Amendment 0001Attachment 1_PWS.pdf

PDF 998 KB Posted

Attached to
Comprehensive Soldier Health and Wellness Program
Solicitation number
W912SV-21-R-0009
Issued by

About this file

This performance work statement outlines requirements for a comprehensive soldier health and wellness program. The contractor must provide full-time personnel including a lead human performance integrator, human performance specialist, performance nutrition coach, and injury prevention and recovery coach. The contractor must develop and execute multi-day in-person training workshops and provide ongoing online and mobile resources. Key requirements include implementing initiatives to increase engagement in wellness activities and improve medical readiness, conducting screening and assessments, and collecting and reporting program metrics and participant outcomes data. The period of performance is 12 months.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

MANG Warrior Resilience & Fitness Directorate Warrior Functional Intensive Training (F.I.T.) Program

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Warrior Functional Intensive Training (Warrior F.I.T.) Program Services, as defined in this PWS.

1.2 Background: The U.S. Army and the Massachusetts National Guard is committed to leaving no Soldier behind, and the Warrior Fit program is a tool which can be used to re-invest our resources into rehabilitating and improving the quality of life of soldiers at risk of being unable to meet the physical fitness standards for continued military service. . Failure to meet minimum physical fitness and readiness standards and the resulting distress has additional wide-ranging effects on the individual their relationships with their military family and unit. It also prevents them from receiving any favorable action to include receipt of awards, ability to utilize the in-state tuition and fee waiver, prohibits promotion or military school attendance and can lead to a bar to re-enlistment or administrative separation. The Warrior FIT program intends to show Soldiers that they are of value to the Massachusetts Army National Guard and provides them the opportunity to once again become successful within the organization. The main thrust of this program is comprehensive soldier health and wellness. The primary focus areas are in emotional health and behavior change, physical fitness and nutrition.

1.3 Period of Performance (PoP): The Period of Performance shall be 12 months.

1.4 General Information:

1.4.1 Quality Control (QC):

1.4.2 The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 business days after contract award.

After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.3 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure

Solicitation: W912SV-21-R-0009 Attachment 1

Amendment 0001 that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.4 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.4.4.1 New Year’s Day: January 1st

1.4.4.2 Martin Luther King, Jr.’s Birthday

1.4.4.3 President’s Day

1.4.4.4 Memorial Day

1.4.4.5 Independence Day: July 4th

1.4.4.6 Labor Day

1.4.4.7 Columbus Day

1.4.4.8 Veteran’s Day: November 11th

1.4.4.9 Thanksgiving Day

1.4.4.10 Christmas Day: December 25th

1.4.5 Place and Performance of Services for full time staff: Work week may vary however presence is expected during normal organizational operating hours. Work performed outside of normal hours is authorized in support of program requirements and in coordination with COR. No overtime or compensatory time is authorized. This schedule is expected to be adhered to except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.

Primary office locations for the four (4) full-time human performance specialists (see paragraphs 5.1.1 – 5.1.4) shall be Hanscom Air Force Base for regular office hours and Joint Base Cape Cod for schedule workshops, although other locations throughout Massachusetts may be required. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. The Government may permit telework by contractor employees when determined to be in the best interest of the Government in meeting work requirements or in circumstances where the primary work location / government installation is closed. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission- critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

Place and Performance of Services for Warrior F.I.T. Tier I, II & III support: The contractor shall provide human performance specialists and subject matter experts (SMEs) as listed in Paragraph 1.4.9 for in-person screening, assessment, education & training at Joint Base Cape Cod (JBCC), Hanscom Air Force Base, authorized Massachusetts National Guard (MANG) / Federal Installations and remotely in support of online consultation. Travel will be throughout the state and contractor will be reimbursed IAW the Joint Travel Regulation and through a contract line item. The

Solicitation: W912SV-21-R-0009 contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.5.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay.

This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.5.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.6 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. For contractors requiring Common Access Card (CAC): The CAC is the DoD Federal Personal Identity Verification (PIV) credential. CAC issuance requirements are as follows:

In accordance with Department of Defense Manual (DoDM) 1000.13-M-V1, DoD Identification (ID) Cards, January 23, 2014, initial issuance of a CAC requires, at a minimum, the completion of an Federal Bureau of Investigation (FBI) fingerprint check with favorable results and submission of a National Agency Check with Inquiries (NACI) (or investigation approved in Federal Investigative Standards) to the Under Secretary of Defense for Intelligence (USD(I)) approved investigative service provider. The issuance of a CAC will be based on four criteria: (a) eligibility for a CAC; (b) verification of DoD affiliation from an authoritative data source; (c) completion of background vetting requirements according to the Federal Information Processing Standards Publication 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, Solicitation: W912SV-21-R-0009

August 2013, and DoD Manual 5200.02, Procedures for the DoD Personnel Security Program (PSP), April 3, 2017, and (d) verification of a claimed identity. Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2, or the Trusted Associate Sponsorship System (TASS).

