A01_PWS_B168_Vindicator.pdf

PDF 106 KB Posted

Attached to
Vindicator Security System Upgrade Federal contract opportunity
Solicitation number
W912SV-17-T-1000
Issued by
Department of the Army Massachusetts Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Vindicator Security System Upgrade, newest first.
File Type Posted
A07_RFI_28-29.pdf PDF
A07_RFI_17-22.pdf PDF
A07_RFI_12-16.pdf PDF
A07_RFI_23-27.pdf PDF
A07_RFI_1-11.pdf PDF
A07_JBCC_NCIC_Access_Form_UPDATED.pdf PDF
A07_JBCC_NCIC_Access_Form.pdf PDF
A07_DFARS_252.209-7999.pdf PDF
A03_JA_B168_Vindicator_Redacted.pdf PDF
A07_WD_15-4045_(Rev.-2).pdf PDF
A07_Provisions_&_Clauses.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Vindicator Security System Upgrade

7 April 2017

1.0 General:

1.1 Scope: Services non-personal. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to upgrade the Vindicator security system so it is fully operational and compatible with existing Vindicator system infrastructure at Otis ANGB, MA.

Except as specified in Paragraph 3.0 titled Government Furnished Property, Material, Equipment and Services. All system components and elements shall be installed in accordance with requirements of ICD 705 Tech Spec, UL 2050, the manufacturer’s instructions, and the contractor shall perform to the standards of this contract.

1.2 Period of Performance (POP): No Later Than (NLT) 30 September 2017

1.3 General Information:

1.3.1 Place and Performance of Services: Performance shall be at the 102IW. Hours of Operation for performance is Eastern Standard Time (EST) of 0700 (7:00 a.m.) and 1600 (4:00 p.m.) during the period of performance, except on recognized United States (US) holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.

1.3.2 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:

1.3.2.1 New Year’s Day: 1 January

1.3.2.2 Martin Luther King, Jr.’s Birthday: Third Monday in January

1.3.2.3 President’s Day: Third Monday in February

1.3.2.4 Memorial Day: Last Monday in May

1.3.2.5 Independence Day: 4 July

1.3.2.6 Labor Day: First Monday in September

1.3.2.7 Columbus Day: First Monday in October

1.3.2.8 Veteran’s Day: 11 November

1.3.2.9 Thanksgiving Day: Third Thursday in November

1.3.2.10 Christmas Day: 25 December

1.3.3 Quality Control (QC). The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS.

1.3.4 Quality Assurance (QA). The Government will evaluate the contractor’s performance under this contract in accordance with a Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level

1.3.5 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the Contracting Officer (KO). The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.3.6 Security Requirements: The Government reserves the right to deny access at any time, for any reason.

1.3.6.1 Sensitive Compartmentalized Information (SCI) Cleared personnel only. USG installations shall be in compliance with paragraph 7.A.3.c.1 (of ICD 705) Prohibit Non SCI Cleared personnel from modifying the Intrusion Detection System (IDS) or Access Control System (ACS). In addition, “Installation and testing within the U.S. shall be performed by U.S. companies using U.S. citizens.” – ICD 705 Tech Spec Chapter 7.

1.3.6.2 Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by 102 Security Forces Pass and Identification (ID) Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, United States Air Force (USAF), and local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.3.6.3 Entrance to JBCC and specifically the 102IW are controlled and security is strictly monitored. In accordance with the 102IW Policy for Contractor Access, the Contractor shall complete a unit developed “Contractor Matrix”, “Day Pass Request Form” or “102IW Request for Identification Application” in order to obtain access. Submissions of these documents are required prior to the pre-performance conference or 10 calendar days prior to start of work. Any additions or changes shall be submitted to the Contracting Officer’s Representative (COR) no less than 3 weekdays prior to required period of performance to allow timely processing. Access credentials will only be issued following an approved identification process to include vetting against authoritative government databases from the 102IW Security Forces Pass and ID Office. The Contractor is cautioned that these requirements shall be strictly enforced and any delays and/or costs associated with not adhering to these requirements shall be at the Contractor’s own expense.

