TE #2 Maintenance Actions & Frequencies for Each System
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-19-R-0012-0002.docx | DOCX document | |
| W91QVN-19-R-0012-0001.docx | DOCX document | |
| W91QVN-19-R-0012.pdf | ||
| A21_Attachment__1_Est_POL_Qty.xls | XLS spreadsheet | |
| A21_TE_1_Facilities_&_Equipment_Listing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE#2 - 1
TECHNICAL EXHIBIT 2
MAINTENANCE ACTIONS AND FREQUENCIES FOR EACH SYSTEM
Equipment Maintenance/Repair Action Freq*
Unitary, Heating and Cooling Unit 1. System understanding 1Y
* Rooftop, packaged air conditioning unit, 2. Remove debris from air screen and clean underneath unit Split air conditioning unit 3. Inspect gasket, look for leaks between unit and structure, caulk as necessary
4. Clean condenser, cooling coil fins and fans by pressure washing with coil cleaning solution.
* If Split AC system, remote unit shall be 5. Remove dirt or dust from all interior parts serviced simultaneously. 6. Replace Filter, Clean if washable filters are installed by filter cleaning solution.
7. Inspect and adjust damper
8. Lubricate condenser motor and fan bearings
9. Check bearing collar set screw on fan shaft to make sure they are tight
10. Check dampers for dirt accumulations. Check felt. Repair or Replace as necessary
11. Check damper motors and linkage for proper operation
12. Lubricate mechanical connection of dampers sparingly
13. Clean coils by pressure washing with coil cleaning solution.
14. Use fin comb to straighten coil fins.
15. Flush and clean condensate pans and drains.
16. Check belts for wear, adjust tension or alignment and replace belts when required
17. Check rigid coupling for alignment on direct drives for tightness of assembly
18. Check electrical connections for tightness
19. Check mounting for tightness
20. Check for corrosion
21. Check mounting bolts and tighten if needed
22. Check and adjust or replace if necessary, vibration eliminators
23. Heating (Electrical)
- Visually inspect for broken parts, contract arcing or any evidence of overheat
24. Clean exterior of motor surfaces of soil accumulation.
25. Lubricate bearings according to horsepower ratings:
26. Add grease - use good grade lithium base grease unless otherwise noted.
27. Check motor windings for accumulation of soil. Blow out with air if required, air pressure must not exceed 30 psig.
TE#2 - 1
28. Check hold down bolts and grounding straps for tightness.
29. The contractor shall get an inspection with HVAC shop prior to putting filters back to the original location, prior to closing any cover/door. During inspection, the contract manager shall stay and get an inspection.
Air Conditioning Machine, Package 1. System understanding 1Y (Special purpose, Computer Room 2. Thoroughly inspect and clean interior and exterior of machine with wet/ dry vacuum, Air conditioning unit) (remove panels).
3. Clean drain-pan and note excessive corrosion, prepare and paint as necessary.
* This unit is normally connected with 4. Check condition of cooling and reheat coils. Use fin comb if needed to straighten fins.
outdoor air cooled condenser and 5. A dirty coil should be cleaned using a coil cleaning solution and pressurized warm water.
shall be serviced simultaneously. 6. Drain and clean humidifier drip pan, replace pan if applicable. Remove scale and paint, if necessary.
7. Lubricate motor and fan bearings, if not sealed. Check alignment of motor and fan.
Clean fan or blower.
8. Check belt tension and condition. Adjust or replace as required.
9. Replace pre-filters if needed.
10. Replace final filters if needed.
11. Check and adjust vibration eliminators. Replace if required.
12. Check and tighten all electrical terminals, connections, and disconnect switches.
13. Remove all trash or debris from work area.
14. The contractor shall get an inspection with HVAC shop prior to putting filters back to the
Air Cooled Condenser 1. System Understanding 1Y (condenser fan(s), and fan motor(s)) 2. Remove debris from air screen and clean underneath unit.
* Other components (i.e. compressor) 3. Pressure wash coil with coil cleaning solution.
are at a separate location to be serviced 4. Straighten fin tubes with fin comb.
simultaneously 5. Check electrical connections for tightness.
6. Check mounting for tightness.
7. Check for and remove all corrosion or rust from unit and supporting steel, prime and Up to 5 tons paint as necessary.
5 ton to 20 tons 8. Check fan blades and belts, if installed. Clean fan blades as necessary.
20 ton to 60 tons 9. Clean up work area.
Over 60 tons 10. Clean exterior of motor surfaces of soil accumulation.
11. Lubricate bearings according to horsepower ratings:
TE#2 - 2
12. Add grease - use good grade lithium base grease unless otherwise noted.
13. Check motor windings for accumulation of soil. Blow out with air if required, air pressure must not exceed 30 psig.
14. Check hold down bolts and grounding straps for tightness.
15. The contractor shall get an inspection with HVAC shop prior to putting filters back to the
Heat Pumps 1. System Understanding 1Y Remove debris from air screen and clean underneath unit
2. Check mounting bolts and tighten if needed.
3. Check fan for vibration or excessive noise. Lubricate fan and motor if required.
4. Clean air intake and screens; change filters as necessary.
5. Clean condenser/ coils, evaporator, heat exchanger, cooling coil fins, fans, blower With pressure wash coil cleaning solution Up to 5 tons 6. Straighten fins with fin comb.
5 ton to 20 tons 7. Clean all type of filters or replace filters..
20 ton to 60 tons 8. Check belt for wear, adjust tension or replace it (include temporary belt) with new if it is Over 60 tons Required.
9. Remove dirt or dust from all interior parts
10. Check all electrical connections and fused disconnect switches.
11. Clean exterior of motor surfaces of soil accumulation.
12. Lubricate bearings according to horsepower ratings:
13. Replace/ Clean filters on the interior air distribution system on the ceiling.(In the building)
14. Add grease - use good grade lithium base grease unless otherwise noted.
15. Check motor windings for accumulation of soil. Blow out with air if required, air pressure must not exceed 30 psig.
16. Check hold down bolts and grounding straps for tightness.
17. Clean up work area.
18. These units are mostly installed with related backup/supplemental indoor/outdoor heating
/cooling equipment. The contractor shall completed preventive maintenance work based on applicable maintenance actions.
19. The contractor shall get an inspection with HVAC shop prior to putting filters back to the original location and close any cover/door. During inspection, the contract manager shall stay and get an inspection.
Air Handler 1. System understanding 1Y With remote coil and damper 2. Check fan blades for dust buildup and clean if necessary.
To be serviced simultaneously. 3. Check fan blades and moving parts for cracks and excessive wear.
4. Check bearing collar set screws on fan shaft to make sure they are tight.
5. Check dampers for dirt accumulations, clean as necessary. Check felt and repair or replace as necessary.
TE#2 - 3
12. Check rigid couplings for alignment on direct drives, and for tightness of assembly.
Check flexible couplings for alignment and wear.
13. Vacuum interior of unit.
14. Lubricate fan shaft bearings while unit is running. Add grease slowly until slight bleeding is noted from the seals. Do not over lubricate. Remove old or excess lubricant.
15. Clean and wash permanent filters by filter cleaning solution. Recharge wire mesh filters
16. Replace disposal filters.
17. Clean up work area.
18. The contractor shall get an inspection with HVAC shop prior to putting filters back to the
Remote Air Intake Damper Remote Air Intake Damper 1Y
1. Check damper for freedom of movement and proper operation.
2. Observe damper operation through full operating range, by activating controller.
Adjust linkage on vanes if out of alignment.
3. Check damper surfaces for wear and clean vanes.
4. Check actuator/damper linkage for proper operation. Adjust if needed. Tighten operator arm set screws.
5. Lubricate mechanical connections sparingly. Wipe off excess.
6. Check actuator for proper operation. If it does not stroke properly, check for binding drive stem.
7. Check for air leaks around actuator and in air line between controller and actuator.
8. Lubricate actuator linkage sparingly. Wipe off excess lubricant. DO NOT LUBRICATE actuator/drive stem.
6. Check damper actuators and linkage for proper operation. Adjust linkage on dampers if out of alignment.
Under 5000 CFM (Under 12 tons) 7. Lubricate mechanical connections of dampers sparingly.
5001 to 15,000 CFM (12 ton to 40 tons) 8. Clean coils by pressure washing with coil cleaning solution.
15,000 to 30,000 CFM (40 ton to 75 tons) 9. Use fin comb to straighten coil fins.
Over 30,000 CFM (over 75 tons) 10. Flush and clean condensate pans and drains, remove all rust. Prepare metal and paint. Hose down coils and drain pans and wash with an appropriate cleaning solution.
11. Check belts for wear and cracks, adjust tension or alignment, and replace any temporary Belts with permanent ones. Multi-belt drives shall only be replaced with matched sets.
TE#2 - 4
9. Clean off any corrosion or rust on damper frame and or damper blades, coat with proper type and color paint.
10. The contractor shall get an inspection with HVAC shop prior to putting filters back to Coil, Preheat, Reheat, Heat recovery Coil, Preheat, Reheat and etc., Remote Area 1Y
/Ventilating Unit and Remote area 1. Vacuum or blow out the fins, coils, etc.
2. Clean and wash permanent filters. Recharge wire mesh filters with oil.
3. Replace disposal filters.
4. Remove any condensate.
5. Check coils. Report any leaks.
6. Check for rust or corrosion around coil frame and coil mounting bracket. Clean, prepare for painting and coat with proper type paint as necessary.
7. The contractor shall get an inspection with HVAC shop prior to putting filters back to the Boiler, Oil Fired 1. System Understanding 1Y
2. Brush/Clean/Remove scale in the all tubes.
3. Brush plate surfaces clean, use vacuum cleaner.
4. Clean breaching, ducts, fireboxes, or main fire tube, and flue passage (smoke stack).
5. Check refractory and brick work; if damaged notify the COR.
6. When the boiler has cooled to the ambient boiler room temperature, wash out mud legs, and flush boiler
7. Flush fuel oil strainer baskets and oil solenoid valve seats.
8. Inspect connecting lines to boiler for accumulations of mud, scale, etc., and clean as needed.
9. Open and check low water cut-off. Clean if necessary. Report if not functioning.
10. Safety relief valve – try lever test
11. Perform combustion and draft test. Adjust burner as necessary. Refer to the TE #5, Combustion and flue gas analysis and template sheet.
TE#2 - 5
Equipment Maintenance/Repair Action
12. Check sacrificial anode rods and replace as necessary. Report any sign of corrosions after internal check.
13. Set the barometric dampers so that they are closed when the burner is not firing, and slightly open when firing. Repair or replace dampers as needed.
14 . The contractor shall get an inspection with HVAC shop prior to putting any disassembled cleaning parts back to the original location/position, prior to closing any cover/door. During inspection, the contract manager shall stay and get an inspection.
Burner:
1. Test and inspect burner (with or without firing) at rated pressure for leaks.
2. Timed trial for ignition for pilots and burners should be in accordance with the instructions in the programmer timer.
3. Check operation of automatic controls and combustion flame safeguards for normal operation. There should be no presence of oil discharge, ignition or flame.
4. Check pre-ignition purging capability of burner, combustion chamber, boiler passes, and breaching. Stack dampers should be fully open during purge and light off period.
5. Check delivery of fuel in relation to its response to the ignition system. Examine electrodes for carbon buildup, discoloration, distortion, and burning of parts, clean and adjust as necessary for proper operation. Check porcelain insulators for cracks.
6. Check ignition transformer to supply dependable arc, adjust and regulate as required for clearance and air gap.
7. Clean and adjust draft regulator and air shutter on a natural draft burner to ensure excess air quantities are minimum for complete combustion. Test with flue gas analyzer.
8. On mechanical draft burners clean and check power-driven fan blower.
9. Check out forced draft fan, clean fan and fan housing, check bearings, pulleys and or couplings and adjust belt tension if required replace worn belts and lubricate pivot points on linkages as necessary.
10. Check and clean filters, water separators, primary, and secondary strainers.
11. Clean, check operation, and adjust controls and safeties.
12. Burners designed to change firing rates automatically should be checked for adequate proportioning changes in fuel and air rates.
13. Check oil level sight glass to see that burner maintains proper oil level (within 1/3") at rated output.
14. Check to ensure that power cannot feedback and energize ignition devices or feed valves after a control shuts off burner.
15. Clean or replace nozzles or cups, and check for tight shutoff of fuel.
TE#2 - 6
16. Check stacks for smoke or haze and adjust burner accordingly.
17. Take flue-gas readings to determine the boiler efficiency. Use the manufacturer's Instructions if available. If they are not, use the TE 5 as a guide for the performance criteria. If efficiency is low, check baffling and passes for short circuiting, and boiler for air infiltration. Adjust dampers and controls to optimize efficiency.
18. The contractor shall test/adjust/balancing burners with all related parts until tested values meet with normal performance range value on combustion analysis review sheet at TE 4 if values are out of normal range criteria.
Tests should be run at the following load points.
a. 100%, 70%, and 40% of rated full load for boilers having metering controls or modulation capacity at these load points.
b. At the high and low fire rates on boilers equipped with OFF/LOW FIRE/HIGH FIRE control.
c. At the single firing load point on boilers equipped with OFF/ON controls only.
19. The contractor shall get an inspection with HVAC shop prior to putting any disassembled parts for cleaning/testing/balancing back to the original location/position, prior to closing any cover/door. During inspection, the contract manager shall stay and get an inspection.
Condensing Unit, Refrigeration 1. System Understanding 1Y
2. Remove debris from air screen and clean underneath unit.
3. Pressure wash coil with coil cleaning solution. Rinse and neutralize (cleaning solution) in accordance with manufacturer's recommendations.
4. Straighten fin tubes with fin comb.
5. Check electrical connections for tightness.
6. Check mounting for tightness.
TE#2 - 7
7. Check all refrigeration lines for support and signs of wear.
8. Thoroughly inspect and clean interior and exterior of machine.
9. Clean and treat all rusted areas. Touch up prime and paint as needed.
10. Perform required lubrication and remove old or excess lubricant.
11. Clean motor with vacuum or low-pressure air (less than 40 psi). Check for obstructions in motor cooling and airflow.
12. Check fan blades for dust buildup and clean if necessary.
13. Check fan blades and moving parts for excessive wear.
14. Check bearing collar set screws on fan shaft to make sure they are tight, if applicable.
15. Clean up the work area and properly dispose of debris and waste.
16. The contractor shall get an inspection with HVAC shop prior to putting any disassembled parts for cleaning/testing/balancing back to the original location, prior to closing any cover/door. During inspection, the contract manager shall stay and get an inspection.
Hot Air Furnace (Warm Air Furnace) 1. System Understanding 1Y *If use with cooling coil, for remote
2. Remove furnace ends and access panels if applicable.
coil maintenance simultaneously. 3. Check the firebox liner or refractory for cracks and leaks.
4. Check smoke stack for obstructions, leaks, etc.
5. Clean bottom of smoke stack (breaching).
6. Clean all fans and motors.
7. Check operation of controls and safeties.
8. Lubricate as required.
9. Check and clean plenum (clean cooling coils and check for leaks, if equipped.)
10. Replace furnace and access panel’s ends if removed.
11. Check all motors, belts, pulleys, shafts, etc. for alignment.
12. Treat all rusted areas with rust inhibitor and touch up paint.
TE#2 - 8
Refrigeration Machine, Reciprocating Major components (i.e. compressors, controls) will be maintained by the 1Y Or Scroll Compressor chiller Government shop or other type of contract. The contractor shall maintain only air Under 40 tons condenser area 40 - 80 tons 80 to150 tons 1. Remove debris from air screen and clean underneath unit.
2. Pressure wash coil with coil cleaning solution.
3. Straighten fin tubes with fin comb.
4. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.
5. Check fan blades and belts. Clean fan blades as necessary.
6. The contractor shall get an inspection with HVAC shop prior to putting any disassembled parts for cleaning/testing/balancing back to the original location, prior to closing any
Refrigeration Machine, Rotary Screw Major components (i.e. compressors, controls) will be maintained by the 1Y Chiller Government shop or other type of contract. The contractor shall maintain only air 100 to 200 tons condenser area over 250 tons
1. Remove debris from air screen and clean underneath unit.
2. Pressure wash coil with coil cleaning solution.
3. Straighten fin tubes with fin comb.
4. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.
5. Check fan blades and belts. Clean fan blades as necessary.
6. The contractor shall get an inspection with HVAC shop prior to putting any disassembled parts for cleaning/testing/balancing back to the original location, prior to closing any
*Frequency:
1Y Annual