1.4.6.1 HSPD-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and shall process all CAC card applications. The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at Attachment 1 at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.

1.4.6.2 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below.

Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security-related matters, such designation facilitates these processes. If an FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:

1. The contractor's FSO or contractor employee shall submit requests for a CAC via email to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be: Mr. Brian J. Daley, (339) 202-3188.

2. The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a USER ID and password, via email, to the FSO. The FSO or contractor employee shall access the TASS account and complete

Solicitation: W912SV-21-R-0009 the CAC application (entering/editing contractor information as applicable) at:

https://www.dmdc.osd.mil/tass/. The FSO or contractor employee shall follow up to ensure that the TA is processing the request.

3. The Government will inform the contractor's applicant, via email, of one of the following:

a. Approval.* Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator:

http://www.dmdc.osd.mil/rsl/).

b. Rejection.* The Government, in separate correspondence, will provide reason(s) for rejection.

c. Return. Additional information or correction to the application required by the contractor employee.

*The contractor shall maintain records of all approved and rejected applications.

1.4.6.3 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by SSN and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615- 0047, "Employment Eligibility Verification." Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.

1.4.6.3.1 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee, and shall obtain a receipt for each card and provide it to the TA/COR.

1.4.6.3.2 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the TA, unless there are extenuating circumstances approved by the COR or KO.

1.4.6.3.3 The contractor will be required to obtain an Army email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. Due to recent changes to Army email procedures, the source for obtaining the email address is being revised; this PWS will be updated to reflect procedures for obtaining the email address. Note: If employees of a contractor lose the privilege to access the network or Army email account, they lose

Solicitation: W912SV-21-R-0009 Attachment 1

Amendment 0001 https://www.dmdc.osd.mil/tass/ https://www.dmdc.osd.mil/tass/ http://www.dmdc.osd.mil/rsl/) http://www.dmdc.osd.mil/rsl/) the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their network and Army email accounts.

1.4.7 Government Information Systems & Networks

1.4.7.1 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:

1.4.7.1.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.

1.4.7.1.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://informationassurance.us.army.mil).

1.4.7.1.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.

1.4.7.1.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.

1.4.7.1.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.

1.4.7.2 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.7.3 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to DoD installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .

Solicitation: W912SV-21-R-0009

Amendment 0001 https://informationassurance.us.army.mil/ http://jko.jten.mil/courses/atl1/launch.html

1.4.7.4 Information Assurance (IA)/Information Technology (IT) Training: All contractor employees and associated subcontractor employees shall complete the DoD IA Awareness Training before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Army workforce training requirements in DoDD 8140.01, DoD 8570.01-M and AR 25-2 within six months of the start of contract performance. In accordance with DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, contractor employees performing Information Assurance Technical (IAT) functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.

1.4.7.5 Information Awareness: All contractor employees with access to a government information system shall be registered in the Army Training Certification Tracking System (ATCTS) (https://atc.us.army.mil/iastar/index.php) at commencement of services, and shall successfully complete the DoD Information Assurance awareness training prior to access to the IS and then annually thereafter.

(https://ia.signal.army.mil/DoDIAA/).

1.4.7.6 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.7.7 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.

1.4.8 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.8.1 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. The contractor shall include procedures covering key control in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

Solicitation: W912SV-21-R-0009 Attachment 1

Amendment 0001 https://atc.us.army.mil/iastar/index.php https://ia.signal.army.mil/DoDIAA/ http://cdsetrain.dtic.mil/opsec/

1.4.8.1.1 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.

1.4.8.1.2 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.9 Special Qualifications: The contractor shall ensure all subject matter expert employees possess the following degrees, licensures, coursework and certifications listed below.

1.4.9.1 Lead Human Performance Integrator: Shall possess a Master’s or Doctoral degree in Exercise Science or Physiology. Must also have either a current American College of Sports Medicine (ACSM) Exercise Physiologist Certification (EP-C) OR National Strength and Conditioning Association (NSCA) Certified Strength and Conditioning Specialist (CSCS) certification. This individual must also have successfully completed six credits of graduate level college coursework in Nutrition Sciences and have ≥ two (2) years’ experience with data analytics.

1.4.9.2 Human Performance Specialist: Shall possess a bachelor’s degree in Exercise Science or similar field. Must also have either a current American College of Sports Medicine (ACSM) Exercise Physiologist Certification (EP-C) OR National Strength and Conditioning Association (NSCA) Certified Strength and Conditioning Specialist (CSCS) certification. This individual must also have successfully completed six credits of college coursework in Nutrition Sciences.

1.4.9.3 Performance Nutrition Coach: Shall be a currently certified Registered Dietician licensed within the Commonwealth of Massachusetts. Possession of a Master’s or doctoral in the field of dietetics and/or nutrition is desirable.

1.4.9.4 Injury Prevention & Recovery Coach Must have passed the National Physical Therapy Examination and be a current licensed Physical Therapist in the Commonwealth of Massachusetts. A Doctoral degree in physical therapy is desirable,

1.4.9.5 Fitness Coach: Shall possess a personal training certification from the ACSM, the NSCA or the ACE.

1.4.9.6 Running Coach: Shall possess personal training certification from the ACSM or the NSCA or the American Council on Exercise (ACE) AND one of more of the following certifications:

Solicitation: W912SV-21-R-0009

-Senior Chi Running Instructor Certification -USA Track and Field Level 3 Certification.

1.4.9.7 Mental Performance Coach: Shall possess a Master’s or Doctoral degree in Clinical Psychology, Clinical Social Work, Industrial-Organizational Psychology, or Sports Psychology and maintain an unrestricted license to practice independently within the Commonwealth of Massachusetts. A minimum of five years of demonstrated experience related to resiliency, motivation enhancement, mental and physical performance optimization and goal setting or certification as a certified mental performance consultant (CMPC) is required.

1.4.10 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.11 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.12 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed. The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the COR/ KO within 14 days of an employee’s departure.

Solicitation: W912SV-21-R-0009

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Contractor Travel: The contractor shall travel to MANG and federal installations upon request during the performance of this contract to implement mobile Warrior Fit Training modules, Service Member assessments and screenings and the Warrior F.I.T. in-person didactic instruction program.

The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract to all requested installations with the exception of the primary duty locations for full-time contractor personnel of Hanscom Air Force Base and Joint Base Cape Cod (workshops). All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials/curriculum produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Phase In / Phase Out Periods: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board during the two-week phase in/ phase out periods. During the phase in period, the contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.

This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment. Computers (i.e.laptops)

Solicitation: W912SV-21-R-0009 furnished shall allow for work at other than the primary work location(s) as required for work workshops and other events, and also telework if/when authorized.

3.2 Equipment: See Attachment 3.

3.3 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): The contractor shall furnish everything required to perform these services; this shall include hand-outs and digital access to all educational curriculum presented to service members; to include access to any referenced psychological health, resiliency, fitness and nutrition journals.

5.0 Requirements: The contractor shall provide services in support of the MARANG Warrior F.I.T. program. This program provides Soldiers with the tools and training necessary to meet DoD physical fitness, height-weight and readiness standards while optimizing operational readiness and demonstrating knowledge and engagement in a wellness focused lifestyle. The contractor will assist in implementing initiatives aimed at increasing total force engagement in wellness activities, improving medical readiness and increasing mental agility/ fund of knowledge related to injury prevention, nutrition, sleep hygiene, resiliency and stress reduction. Contract personnel will engage Soldiers within three target populations (Warrior F.I.T. mentees, identified at-risk population, and the total force) in innovative educational and didactic forums in order to demonstrate increased physical / mental fitness outcomes and ensure Service Members identify with a mindset associated with tactical athletes/warriors.

5.1 The contractor shall provide four (4) Full Time Equivalent (FTE) employees: Lead Human Performance Integrator, Human Performance Specialist, Performance Nutrition Coach, and Injury Prevention and Recovery Coach to support the Warrior Resilience & Fitness program 40 hours per week. The employee special qualification requirements for the FTE employees are stated in section 1.4.9.

5.1.1 The Lead Human Performance Integrator (Warrior F.I.T. program full-time integrator) will serve as the primary point of contact between MA ARNG personnel and the contractors extended human performance network of industry and technical experts. This individual shall provide 40 hours of services per week. The Lead Human Performance Integrator shall serve as a program integrator and wellness mentor, performance improvement coach and provide in-person support to Tier 1, 2 & 3 initiatives. The Lead Human Performance Integrator is expected to attend all Warrior F.I.T. program IPRs, coordinate and perform as necessary baseline, mid-point and follow-up data collection/analyzation, provide access to raw data collected and present program outcomes to the COR in accordance with the deliverables schedule. This individual shall serve as conduit to and facilitate participant consultation with human performance subject matter experts. The human performance specialist shall provide drop-in performance and assessment screening opportunities at Hanscom AFB weekly and at pre-determined MANG and federal installations a minimum of once per month. The human performance specialist shall provide program overviews, educational briefings and resource brokerage services to individual MANG members and units as requested. In addition, the human performance specialist shall participate in command consultations regarding unit wellness / holistic health & fitness (H2F) and

Solicitation: W912SV-21-R-0009 participate in / provide instruction at Officer and Non-Commissioned Officer Professional Development seminars.

5.1.2 The Human Performance Specialist will serve as the wellness mentor and performance improvement coach. This individual shall provide 40 hours of services per week. The human performance specialist shall provide in-person support to Tier 1, 2 & 3 initiatives, is expected to attend all Warrior F.I.T. program IPRs, coordinate baseline, mid-point and follow-up data collection/analyzation, provide access to raw data collected. This individual shall serve as conduit to and facilitate participant consultation with human performance subject matter experts.

The human performance specialist shall provide drop-in performance and assessment screening opportunities at Hanscom AFB weekly and at pre-determined MANG and federal installations a minimum of once per month. The human performance specialist shall provide program overviews, educational briefings and resource brokerage services to individual MANG members and units as requested. In addition, the human performance specialist shall participate in command consultations regarding unit wellness / holistic health & fitness (H2F) and participate in / provide instruction at Officer and Non-Commissioned Officer Professional Development seminars.

5.1.3 The Performance Nutrition Coach shall serve as the primary SME for nutrition and diet consultations for MANG personnel. This individual shall provide 40 hours of services per week.

The performance nutrition coach shall provide drop-in performance, assessment and screening opportunities at Hanscom AFB weekly and at pre-determined MANG and federal installations a minimum of once per month. The performance nutrition coach shall provide program overviews, educational briefings and resource brokerage services to individual MANG members and units as requested. The performance nutrition coach shall conduct screening and assessment for individuals enrolled in the Army Body Composition Program. In addition, the performance nutrition coach shall participate in command consultations regarding unit wellness / holistic health & fitness (H2F) and participate in / provide instruction at Officer and Non-Commissioned Officer Professional Development seminars.

5.1.4 The Injury Prevention & Recovery Coach (IPRC) shall serve as the primary SME for injury prevention and rehabilitation consultations as well providing therapeutic exercise prescriptions and sessions as necessary. This individual shall provide 40 hours of services per week. The IPRC shall provide drop-in assessments and screening opportunities at Hanscom AFB weekly and at pre-determined MANG and federal installations a minimum of once per month. The IPRC shall provide program overviews, educational briefings and resource brokerage services to individual MANG members and units as requested. The performance nutrition coach shall conduct screening and assessment for individuals enrolled in the Army Body Composition Program. In addition, the IPRC shall participate in command consultations regarding unit wellness / holistic health & fitness (H2F) and participate in / provide instruction at Officer and Non-Commissioned Officer Professional Development seminars.

5.2 Warrior F.I.T. program implementation. All human performance subject matter experts (SME) must meet the minimum requirements for their specialty as outlined in 1.4.9.

5.2.1 Army Warrior F.I.T. Tier I: The contractor shall develop and execute two (2) multi-day in-person didactic human performance screening, assessment, education & training workshop

Solicitation: W912SV-21-R-0009 series for personnel who currently do not meet readiness and performance standards or who have been identified by their command to participate in a human performance optimization program. These two workshops, to be known as FY22 Army Tier I iterations (A) & (B), shall each consist of six total days of in-person instruction to be scheduled as three (3), 2-day events (“Foundation”, “Synthesis”, and “Capstone”) within separate 90 day periods. The identified individuals, hereafter known as Warrior F.I.T. mentees, will be provided a personalized fitness plan, nutrition plan & mental performance optimization plan within (7) days of initial assessment and screening. Each Warrior F.I.T. mentee will be provided unlimited access to an established online learning portal and virtual application and have the ability to consult with SMEs through the online portal/virtual application, via on-site support with the human performance specialist program integrator, human performance specialist, performance nutrition coach and IPRC, as well as phone, electronic mail or drop-in instruction. A Human Performance curriculum textbook shall be provided to each mentee. The contractor shall support Tier I implementation by having a SME team representing all the specialties identified in paragraph 1.4.9 of this document (i.e running coach, strength & conditioning coach, performance nutrition coach, mental performance coach) on site during each Warrior F.I.T. iteration in order to provide on-site assessment, screening and instruction for Warrior F.I.T. mentees. Assessment must include pre and post testing of individual Soldier ability to meet or exceed United States Army physical fitness test (APFT), Army combat fitness test (ACFT) and Army body composition standards. Each mentee will receive in person feedback and ongoing consultation throughout the performance period.

