About this file
This document provides responses to contractor questions on a solicitation for maintenance and improvement dredging of the Portsmouth Harbor Federal Navigation Project. The solicitation requires dredging approximately 674,800 cubic yards of ordinary material and 14,700 cubic yards of hard rock material to expand the 35-foot deep turning basin in Portsmouth Harbor, along with maintenance dredging of 2,300 cubic yards of ordinary material in the channel and turning basin. All dredged material will be transported by scow and disposed at four sites, with hard material and some ordinary material disposed at the Isle of Shoals North Disposal Site, some ordinary material disposed at the Salisbury and Newbury Nearshore Disposal Sites, and approximately 300,000 cubic yards of ordinary material placed as beach fill at Nantasket Beach. The responses clarify disposal criteria, environmental windows, blasting procedures, survey requirements, and address contractor concerns regarding project scope and schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Revised Plan Sheets (Drawings) 9-1-2021.pdf | ||
| Amendment 0005.pdf | ||
| Revised Spec Sections 01-11-00 and 01-22-00_Amend 0005.pdf | ||
| C-103_Amend0004.pdf | ||
| C-301_Amend0004.pdf | ||
| C-101_Amend0004.pdf | ||
| G-001_Amend0004.pdf | ||
| C-302_Amend0004.pdf | ||
| Amendment 00003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| W912WJ21B0015.pdf | ||
| Drawings.pdf | ||
| Specs.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912WJ21B0015
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to Requests for Information. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0015
X 9B. DATED (SEE ITEM 11)
28-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2021
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
RESPONSES TO REQUESTS FOR INFORMATION
1. Please provide the XYZ data file that was used to create the “top of hard (rock) material” surface as shown on Plan Drawings C-301 and C-302 so that contractors may use it for planning purposes and to verify the contract rock quantity.
GOVERNMENT RESPONSE: Top of hard (rock) material was derived from the limited boring information and geotechnical report data already provided as part of the solicitation package.
2. SECTION 01 11 00 Page 13, Paragraph b. “Sequence Notes” states: “The Contractor is not responsible for determining if material is suitable for beach placement. The Contractor is responsible for assessing the material before the scow/barge leaves the dredge site to make sure that the material is suitable for hydraulic pumping onto the beach through a hydraulic pipeline.”
a. Could you please describe/clarify the criteria to be evaluated to determine if “material is suitable for hydraulic pumping”?
b. Is there universal criteria to determine whether the material is suitable for hydraulic pumping? Or will the decision to send the dredged material for hydraulic pumpout be at each contractor’s discretion, and unique to that contractor’s equipment used for hydraulic pumpout?
c. What role does the Geological Field Technician play in determining if a scow load is to be sent to the nearshore disposal area versus being sent for beach pumpout?
GOVERNMENT RESPONSE:
a. The evaluation is based on the contractor’s experience in hydraulically pumping sediments and his/her knowledge of what size and type of sediments their pumping equipment can handle.
b. The majority of the material removed from Regions R1, R2, and R3 will be suitable for pumping. However, there is the possibility of encountering small pockets of cobbly material that could potentially not be suitable for pumping. The contract requires that Nantasket Beach have disposal priority for material removed from Regions R1, R2, and R3, however, it will be at the discretion of the contractor for sending a scow from the dredge site, with material that the contractor deems of not being suitable for pumping, to either the Salisbury or Newbury Nearshore Disposal Sites.
c. The Geotechnical Field Technician’s primary role is to take photographs of dredged material headed for Nantasket Beach and the Salisbury and Newbury Nearshore Disposal Sites as specified under amended subpart 1.17a in Section 35 20 23 MECHANICAL DREDGING. Refer to “Specification Changes” under Amendment 0001 for changes to subpart 1.17a. The technician may provide input to assist the
Contractor in making the final decision as to whether a scow is sent to either Nantasket Beach or the Salisbury/Newbury Nearshore Disposal Sites but has no authority on dictating where a scow is sent.
3. Would the Government consider separating Optional CLIN 0005 “Disposal of Dredged Ordinary Material at Nantasket Beach and Nearshore Disposal Sites” into its component parts so that there are separate line items for Nearshore Disposal and Nantasket Beach disposal? The associated cost with each of these activities is markedly different and warrant separate CLINS.
GOVERNMENT RESPONSE: Optional Bid Item 0005 has been revised so that Optional Bid Item 0005 pertains to Nantasket Beach and added Optional Bid Item 0007 pertains to the nearshore disposal sites. See attached Amendment 0004 Spec Changes and Revised Bidding Schedule for details on changes to bidding schedule and specification Sections 01 11 00, 01 22 00, and 01 71 23.
4. What is the criteria for proving that contractors have “exposed the top and sides of rock to -39 feet MLLW”? Are contractors required to demonstrate refusal of the dredge bucket in this area?
GOVERNMENT RESPONSE: Determination for exposure of the rock shall be left to the contractor’s own means and methods. The intent is to expose the footprint and depth of the rock to the maximum extent practicable to ensure that once the rock has been removed no rock exists above the required depth of -37 feet MLLW within the turning basin expansion area.
Any rock that is found to remain above -37 feet MLLW shall be removed at the expense of the contractor.
5. Due to the complexity of transporting and placing sand on Nantasket Beach, would the Government please consider allowing two full seasons to perform this scope of work and extend the completion date for this project to April 2023?
GOVERNMENT RESPONSE: Refer to Section 01 11 00 SCOPE OF WORK under subpart 1.4.1c.
6. Drawing Sheets C-102 & C-103, Nantasket Beach Placement:
For the beach placement, will the contractor be allowed to pump off its barges from the south side of the beach (Weir River) instead of sitting in the open Atlantic in the winter months?
GOVERNMENT RESPONSE: Working and discharging to the beach from Weir River (south side of Nantasket Beach) will not be allowed as no environmental permits or easements have been granted or procured.
7. Due to the state line of Maine and New Hampshire running through the Piscataqua River, which environmental dredging window shall apply?
GOVERNMENT RESPONSE: The Maine window applies to any dredge material removed from Maine waters and the New Hampshire window applies to any dredge material removed from New Hampshire waters. Transport of material through either Maine or New Hampshire waters will be allowed 15 October to 31 March of the given contract year(s).
8. Will blasting be allowed while there is a ship berthed at the Coastal Cement facility southwest to the dredging area?
GOVERNMENT RESPONSE: Refer to Section 35 30 00 UNDERWATER DRILLING AND CONFINED BLASTING under subparts 3.1.2c(2), 3.1.2c(3), and 3.1.2c(4).
9. Would the Govt. consider expanding the 500-foot radius for placement of material at IOS-N disposal area? We believe this condition is too restrictive and may result in unnecessary increased cost to the Government/contractor.
GOVERNMENT RESPONSE: The diameter of the placement target at the IOS-N is governed by the permitting authority which has allowed up to a diameter of 1,000 feet (500-foot radius) at the location for placement of ordinary material and up to a diameter of 1,000 feet (500-foot radius) at the location for placement of rock.
10. The exposed nature and sea conditions of the Nantasket Beach Placement site make a scow unloading operation unsafe, impractical, and cost prohibitive. We request that a nearshore disposal site be constructed at the Nantasket Beach location in lieu of a scow unloading operation, as we believe this method to be the most practical and cost-effective way to provide sand of beneficial use to Nantasket Beach.
GOVERNMENT RESPONSE: A nearshore disposal site in the vicinity of, or nearby, Nantasket Beach has neither been evaluated nor environmentally permitted for use. No nearshore disposal site at Nantasket Beach will be available for this project.
11. If the Government insists that sand must be hydraulically placed directly on Nantasket we request that a near-shore disposal area be constructed so that a hydraulic dredge or hopper dredge may re-handle the dredge material from the near-shore disposal area to Nantasket Beach.
GOVERNMENT RESPONSE: A nearshore disposal site in the vicinity of, or nearby, Nantasket Beach has neither been evaluated nor environmentally permitted for use. No nearshore disposal site at Nantasket Beach will be available for this project.
12. Pre-Solicitation Plans and Specs were received on May 17, 2021, and we shared our comments and concerns with the Government on May 28, 2021. Were those concerns taken in to account with regard to the final Plans and Specs? We believe that an Industry Day discussion would have been extremely useful to the Corps and to Contractors to design a successful project.
GOVERNMENT RESPONSE: Yes, comments were taken into consideration. Contract plans and specifications were adjusted based on comments the Government considered reasonable.
13. Section 35 20 23, page 9, paragraph 1.14 (Derelict Moorings) states; “Such moorings shall be removed and disposed of as debris by the Contractor at the contract price for dredging.” For purposes of estimating this work, what quantity of derelict moorings should the contractor assume in its pricing?
GOVERNMENT RESPONSE: Verbiage under part 1.14 has been changed. See Amendment 0004 Spec Changes.
