC document | |
| W91ZRS-08-R-0003.doc | DOC document | |
| CEKT062001volume2.doc | DOC document | |
| CEKT062001solicitation .doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT H
W91ZRS-08-R-0003
GENERAL DECISION: CT20080004 06/06/2008 CT4
Date: June 6, 2008
General Decision Number: CT20080004 06/06/2008
Superseded General Decision Number: CT20070004
State: Connecticut
Construction Types: Building, Heavy and Highway
County: Hartford County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories); HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 04/04/2008
3 04/11/2008
4 05/02/2008
5 05/23/2008
6 06/06/2008
ASBE0006-006 09/01/2007
Rates Fringes
Asbestos Workers/Insulator
Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls.
East Granby, Enfield, Granby, Hartland, Suffield and Windsor-Locks...........$ 29.49 18.03
ASBE0033-001 06/01/2007
Rates Fringes
Asbestos Workers/Insulator
Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls.
Avon, Berlin, Bloomfield, Bristol, Burlington, Canton, East Windsor, East
Hartford, Farmington, Glastonbury, Hartford, Manchester, Marlborough, New Britain, Newington, Plainville, Rocky Hill, Southington, Simsbury, South Windsor, West
Hartford, Windsor, Wethersfield................$ 32.21 19.20
ASBE0201-003 04/01/2005
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping,vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 20.50 10.30
BOIL0237-001 10/01/2007
Rates Fringes
BOILERMAKERS.....................$ 32.73 33%+8.72
BRCT0001-001 04/07/2008
Rates Fringes
BRICKLAYER (BUILDING
CONSTRUCTION)
(ZONE A)....................$ 31.00 18.54+a
PAID HOLIDAY: Employees shall receive 4 hours for Christmas
Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employees may schedule work on Christmas Eve and employees shall receive pay for actual hours worked in addition to holiday pay.
BRCT0001-003 04/07/2008
Rates Fringes
BRICKLAYER (HEAVY & HIGHWAY
CONSTRUCTION)
BRICKLAYERS, CEMENT
MASONS, CEMENT FINISHERS,
PLASTERERS, STONE MASONS....$ 31.00 17.89
CARP0024-003 05/05/2008
Rates Fringes
Carpenters: (BUILDING
CONSTRUCTION
Berlin, Bristol, Burlington, Canton, Marlborough, New
Britain, Newington, Plainville, Southington)
CARPENTERS (Including
Drywall/Acoustical); SOFT
FLOOR LAYERS................$ 27.90 16.96
MILLWRIGHTS.................$ 28.65 16.96
CARP0024-005 05/05/2008
Rates Fringes
Carpenters: (HEAVY & HIGHWAY
CONSTRUCTION:
Berlin, Bristol, Burlington,Canton, Marlborough, New Britain, Newington, Plainville, Southington)
CARPENTERS; PILEDRIVERS.....$ 27.90 16.96
DIVER TENDERS...............$ 27.90 16.96
DIVERS......................$ 36.36 16.96
CARP0043-001 05/05/2008
Rates Fringes
Carpenters: (BUILDING
CONSTRUCTION:
Avon, Bloomfield, East
Granby, East Hartford, East
Windsor, Enfield, Farmington, Glastonbury, Granby, Hartford, Hartland, Manchester, Rocky Hll, Simsbury, South Windsor, Suffield, West Hartford, Wethersfield, Windsor, Windsor Locks)
CARPENTERS (Including
Drywall/Acoustical); SOFT
FLOOR LAYERS................$ 27.90 16.96
MILLWRIGHTS.................$ 28.65 16.96
CARP0043-003 05/05/2008
Rates Fringes
Carpenters: (HEAVY & HIGHWAY
CONSTRUCTION:
Avon, Bloomfied, East Granby, East Hartford, East Windsor, Enfield, Farmington, Glastonbury, Granby, Hartford, hartland, Manchester, Rocky Hill, Simsbury, South Windsor, Suffield, West Hartford, Wethersfield, Windsor, Windsor Locks)
CARPENTERS; PILEDRIVERS.....$ 27.90 16.96
DIVER TENDERS...............$ 27.90 16.96
DIVERS......................$ 36.36 16.96
* ELEC0035-002 06/01/2008
Rates Fringes
Electricians:
Entire County, excluding
