W91364-12-B-0003-0001.doc

DOC document 46 KB Posted

Attached to
Predator Operations Center at Springfield Air National Guard Base
Solicitation number
W91364-12-B-0003
Issued by

About this file

SF 30 Amendment 0001 to Solicitation W91364-12-B-0003

View the file

Other files

File Type Posted
Predator_OC_Bid_Opening_Sign_In.pdf PDF
Predator_OC_Bid_Abstract_Signed.pdf PDF
Squad Ops Electric One Line.pdf PDF
Squad Ops plumbing sanitary.pdf PDF
Squad Ops Breaker Panels.pdf PDF
Springfield Squad Ops Original Dwgs 1 of 3.pdf PDF
Squad Ops - Floor Plan.pdf PDF
Springfield Squad Ops Original Dwgs 3 of 3.pdf PDF
Predator Q A.docx DOCX document
Springfield Squad Ops Original Dwgs 2 of 3.pdf PDF
Squad Ops Plumbing Water.pdf PDF
Squad Ops Power floor plan.pdf PDF
Squad Ops HVAC.pdf PDF
Predator OC Pre-Bid Site Visit.pdf PDF
W91364-12-B-0003.doc DOC document
SF 24.pdf PDF
Bid Package.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 1 year of date of award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

The following have been deleted:

52.217-5
Evaluation Of Options
JUL 1990

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.215-21 Alt III
Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--Modifications (Oct 2010) - Alternate III
OCT 1997
52.232-99 (Dev)
Providing Accelerated Payment to Small Business Subcontractors (Deviation)
AUG 2012
52.247-34
F.O.B. Destination
NOV 1991
252.242-7006
Accounting System Administration
FEB 2012

The following have been added by full text:

CLAUSE 52.215-21 ALT 111

Paragraph ( c ) Submit the cost portion of the proposal via the following electronic media: e-mail.

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .