This amendment modifies an existing solicitation for maintenance dredging of Wellfleet Harbor in Massachusetts. The scope of work involves dredging approximately 162,000 cubic yards of fine-grained sediments from the 10-foot-deep entrance channel and anchorage basin to the authorized project depth plus one foot of overdepth using a mechanical dredge. Dredged material will be transported via scow approximately 15 nautical miles to the Cape Cod Bay Disposal Site. Additional work includes removal of derelict moorings. The solicitation allows dredging between October 1 and December 15, 2020. The amendment provides responses to requests for information, clarifying that an environmental closed bucket is required, the terms for payment of additive items, and that all material is expected to be removable with the currently prescribed equipment. The contracting agency is the U.S. Army Corps of Engineers, New England District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to Requests for Information (RFIs). All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0009
X 9B. DATED (SEE ITEM 11)
12-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jul-2020
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0001
Question #1:
In a majority of the geotechnical data, obtained via vibracore samples, it is stated that the cores were driven to refusal, and not full project depth in the anchorage. Please clarify what material was encountered upon refusal, and whether this material is able to be removed with the mandated environmental bucket that would be utilized on a maintenance project such as this.
How would the contractor be compensated should areas remain above finished grade that are unable to be removed with standard environmental clamshell dredging equipment?
Government Response 1:
The sampling team used an older vibracore system available to the sampling team at the time of data collection that would sometimes get hung up on harder packed material at depth. The hard packed material encountered was sandy shoal material at depth and not rock or native parent material. It is expected that an environmental bucket can remove the material outlined within the plans and specifications.
Question #2:
Please clarify the terms of additive item 0004. Under what circumstances this item would be paid?
Government Response 2:
Additives are awarded at the time of full contract award and payable as the material outlined in the additive is removed.
Question #3: If the material in either prism is not able to be dug with a closed environmental bucket, will the Contractor be allowed to utilize an open conventional bucket?
Government Response 3:
We anticipate all material to be removable by the equipment currently prescribed in the plans and specifications of the solicitation. However, we have inquired with the Massachusetts Dept of Environmental Protection about the requirement for an “environmental, closed bucket” as outlined in the 401(b) Water Quality Certification, and at this time the use of an open conventional bucket will not be allowed.
(End of Summary of Changes)