4.Appendix_A_Civil_Combined-8-18-17.pdf
PDF 4 MB Posted
- Attached to
- Modular Small Arms Range (MSAR) Federal contract opportunity
- Solicitation number
- W91364-18-R-8000
About this file
Appendix A - Civil
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0.W91364-18-R-8000-0002_MSAR_Sol_Amend.pdf | ||
| Addendum_04_W91364-18-R-8000.pdf | ||
| Addendum_03_MSAR_W91364-18-R-8000.pdf | ||
| 0.W91364-18-R-8000-0001_MSAR_Sol_Amend.pdf | ||
| Addendum_02_MSAR_W91364-18-R-8000.pdf | ||
| Addendum_01_MSAR_W91364-18-R-8000.pdf | ||
| Pre_Bid_Attendance_Roster_6_Dec_17_FINAL.pdf | ||
| 5.Appendix_B_Geotech.pdf | ||
| 1-SEC_01-General_Requirements-MSAR.pdf | ||
| 3-Attachment_2_WD_OH17109_Mod_14_date-10_27_17.pdf | ||
| 8.Appendix_E_B155_Soils_report.pdf | ||
| 6.Appendix_C_Hydrant_Flow_test.pdf | ||
| 7.Appendix_D_Bidding_Schedule.pdf | ||
| 0.W91364-18-R-8000_MSAR_Sol.pdf | ||
| 9.EXHIBITS_A-C_MSAR.pdf | ||
| 2-Attachment_1_MSAR_R1_SOO_20170920.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
180th FIGHTER WING
SWANTON, OHIO
MODULAR SMALL ARMS RANGE
PROJECT 94539
AUGUST 2017
CONTRACT WYTD109008
FINAL SUBMITTAL
C-001 - LEGEND AND ABBREVIATIONS
C-002 - LOCATION AND VICINITY MAP
C-003 - ACCESS AND SAFETY PLAN
C-004 - ACCESS AND SAFETY NOTES
C-005 - EXISTING CONDITIONS PLAN
C-006 - DEMOLITION PLAN
C-101 - SITE PLAN
C-201 - GRADING AND DRAINAGE PLAN
C-301 - UTILITY PLAN
C-501 - SITE DETAILS
SHEET INDEX
C O
P Y
R I G
H T
B
U R
N S
A
D
M c D
O N
N E
L
E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
AutoCAD SHX Text C
CONTOUR
BENCHMARK
BORING LOCATION
SIDEWALKS
BUILDING AND STRUCTURE
TREES AND SHRUBS
COMPACTED EARTH
CRUSHED ROCK AGGREGATE
GAS METER
SPOT ELEVATION
SANITARY SEWER
STORM SEWER
WATER
GAS
ELECTRIC (UNDERGROUND)
FIRE WATER
COMMUNICATIONS
(UNDERGROUND)
WATER VALVE
DEMOLITION OR REMOVAL
DEMOLITION OR REMOVAL
BOLLARD
TREE REMOVAL
NORTH ARROW
CONCRETE
EARTH
RIP RAP
C001
A
C001
C001
A
C001
A
UTILITY POLE
NOTES:
1. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET UNLESS INDICATED OTHERWISE.
2. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE CENTER, EDGE OF
PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE.
3. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND GOVERNMENT
REGULATORY AGENCIES AND THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL AND
GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN
REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST STRINGENT. WHERE A QUESTION REMAINS
ON WHICH REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CONTRACTING OFFICER'S
REPRESENTATIVE IN WRITING. THE DECISION OF THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL BE
CONSIDERED FINAL.
RECORD DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE
PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER'S
REPRESENTATIVE.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING TRACK OF ANY
CONTRACTING OFFICER'S REPRESENTATIVE-APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED
ON APPROVED CONSTRUCTION DRAWINGS. THESE REVISIONS SHALL BE USED TO PREPARE RECORD DRAWINGS OF
COMPLETED CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER CHANGES OR
DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE
NOTED. THIS INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED
DURING CONSTRUCTION.
4. THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF
SUBMITTED RECORD DRAWINGS. IF THE RECORD DRAWINGS ARE CONSIDERED UNACCEPTABLE, THEY SHALL BE
RETURNED TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION.
ANG AIR NATIONAL GUARD
ATFP ANTI TERRORISM/FORCE PROTECTION
BLDG BUILDING
COMM COMMUNICATION
DIA DIAMETER
E EAST OR EASTING
ELEV ELEVATION
FAA FEDERAL AVIATION ADMINISTRATION
FF FINISH FLOOR
FH FIRE HYDRANT
FT FEET
F FIRE WATER
G GAS
GA GAGE OR GAUGE
HH HANDHOLE
ID IDENTIFICATION
IN INCH
INV INVERT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
N NORTH OR NORTHING
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PCC PORTLAND CEMENT CONCRETE
PE POLYETHYLENE
PIV POST INDICATOR VALVE
PV PHOTOVOLTAIC
PVC POLYVINYL CHLORIDE
R RADIUS
SD STORM DRAIN
SS SANITARY SEWER
T THICKNESS
TYP TYPICAL
V VOLTS
W WATER
LEGEND:
CENTERLINE
ATFP SETBACK33' ATFP
GAS VALVE
ELECTRIC (OVERHEAD)
COMMUNICATION MANHOLE
TRANSFORMER
ELECTRIC HANDHOLE
BORING LOCATION
SIGN
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
LETTER OR NUMBER
DESIGNATOR
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE
ON DRAWINGS WITHIN
THE SAME DISCIPLINE)
DRAWING SEQUENCE NUMBER
INDICATES WHERE TITLE IS
LOCATED (MAY NOT BE
PRESENT IF CALLOUT AND
TITLE ARE ON THE SAME
DRAWING)
LEGEND: ABBREVIATIONS:
SECTION, DETAIL, AND ELEVATION
SYMBOL IDENTIFIERS
SECTION, DETAIL, AND ELEVATION
IDENTIFICATION SYSTEM
SECTION CALLOUT EXAMPLE DETAIL CALLOUT EXAMPLE
C O
P Y
R I G
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C001.DWG
C-001
LEGEND AND ABBREVIATIONS
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text
EU
AutoCAD SHX Text
CU
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text H
B-#
CBR 2
CBR 1
CBR 6
C
BR
A
C
BS 1
SAN
L
IF
T S
TATIO
N
SAN
M
H
SAN
P
U
M
P
SAN
M
H
4' W
ID
E H
EAD
W
ALL
I.E
. 1
8" C
O
R
. M
ETAL N
E =
60.9
TELE. M
H 1
RIM
665.63
12" S
TO
RM
.5
664.5
.5
664.5
665.5
664.5
663.5
664.5
664.5
.5
.5
.5
.5
.5
.5
664.5
664.5
664.5
.5
.5
.5
.5
.5
663.5
.5
663.5
4 664.5
664.5
664.5
.5
.5
.5
4" D
I
H
A
N
D
H
O
LE
SAN C
O
ABAN
D
O
N
ED
C
O
M
M
C
BS 1
C
B
S
C
BS 1
T
R
E
N
C
H
D
R
A
IN
ST M
H 1
12" S
TO
R
M
BOTTOM
60.1
ABANDONED C
OMM.
