Attachments 25QA052_Revised.pdf
PDF 8 MB Posted
- Solicitation number
- W912WJ25QA052
About this file
The document is a Statement of Work for the Barre Falls Dam Heating System Replacement project by the U.S. Army Corps of Engineers. The solicitation requires a contractor to remove the existing oil-fired boiler and install a new high-efficiency liquid propane fired condensing combination boiler compatible with the existing forced hot water system. Additionally, the contractor will supply and install a 1000-gallon underground liquid propane storage tank at the project office and remove the existing 119-gallon water heater and associated equipment.
The procurement is set aside for small businesses under NAICS code 238220 with a small business size standard of $19 million. The project's construction magnitude is between $25,000 and $100,000. All vendors must have an active registration in SAM.gov at the time of submission, and vendors without active registration will be rejected as non-responsive. The solicitation includes nine informational photos detailing the current heating system, fuel line locations, and proposed tank installation area, which provide visual context for the required work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25QA052-0002.pdf | ||
| Amendment W912WJ25QA052-0001.pdf | ||
| Attachments 25QA052.pdf | ||
| Solicitation W912WJ25QA052.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0001
ADDITIONAL INFORMATIONAL PHOTO
BLUE STAR INDICATING ALTERNATIVE TANK LOCATION
BARRE FALLS DAM HEATING SYSTEM REPLACEMENT
U.S. ARMY CORPS OF ENGINEERS
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photos
Informational Photo Number 1: Map of furnace location in project office.
Approximate new tank location
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photos
Informational Photo Number 2. Placement of existing boiler and electric water heater.
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photo Number 3. Pipe configuration from hot water heater to boiler.
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photo Number 4. Barre Falls Dam Water Heater Manufacturer.
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photo Number 5. Location where fuel line enters the building
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photo Number 6. Fuel line inside furnace room
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photo Number 7. Fuel line into Furnace.
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photos
Informational Photo Number 8. Looking south from Coldbrook Road at the area west of the
Project Office where the underground propane tank will be installed.
BARRE FALLS DAM PROJECT OFFICE
BARRE, MASSACHUSETTS
STATEMENT OF WORK
Informational Photos
Informational Photo Number 9. Looking north toward Coldbrook Road at the area west of the
Project Office where the underground propane tank will be installed.
| Attachments 25QA052_Revised.pdf |
| Additional Pic.pdf |
| Attachments 25QA052.pdf |
| As-Builts Page 1.pdf |
| As-Builts Page 2.pdf |
File details come from the government source that posted it. Updated .