Army Warrior F.I.T. Tier I is expected to be limited to fifty (50) Warrior F.I.T for each iteration.

mentees each. Dates and curriculum requirements for Army Warrior F.I.T. Tier I instructional weekends shall be determined during the phase-in period.

5.2.2 Army Warrior F.I.T. Tier II: Using the four (4) full-time personnel, the contractor shall provide in-person re-assessments and movement screenings for the individuals who participated in Warrior FIT Tier I during FY21 (prior year’s Tier I). Mental Performance and Nutrition Assessments will also be conducted in conjunction with the Tier II re-screening, and each individual will receive a revised comprehensive, individualized performance optimization and nutrition plan by health and performance experts within two weeks of assessment. Tier II screening days require a minimum of three personnel to be present, identified as follows. Two personnel from the following labor categories (qualifications are identified in paragraph 1.4.9):

Human Performance Integrator, Human Performance Specialist or Performance Nutrition Coach.

One person from the following labor categories (qualifications are identified in paragraph 1.4.9):

Injury Prevention & Recovery Coach. Each Tier II individual will be provided unlimited access to an established online learning portal and accompanying mobile application. The tier II population will be afforded the ability to consult with performance optimization SMEs through the following mediums: mobile application, online portal, coordination with the any of the 4 full time personnel, electronic mail or drop in instruction. All program instructional materials to support the tier II population and their performance plan will be provided to the identified individuals.

5.2.3 Army Warrior F.I.T. Tier III: The contractor shall provide access to an established online learning portal and mobile platform application, readily available through standard commercial application stores (e.g. Apple App Store, Google Play, etc.), which will include education and training modules on mental performance, mindfulness, strength & conditioning, injury prevention & recovery, nutrition, meal preparation, cooking tips/recipes, training plans and exercise demonstration videos. These materials should be accessible both on-line (connected to the internet) and off-line (locally downloadable). The mobile application and online learning portal

Solicitation: W912SV-21-R-0009 must also afford users the ability to consult with human performance experts and engage in peer support activities. A minimum of 1,140 human performance portal / online application account logins (valid for one calendar year from date of account initiation) shall be provided to Massachusetts Army National Guard personnel.

5.2.4 Warrior F.I.T Seminars: The contractor will provide 8 additional single day seminars to be coordinated with Army SME and Warrior F.I.T integrator leads. Potential topics to be considered, but are subject to change, include “Warrior F.I.T. Army Leadership Familiarization”, “ACFT Specific Training”, “Pregnancy/Post-Partum Fitness” “Warrior F.I.T. Alumni Weekend”, “Warrior F.I.T. Injury Prevention and Recovery” or may be additional Tier I events as needed.

5.2.5 The Army Warrior FIT integrator leads shall coordinate workshop lengths, specific curriculum topics and schedule workshop dates and locations with the contractor during the phase-in post award period. No workshops shall be scheduled during the phase in period.

5.2.6 The contractor shall submit a draft assessment plan, training & education curriculum and staffing plan for Warrior F.I.T. Tiers one and two within thirty days of contract award.

5.2.7 The contractor shall maintain knowledge of current United States Army standards and regulations related to Warrior Resilience & Fitness (WRF), Holistic Health & Fitness (H2F) and the Total Force Fitness (TFF) paradigm.

5.2.8 The contractor shall collaborate with the MANG, National Guard Bureau, the United States Army, the Uniformed Services University (and its affiliated Human Performance Resource Center and Consortium for Health and Military Performance), Defense Health Agency, M.I.T.

Lincoln Laboratory, U.S. Army Natick Soldier Systems Center and their affiliates as requested by the COR and KO for the purposes of research and performance optimization initiatives. The contractor shall participate in external evaluations related to outcome measures and scalability as requested by the above entities and with advance notice of at least thirty days.

5.2.9 The contractor is responsible for providing access to raw data and completing data analysis related to program implementation (satisfaction,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .