This document package includes a solicitation for a construction project and related bidder inquiries. The solicitation is for renovations to the Cold Regions Research and Engineering Laboratory Mobility Lab Building in Hanover, New Hampshire, including installing insulation, a heating system, and replacing overhead and walk doors. The period of performance is 70 days from notice to proceed. Proposals are due by 2:00pm on November 17, 2022 and shall be submitted via email. The solicitation is set aside for 100% service-disabled veteran-owned small businesses. Known asbestos containing materials are located on the exterior of the building near upper doors. Required permits include a local hot work permit and compliance with Army safety regulations. Questions from bidders are addressed and include confirmation that taxes shall be included in pricing, and one person may fill project manager, quality control, and safety roles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0004 W913E5
CRREL Mobility Laboratory Improvements, Hanover, New Hampshire
See attached documentation for content of the revisions to the solicitation
Date for receipt of proposals is 17 November 2022 at 1400 hours CST
Government Point of Contact: William Rawe,Contract Specialist, William.T.Rawe@usace.army.mil
ERDC CONTRACTING OFFICE
HANOVER OFFICE
72 LYME ROAD
HANOVER, NH 03755-1290
See Item 6
W913E5-23-R-0001
1 2
11/10/2022
10/18/2022
Am #0004 - 2
(Continuation SF 30)
10 November 2022
Solicitation No. W913E5-23-R-0001
Date of Issue: 18 Oct 2022
New Date of Receiving Proposals: 17 Nov 2022
SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of CRREL Mobility Lab Upgrades and Renovation.
TO: Prospective Offerors and Others Concerned
1. The specifications for subject project are hereby modified as follows.
a. Specifications. (Descriptive Changes.) Section 00 72 00, clause
52.211-10 is revised to read:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within
10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 70 days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
Section 01 81 00, paragraph 1.2.2 is revised to as follows to clarify that Air
Conditioning (AC) is not required to be installed:
Thermostats: CRREL will accept either: (a) multiple heating / AC systems for each zone described, or (b) one primary centralized heating and AC system for all the zones. If one system for all the zones is proposed by the Contractor, then each zone shall have a sperate thermostat to allow CRREL to control temperatures separately for each zone, and turn off certain zones as desired. Specifically, a thermostat will be required in Bay 1, another thermostat for the zone of Bay 2-
4, and another thermostat for the zone of the downstairs space. If separate systems for each zone are proposed, it is assumed that each zone will logically have a separate thermostat
b. Specifications (New and/or Revised and Reissued).
Pages or Sections Deleted Pages or Sections Substituted or Added
None SF 1442 (Reissue)
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Revised proposals will be received until 2:00 p.m., CDT, 17 NOV 2022. Provide revised proposals by emailing it to Bill Rawe
(William.T.Rawe@usace.army.mil).
Attachments:
Vehicle Storage Building-Known ACM
Bidder Inquiries mailto:William.T.Rawe@usace.army.mil
Am #0004 - 3
(Continuation SF 30)
ERDC CONTRACTING OFFICE
HANOVER OFFICE
72 LYME ROAD
HANOVER, NH 03755-1290
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W913E5-23-R-0001
ERDC CONTRACTING OFFICE
HANOVER OFFICE
72 LYME ROAD
HANOVER, NH 03755-1290
CRREL Mobility Laboratory Improvements Hanover, New Hampshire
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
THIS SOLICITATION IS RESTRICTED TO 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES
ERDC CONTRACTING OFFICE
3909 HALLS FERRY ROAD
VICKSBURG, MS 39180-6199
W913E5
William Rawe EMAIL: William.T.Rawe@usace.army.mil
10/18/2022
11/17/2022
FAR 52.211-10
u4ctcwtr Highlight
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
BIDDER INQUIRIES
SOLICITATION W913E5-23-R-0001
CRREL MOBILITY LAB UPGRADES
Page 1 of 2 As of 11/10/2022
Inquiry: Would the government accept previously filled out PPQ forms in lieu of sending out the attached PPQ form as some Contracting Officers have been pushing back on the amount of times they fill out PPQ's for certain projects?
Government Response: The Government will accept previously filled out PPQ’s
Inquiry: Please confirm if SECTION 00 45 00 referenced on Standard Form 1442 is suppose to be included within the package. As we are not able to find this Section.
Government Response: Section 00 45 00 was provided in Am-0003.
Inquiry: The RFP refers to this project as a Design-Build, and defines the Design-Build Process in Section 00 21 00 of the specification as follows:
"the procurement of a facility utilizing a Request for Proposal (RFP) to solicit for the design and construction of a facility by a single contractual entity. The contractual entity may be a 'Design-
Build' firm, or joint venture between an architect engineer (A-E) and construction firm, or a construction management (CM) firm joint venture with an A-E and a construction firm."
That said, it does not appear that the specification outlines specific criteria for the Design portion. Please confirm that the government intends for this project to be considered Design-
Build, and if so, please clarify the Architectural/Engineering design requirements/specifications of the project.
Government Response: Technically this is a design-build project but there are no design requirements specified by the government and no design effort that will be evaluated by the government.
Inquiry: Please confirm if taxes should be carried in proposal?
Government Response: Prices submitted shall be inclusive of any taxes the offeror is required to pay. They shall not be listed separately.
Inquiry: Please confirm if any state, local, and/or Federal permits will be required on this project?
Government Response:
A building or construction permit is not needed. Local Hot Work permit will be required for any griding or welding. (DPW can approve them), state licensed propane mechanic, compliance with
EM 385-1-1, no TCE brought on site, and erosion control are required.
Modifications to electrical system shall be coordinated with DPW.
Any level of excavation in this area will need to be coordinated in advance with the CRREL
Facilities Manager. CRREL will need to arrange for TCE monitoring of excavation while the work is being conducted.
BIDDER INQUIRIES
SOLICITATION W913E5-23-R-0001
CRREL MOBILITY LAB UPGRADES
Page 2 of 2 As of 11/10/2022
Inquiry: Please confirm if there are any known hazardous materials?
Government Response: Our records show that there is no asbestos in the building, but there is some on the exterior waterproofing near upper doors. See attachment (Vehicle Storage
Building-Known ACM) for locations of Asbestos Containing materials (ACM).
Inquiry: Are there any additional Plans or Specifications pertaining to this project?
Government Response: All plans and specifications available was issued with the original solicitation.
Inquiry: Are the new doors going in to be installed into existing frames?
Government Response: All overhead doors and pedestrian doors are to be installed in new frames. Overhead doors also need to have new openers and controls run.
Inquiry: Are new doors to be installed Residential door style?
Government Response: All doors shall be commercial grade doors.
Inquiry: Will the government accept CPAR evaluations in lieu of PPQs?
Government Response: CPARS are acceptable in lieu of or in additional to PPQs.
Inquiry: After discussing the schedule of 40 days, we found that 40 days for the Period of
Performance is not enough time. Can the government add 30 days to the Period of
Performance?
Government Response: The period of performance will be changed to 70 days.
Inquiry: Does this project require a separate Superintendent, QC & SSHO person while work is taking place, or can one person do all three hats?
Government Response: A single person may fill these three positions.
Inquiry: The SOW/spec states:
Thermostats: CRREL will accept either: (a) multiple heating / AC systems for each zone described, or (b) one primary centralized heating and AC system for all the zones.
Please confirm whether the government requires just heat or heating/cooling.
Government Response: Only heating is required.
FLOW
BAY NO. 1 BAY NO. 2 BAY NO. 3 BAY NO. 4
6C
10A*
10C**
9B
9A
6A
9C
6B
10B**
Mabbett & Associates, Inc.
5 Alfred Circle Bedford, MA 01730-2318
T. 781-275-6050 - 800-877-6050 www.mabbett.com
COLD REGIONS RESEARCH AND
ENVIRONMENTAL LABORATORY
HANOVER, NH
VEHICLE STORAGE
BUILDING
UPPER LEVEL
* NOT TO SCALE
| Am-0004_W913E5-23-R-0001 |
| Am-0004_W913E5-23-R-0001_Narrative |
| SF 1442 |
| Bidder Inquiries |
| Vehicle Storage Building-Known ACM |
File details come from the government source that posted it. Updated .