TO
P =
64.8
HAND H
OLE 2
COMM. M
H 5
RIM
664.73
TR
EN
C
H
D
R
AIN
O
VER
H
EAD
S
TEAM
S
U
PPLY
TR
EN
C
H
D
R
AIN
T
R
E
N
C
H
D
R
A
IN
I.E
. 1
8" C
O
R
. M
ETAL N
E =
61.4
SAN LIFT STATION
YW TAXI LIGHT
670.79
YW TAXI LIGHT
670.71
A1
A3
A4
A5
A
A2
W
W
W
W
PROJECT LOCATION
PROJECT
LOCATION
OAK OPENINGS
PARK
TOLDEO
EXPRESS
AIRPORT
HARBOR
VIEW
TOLEDO
TOLEDO
SOUTH
EBER
ROAD
INTERSTATE 80
TOLEDO EXPRESS AIRPORT
AIRPORT HIGHWAY
AIR NATIONAL
GUARD BASE
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
Z:\CLIENTS\ANF\OHNG\94539_OHANGMODSARRFP\DESIGN\CIVIL\SHEETS\WYTD A C002.DWG 8/17/2017 10:43 AM JTSCHNEIDER
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C002.DWG
C-002
LOCATION AND VICINITY MAP
SCALE: 1" = 1000'
J7
BASE LOCATION PLAN
0 2000'1000'
NOT TO SCALE
G1
VICINITY PLAN
NOT TO SCALE
D7
LOCATION PLAN
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text L E G E N D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY A
AutoCAD SHX Text
TXY B1
AutoCAD SHX Text
TXY B1
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY B9
AutoCAD SHX Text
TXY B11
AutoCAD SHX Text
TXY B13
AutoCAD SHX Text
TXY D13
AutoCAD SHX Text
TXY D11
AutoCAD SHX Text
TXY D9
AutoCAD SHX Text
TXY D6
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY B6
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D1
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY N3
AutoCAD SHX Text
TXY N2
AutoCAD SHX Text
RUNWAY 7-25
AutoCAD SHX Text
SANDUSKY
AutoCAD SHX Text
LORAIN
AutoCAD SHX Text
EUCLID
AutoCAD SHX Text
ASHTABULA
AutoCAD SHX Text
CLEVELAND
AutoCAD SHX Text
WARREN
AutoCAD SHX Text
YOUNGSTOWN
AutoCAD SHX Text
KENT
AutoCAD SHX Text
AKRON
AutoCAD SHX Text
ALLIANCE
AutoCAD SHX Text
BARBERTON
AutoCAD SHX Text
STRONGSVILLE
AutoCAD SHX Text
ELYRIA
AutoCAD SHX Text
FREMONT
AutoCAD SHX Text
NORWALK
AutoCAD SHX Text
BOWLING GREEN
AutoCAD SHX Text
DEFIANCE
AutoCAD SHX Text
FOSTORIA
AutoCAD SHX Text
FINDLAY
AutoCAD SHX Text
VAN WERT
AutoCAD SHX Text
LIMA
AutoCAD SHX Text
BUCYRUS
AutoCAD SHX Text
ASHLAND
AutoCAD SHX Text
WOOSTER
AutoCAD SHX Text
MASSILLON
AutoCAD SHX Text
CANTON
AutoCAD SHX Text
EAST LIVER POOL
AutoCAD SHX Text
NEW PHILADELPHIA
AutoCAD SHX Text
STEUBENVILLE
AutoCAD SHX Text
MT. VERNON
AutoCAD SHX Text
COSHOCTON
AutoCAD SHX Text
CAMBRIDGE
AutoCAD SHX Text
NEWARK
AutoCAD SHX Text
ZANESVILLE
AutoCAD SHX Text
GAHANNA
AutoCAD SHX Text
LANCASTER
AutoCAD SHX Text
WESTERVILLE
AutoCAD SHX Text
UPPER ARLINGTON
AutoCAD SHX Text
BELLEFONTAINE
AutoCAD SHX Text
SIDNEY
AutoCAD SHX Text
SCIOTO
AutoCAD SHX Text
MARION
AutoCAD SHX Text
MANSFIELD
AutoCAD SHX Text
GREENVILLE
AutoCAD SHX Text
SPRINGFIELD
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
BEAVERCREEK
AutoCAD SHX Text
WASHINGTON COURT HOUSE
AutoCAD SHX Text
KETTERING
AutoCAD SHX Text
MIDDLETOWN
AutoCAD SHX Text
HAMILTON
AutoCAD SHX Text
FAIRFIELD
AutoCAD SHX Text
CINCINNATI
AutoCAD SHX Text
HILLSBORO
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
CHILLICOTHE
AutoCAD SHX Text
ATHENS
AutoCAD SHX Text
GALLIPOLIS
AutoCAD SHX Text
PORTSMOUTH
AutoCAD SHX Text
MARIETTA
AutoCAD SHX Text
MUSKINGUM
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
IRONTON
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
COLUMBUS
AutoCAD SHX Text
CIRCLEVILLE
AutoCAD SHX Text
CAMPBELL
AutoCAD SHX Text
HILL 1549
AutoCAD SHX Text
PARMA
AutoCAD SHX Text
PYMATUNING
AutoCAD SHX Text
RESERVOIR
AutoCAD SHX Text
CUYAHOGA FALLS
AutoCAD SHX Text
RIVER ROAD
AutoCAD SHX Text
SWANTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FREMONT PKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
OHIO TURNPIKE
AutoCAD SHX Text N
ST
ON
E
DR
IV
E
ST
ON
E
DR
IV
E
S
TO
NE
D
RI
VE
SWALE
BLDG #127
SHED
LANDSCAPE
CANOPY
SHED
BL
DG
SW
AL
E
BLDG #118 1'
W
AL
L
F-
MONITORING
WELLS
SW
AL
E
SW
AL
E