1.3.6.4 The Contractor will coordinate with the COR on all security issues and to gain access to the base and all areas necessary to execute this service.

1.3.6.5 The Contractor shall ensure that all employees, suppliers, and subcontractors and their employees comply with established security procedures for entering the installation and its facilities, including special security procedures for entry to restricted or controlled areas.

1.3.6.6 All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and be authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of US government issued photo identification (driver’s license, US passport, US work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

1.3.6.7 All personnel, the vehicles and property under their control are subject to search upon entering or exiting the installation, or at any point while on the installation. Any vehicles or personnel found in possession of prohibited items will be removed, and/or barred, from the installation and released to the appropriate civil authorities.

1.3.6.8 The Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.

1.3.6.9 All contractors and their subcontractors who are issued passes to gain access for the 102 IW return all local access credentials to the Contracting Officer Representative (COR) when the contract is completed or when a contractor employee no longer requires access to the installation (e.g., quits or the contract is terminated). Failure to do so will initiate immediate notification to SF for an appropriate update in Defense Biometric Identification System (DBIDS) when a contractor refuses to return issued access media. If a local access credential is not returned, the Installation Commander may consider debarment.

1.3.6.10 Photography and recording is not allowed except for official use and by permit only.

Photographs will be reviewed by the Special Security Officer to ensure sensitive and/or classified information is not revealed.

1.3.6.11 The Contractor shall not post to company websites, publications, newsletters or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the Contracting Officer Representative (COR) or Technical Point of Contact, as applicable.

1.3.6.12 Because observation of events, operations, physical changes, etc. may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.) Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data or information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:

1.3.6.12.1 Tactics, techniques and procedures, work schedules, increases, change, or decreases in work/deployment frequency of government personnel or vehicles; specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the installation Security Office.

1.3.7 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.3.8 Areas controlled by Contractor employees shall comply with installation operations plans/instructions for Force Protection Condition procedures, Random Antiterrorism Measures (RAMS) and local search /identification requirements. The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the end of each work shift, all Government facilities, equipment, and materials shall be secured.

1.3.9 Anti-Terrorism (AT) Level 1 Awareness Training. All contractor employees, to include subcontractor employees, requiring access to National Guard Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training no later than 30 calendar days after contract start date and no later than 30 calendar days of new employees commencing performance. AT level 1 awareness training can be completed at the following website: http://jko.jten.mil/courses/atl1/launch.html or by locally approved training provided by the installation. The contractor shall submit certificates if completed through the website or by submitting roster with employee signature validating completion in accordance with Technical Exhibit 2.

1.3.10 SPECIAL QUALIFICATIONS: Contractor shall be currently certified by Vindicator Technologies and authorized to operate and maintain Vindicator IDS (Intrusion Detection System), VCC (Vindicator Command and Control Systems) and ACS (Access Control Systems).

1.3.11 Identification of Contractor Employees: The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products.

1.3.12 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in Federal Acquisition Regulation (FAR) Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.3.13 Safety and Fire Protection Requirements.

1.3.13.1 Safety Requirements. The contractor shall take all necessary precautions to meet proper safety standards and regulations of all local, state and federal codes and regulations. In performing work under this contract, the contractor shall:

1.3.13.1.1 Comply with all Occupational Safety and Health Administration (OSHA) regulations and requirements shall apply to all work performed on the Installation.

1.3.13.1.2 Conform to any additional restrictions outlined by the Base Safety Officer (BSO) and the JBCC Fire Department (FD) during the course of the contract to insure the safety of their employees, government employees and the general public.

1.3.13.1.3 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

1.3.13.1.4 Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

1.3.13.1.5 Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the Contractor.

http://jko.jten.mil/courses/atl1/launch.html

1.3.13.1.6 Record and report promptly (within one hour) to the contracting officer or authorized COR all available facts relating to each instance of damage to government property or injury to either Contractor or government personnel.

1.3.13.1.7 In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

1.3.13.1.7.1 If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

1.3.13.1.8 When entering the Installation there are requirements that shall be adhered to. They are as follows:

1.3.13.1.8.1 While on the installation, use of a cell phone while operating a vehicle or other motorized equipment is prohibited by DoD regulations unless the operator is utilizing a hands-free device.

1.3.13.1.8.2 The installation speed limit is 40 mph unless otherwise posted. Motor vehicle regulations are strictly enforced and excessive violations may result in the loss of driving privileges on the installation.

1.3.13.1.8.3 The Installation speed limit is reduced to 15 mph and strictly enforced adjacent to military troop movements (i.e., personnel, vehicle convoys, etc.) traversing installation roadways.

1.3.13.1.8.4 Failure to follow the on base requirements is grounds for removal from the installation.

1.3.13.2 Fire Prevention and Protection Plan. This section covers the responsibility of the Contractor while performing under this contract. The emergency telephone number for JBCC is 911.

1.3.13.2.1 The Contractor shall strictly adhere to the attached “Joint Base Cape Cod (JBCC) Fire Prevention Standard 911-1” (attachment 1) while performing work on any area of the JBCC.

1.3.14 Environmental Controls. This section covers the responsibility of the contractor while performing under this contract.

1.3.14.1.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the KO pursuant to notice requirements and negotiate a modification to the contract.

1.3.14.1.2 Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities.

2.0 Government Roles and Responsibilities:

2.1 The Contracting Officer (KO) is the only individual with the authority to authorize changes within this project that will have an effect on the scope and/or monetary value (increase or decrease) of contract.

2.2 The Contracting Officer’s Representative (COR) is the individual designated and authorized in writing by the Contracting Officer at contract award to perform specific technical or administrative functions on contracts. The key role of the COR is to observe, document, and communicate contractor performance to both the KO and Contractor. All coordination and correspondence should be forwarded through the COR to the KO. COR and alternate COR (if applicable) will be responsible for the inspection and acceptance of performance and any deliverables under the scope of this PWS and resulting contract.

The COR does NOT have authority to change the terms and conditions of the contract.

2.2.1 All contracting actions and/or correspondence should be forwarded through the COR. The COR will act as the Contracting Officer’s representative for technical matters, providing technical direction and discussion as necessary with respect to the specification or PWS, and monitoring the progress and quality of the contractor’s performance in accordance with the PRS and QASP. The COR does not have authority to take any action, either directly or indirectly, that would change the pricing, quantity, quality, place of performance, delivery schedule, or any other term and condition of the contract, or to direct the accomplishment of effort that goes beyond the scope of the PWS in the contract. When, in the opinion of the contractor, the COR requests efforts outside the existing scope of the contract, the contractor shall promptly notify the KO in writing. The contractor under such direction shall take no action until the KO has resolved the issue or has otherwise issued a modification to the contract.

2.2.2 In the absence of the COR (due to reasons such as leave, illness, and official travel), all responsibilities and functions assigned to the COR shall be the responsibility of the KO until an alternate is assigned.

2.3 Government personnel other than KOs and the authorized COR, may, with KO coordination, observe Contractor operations. However, these personnel may not interfere with Contractor performance or make any changes to the contract.

2.4 Other Observers. Authorized government personnel shall be permitted to observe operations as necessary.

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, services, and/or utilities listed below:

3.1 Facilities: N/A

3.2 Equipment: N/A

3.3 Materials: N/A

3.4 Services: N/A

3.5 Utilities: All utilities will be available for the contractor’s use in the performance of this contract.

4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E). Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.1 Secret Facility Clearance: Secret Facility Clearance: The contractor does not require Secret Facility Clearance, but will be required to submit a “Contractor Matrix” to the COR in accordance with paragraph 1.4.6.2.

5.0 CONTRACT PERFORMANCE REQUIREMENTS. The contractor shall provide the following:

5.1 Upgrade Vindicator ACS (Access Control Systems), Vindicator IDS (Intrusion Detection System), VCC (Vindicator Command and Control Systems), and reporting systems to most current version (Windows 7 or 10). All IDS, VCC, ACS, and Security Archive Workstations (SAW) are previous generation and shall be upgraded to match 102d Security Forces Squadron (SFS) infrastructure.

5.2 All ACS/IDS systems shall be compatible and fully integrate with 102 SFS’s equipment.

5.3 Repair, restore, and/or upgrade system to full operational capability to include potential removal of sensors, repair of sensors, or upgrading of sensors.

5.4 Ensure system is appropriately configured to enable SSO personnel and Security Forces (located in a separate building) are simultaneously notified of unauthorized entry and all other security risks, to include internal and external.

5.5 Add access control capability (proxy reader with PIN pad and all associated equipment) to the door between buildings.

5.6 Install badge-out system on SCIF door. Modify or remove crashbar to prevent routine exit without scanning the badge. Install panic/emergency button to unlatch door from inside for actual emergencies. All installation must comply with ICD 705 Technical Specification Version 1.3 and be completed with SCIF accreditation in mind. Coordinate with base civil engineering personnel as needed and use existing/available material to the maximum extent possible.

5.7 Minimum warranty requirements shall be three (3) years for parts and (1) year for labor.

5.8 Payment Requirements.

5.8.1 In accordance with FAR 52.212-1(k), prospective awardees shall have an active Cage Code prior to award of a government contract. In accordance with FAR 52.212-3, prospective awardees shall have completed the Online Representations and Certifications. To register for a Cage Code or to complete Online Representations and Certifications, go to the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/.

5.8.2 Contractor must not be debarred, suspended, proposed for debarment, excluded or disqualified under the non-procurement common rule, or otherwise declared ineligible from receiving Federal contracts, certain subcontracts, and certain Federal assistance and benefits. The Government will not issue an award to any business identified as debarred, or otherwise disqualified as identified above.

5.8.3 Contractors interested and capable of obtaining contract award must register with the Wide Area Work Flow (WAWF) located at https://wawf.eb.mil/. Contractors are required to create and submit invoices electronically through WAWF and receive payment via electronic funds transfer (EFT) for https://www.sam.gov/portal/public/SAM/ supplies or services rendered. WAWF is a secure Web-based system for electronic invoicing, receipt and acceptance. The WAWF application enables electronic form submission of invoices, government inspection, and acceptance documents in order to support DoD’s goal of moving to a paperless acquisition process.

5.8.4 The Contractor shall submit invoice consistent with the format of the contract line items.

Contractor shall submit invoice within five (5) calendar days after the completion of each performance period.

5.8.5 The Government will review the invoice and reject or authorize payment as applicable through

WAWF.

5.8.6 The contract payment terms shall be made in accordance with established discounted terms.

Contractor is encouraged to provide additional discounts when submitting their invoice.

5.8.7 The contract payment terms shall be made in accordance with established discounted terms.

Contractor is encouraged to provide additional discounts when submitting their invoice.

5.9 Contractor Manpower Reporting (CMR). The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall completely fill in all the information in the format using the following web address http://www.ecmra.mil/.

5.9.1 The required information includes: (1) Contracting Office, KO, COR; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period;

(4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).

5.9.2 As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year.

6.0 Definitions and Acronyms.

6.1 Definitions.

http://www.ecmra.mil/

6.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

6.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

6.1.3 CONTRACTING OFFICER'S REPRESENTATIVE. An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

6.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

6.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

6.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

6.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

6.1.8 QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

6.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN. An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

6.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

6.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privet of contract with the subcontractor.

6.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

6.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.

6.2 Acronyms.

6.2.1 AF Air Force

6.2.2 AFARS Army Federal Acquisition Regulation Supplement

6.2.3 AFI Air Force Instruction

6.2.4 AFMAN Air Force Manual

6.2.5 AGR Active Guard and Reserve

6.2.6 ANG Air National Guard

6.2.7 AQL Acceptable Quality Level

6.2.8 AT Anti-Terrorism

6.2.9 BSO Base Safety Officer

6.2.10 CFP/M/E Contractor Furnished Property, Materials, Equipment

6.2.11 CM Contract Manager

6.2.12 CMR Contractor Manpower Reporting

6.2.13 CONUS Continental United States (excludes Alaska and Hawaii)

6.2.14 COR Contracting Officer Representative

6.2.15 DA Department of the Army

6.2.16 DFARS Defense Federal Acquisition Regulation Supplement

6.2.17 DOD Department of Defense

6.2.18 EFT Electronic Funds Transfer

6.2.19 EST Eastern Standard Time

6.2.20 FAR Federal Acquisition Regulation

6.2.21 FD Fire Department

6.2.22 FSC Federal Service Code

6.2.23 FPCON Force Protection Condition

6.2.24 GFP/M/E Government Furnished Property, Materials, Equipment

6.2.25 HQDAF Headquarters, Department of Air Force

6.2.26 ID Identification

6.2.27 IG Inspector General

6.2.28 IW Intelligence Wing

6.2.29 JBCC Joint Base Cape Cod

6.2.30 KO Contracting Officer

6.2.31 OCI Organizational Conflict of Interest

6.2.32 ODC Other Direct Costs

6.2.33 OSHA Occupational Safety and Health Administration

6.2.34 POC Point of Contact

6.2.35 POP Period of Performance

6.2.36 PRS Performance Requirements Summary

6.2.37 PWS Performance Work Statement

6.2.38 QA Quality Assurance

6.2.39 QAP Quality Assurance Program

6.2.40 QASP Quality Assurance Surveillance Plan

6.2.41 QC Quality Control

6.2.42 QCP Quality Control Program

6.2.43 SAM System for Award Management

6.2.44 TE Technical Exhibit

6.2.45 UIC Unit Identification Code

6.2.46 US United States

6.2.47 USAF United States Air Force

6.2.48 WAWF Wide Area Work Flow

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

PWS

Paragraph

Task / Performance Standard

Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

5.1 Upgrade Vindicator ACS

(Access Control Systems), Vindicator IDS (Intrusion Detection System), VCC (Vindicator Command and Control Systems), and reporting systems.

All equipment shall be the most current version (Windows 7 or 10).

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.2 All ACS/IDS systems

shall be compatible and fully integrate with 102 SFS’s equipment.

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.3 Repair, restore, and/or

upgrade system to full operational capability to include potential removal of sensors, repair of sensors, or upgrading of sensors.

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.4 Ensure system is

appropriately configured so SSO personnel and Security Forces are notified of unauthorized entry and all other security risks, to include internal and external.

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.5 Add access control

capability (proxy reader with PIN pad and all associated equipment) to the door between buildings.

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.6 Install badge-out system

on SCIF door.

System shall be fully operational and integrated with the current Vindicator security system.

COR and Electronic Security Systems (EES) NCOIC inspection and verification of a fully operational system.

5.8.4 Submit invoice

consistent with the format of the contract line items. Contractor shall submit invoice within five (5) calendar days after the completion of each performance period.

5% failure to submit invoice consistent with the format of the contract line items. Contractor shall submit invoice within five (5) calendar days after the completion of each performance period.

Rejected or Disapproved Invoice & Receiving Report in WAWF by Government Assigned Acceptor.

TECHNICAL EXHIBIT 2

Deliverables Schedule

Deliverable Frequency Number of Copies

Medium/Format Submit To

1.4.6.2 Security Requirements – Base Access

10 days prior to performance start date and when changes to personnel occur

N/A Electronic Submission via email

COR

1.4.9 Anti-Terrorism (AT) Level 1 Awareness Training

No later than 30 calendar days after contract start and no later than 30 calendar days after start of new employee commencing performance

N/A Electronic Submission via email

KO

1.4.10 Vindicator Certification

Submit with quotation no later than the established response time.

1 Electronic KO

5.8 Payment Requirements

Upon completion of performance

N/A Electronic Submission in

WAWF

https://wawf.eb.mil/

5.9 Contractor Manpower Reporting (CMR)

October of each year upon completion of performance