AMENDMENT 0004
SPECIFICATION CHANGES
1. Amend Section 01 11 00 SUMMARY OF WORK as follows:
A. Under subpart 1.4.1 titled “General”, remove the verbiage “Optional Bid Items 0004 and 0005” from subpart 1.4.1c(1) and replace it with the following:
Optional Bid Items
B. Under subpart 1.4.3.1 titled “BASE BID ITEMS”, remove the following verbiage from subpart
1.4.3.1d:
0004 and 0005
C. Under subpart 1.4.3.1 titled “BASE BID ITEMS”, remove the verbiage “Optional Bid Item 0004 and
0005” and “Optional Bid Item 0005” from subpart 1.4.3.1e and replace it with the following:
Optional Bid Items
D. Under subpart 1.4.3.2 titled “OPTIONAL BID ITEMS”, remove the verbiage “See Optional Bid
Item 0004 on Bid Schedule” from 1.4.3.2a and replace it with the following:
See Optional Bid Items on Bid Schedule
E. Under subpart 1.4.3.2 titled “OPTIONAL BID ITEMS”, remove the verbiage “See Optional Bid
Items 0005 on Bid Schedule” from 1.4.3.2b and replace it with the following:
See Optional Bid Items on Bid Schedule
F. Under subpart 1.4.3.2 titled “OPTIONAL BID ITEMS”, remove the verbiage “Base Bid Items with
Optional Items 0004 and 0005 AWARDED” from 1.4.3.2b(1)(b) and 1.4.3.2b(1)(c) and replace it with the following:
Base Bid Items with Optional Bid Items AWARDED
G. Under subpart 1.9.1 titled “Work Sequence”, remove the title “Base Bid Items (Optional Items 0004 and 0005 NOT AWARDED)” from 1.9.1.1 and replace it with the following:
Base Bid Items with Optional Bid Items NOT AWARDED
H. Under subpart 1.9.1 titled “Work Sequence”, remove the verbiage “Optional Items 0004 and 0005
ARE NOT AWARDED” from 1.9.1.1 and replace it with the following:
Optional Bid Items ARE NOT AWARDED
I. Under subpart 1.9.1 titled “Work Sequence”, remove the title “Base Bid Items (Optional Items 0004 and 0005 AWARDED)” from 1.9.1.2 and replace it with the following:
Base Bid Items with Optional Bid Items AWARDED
J. Under subpart 1.9.1 titled “Work Sequence”, remove the verbiage “Optional Items 0004 and 0005
ARE AWARDED” from 1.9.1.2a and replace it with the following:
Optional Bid Items ARE AWARDED
2. Amend Section 01 22 00 MEASUREMENT AND PAYMENT as follows:
A. Under part 1.3 titled “BIDDING SCHEDULE - PAYMENT ITEMS”, remove subpart “d.” in its entirety and replace it with the following verbiage:
d. Item No. 0004, "Mobilization and Demobilization for Disposal at Nantasket Beach.”
Payment for the contract job price will be made for all costs associated with mobilization and demobilization (as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION") necessary to complete the work to transport to and dispose of dredged ordinary material on Nantasket Beach.
NOTE TO BIDDER REGARDING PAYMENT ITEM NO. 0004: THE BIDDER SHALL PREPARE A
JOB PRICE FOR MOBILIZATION AND DEMOBILIZATION THAT ONLY INCLUDES THE
ADDITIONAL COSTS NEEDED FOR THE TRANSPORTATION AND DISPOSAL OF DREDGED
ORDINARY MATERIAL ON NANTASKET BEACH THAT ARE ABOVE THE COSTS ALREADY
INCLUDED IN PAYMENT ITEM NO. 0001. PROVIDE A PLANT AND EQUIPMENT LIST
SPECIFICALLY FOR ITEM NO. 0004.
Unit of measure: JOB.
B. Under part 1.3 titled “BIDDING SCHEDULE - PAYMENT ITEMS”, remove subpart “e.” in its entirety and replace it with the following verbiage:
e. Item No. 0005, "Disposal of Dredged Ordinary Material at Nantasket Beach.”
The contract price per cubic yard for Bidding Schedule Payment Item 0005 shall include all costs associated with the transportation of ordinary material to Nantasket Beach, and the placement of ordinary material on Nantasket Beach as specified in Section 01 11 00 SUMMARY OF WORK, Section 35 20 23 MECHANICAL DREDGING, and as indicated in other parts of the Contract Documents.
The contract price per cubic yard for Payment Item 0005 shall also include costs for performing a scow volume survey for each loaded scow heading to Nantasket Beach and the submission of scow data as specified under subpart titled "Scow Volume Surveys" in Section 01 71 23 FIELD ENGINEERING FOR DREDGING; providing field engineering and survey work; pumping of ordinary material from scows/barges to Nantasket Beach via offloader pumps/booster pumps and hydraulic pipeline; placement of ordinary material as beach fill within the designated limits and location on the beach; the spreading and grading of the beach fill to the lines and grades as indicated on Contract Drawings C-102, C-103, and C-303, and as specified in Section 01 71 24 FIELD ENGINEERING FOR BEACH FILL PLACEMENT, and Section 35 20 26 BEACH FILL PLACEMENT; and costs.
NOTE TO BIDDER REGARDING PAYMENT ITEM NO. 0005: THE BIDDER SHALL PREPARE A
PER CUBIC YARD PRICE THAT ONLY INCLUDES THE ADDITIONAL COSTS NEEDED TO
TRANSPORT AND DISPOSE OF DREDGED ORDINARY MATERIAL ON NANTASKET BEACH
THAT ARE ABOVE THE COSTS ALREADY INCLUDED IN PAYMENT ITEM NO. 0002.
Unit of measure: Cubic Yard (CD).
C. Under part 1.3 titled “BIDDING SCHEDULE - PAYMENT ITEMS”, add the following verbiage as subpart “g.”:
g. Item No. 0007, " Mobilization and Demobilization for Disposal Work and the Disposal of Dredged Ordinary Material at the Nearshore Disposal Sites.”
The contract price per cubic yard for Bidding Schedule Payment Item 0007 shall include all costs associated with mobilization and demobilization (as defined in Special Contract Requirements clause "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION") necessary to complete the work to transport and dispose of dredged ordinary material at the Salisbury and Newbury Nearshore Disposal Sites, the transportation to and disposal of dredged ordinary material at the nearshore disposal sites, as specified in Section 01 11 00 SUMMARY OF WORK, Section 35 20 23 MECHANICAL DREDGING, and as indicated in other parts of the Contract Documents.
The contract price per cubic yard for Payment Item 0007 shall include costs for performing a scow volume survey for each loaded scow headed to the nearshore disposal sites and the submission of scow data as specified under subpart titled "Scow Volume Surveys" in Section 01 71 23 FIELD
ENGINEERING FOR DREDGING.
NOTE TO BIDDER REGARDING PAYMENT ITEM NO. 0007: THE BIDDER SHALL PREPARE A
PER CUBIC YARD PRICE THAT ONLY INCLUDES THE ADDITIONAL COSTS NEEDED FOR
THE MOBILIZATION AND DEMOBILIZATION WORK, AND THE TRANSPORTATION AND
DISPOSAL OF DREDGED ORDINARY MATERIAL AT THE NEARSHORE DISPOSAL SITES
THAT ARE ABOVE THE COSTS ALREADY INCLUDED IN PAYMENT ITEM NO. 0001 AND
PAYMENT ITEM NO.0002. PROVIDE A PLANT AND EQUIPMENT LIST SPECIFICALLY FOR
ITEM NO. 0007.
Unit of measure: Cubic Yard (CD).
3. Amend Section 01 71 23 FIELD ENGINEERING FOR DREDGING as follows:
A. Under part 1.4 titled “Submittals” add the following verbiage”
SD-07 Certificates
Scow Volume Surveys; G, RO
B. Under subpart 3.1.1 titled “Contractor Quality Control Surveys”, remove third and fourth paragraphs under “Additional Contractor Quality Control Surveys:” in their entirety and replace them with the following:
Progress Contractor's Quality Control Survey of Regions R1 through R4 (required only if Optional Bid Items are awarded). Regions R1 through R4 must be surveyed all at the same time under this one survey.
Contractor After Dredge Survey of Regions R1 through R5 (required only if Optional Bid Items are awarded). Regions R1 through R5 must be surveyed all at the same time under this one survey.
C. Under part 3.1 titled “Contractor Surveys add the following verbiage as subpart 3.1.5:
Scow volume surveys are required only if Optional Bid Items are awarded.
a. A scow volume survey is required for each scow filled and sent for disposal at Nantasket Beach, and the Salisbury and Newbury Nearshore Disposal Sites. The following steps shall be performed for EACH scow:
(1) Remove volume of ordinary material needed to fill scow.
(2) Perform hydrographic scow volume survey of dredged area where ordinary material was removed to fill scow noted in step 1.
(3) Compute volume of ordinary material loaded into scow in step 1 using either the pre-dredge survey of record, a previous scow volume survey from step 2, or a combination of both. The intent of the scow volume survey is to compute the volume of material in the scow using survey data.
