Brand_Name__130_condenser.pdf
PDF 166 KB Posted
- Attached to
- HVAC Replacement Building 130
- Solicitation number
- W912PQ-17-R-0010
About this file
Brand Name Letter
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-17-R-0010-0003.pdf | ||
| W912PQ-17-R-0010-0002.pdf | ||
| W912PQ-17-R-0010-0001.pdf | ||
| Carrier_Unit_Info.PNG | PNG image | |
| W912PQ-17-R-0010.pdf | ||
| General_Decision_Number_NY16.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLE SOURCE / NAME BRAND JUSTIFICATION
(For Other Than Full and Open Competition)
Reference: FAR 6.303-2
Section/Unit Name: ______________________________________________________
Requestor: ____________________________ Ext: ___________________________
1. State Relevance Of Purchase To Your Mission, Purpose, Research or Study:
2. Identify Supplies Or Services To Be Approved For Sole Source/Name Brand Treatment:
3. Identify Sole Source/Name Brand Manufacturer:
Name of Mfr __________________________________________________________
Mailing Address _______________________________________________________
Phone Number ________________________________________________________
Fax Number __________________________________________________________
Web Site Address (if available) ___________________________________________
4. Identify Provider/distributor of Service/Supply (if different from item 3):
Name _______________________________________
Address _____________________________________
Phone Number ________________________________
Fax Number __________________________________
5. If the Purchase is Related To Compatibility With Existing Equipment or Services, Identify the Existing Item(s) or Services:
6. Specific efforts (including market research) made to determine the availability of another source:
7. Sole Source Considerations: (Mark Only The One That Best Qualifies. Provide details in Paragraph 9)
A. FAR 6.302-1 – Only one responsible source, and no other supplies or services will satisfy Agency requirements:
[ ] Exclusive Rights - Item under patent or copyright held by a single vendor and item possesses functions or capabilities critical to use. (Attach applicable support) [ ] Exclusive Capability - Only one vendor qualified. No other potential vendors known. (Complete Section 9) [ ] Requires specially trained personnel to accomplish task.
[ ] Possesses widely known specialized expertise to accomplish task.
[ ] Possesses unique test equipment or facilities for need or task.
[ ] Responsible for integrated system performance where warranties or results will be voided if other products or vendors are introduced.
[ ] Quality of equipment from other known vendor sources have been demonstrated to be inferior or documented to be unacceptable.
[ ] Proprietary Design - Item possesses a unique function or capability critical in the use of the item and not available from any other sources.
[ ] Replacement Equipment - The purchase is for equipment associated with use of existing equipment where compatibility is essential for integrity of results. . (Complete Paragraph 8) ] Replacement Parts - The purchase is for replacement parts needed for repair of existing equipment where compatibility with equipment from the original manufacturer is paramount. (Complete Paragraph 8)
[ ] Replacement Accessories - The purchase is for accessories sought for enhancement of existing equipment where compatibility with equipment from the original manufacturer is paramount. (Complete Paragraph 8) [ ] Technical Service - The purchase is for technical services associated with the assembly, installation or servicing of equipment of a highly technical or specialized nature.
[ ] Follow-on acquisition for the continued development, production or use of specialized equipment or services.
B. FAR 6.302-2 - Unusual and compelling Urgency [ ] The Government would be seriously injured unless the agency is permitted to limit the number of sources from which to solicit bids or proposals. (Lack of advance planning is unacceptable)
(1) Explanation of the urgency:
(2) Why only the proposed Manufacturer/Supplier can meet need:
C. FAR 6.302-3 – Industrial mobilization; engineering, developmental, or research capability;
or expert services [ ] Award to this source is required in order to maintain the facility, manufacturer, or supplier available for furnishing supplies or services in case of a national emergency or mobilization.
[ ] Award is necessary to acquire the services of an expert or neutral person for any current or anticipated litigation or dispute.
D. FAR 6.302-4 – International agreement [ ] Competition precluded by the terms of an international agreement or treaty between the U.S. and a foreign government or international organization.
E. FAR 6.302-5 – Authorized or required by statute (or regulation) ] Statute (or regulation) expressly authorizes or requires that the acquisition be made from a specified source or through another agency. (Cite the statute or regulation in Paragraph 9 and provide supporting documentation.)
F. FAR 6.302-6 – National Security [ ] Disclosure of the unit’s needs would compromise national security, unless the unit is permitted to limit the number of sources from which to solicit bids or proposals.
G. FAR 6.302-7 – Public Interest [ ] Full and open competition need not be provided for when the Agency Head determines that it is not in the public interest in the particular acquisition concerned.
8. Replacement Equipment, Parts Or Accessories - (Mark One That Qualifies)
A. [ ] The item is manufactured or produced by the supplier and the supplier solely distributes (sells) direct to the customer.
B. [ ] The item is produced by the manufacturer, but not sold direct to the customer by the manufacturer, and the manufacturer solely distributes the item through a single supplier in the world, United States, or identified market area.
Note: If item is available from more than one supplier, the item can be treated as proprietary, but must be solicited from multiple sources of supply.
9. Narrative Justification - (Please Be Precise In Your Explanation)
10. I hereby certify the information provided herein to be accurate and complete to the best of my knowledge.
I understand any false or misleading information may be considered a violation under Federal Acquisition Regulations and subject to legal action.
Signature _________________________________________ Date: ___________________
Title: __________________________________________
Section Manager: ___________________________________ Date: ___________________ (Signature)
Typed Name: ______________________________________
FOR CONTRACTING USE ONLY:
It is the Contracting Officer’s determination that the anticipated cost to the Government will be fair and reasonable.
The Contracting Officer certifies that the justification is accurate and complete to the best of the Contracting Officer’s knowledge and belief.
Approved: __________________________________ Date: _______________________
| Reference: FAR 6.303-2 |
| B. FAR 6.302-2 - Unusual and compelling Urgency |
| FOR CONTRACTING USE ONLY: |
| SectionUnit Name: 174 CES | |
| Requestor: SSgt Josh Fuqua | |
| Ext: 233-2336 | |
| Name of Mfr: Carrier Enterprise Northeast | |
| Mailing Address: 1401 Erie Blvd | |
| Phone Number: 315-476-7070 | |
| Fax Number: 315-422-1590 | |
| Web Site Address if available: www.commercial.carrier.com | |
| Name: | |
| Address: | |
| Phone Number_2: | |
| Fax Number_2: | |
| 2017-08-25T10:51:30-0400 | |
| FUQUA.JOSHUA.PAUL.1266317804 |
| Date: 25 August 2017 | |
| Title: Joshua P. Fuqua, SSgt., NYANG | |
| Date_2: 25 August 2017 | |
| Typed Name: David F. Livesay, Capt, NYANG | |
| Date_3: 6 Sep 17 | |
| Text1: Replace failing condensing unit on HVAC system at Building 130. | |
| Text2: HVAC condensing unit, line sets , and evaporator coil | |
| Text3: The building's existing HVAC system is Carrier brand. The air handler component of the system will remain and the new condensing unit must be Carrier for compatibility. | |
| Text4: None | |
| Text5: | |
| Text6: | |
| Text7: The condensing unit at B130 is failing and needs to be replaced ASAP. This unit is part of the Carrier HVAC system that heats and cools the building. The air handling unit is in very good condition and does not require replacing. The new condensing unit must be compatible with the air handler for the system to function. | |
| 2017-09-06T09:09:33-0400 | |
| ashley.pace.1@us.af.mil |
| Check Box1: Off | |
| Check Box2: Off | |
| Check Box3: Off | |
| Check Box4: Off | |
| Check Box5: Off | |
| Check Box6: Off | |
| Check Box7: Off | |
| Check Box8: Off | |
| Check Box9: Yes | |
| Check Box10: Off | |
| Check Box11: Off | |
| Check Box12: Off | |
| Check Box13: Off | |
| Check Box14: Off | |
| Check Box15: Off | |
| Check Box16: Off | |
| Check Box17: Off | |
| Check Box18: Off | |
| Check Box19: Off | |
| Check Box20: Off | |
| Check Box21: Off | |
| Check Box22: Off | |
| 2017-08-25T09:59:49-0400 | |
| LIVESAY.DAVID.FRANCIS.1015039104 |
File details come from the government source that posted it. Updated .