RFQ-mod.pdf
PDF 134 KB Posted
- Attached to
- Data Acquisition System
- Solicitation number
- W9132T20Q0056
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HBM_Srain Gauge_Series Y.pdf | ||
| List of Sensor Models.pdf | ||
| ST350-Strain-Transducer.pdf | ||
| Datasheet-Accelerometer-A1512.pdf | ||
| QA-2.docx | DOCX document | |
| LD620.pdf | ||
| QA.docx | DOCX document | |
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81EWF01190884
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
To revise the description of requirements section 2.a.ii, and extend the delivery date. Updated offers/pricing are requested based on this revision.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9132T20Q0056
X 9B. DATED (SEE ITEM 11)
26-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jul-2020
CODE
ERDC CONTRACTING OFFICE
CHAMPAIGN OFFICE
P O BOX 9005
CHAMPAIGN IL 61826-9005
W9132T 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9132T20Q0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-Jun-2020 11:59 AM to 21-Jul-2020 11:59 AM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
DESCRIPTION OF REQUIREMENTS
Data Acquisition Unit for Structural Load Floor Requirements
Background: The ERDC-CERL structural load floor is located at the East side of Building 2 at ERDC- CERL in Champaign, IL. The load floor consists of 24 in. thick reinforced concrete, with a system of tunnels and walls below. The floor contains capped bolt holes spaced 3 ft. on center each way. A reaction wall in a vertical box configuration is post-tensioned to the floor and used to mount actuators used for testing. This laboratory was built in 1969 and has been used for numerous tests, but the data acquisition system is out of date and is in need of an upgraded to be compatible with current testing standards. The space allows for multiple test configurations assembled at the North, South and East faces of the reaction wall. Test configurations include lateral (in-plane) and vertical loading of wall panels; out-of-plane lateral loading of wall panels; vertical and lateral loading of columns; three or four point beam bending tests; and lateral or vertical loading of floor diaphragms. To account for the specific data acquisition needs of each test configuration, the data acquisition system must allow for a multitude of signal inputs and sensor types.
The sections below define the existing components that the Government already owns (Section 1) that the components to be supplied by the contractor (Section 2) need to be compatible with to create a functional data acquisition system that will accommodate the data collection and testing conducted on the Structural Load Floor. Installation of the components is NOT required.
1) Existing Sensor Types: The DAQ system shall support sensors of the following type. The following sensors are to assist in defining module input requirements. These sensors are not required as part of this effort.
a. Strain Measurement
i. Strain gauges
1. Gauge lengths: 3 mm, 10 mm, 50 mm, and 150 mm
2. Nominal resistance: 120 ohms
3. Temperature Response: 10.8 ppm/K
4. Number of wires: 2
ii. Strain Transducer
1. Gauge Length: 76.2 mm (3 inches)
2. Nominal Resistance: 350 ohms
3. Excitation Voltage: +1 to +30V AC or DC
4. mV level, ratiometric to excitation voltage
5. Temperature Range: -50 °C to 80 °C
6. Cable: 2 shielded twisted pair (22 awg) with drain wire, 0.187” diameter, red pvc jacket
b. Deflection Measurement
i. Cable potentiometer
1. Cable Length: 2286 mm (80 inches)
2. Excitation Voltage: +1 to +30V AC or DC
3. Output: 0 to 50% of excitation voltage 4.
Linearity: +/- 0.3% to +/-0.15%
5. Temperature Range: -40 °C to 95 °C
6. Cable: 2 shielded twisted pair (22 awg) with drain wire, 0.187” diameter, red pvc jacket
ii. Linear Variable Differential Transformer (LVDT)
1. Travel: 25mm, 50 mm, 75 mm, 100 mm, 150 mm
2. Excitation Voltage: +10 to +30 VDC at 25 mA maximum
3. Temperature Range: -20 °C to 85 °C
4. Bandwidth: 500 Hz
c. Vibration Measurement
i. Accelerometer
1. Type: Uniaxial
2. Range +/- 5 g
3. Differential Sensitivity: 400 mV/g
4. Excitation Voltage: +5 VDC +/- 5%
5. Output: +/- 2 VDC
6. Linearity: +/- 0.3% to +/-0.15%
7. Temperature Range: -50 °C to 80 °C
8. Cable: 2 shielded twisted pair (22 awg) with drain wire, 0.187” diameter, red pvc jacket
2) Data Acquisition (DAQ) System Requirements to be supplied by the contractor:
The contractor shall provide a DAQ system consisting of a central unit and connection capabilities that will support the sensors defined above.
a. The DAQ Unit shall accommodate the following:
i. Electrical requirements: 120 VAC, 60 AMP, NEMA 5-15P connector
ii. A total of 112 possible inputs
1. (16) base modules; Sample rate up to 2Ms/s
2. (2) modules with 8 channels for High voltage banana jack connectors
3. (10) Modules with a total of 40 channels that include multi-pin connectors and BNC connectors
4. (4) 78 pin connector modules that supports additional channels.
5. Supports at least 24 strain gauges or 24 thermal couples (System to include connections and signal conditioning)
iii. Integrated computer screen for visual display during data collection
iv. Temperature Requirement: 10 °C - 40 °C
v. Humidity Requirement: 10-90%, Non-condensing
vi. Shock Limits: Meets MIL-STD 810F
vii. Vibration Limits: Meets MIL-STD 810F
viii. Can connect to secondary monitor display
ix. Can connect to additional DAQ units
b. If not included in the main unit the following breakout modules shall be provided
i. (6) 4 channel module that supports strain gauges and thermocouples
ii. (4) 78 pin to 16 BNC module
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
28-AUG-2020 1 PR W2R2 CONST ENGR LAB
RECEIVING CLERK
2902 NEWMARK DRIVE
P.O. BOX 9005
CHAMPAIGN IL 61826-9005
217-373-4456
FOB: Destination
W52EU2
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
30-SEP-2020 1 PR W2R2 CONST ENGR LAB
RECEIVING CLERK
2902 NEWMARK DRIVE
P.O. BOX 9005
CHAMPAIGN IL 61826-9005
217-373-4456
FOB: Destination
W52EU2
(End of Summary of Changes)
File details come from the government source that posted it. Updated .