Brand_Name__130_condenser.pdf

PDF 166 KB Posted

Attached to
HVAC Replacement Building 130
Solicitation number
W912PQ-17-R-0010
Issued by

About this file

Brand Name Letter

View the file

Other files

File Type Posted
W912PQ-17-R-0010-0003.pdf PDF
W912PQ-17-R-0010-0002.pdf PDF
W912PQ-17-R-0010-0001.pdf PDF
Carrier_Unit_Info.PNG PNG image
W912PQ-17-R-0010.pdf PDF
General_Decision_Number_NY16.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLE SOURCE / NAME BRAND JUSTIFICATION

(For Other Than Full and Open Competition)

Reference: FAR 6.303-2

Section/Unit Name: ______________________________________________________

Requestor: ____________________________ Ext: ___________________________

1. State Relevance Of Purchase To Your Mission, Purpose, Research or Study:

2. Identify Supplies Or Services To Be Approved For Sole Source/Name Brand Treatment:

3. Identify Sole Source/Name Brand Manufacturer:

Name of Mfr __________________________________________________________

Mailing Address _______________________________________________________

Phone Number ________________________________________________________

Fax Number __________________________________________________________

Web Site Address (if available) ___________________________________________

4. Identify Provider/distributor of Service/Supply (if different from item 3):

Name _______________________________________

Address _____________________________________

Phone Number ________________________________

Fax Number __________________________________

5. If the Purchase is Related To Compatibility With Existing Equipment or Services, Identify the Existing Item(s) or Services:

6. Specific efforts (including market research) made to determine the availability of another source:

7. Sole Source Considerations: (Mark Only The One That Best Qualifies. Provide details in Paragraph 9)

A. FAR 6.302-1 – Only one responsible source, and no other supplies or services will satisfy Agency requirements:

[ ] Exclusive Rights - Item under patent or copyright held by a single vendor and item possesses functions or capabilities critical to use. (Attach applicable support) [ ] Exclusive Capability - Only one vendor qualified. No other potential vendors known. (Complete Section 9) [ ] Requires specially trained personnel to accomplish task.

[ ] Possesses widely known specialized expertise to accomplish task.

[ ] Possesses unique test equipment or facilities for need or task.

[ ] Responsible for integrated system performance where warranties or results will be voided if other products or vendors are introduced.

[ ] Quality of equipment from other known vendor sources have been demonstrated to be inferior or documented to be unacceptable.

[ ] Proprietary Design - Item possesses a unique function or capability critical in the use of the item and not available from any other sources.

[ ] Replacement Equipment - The purchase is for equipment associated with use of existing equipment where compatibility is essential for integrity of results. . (Complete Paragraph 8) ] Replacement Parts - The purchase is for replacement parts needed for repair of existing equipment where compatibility with equipment from the original manufacturer is paramount. (Complete Paragraph 8)

[ ] Replacement Accessories - The purchase is for accessories sought for enhancement of existing equipment where compatibility with equipment from the original manufacturer is paramount. (Complete Paragraph 8) [ ] Technical Service - The purchase is for technical services associated with the assembly, installation or servicing of equipment of a highly technical or specialized nature.

[ ] Follow-on acquisition for the continued development, production or use of specialized equipment or services.

B. FAR 6.302-2 - Unusual and compelling Urgency [ ] The Government would be seriously injured unless the agency is permitted to limit the number of sources from which to solicit bids or proposals. (Lack of advance planning is unacceptable)

(1) Explanation of the urgency:

(2) Why only the proposed Manufacturer/Supplier can meet need:

C. FAR 6.302-3 – Industrial mobilization; engineering, developmental, or research capability;

or expert services [ ] Award to this source is required in order to maintain the facility, manufacturer, or supplier available for furnishing supplies or services in case of a national emergency or mobilization.

[ ] Award is necessary to acquire the services of an expert or neutral person for any current or anticipated litigation or dispute.

D. FAR 6.302-4 – International agreement [ ] Competition precluded by the terms of an international agreement or treaty between the U.S. and a foreign government or international organization.

E. FAR 6.302-5 – Authorized or required by statute (or regulation) ] Statute (or regulation) expressly authorizes or requires that the acquisition be made from a specified source or through another agency. (Cite the statute or regulation in Paragraph 9 and provide supporting documentation.)

F. FAR 6.302-6 – National Security [ ] Disclosure of the unit’s needs would compromise national security, unless the unit is permitted to limit the number of sources from which to solicit bids or proposals.

G. FAR 6.302-7 – Public Interest [ ] Full and open competition need not be provided for when the Agency Head determines that it is not in the public interest in the particular acquisition concerned.

8. Replacement Equipment, Parts Or Accessories - (Mark One That Qualifies)

A. [ ] The item is manufactured or produced by the supplier and the supplier solely distributes (sells) direct to the customer.

B. [ ] The item is produced by the manufacturer, but not sold direct to the customer by the manufacturer, and the manufacturer solely distributes the item through a single supplier in the world, United States, or identified market area.

Note: If item is available from more than one supplier, the item can be treated as proprietary, but must be solicited from multiple sources of supply.

9. Narrative Justification - (Please Be Precise In Your Explanation)

10. I hereby certify the information provided herein to be accurate and complete to the best of my knowledge.

I understand any false or misleading information may be considered a violation under Federal Acquisition Regulations and subject to legal action.

Signature _________________________________________ Date: ___________________

Title: __________________________________________

Section Manager: ___________________________________ Date: ___________________ (Signature)

Typed Name: ______________________________________

FOR CONTRACTING USE ONLY:

It is the Contracting Officer’s determination that the anticipated cost to the Government will be fair and reasonable.

The Contracting Officer certifies that the justification is accurate and complete to the best of the Contracting Officer’s knowledge and belief.

Approved: __________________________________ Date: _______________________

Reference: FAR 6.303-2
B. FAR 6.302-2 - Unusual and compelling Urgency
FOR CONTRACTING USE ONLY:
SectionUnit Name: 174 CES
Requestor: SSgt Josh Fuqua
Ext: 233-2336
Name of Mfr: Carrier Enterprise Northeast
Mailing Address: 1401 Erie Blvd
Phone Number: 315-476-7070
Fax Number: 315-422-1590
Web Site Address if available: www.commercial.carrier.com
Name:
Address:
Phone Number_2:
Fax Number_2:
2017-08-25T10:51:30-0400
FUQUA.JOSHUA.PAUL.1266317804
Date: 25 August 2017
Title: Joshua P. Fuqua, SSgt., NYANG
Date_2: 25 August 2017
Typed Name: David F. Livesay, Capt, NYANG
Date_3: 6 Sep 17
Text1: Replace failing condensing unit on HVAC system at Building 130.
Text2: HVAC condensing unit, line sets , and evaporator coil
Text3: The building's existing HVAC system is Carrier brand. The air handler component of the system will remain and the new condensing unit must be Carrier for compatibility.
Text4: None
Text5:
Text6:
Text7: The condensing unit at B130 is failing and needs to be replaced ASAP. This unit is part of the Carrier HVAC system that heats and cools the building. The air handling unit is in very good condition and does not require replacing. The new condensing unit must be compatible with the air handler for the system to function.
2017-09-06T09:09:33-0400
ashley.pace.1@us.af.mil
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
2017-08-25T09:59:49-0400
LIVESAY.DAVID.FRANCIS.1015039104

File details come from the government source that posted it. Updated .