BUILDING SEVEN DOOR QUESTIONS ANSWERS.docx

DOCX document 12 KB Posted

Attached to
Replace Building Door
Solicitation number
W912PQ-11-R-0006
Issued by

About this file

Attached are the questions and answers to the questions that were asked during the site visit and the questions that were also asked after the site visit.

View the file

Other files

File Type Posted
BUILDING SEVEN DOOR QUESTIONS ANSWERS.docx DOCX document
BUILDING SEVEN AMENDMENT.pdf PDF
Stratton Building 7 Garage Door_SIGNED.PDF PDF
BUILDING 7 SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Seven Project Questions

1) Who is going to be responsible for the removal of the electrical connections and conduit to the door controller and opener motor? ANG will provide this service

2) There is doweling in the side walls. Does there need to be doweling on the floor for the first course of block? No

3) Does there need to be reinforcing rebar in the rest of the wall vertically? Not just on the sides of the new door? No

4) Will a dumpster be allowed near the door on the outside of the building? If yes, what arrangements need to be made? Will the contractor be permitted to drive their vehicles on the apron to the work site? Yes, arrange with CE for dumpster location. The Contractor will be able to drive as long as they stay near the building and don’t cross the red line onto the apron area.

5) Is there an existing metal wall panel system warranty currently in place that could be comprised with this scope of work? If yes, is a new warranty going to be required? No

6) Can an “OR EQUAL” metal wall panel system be used? Yes, but all materials will be submitted for approval.

7) In reference to the new 3’ x 7’ man door is glass going to be required in the door? If yes, what type of glass? No glass required

8) On SKS-S2 CMU note #4 indicates that the contractor shall employ a third party engineer to observe masonry construction. Is this going to apply to this project? Eliminate notes #3 and #4 on SKS-S2

9) Will testing be performed by the owner? Eliminate notes #3 and#4 on SKS-S2. As long as the grout design mix is submitted to the Owner, no further testing will be required.

10) Drawing SKS-S2 has a metal siding detail with a 2” deep profile. The metal siding manufacturer (CENTRIA) is saying that they do not have a 2” deep profile. They have a 1-1/2” deep profile. Is the 1-1/2 deep profile going to be acceptable? Yes, the siding detail should show a 1-1/2” deep profile.

File details come from the government source that posted it. Updated .