(4) For each scow, document the designation number given to the scow, the scow volume as computed in step 3, and the location where the scow was sent for final disposal.
b. Repeat steps 1 through 4 above for EACH scow to be loaded and sent for disposal at Nantasket Beach, and the Salisbury and Newbury Nearshore Disposal Sites.
c. As part of the request for Contractor Progress Payment, submit the total volume for all scows sent for disposal during the payment period being requested, and an MS Excel spreadsheet (version 2013 or later) showing a listing of all scows sent for disposal during the progress payment period. Each scow listed in the spreadsheet shall include each scow's documented data from step 4.
d. Submit survey field data as specified above under subpart titled "Field Data" found under subpart titled "Data Submission Requirements for Contractor Surveys". Submission of "3x3 Minimum Plots" not required for scow volume surveys.
4. In Section 35 20 23 MECHANICAL DREDGING under part 1.14, remove paragraph in its entirety and replace it with the following verbiage:
As the areas to be dredged are not located in any existing mooring fields, the Government does not expect any derelict moorings to be found. However, if any derelict moorings are found during dredging operations, the Contractor shall report the finding and location of derelict moorings immediately to the Contracting Officer. The work to remove derelict moorings will be done at an equitable adjustment to the contract price in accordance the CONTRACT CLAUSE titled "Changes."
Changes were made to the following drawings and are attached as part of this amendment.
G-001 C-101 C-103 C-301 C-302
REVISED BIDDING SCHEDULE
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT
1.1 LINE ITEMS
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID ITEMS
0001 Mobilization and Demobilization for Dredging and Disposal at Isles of Shoals North (IOS-N)
Disposal Site
JOB
JOB
Dredging of 35-Foot Federal Navigation Channel and Turning Basin, and the Turning Basin Expansion Area with Disposal of Ordinary Material at the Isles of Shoals North (IOS-N) Disposal Site
0002AA First 541,700 CD
541,700
CD
0002AB Over 541,700 CD 135,400 CD $ $
0003 Removal of Hard (Rock) Material within the 35-Foot Turning Basin Expansion Area with Disposal of Rock at Isles of Shoals North (IOS-N) Disposal Site
0003AA First 8,000 CD 8,000 CD $ $
0003AB Over 8,000 CD 6,700 CD $ $
TOTAL ESTIMATED AMOUNT FOR BASE BID ITEMS $
OPTIONAL BID ITEMS
0004 Mobilization and Demobilization for Disposal at Nantasket Beach (See Note 5) 1 JOB JOB $
0005 Disposal of Dredged Ordinary
Material at Nantasket Beach
(See Note 5) 300,000 CD $ $
0006 Geotechnical Field
Technician 1 JOB JOB $
0007 Mobilization and Demobilization for Disposal Work and the
Disposal of Dredged Ordinary
Material at the Nearshore
Disposal Sites 192,500 CD $ $
TOTAL ESTIMATED AMOUNT FOR OPTIONAL BID ITEMS $
TOTAL ESTIMATED AMOUNT FOR BASE BID AND OPTIONAL BID ITEMS $
1.2 BID NOTES
Note 1: "CD" = Cubic Yards.
Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the TOTAL ESTIMATED AMOUNT for Line Items 0001 through 0007 which includes the Base Bid Items and the Optional Bid Items. The minimum work awarded will be the Base Bid Item work.
Note 3: All work shall be completed within the time period specified in the SPECIAL CONTRACT REQUIREMENTS, Subpart "COMMENCEMENT, PROSECUTION AND
COMPLETION OF WORK (APR 1984) FAR 52.211-10."
Note 4: Base Bid Item Numbers 0002 and 0003 are subdivided into two estimated quantities and shall be separately priced. The Government will evaluate these items on the basis of the total price of their sub-items.
(AFARS 5152.211-9001 Variations in Estimated Quantities -- Subline Items).
Note 5: Optional Bid Item Numbers 0004 and 0005 must be awarded together.
Note 6: Line Item Numbers 0004, 0005, 0006 and 0007 are Optional Bid Items that may, at the option of the Government, be exercised at any time up to receipt by the Contractor of the Notice to Proceed (NTP). If the Optional Bid Items are awarded, no additional calendar days will be added to the project duration.
Note 7: All Offerors MUST be registered and active in SAM.GOV at the time of bid submission. Offerors not registered and active in SAM at time of submission will be rejected.
Note 8: All Offerors MUST submit an Electronic bid submissions and must include a scanned copy of the original bid guarantee. The original bid guarantee with “wet” signature and raised seal (if applicable) must be mailed or delivered to the address instructed on the “Virtual Bid Opening Solicitation Instructions” and received by the bid opening time and date.
Note 9: Identify a point of contact e-mail for all correspondence related to this bid: @ .
- End of Bidding Schedule -
(End of Summary of Changes)