BLDG #125
BL
DG
BL
DG
ASPHALT PARKING AREA
ASPHALT
BLDG #139
SHED
SHED
SHED
ASPHALT PARKING AREA
ASPHALT PARKING AREA
ASPHALT PARKING AREA
ASPHALT PARKING AREA
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT PARKING AREA
CONCRETE
CO
NC
RE
TE
D
RI
VE
ASPHALT
BLDG #113 BLDG #114
BLDG #110
BLDG #112
BLDG #101
BLDG #321
BLDG #102
BLDG #124
BLDG #313
BLDG #115
BLDG #131
BLDG #137
BLDG #103
BLDG #138
SW
AL
E
SW
AL
E
SWALE
DI
TC
H
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CANOPY
CA
NO
PY
EDGE OF POND
A
A
A
A
A
A
F
F
F
F
F
F
F
BLDG #136
BLDG #120
BL
DG
BLDG #134
BLDG #128
BLDG #129
ASPHALT
ASPHALT
ASPHALT
DIRT MOUNDS
DIRT MOUNDSDEBRIS PILE
EDGE OF WOODS
ASPHALT PARKING AREA
ASPHALT PARKING AREA
ASPHALT PARKING AREA
STONE DRIVE
ST
ON
E
DR
IV
E
STONE DRIVE
SWALE
SWALE
SWALE
SW
AL
E
DI
TC
H
DI
TC
H
DITCH
DITC
H
DITCH
BLDG #148
BLDG #117
ASPHALT
FUEL TANKS
SMALL ARMS
RANGE
STONE DRIVE
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
BLDG #155
BLDG #150 BLDG #140
BLDG #141
BLDG #145
BLDG #151
BLDG #152 BLDG #154
BLDG #153
222 226
BLDG #146
SOLAR (PV) FIELD
ASPHALT
PARKING AREA
A
SP
HA
LT
P
AR
KI
NG
A
RE
A
ASPHALT
ASPHALT
ASPHALT
ASPHALT
STONE DRIVE
STONE DRIVE
STONE DRIVE
ST
ON
E
AS
PH
AL
T
EDGE OF WOODS
EDGE OF WOODS
EDGE OF WOODS
ASPHALT
EDGE OF WOODS
DI
TC
H
ASPHALT PARKING AREA
EDGE OF WOODS
MAIN GATE
E B
R
R
O
A D
CONTRACTOR
ACCESS (TYP)
SOLAR PV FIELD
MODULAR SMALL ARMS
RANGE WORK AREA
SURVEY NOTES:
1. SURVEY WAS PERFORMED IN MARCH 2009 BY T.R. WORLINE AND ASSOCIATES; SWANTON, OHIO.
2. HORIZONTAL CONTROL IS IN ACCORDANCE WITH STATE PLANE COORDINATE SYSTEM - OHIO NORTH
ZONE - NAD 1983 BASED ON LUCAS COUNTY BENCHMARKS.
LUCAS COUNTY BENCHMARK #678
N 697830.63
E 1611222.55
BRASS PLATE MARKED VAN FLEET
N 695258.48
E 1611224.14
SURVEY BENCHMARK 1703
N 702566.00
E 1614808.60
SURVEY BENCHMARK 1704
N 702061.26
E 1614631.42
SURVEY BENCHMARK 1705
N 702324.97
E 1615253.83
SURVEY BENCHMARK 1706
N 702020.79
E 1615015.66
SURVEY BENCHMARK 1707
N 701280.16
E 1614390.13
SURVEY BENCHMARK 1713
N 702309.89
E 1616435.46
3. VERTICAL CONTROL BASED ON NGVD 1929 DATUM US STANDARD SURVEY FEET.
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C003.DWG
C-003
ACCESS AND SAFETY PLAN
SCALE: 1" = 200'
I1
ACCESS AND SAFETY PLAN
400'0 200'
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text 34-16
AutoCAD SHX Text 34-16
AutoCAD SHX Text 11590
AutoCAD SHX Text
TC
AutoCAD SHX Text 662.63
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 19237
AutoCAD SHX Text C
AutoCAD SHX Text 666.79
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ACCESS AND SAFETY NOTES:
I. ACCESS AND STAGING:
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT,
AND DELIVERIES ARE ILLUSTRATED ON DRAWING C003 AND ARE SUBJECT TO THE
APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES WITH THE
APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS
ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE
CONTRACTING OFFICER'S REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE PROJECT SITE, BASE, AND AIRFIELD.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL
ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL
PROJECT AREAS, AIRFIELD AREAS, AND EXISTING ROADWAYS AT ALL TIMES WITHOUT
DELAY TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES,
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE, POLICE,
LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS
CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION
LIMITS UNLESS COORDINATED OTHERWISE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA
FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING IS SUBJECT
TO THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE. CONTRACTOR
MAY SUBMIT ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN.
CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE
CONTRACTING OFFICER'S REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE PROJECT SITE, BASE, AND AIRFIELD.
7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND
VEHICLES SHALL BE PARKED IN THE STAGING AREA.
8. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A
PROFESSIONALLY PAINTED SIGN, MEETING CONTRACTING OFFICER'S REPRESENTATIVE
APPROVAL, TO DIRECT MATERIAL SUPPLIERS, EMPLOYEES, AND DELIVERIES TO THE
CONSTRUCTION SITE. THE SIGN SHALL READ “CONSTRUCTION VEHICLES ONLY - NO
VENDORS ALLOWED.”
9. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING
OFFICER'S REPRESENTATIVE REGARDING CONSTRUCTION DELIVERIES PRIOR TO THOSE
DELIVERIES. DELIVERIES SHALL BE SCHEDULED MONDAY-FRIDAY, 8:00 AM TO 3:00 PM.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY
WHEN ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE
A CURRENT AND VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS,
AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION AND INSURANCE.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR
COORDINATING WITH THE BASE SECURITY OFFICE IN OBTAINING PROPER SECURITY
CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS.
12. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY
THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO
THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
II. AIRFIELD OPERATIONS COORDINATION:
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED IN FEDERAL
AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC) 150/5370-2E, OPERATIONAL
SAFETY ON AIRPORTS DURING CONSTRUCTION (CURRENT EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA WITHOUT
CLEARANCE FROM BASE AND AIRFIELD OPERATIONS AND THE CONTRACTING OFFICER'S
REPRESENTATIVE, AND SHALL CONDUCT WORK IN SUCH A MANNER TO ENSURE A
MINIMUM HINDRANCE TO AVIATION OPERATIONS. PEDESTRIAN TRAFFIC AND PRIVATELY
OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT OPERATIONS AREA.
3. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT
AND HELICOPTER LANDING GEAR, PROPELLERS AND ROTORS, OR OF BEING INGESTED
BY JET ENGINES, SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT OPERATION AREAS.
CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED ONTO
AIRFIELD FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS TO PREVENT FOREIGN
OBJECT DAMAGE (FOD). STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER
TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET BLAST
III. EQUIPMENT AND STOCKPILE HEIGHT:
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN
AIRCRAFT OPERATIONS AREA IS GOVERNED BY FEDERAL AVIATION ADMINISTRATION
(FAA) ADVISORY CIRCULAR AC 150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS).
WHEN EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR
WHEN CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER'S REPRESENTATIVE AND BASE AND
AIRPORT OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO COORDINATE THE
SUBMITTAL OF FAA FORM 7460-1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE
CRANES SHALL BE ISSUED BY BASE AND AIRPORT OPERATIONS AND THE CONTRACTING
OFFICER'S REPRESENTATIVE AFTER APPROVAL BY THE FAA.
2. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS
LOWERED TO THEIR LOWEST ELEVATION.
3. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN
ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE AVIATION SURFACES. ALL
STOCKPILES ADJACENT TO AIRCRAFT OPERATIONS AREA SHALL BE IDENTIFIED WITH A
360-DEGREE RED OBSTRUCTION LIGHT PLACED AT THE HIGHEST POINT OF THE
STOCKPILE. STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS
PROHIBITED.
IV. OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL
APPLICABLE PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT
AND REMEDY ANY SAFETY CONCERNS IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE OR AIRPORT PROPERTY. ANY
TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE
THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE
CONTRACTING OFFICER'S REPRESENTATIVE.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED
EQUIPMENT WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
6. ALL WORK SHALL BE CONSTRUCTED IN COMPLIANCE WITH THE 1994 PART 91 SOIL
EROSION AND SEDIMENT CONTROL OF THE NATURAL RESOURCES AND ENVIRONMENTAL
PROTECTION ACT (1994). CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
REQUIREMENTS WITH STATE AND LOCAL AUTHORITIES AND SUBMITTING DOCUMENTS
FOR PERMITTING.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES,
STAGING AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL
EROSION AND STORM WATER RUNOFF.
8. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY
CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO THE BASE AND AIRPORT
OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT
SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE.
9. GASOLINE, DIESEL FUEL, OIL, AND OTHER HAZARDOUS WASTE RESULTING FROM
CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN
ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS
AND PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS
ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
10.IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF ANY WATER
LINES OR FIRE HYDRANTS ON PROJECT PROPERTY OR ADJOINING PROPERTY, THE
CONTRACTOR SHALL PROVIDE A MINIMUM ADVANCE NOTICE OF 48 HOURS TO THE LOCAL
FIRE AUTHORITY AND ALL OTHER EMERGENCY SERVICES.
11.FAILURE TO COMPLY WITH BASE AND AIRPORT OPERATIONS AND THE CONTRACTING
OFFICER'S REPRESENTATIVE SAFETY REQUIREMENTS SHALL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE
ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING
OFFICER'S REPRESENTATIVE.
12. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE AND
AIRPORT OPERATIONS SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA AND
SHALL NOT BE PERMITTED TO RETURN THROUGHOUT THE REMAINDER OF THE PROJECT.
V. MISCELLANEOUS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN AND PROPOSED
PROJECT SCHEDULE TO THE CONTRACTING OFFICER'S REPRESENTATIVE FOR
APPROVAL. THE SAFETY PLAN SHALL IDENTIFY THE FOLLOWING ITEMS:
a. PROPOSED ACCESS POINTS, HAUL ROUTES, AND STAGING AREA.
b. TEMPORARY MARKING AND SIGNAGE TO BE USED, IF ANY.
c. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL DEVICES.
d. AREAS TO WHICH CONSTRUCTION OPERATIONS SHALL BE LIMITED.
e. METHODS BY WHICH THE CONTRACTOR SHALL COMMUNICATE WITH THE BASE
AND THE CONTRACTING OFFICER'S REPRESENTATIVE.
2. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT
TO THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE, WHO SHALL BE
PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE
WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE
AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE
REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND
CONTACT INFORMATION OF REPRESENTATIVES TO THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION
BETWEEN ANY SUBCONTRACTORS AND THE CONTRACTING OFFICER'S REPRESENTATIVE.
ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED
AND APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION
WORK AREA AND ASSOCIATED ROADWAYS BY USING BARRICADES APPROVED BY THE
CONTRACTING OFFICER'S REPRESENTATIVE.
5. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY
DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. CONTRACTOR
SHALL PROVIDE EACH VEHICLE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD
BE AT LEAST 3 FEET SQUARE HAVING INTERNATIONAL ORANGE AND WHITE CHECKERED
PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
6. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN
ALARM WHEN MOVING IN REVERSE.
7. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
8. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
9. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 WEEK TO BASE AND THE
CONTRACTING OFFICER'S REPRESENTATIVE FOR ROAD CLOSURE PRIOR TO THE ROAD
REQUIRING CLOSURE.
10.PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE
CONTRACTOR SHALL REQUEST THE CONTRACTING OFFICER'S REPRESENTATIVE TO
SCHEDULE AN INSPECTION. NO ROADWAY SHALL BE RE-OPENED UNTIL THE
CONTRACTING OFFICER'S REPRESENTATIVE HAS COMPLETED INSPECTION AND
APPROVED THE RE-OPENING OF AREA.
11.CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR
FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL TRAINING COURSE.
12. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION
EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS
TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER'S
REPRESENTATIVE.
13.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION,
TRENCHING, AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL
REGULATIONS AND OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA)
REGULATIONS FOR CONSTRUCTION.
14.OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE
PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS
ACCEPTABLE TO THE CONTRACTING OFFICER'S REPRESENTATIVE.
15.CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER'S REPRESENTATIVE A
COMPLETED AF 103 SEVEN DAYS PRIOR TO STARTING ANY EXCAVATION, DEMOLITION,
OR DISTURBANCE OF ANY FACILITY GREATER THAN 4 INCHES IN DEPTH. CONTRACTOR
SHALL MARK THE LIMITS OF THE AREA TO BE DISTURBED A MINIMUM OF 48 HOURS PRIOR
TO BEGINNING WORK. CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED AF 103
ON SITE ALL TIMES.
16.DEWATERING OF TRENCHES AND EXCAVATIONS MAY BE REQUIRED.
17.CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S
REPRESENTATIVE A MINIMUM OF 7 DAYS PRIOR TO REQUESTING A SHUT DOWN OR
INTERRUPTION OF ANY EXISTING UTILITY.
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C004.DWG
C-004
ACCESS AND SAFETY NOTES
A 8/18/17 CAS KNR ISSUED FOR BID
663.0
.0
.0
.0
663.0
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
C
C
C
C
W
W W
A L
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
C
C
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
S T
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W
W
W
W
W
AL
ALAL
AL
AL
G
G
C
C
C
C
C
C
C
G
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
G
G
G
G
G
G
G G
W
W
W
W
W W
W W
W
ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST
AL
A L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
S A
S
A
S
A
S
A
S
A
S
A
S
A
A
L
A
L
A L
A L
A L
A L
A L
A L
A L
A L
AL
AL
AL
AL
A
L
SUBSURFACE INVESTIGATION
NOTES:
1. GEOTECHNICAL INVESTIGATIONS WERE PERFORMED BY BOWSER
MORNER IN 2006 AND 2010. THE RESULTS OF THE INVESTIGATION
ARE CONTAINED IN THE PROJECT GEOTECHNICAL REPORT.
BORING LOCATION SHOWN ON THIS DRAWING ARE APPROXIMATE.
SEE APPENDIX B IN PERFORMANCE WORK STATEMENT FOR
BORING LOGS.
G
P
E
ELECTRIC
HH7
(3)#2 AWG 15kV, (1)#2 AWG 600V
2 X 5" PVC
CONDUITS
CONCRETE
ENCLOSED
S21
S20
C
O
R
R
U
G
A
T
E
D
P
L
A
S
T
I
C
WEATHER
MONITOR
TREELINE
4"SS
6"W (DUCTILE
IRON)
WATER
VALVE 110
FH 26
WATER VALVE
109 (CAPPED)
GAS VALVE
CB-15
S
D
W
U C
T I L
E
I R
O N
ELECTRIC
HH6
WATER VALVE
COMM MH 18
(6 ) 4
C O
M M
(P V
C
2"G (PE)
6"W (DUCTILE
IRON)
BUILDING 155
LOGISTICS SUPPLY
COMPLEX
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND
UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM
EXISTING RECORDS, MASTER PLANS, AND FIELD SURVEYS.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE
PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND
SURVEY INFORMATION, AND TO TAKE NECESSARY
PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION.
THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING
CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE
BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN
THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE
CONTRACTING OFFICER'S REPRESENTATIVE BEFORE ANY
FURTHER WORK COMMENCES. IN THE EVENT AN
UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE IS
ENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS
NOT TO BE DAMAGED DURING DEMOLITION AND
CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR
REPLACE DAMAGED OR DISTURBED ITEMS TO THE
SATISFACTION OF THE CONTRACTING OFFICER'S
REPRESENTATIVE.
4. NUMBERS AND NAMES OF UTILITY STRUCTURES ARE
ASSOCIATED WITH BASE MASTER UTILITY FILES.
ACCESS ROAD
LOADING RAMP
B-7 c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C005.DWG
C-005
EXISTING CONDITIONS PLAN
SCALE: 1" = 20'
J1
EXISTING CONDITIONS PLAN
40'10'0 20'
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 19237
AutoCAD SHX Text C
AutoCAD SHX Text 666.79
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
SS
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702000.00
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
C
C
C
C
W
W W
A L
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
C
C
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
S T
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W
W
W
W
W
AL
ALAL
ALAL
G
G
C
C
C
C
C
C
C
G
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
G
G
G
G
G
G
G G
W
W
W
W
W W
W W
W
ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST
AL
A L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
S A
S
A
S
A
S
A
S
A
S
A
S
A
A
L
A
L
A L
A L
A L
A L
A L
A L
A L
A L
AL
AL
AL
AL
A
L
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY
MATERIALS SHALL BE DISPOSED OF OFF BASE.
2. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY
OF THE FOLLOWING MATERIALS: AGGREGATE, CONCRETE,
ASPHALT, MASONRY, FOUNDATIONS, REBAR, FENCE
MATERIAL, PIPING, AND MISCELLANEOUS STRUCTURES.
LARGE PIECES OF MATERIAL MAY NEED TO BE CRUSHED
AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED
AWAY TO THE WASTE DISPOSAL SITE.
3. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN
SHALL BE REPAIRED OR REMOVED AND REPLACED AT NO
ADDITIONAL COST TO GOVERNMENT.
4. SPECIAL HANDLING AND CONSIDERATION SHALL BE
REQUIRED FOR EXCAVATED SOILS THOUGHT TO CONTAIN
PETROLEUM-BASED, CONTAMINATED, OR HAZARDOUS
SUBSTANCES. CONTRACTOR SHALL PERIODICALLY MONITOR
EXCAVATED SOILS. SOILS SHALL BE TREATED ON SITE OR
DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE
PROJECT SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE REMOVAL OF PETROLEUM-BASED,
CONTAMINATED, AND HAZARDOUS MATERIALS WITH
CONTRACTING OFFICER'S REPRESENTATIVE.
UTILITY DEMOLITION NOTES:
1. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE
CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO
BEGINNING WORK. CONTRACTOR SHALL CONTACT THE
CONTRACTING OFFICER'S REPRESENTATIVE AND ALL
ASSOCIATED UTILITY COMPANIES AND AGENCIES TO
IDENTIFY THE LOCATION OF UTILITIES. UTILITIES
PRESENTED ON THIS DRAWING ARE APPROXIMATE AND ARE
SHOWN BASED ON THE BEST AVAILABLE INFORMATION.
2. IN THE EVENT AN UNEXPECTED UTILITY INTERFERENCE IS
ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE. ANY UTILITY SERVICES DISTURBED BY
THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED
IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE
SATISFACTION OF THE CONTRACTING OFFICER'S.
3. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE PRIOR TO REMOVAL OF
EXISTING UTILITIES IN SERVICE. RELOCATED UTILITIES
SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING
UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO THE
FACILITIES SERVED BY THE UTILITY. ALL RELOCATIONS
SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE.
4. IN AREAS OF UTILITY REMOVAL OF ABANDONED LINES, THE
PORTION OF EXISTING ABANDONED LINES TO REMAIN SHALL
BE CAPPED OR PLUGGED AT REMOVAL INTERFACE.
BUILDING 155
LOGISTICS SUPPLY
COMPLEX
TREE REMOVAL
KEYED DEMOLITION NOTES:
SALVAGE WEATHER MONITOR AND RETURN TO THE
GOVERNMENT IN USABLE CONDITION.
REMOVE TREES TO LIMITS SHOWN.
50'±170'±
BLDG 158
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C006.DWG
C-006
DEMOLITION PLAN
DEMOLITION PLAN
40'10'0 20'
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 19237
AutoCAD SHX Text C
AutoCAD SHX Text 666.79
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
SS
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL SITE NOTES:
1. ATFP REQUIREMENTS MAY NOT APPLY. OFFSET SHOWN
FOR GENERAL INFORMATION.
2. MODULAR BUILDING AREA LIMITS SHOWN FOR
INFORMATION ONLY. CONTRACTOR SHALL PROVIDE A
BUILDING AREA PAD THAT EXTENDS A MINIMUM OF 4 FEET
BEYOND THE OUTSIDE WALL OF THE FINAL MODULAR UNIT
FOOTPRINT. THAT LIMIT SHALL BE THE FINAL MODULAR
BUILDING AREA LIMIT AND THE AGGREGATE DRIVES, ETC.
SHALL BE MEASURED FROM THAT LIMIT.
3. PROVIDE 4" MINIMUM AGGREGATE SURFACING FOR
MODULAR BUILDING AREA EXCLUSIVE OF CONCRETE
FOUNDATION AND LANDINGS. GRADATION SHALL NOT
VARY FROM LOW LIMIT ON ONE SIEVE TO HIGH LIMIT ON
ADJACENT SIEVE OR VICE VERSA. TEST BY ASTM C136 AND
C117, AND CONFORM TO ITEMS 304 (BASE COURSE) AND
703 (SURFACE COURSE) OF THE STATE OF OHIO
DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND
MATERIAL SPECIFICATIONS.
4. PROVIDE MINIMUM 5' x 5' CONCRETE LANDINGS AT ALL
EXTERIOR DOORS.
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
Z:\CLIENTS\ANF\OHNG\94539_OHANGMODSARRFP\DESIGN\CIVIL\SHEETS\WYTD A C101.DWG 8/17/2017 11:01 AM JTSCHNEIDER
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C101.DWG
C-101
SITE PLAN
SITE PLAN
40'10'0 20'
25'±
70'±
A T
P
A
N D
O F
F
S
O T
E
25'±
BUILDING AREA
(SEE NOTE 2)
GRAVEL ACCESS DRIVE
BUILDING 158
BUILDING 155
LOGISTICS SUPPLY
COMPLEX
20'±
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
SS
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 19237
AutoCAD SHX Text C
AutoCAD SHX Text 666.79
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702000.00
663.0
.0
.0
.0
663.0
GENERAL GRADING NOTES:
1. EXTERIOR FINISH GRADES AT BUILDING ENTRANCES
AND EGRESSES SHALL BE 0.6 INCHES BELOW BUILDING
FINISH FLOOR UNLESS INDICATED OTHERWISE.
2. EXTERIOR FINISH GRADES ADJACENT TO BUILDING
SHALL BE 6.00 INCHES BELOW BUILDING FINISH FLOOR
UNLESS INDICATED OTHERWISE.
3. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL
TIMES DURING CONSTRUCTION. ANY DRAINAGE
FEATURE OR STRUCTURE DISTURBED DURING
CONSTRUCTION SHALL BE RESTORED TO EXISTING
CONDITIONS OR BETTER SUBJECT TO THE APPROVAL
OF THE CLIENT REPRESENTATIVE.
4. SURFACES AROUND FACILITY SHALL BE GRADED TO
PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDINGS
AND PAVEMENTS.
5. THE CONTRACTOR SHALL REMOVE STANDING WATER
FROM THE PROJECT WORK LIMITS AS NECESSARY TO
PROTECT SUBGRADE, SUBBASE, AND/OR BASE COURSE
OF NEW PAVEMENT, SURROUNDING
PAVEMENT-TO-REMAIN, OR OTHER COMPLETED
WORKS.
6. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE
RE-VEGETATED.
7. STORM WATER DETENTION AREA LIMITS ARE SHOWN TO
INDICATE ONE POSSIBLE AREA THAT MAY BE USED FOR
DETENTION. CONTRACTOR SHALL BE RESPONSIBLE
FOR DESIGNING THE STORM WATER DETENTION
SYSTEM AND DETERMINING THE AREA NEEDED AND
FINAL LOCATION AND DETAILS,
BUILDING 155
LOGISTICS SUPPLY
COMPLEX
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C201.DWG
C-201
GRADING AND DRAINAGE PLAN
GRADING AND DRAINAGE PLAN
40'10'0 20'
BUILDING 158
MODULAR BUILDING AREA
FFE: 100 YR FLOOD +1
FOOT (MIN.)
STORMWATER DETENTION
AREA (SEE NOTE 7)
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
SS
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702000.00
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
A L
C
C
C
C
W
W W
A L
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
AL
C
C
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
S T
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W
W
W
W
AL
AL
AL
ALAL
G
G
C
C
C
C
C
C
C
G
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
G
G
G
G
G
G
G G
W
W
W
W
W W
W W
W
ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST
AL
A L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A L
A L
A L
A L
A L
A L
A
L
A L
A L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
S A
S
A
S
A
S
A
S
A
S
A
S
A
A
L
A
L
A L
A L
A L
A L
A L
A L
A L
A L
AL
AL
AL
AL
A
L
(3)#2 AWG 15kV, (1)#2 AWG 600V
2 X 5" PVC
CONDUITS
CONCRETE
ENCLOSED
BUILDING 155
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED
OTHERWISE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
UTILITY CONNECTIONS WITH MODULAR UNITS.
3. CONTRACTOR SHALL CONTACT THE CLIENT
REPRESENTATIVE AND ALL ASSOCIATED UTILITY
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION
OF UTILITIES PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL COORDINATE ALL REQUIRED
UTILITY SHUTDOWNS FOR UTILITY CONNECTIONS WITH
THE CLIENT REPRESENTATIVE.
5. CONNECTION TO EXISTING UTILITY MAINS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH ALL
REQUIREMENTS OF ASSOCIATED UTILITY COMPANIES
AND AGENCIES.
6. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE
AS FOLLOWS UNLESS INDICATED OTHERWISE:
WATER: 60 INCHES
FIRE PROTECTION: 60 INCHES
ELECTRICAL AND COMMUNICATION: 36 INCHES
ALL OTHER UTILITIES: 42 INCHES
7. ALL UTILITY STRUCTURES SHALL BE H-20 RATED.
8. COVERS AND CASTINGS OF MANHOLES AND
STRUCTURES SHALL BE PER THE LOCAL STANDARDS.
9. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE
APPROVED BY THE CLIENT REPRESENTATIVE.
10.THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED
AT ALL TEES, BENDS, OR ELBOWS OF PRESSURIZED
PIPING.
S c a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C301.DWG
C-301
UTILITY PLAN
UTILITY PLAN
40'0 20'
KEYED NOTES:
CONNECT TO EXISTING WATER LINE AND EXTEND TO
NEW FACILITY TO PROVIDE SERVICE FOR NEW FIRE
HYDRANT.
CONNECT TO EXISTING GAS LINE.
INSTALL NEW FIRE HYDRANT (INCLUDING BOLLARDS).
EXTEND NATURAL GAS TO CONNECTION(S) AT
MODULAR UNIT(S) IN ACCORDANCE WITH
MANUFACTURER'S AND CLIENT REPRESENTATIVE'S
REQUIREMENTS.
EXTEND ELECTRIC SERVICE TO CONNECTION(S) AT
MODULAR UNIT(S) IN ACCORDANCE WITH
MANUFACTURER'S AND CONTRACTING OFFICER'S
REPRESENTATIVE'S REQUIREMENTS.
EXISTING SPLICE WITH A LOOP ON EACH END IN
MANHOLE 6. CONNECT TO EXISTING ELECTRICAL
MANHOLE. PROVIDE NEW CABLE AS REQUIRED.
CONNECT TO EXISTING COMMUNICATIONS MANHOLE.
EXTEND COMMUNICATION LINE(S) TO CONNECTION(S)
AT MODULAR UNIT(S) IN ACCORDANCE WITH
MANUFACTURER'S AND CONTRACTING OFFICER'S
REPRESENTATIVE'S REQUIREMENTS.
PROVIDE SECTIONALIZING CABINET FOR CONNECTION
TO EXISTING POWER FEEDER IN MH6.
PROVIDE ELECTRICAL TRANSFORMER, MAIN PANEL
BOARD, AND EQUIPMENT PADS.
PROVIDE 3-CELL FABRIC INNERDUCT IN EXISTING
DUCT. PROVIDE FIBER OPTIC BACKBONE AND
COPPER BACKBONE IN SEPARATE CELLS.
UTILIZE EXISTING DUCTBANK WHERE POSSIBLE.
PROVIDE CABLE IN EXISTING SPACE DUCT. PROVIDE
NEW DUCTBANK IF SUFFICIENT SPACE DOES NOT
EXIST.
BORE UNDER EXISTING ROAD. PROVIDE NEW
DUCTBANK AND CABLE.
PROVIDE COMMUNICATIONS DUCTBANK AND CABLE.
PROVIDE NEW DUCTBANK AND CABLE.
CONTRACTOR SHALL COORDINATE REQUIREMENTS
AND FINAL TERMINATIONS WITHIN BUILDING 155.
EXISTING COMMUNICATIONS
MANHOLE MH18
EXISTING FIRE
HYDRANT #26
BUILDING 158
MODULAR BUILDING
AREA
SCALE: 1" = 30'
B1
UTILITY PLAN
60'0 30'
SEE B1 THIS SHEET FOR CONTINUATION
SEE J1 THIS SHEET FOR CONTINUATION
EXISTING POWER MANHOLE MH6
PROVIDE 4' x 4' x 4' INNER DIMENSION
COMMUNICATIONS MANHOLE MH18A
NEW POWER MANHOLE
208Y/120V, 3 PHASE,
4 WIRE PANELBOARD
12.47 KV DELTA TO
208Y/120V PAD
MOUNTED
TRANSFORMER
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text E 1615700.00
AutoCAD SHX Text E 1615800.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702300.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text E 1615900.00
AutoCAD SHX Text N 702200.00
AutoCAD SHX Text N 702100.00
AutoCAD SHX Text N 702000.00
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
SS
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text ss
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text N 701800.00
AutoCAD SHX Text N 701900.00
AutoCAD SHX Text N 701800.00
AutoCAD SHX Text N 701900.00
AutoCAD SHX Text E 1615500.00
AutoCAD SHX Text E 1615600.00
AutoCAD SHX Text
2"G (PE)
AutoCAD SHX Text
12"W (DUCTILE IRON)
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text a r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 141312111098765432
J
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
180th FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
94539 ---
MODULAR SMALL ARMS RANGE
PROJECT NO: WYTD109008
K. ROBERTSC. STEWART
J. SCHNEIDER09/08/16
WYTD A C501.DWG
C-501
SITE DETAILS
6" CRUSHED
AGGREGATE
SURFACE COURSE
36" COMPACTED
SUBGRADE
COMPACTED BACKFILL
FULL DEPTH SAW CUT (TYP.)
TACK COAT
ASPHALTIC CONCRETE, 4" MIN.
EXISTING
BASE
EXISTING
ASPHALTIC
CONCRETE
CRUSHED ROCK BASE
COURSE, 6" MIN
12" EXCAVATION LIMITS
NOTES:
1. THICKNESS OF ALL REPLACEMENT COURSES SHALL BE EQUAL
TO EXISTING BUT SHALL NOT BE LESS THAN INDICATED.
2. BASE COURSE SHALL BE ASPHALTIC CONCRETE BASE TO
REPLACE ALL OTHER BASE MATERIALS.
NOTES:
NOTES:
DANGER
FIRING IN
PROGRESS
WHEN RED LIGHT IS LIT
NOT TO SCALE
B3
BOLLARD DETAIL
NOT TO SCALE
B7
SIGN DETAIL
NOT TO SCALE
J7
PAVEMENT REMOVAL AND REPLACEMENT DETAIL
NOT TO SCALE
B1
CRUSHED AGGREGATE
SURFACE COURSE DETAIL
A
A 8/18/17 CAS KNR ISSUED FOR BID
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
MIN
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
6" STD WT STEEL PIPE WITH SAFETY YELLOW PAINT. (FILL WITH CONCRETE)
AutoCAD SHX Text
SIGNS TO BE 18 GAUGE STEEL W/ BAKED ENAMEL FINISH
AutoCAD SHX Text FLANGED STEEL SIGN POST (GREEN BAKED ENAMEL 8'x3 /8" WIDE)
AutoCAD SHX Text
SET STEEL POST IN CONCRETE
AutoCAD SHX Text
1. PREPARE SURFACE IN FIELD PREPARE SURFACE IN FIELD BY SSPC-SP3 METHODS TO SSPC-SP6 QUALITY AND 1.0 MIL MIN PROFILE DEPTH. FIRST COAT IS TO BE ALKYD PRIMER AT MIN 40% SOLIDS BY VOLUME. APPLIED AT 2 MILS DRY. SECOND AND THIRD COATS ARE TO BE ALKYD GLOSS ENAMEL MIN 40% SOLIDS BY VOLUME. EACH COAT APPLIED AT 1.5 MILS DRY. TOTAL COATING 5 MIL MIN DRY FILM. 2. ALL GUARD POSTS NEAR ALL GUARD POSTS NEAR MECHANICAL EQUIPMENT PADS SHALL BE NO FURTHER THAN 18-INCHES FROM THE PAD. 3. ISOLATION JOINTS SHALL ISOLATION JOINTS SHALL SURROUND POSTS EMBEDDED IN PAVEMENT.
AutoCAD SHX Text
1. SIGN WORDING, SHAPE, AND SIGN WORDING, SHAPE, AND COLOR SHALL BE APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE. 2. SIGN FOR SIGN FOR LOW-EMISSION/FUEL EFFICIENT PARKING SHALL STATE "LOW-EMISSION OF FUEL EFFICIENT VEHICLE PARKING ONLY" OR AS APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE. 3. SIGN POST SHALL BE SIGN POST SHALL BE MINIMUM 2'-0" CLEAR FROM BACK OF CURB OR AT BACK OF SIDEWALK IF SIDEWALK IS ADJACENT TO CURB.ADJACENT TO CURB.
SEE NOTE 1
| 000 COVER |
| C-001 LEGEND AND ABBREVIATIONS |
| C-002 LOCATION AND VICINITY MAP |
| C-003 ACCESS AND SAFETY PLAN |
| C-004 ACCESS AND SAFETY NOTES |
| C-005 EXISTING CONDITIONS PLAN |
| C-006 DEMOLITION PLAN |
| C-101 SITE PLAN |
| C-201 GRADING AND DRAINAGE PLAN |
| C-301 UTILITY PLAN |
| C-501 SITE DETAILS |