Berlin, Bristol, Hartland, New Britain, Newington, Plainville and Southington..$ 34.40 18.57
ELEC0042-001 08/28/2005
Rates Fringes
Line Construction:
(Line Construction)
Driver Groundmen............$ 25.99 10.70+6.25%
Groundmen...................$ 19.06 10.70+6.25%
Heavy Equipment Operators...$ 31.19 10.70+6.25%
Linemen, Cable Splicers, Dynamite Men................$ 34.65 10.70+6.25%
Material Men, Tractor
Trailer Drivers, Equipment
Operators...................$ 29.45 10.70+6.25%
Line Construction:
(Railroad Construction and
Maintenance)
Driver Groundmen............$ 26.74 10.70+6.25%
Heavy Equipment Operators...$ 32.09 10.70+6.25%
Linemen, Cable Splicers, Dynamite Men................$ 35.65 10.70+6.25%
Material Men, Tractor
Trailer Drivers, Equipment Operators.........$ 30.30 10.70+6.25%
* ELEC0090-001 06/01/2008
Rates Fringes
Electricians:
Berlin, Bristol, New
Britain, Newington, Plainville, Southington.....$ 34.20 18.33
* ELEC0488-004 06/01/2008
Rates Fringes
Electricians:
Hartland Township...........$ 34.10 18.58
ELEV0091-001 01/01/2008
Rates Fringes
ELEVATOR MECHANIC................$ 41.34 16.285+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day, plus the Friday after Thanksgiving.
b. VACATION: Employer contributes 8% of basic hourly rate for
5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0478-002 04/06/2008
Rates Fringes
Power equipment operators:
(HEAVY & HIGHWAY CONSTRUCTION)
GROUP 1....................$ 33.05 16.90+a
GROUP 2....................$ 32.73 16.90+a
GROUP 3....................$ 31.99 16.90+a
GROUP 4....................$ 31.60 16.90+a
GROUP 5....................$ 31.01 16.90+a
GROUP 6....................$ 30.70 16.90+a
GROUP 7....................$ 30.36 16.90+a
GROUP 8....................$ 29.96 16.90+a
GROUP 9....................$ 29.53 16.90+a
GROUP 10....................$ 27.49 16.90+a
GROUP 11....................$ 27.49 16.90+a
GROUP 12....................$ 27.43 16.90+a
GROUP 13....................$ 28.96 16.90+a
GROUP 14....................$ 26.85 16.90+a
GROUP 15....................$ 26.54 16.90+a
GROUP 16....................$ 25.71 16.90+a
GROUP 17....................$ 25.30 16.90+a
GROUP 18....................$ 24.65 16.90+a
Hazardous waste premium $3.00 per hour over classified rate.
Crane with 150 ft. boom (including jib): $1.50 extra.
Crane with 200 ft. boom (including jib): $2.50 extra.
Crane with 250 ft. boom (including jib): $5.00 extra.
Crane with 300 ft. boom (including jib): $7.00 extra.
Crane with 400 ft. boom (including jib); $10.00 extra.
a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Crane Handling or Erecting Structural Steel or tone; Hoisting Engineer (2 drums or over); Front End Loader
(7 cubic yards or over) Work Boat 26 ft. & over.
GROUP 2: Cranes (100 ton rated capacity and over); Excavator over 2 cubic yards; Piledriver ($3.00 premium when operator controls hammer).
GROUP 3: Excavator; Cranes (under 100 ton rated capacity), Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber tire Excavator (Drott-1085 or similar); Grader Operator;
Bulldozer Fine Grade (slopes. shaping, laser or GPS, etc.)
GROUP 4: Trenching machines; Lighter Derrick; Concrete
Finishing Machine, cmi Machine or Similar; Koehring Loader
Skooper).
GROUP 5: Specialty Railroad Equipment; Asphalt Spreader;
Asphalt Reclaiming achine; Line Grinder; Concrete Pumps;
Drills with Self Contained Power Units; Boring Machine;
Post Hole Digger; Auger; Pounder; Well Digger; Milling
Machine (over 24" Mandrell); Side Boom; Combination Hoe and
Loader; Directional Driller.
GROUP 6: Front End Loader (3 cu. yds. up to 7 cubic yards);
Bulldozer (Rough grade dozer).
GROUP 7: Asphalt Roller; Concrete Saws and Cutters (Ride on
Types); Vermeer Concrete Cutter; Stump Grinder; Scraper;
Snooper; Skidder; Milling Machine (24" and Under Mandrel).
GROUP 8: Mechanic; Grease Truck Operator; Hydroblaster;
Barrier Mover; Power Stone Spreader; Welder; Work Boat
Under 26 ft.; Transfer Machine.
GROUP 9: Front End Loader (under 3 cubic yards); Skid Steer
Loader (regardless of attachments); (Bobcat or similar);
Fork Lift; Power Chipper; Landscape Equipment (including
Hydroseeder).
GROUP 10: Vibratory Hammer, Ice Machine, Diesel and Air
Hammer, etc.
GROUP 11: Conveyor; Earth Roller; Power Pavement Breaker
(Whiphammer); Robot Demolition Equipment.
GROUP 12: Wellpoint Operator.
GROUP 13: Portable Asphalt Plant Operator; Portable Concrete
Plant Operator; Portable Crusher Plant Operator.
GROUP 14: Compressor Battery Operator.
GROUP 15: Power Safety Boat; Vacuum Truck; Zim Mixer;
Sweeper; (Minimum for any job requiring a CDL License)
GROUP 16: Elevator Operator; Tow Motor Operator (Solid Tire
No Rough Terrain).
GROUP 17: Generator Operator; Compressor Operator; Pump
Operator; Welding Machine Operator; Heater operator.
GROUP 18: Maintenance Engineer.
ENGI0478-005 04/06/2008
Rates Fringes
Power equipment operators:
(BUILDING CONSTRUCTION)
Cranes: 100 ton rated capacity and over...........$ 32.73 16.90+a
Cranes: 2 drums or over.....$ 33.05 16.90+a
Cranes: under 100 ton rated capacity..............$ 31.99 16.90+a
Excavator/Loader
Combination.................$ 31.01 16.90+a
Forklift Operator...........$ 29.53 16.90+a
Hoist engineer: 2 drums or over........................$ 33.05 16.90+a
Hoist engineer: all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation................$ 31.99 16.90+a
Maintenance engineer........$ 24.65 16.90+a
Roller, All Types...........$ 30.36 16.90+a
Hazardous waste premium $3.00 per hour over classified rate.
Crane with boom, including jib, 150 feet - $1.50 extra
Crane with boom, including jib, 200 feet - $2.50 extra
Crane with boom, including jib, 250 feet - $5.00 extra
Crane with boom, including jib, 300 feet - $7.00 extra
Crane with boom, including jib, 400 feet - $10.00 extra
a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled,the working day before and the working day ater the holiday.
Holidays falling on Saturday may be observed on Saturday, or if the eployer so elects, on the preceeding Friday.
IRON0015-002 12/31/2007
Rates Fringes
Ironworkers: (Ornamental, Reinforcing, Structural
(Including Metal Building
Erecting) and Precast
Concrete Erection)...............$ 31.30 21.93+a
a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.
LABO0056-002 04/07/2008
Rates Fringes
Laborers: (BUILDING)
Mason Tenders (Brick &
Cement).....................$ 23.75 14.00
Unskilled...................$ 23.25 14.00
LABO0056-003 04/07/2008
Rates Fringes
Laborers: (HEAVY & HIGHWAY
CONSTRUCTION)
GROUP 1.....................$ 23.25 14.00
GROUP 2.....................$ 23.50 14.00
GROUP 3.....................$ 23.60 14.00
GROUP 4.....................$ 23.75 14.00
GROUP 5.....................$ 25.25 14.00
GROUP 6.....................$ 25.00 14.00
GROUP 7.....................$ 24.25 14.00
GROUP 8.....................$ 15.00 14.00
LABORERS CLASSIFICATIONS
GROUP 1: Laborers (Unskilled).
GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen.
GROUP 3: Pipelayers.
GROUP 4: Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block pavers and curb setters.
GROUP 5: Toxic waste remover (non-mechanical systems).
GROUP 6: Blasters.
GROUP 7: Asbestos Removal, non-mechanical systems (does not include leaded joint pipe).
GROUP 8: Traffic control signalmen.
LABO0056-004 04/07/2008
Rates Fringes
Laborers: (TUNNEL
CONSTRUCTION)
CLEANING, CONCRETE AND
CAULKING TUNNEL:
Concrete Workers, Form
Movers and Strippers.......$ 26.70 14.00+a
Form Erectors..............$ 26.975 14.00+a
ROCK SHAFT, CONCRETE,
LINING OF SAME AND TUNNEL
IN FREE AIR:
Brakemen, Trackmen, Tunnel Laborers, Shaft
Laborers...................$ 26.70 14.00+a
Laborers Topside, Cage
Tenders, Bellman...........$ 26.60 14.00+a
Miners.....................$ 27.50 14.00+a
SHIELD DRIVE AND LINER
PLATE TUNNELS IN FREE AIR:
Brakemen and Trackmen......$ 26.70 14.00+a
Miners, Motormen, Mucking
Machine Operators, Nozzlemen, Grout Men, Shaft and Tunnel, Steel and Rodmen, Shield and
Erector, Arm Operator, Cable Tenders..............$ 27.50 14.00+a
TUNNELS, CAISSON AND
CYLINDER WORK IN
COMPRESSED AIR:
Blaster....................$ 32.95 14.00+a
Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders..............$ 32.78 14.00+a
Change House Attendants, Powder Watchmen, Top on
Iron Bolts.................$ 31.117 14.00+a
Mucking Machine Operator...$ 33.45 14.00+a
a. PAID HOLIDAYS: On tunnel work only: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
No employee shall be eligible for holiday pay when he fails, without cause, to work the regular work day preceding the holiday or the regular work day following the holiday.
* PAIN0011-003 06/01/2008
Rates Fringes
Painters: (BRIDGE
CONSTRUCTION)
Brush, Roller, Blasting
(Sand, Water, etc.) Spray...$ 37.65 14.20
* PAIN0011-004 06/01/2008
Rates Fringes
Painters: (Including Drywall
Finishing)
Blast and Spray.............$ 30.87 14.00
Brush and Roll..............$ 27.87 14.00
Paperhanger.................$ 28.37 14.00
Red Label...................$ 28.37 14.00
Tanks, Towers, Swing........$ 29.87 14.00
Taper.......................$ 28.62 14.00
* PLUM0777-004 06/01/2008
Rates Fringes
Plumbers and Pipefitters
(Including HVAC Work)............$ 35.37 19.71
ROOF0009-002 01/01/2008
Rates Fringes
Roofers:
Composition.................$ 29.40 13.48
Slate and Tile..............$ 29.90 13.48
SFCT0676-001 08/01/2007
Rates Fringes
Sprinkler Fitters................$ 36.50 15.10+a
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.
SHEE0040-002 07/01/2007
Rates Fringes
Sheet metal worker (Including
HVAC Duct Work)..................$ 29.55 23.15
SUCT1991-002 11/01/1991
Rates Fringes
Glaziers.........................$ 18.88 4.58
Plasterer........................$ 17.00
Power equipment operators:
Backhoes....................$ 16.83 3.45
Bulldozers..................$ 16.98 3.37
Front End Loaders...........$ 18.20 3.41
TILE SETTER......................$ 20.75
Truck drivers (Building)
3 Axle......................$ 13.29 2.64
4 Axle......................$ 10.00 .27
TEAM0064-004 04/01/2008
Rates Fringes
Truck drivers: (BUILDING
CONSTRUCTION)
2 Axle......................$ 26.18 12.47+a
Hazardous waste removal work receives additional $1.25 per hour.
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day and Good
Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.
TEAM0064-005 04/01/2008
Rates Fringes
Truck drivers: (HEAVY &
HIGHWAY CONSTRUCTION)
2 Axle Ready Mix............$ 26.28 12.47+a
2 Axle......................$ 26.18 12.47+a
3 Axle Ready Mix............$ 26.33 12.47+a
3 Axle......................$ 26.28 12.47+a
4 Axle Ready Mix............$ 26.43 12.47+a
4 Axle......................$ 26.38 12.47+a
Heavy Duty Trailer 40 tons and over....................$ 26.63 12.47+a
Heavy Duty Trailer up to
40 tons.....................$ 26.38 12.47+a
Specialized (Earth moving equipment other than conventional type on-the-road trucks and semi-trailers, including
Euclids)....................$ 26.43 12.47+a
Hazardous waste removal work receives additional $1.25 per hour.
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day and Good
Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .