Amendment 07
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_Amendment_06.pdf | ||
| A21_Amendment_05.docx | DOCX document | |
| A21_Amendment_04.docx | DOCX document | |
| A2_Drawing_4_for_Com_.Room_2F.pdf | ||
| A2_Drawing_3_for_Com_.Room_1F.pdf | ||
| A2_Drawing_1_for_unpdated_drawing_1,_ACS_7005BAACH_1st_floor_Camera_blindspots_and_existing.pdf | ||
| A2_Drawing_2_for_Regular_Floor_Drawing-7005BAACH__2nd_floor2_Camera_blindspots.pdf | ||
| A21_Amendment_03.docx | DOCX document | |
| A21_Amendment_02....docx | DOCX document | |
| A2_Regular_Floor_Drawing-7005BAACH__2nd_floor2_Camera_blindspots.pdf | ||
| A21_Amendment_01.docx | DOCX document | |
| A2_ACS_7005BAACH_1st_floor_Camera_blindspots_and_existing_(003).pdf | ||
| A21_RFQ.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN-17-T-0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT .
a. The purpose of this amendment is to answer for vendor's questions.
1. Regarding the drawings when you posted today, the Red dot cameras(New) to be newly installed are a total of 67 EA (49EA for 1st floor + 18EA for the 2nd floor), which does not correspond with CLIN 0001 (81EA). That is, 14 cameras are exceeded (81EA of CLIN0001 - 67 EA of Red dot cameras).
Do the Government need spare 14 cameras? Or not? Could you please tell us the differences between the drawings and CLIN 0001?
All 81 cameras will be installed. 14 in question, 5 will be on the outside, 9 of them will be in side.
2. In the PWS of Amendment 0001, additional 10 exterior CCTV cameras will be installed.
However, as we see the drawing, the 5 exterior (Red dot) cameras seems to be installed at the 1st floor according to the drawing.
Could you please tell us the differences between the drawings and the PWS?
A: We have 5 outside cameras that we are still debating on where would be the right place to put them. 9 inside will be used to fill blind spots that we identified.
What kind of conduit for the exterior CCTV cameras is required? Steel conduit or flexible conduit?
A: Steel
3. Could you please provide us with a cable drawings between green dot cameras and Comm/Switch Room?
A: we cannot provide.
4. How many PoE ports are installed at each switch rooms in detail?
A: Cannot give, Varys depending on what is connected.
5. In the drawing 4, the 3rd floor is marked. Is it correct we don't have to consider the 3rd floor regarding installation of CCTVs?
A: there is no 3rd floor.
6. Is 220Volt available to operate the 65” monitor, or does the Government require that all equipment will operate on 110Volts?
A:110 Volts
7. For the question No.8 from the last QnA, it is a little bit confused. what do you mean by 'No, Use standard UTP'? UTP CMP cable required for this contract is already fire retardant.
A: UTP will be used in the Hospital.
8. As for "POE Hub" in the switch room, those should be provided by the contractor? or those will be provided by US Army?
A: Switch's will be installed by IMD
9. How long should recorded log be kept? Please let us know the minimum recorded log retention.
A: 12 Months
10. Is the NVR located at the Record/Reception Room (1269) at the first floor? If not, please advise the location.
A: Located 1508D
11. Could you advise the PoE Switch locations? As we would install 81 cameras, it means we need 4 x 24 port PoE Switches.
A: Switches are located in the Comm's rooms
12. Could you advise the Height from floor and ceiling?
A: cannot provide, it changes depending on location in Hospital.
13. Could you advise the Height from ceiling and roof?
A: cannot provide, it changes depending on location in Hospital.
14. Could you advise the material of ceiling? Is it plaster board?
A: Plaster in some areas tile in others.
b. The closing date is extended from 12 May 2017, 01:00, p.m. to 17 May 2017, 01:00, p.m.(Korea Local Time)
c. All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-May-2017 01:00 PM to 17-May-2017 01:00 PM.
(End of Summary of Changes) image1.wmf