BUILDING 7 SOLICITATION.pdf

PDF 253 KB Posted

Attached to
Replace Building Door
Solicitation number
W912PQ-11-R-0006
Issued by

About this file

Project Solicitation. This project is being set aside for small business. The site visit for this project will be held on Thursday 14 April at 10AM. Please take the time to read the site visit instructions which will be found on page eighteen of the solicitation.

View the file

Other files

File Type Posted
BUILDING SEVEN DOOR QUESTIONS ANSWERS.docx DOCX document
BUILDING SEVEN DOOR QUESTIONS ANSWERS.docx DOCX document
BUILDING SEVEN AMENDMENT.pdf PDF
Stratton Building 7 Garage Door_SIGNED.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F9S3S40308A001

The project is to replace the overhead door in building seven at Stratton Air National Guard Base Scotia, NY.

A three page PDF file draw ing show ing the specif ics of this project w ill also be included electronically w ith this solicitation. The draw ing is dated March 17, 2011 and the project number is 22601.

MICHAEL KENNETH SPATUZZI 518 344-2487

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Apr-2011

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________14 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Apr 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

W912PQ - 109 MSG/MSC

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

W912PQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

11:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

518-344-2687FAX:TEL: 518-344-2477 TEL: FAX:

W912PQ-11-R-0006 22

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PQ-11-R-0006

Section 00010 - Solicitation Contract Form

LIQUIDATED DAMAGES

STATEMENT OF LIQUIDATED DAMAGES

(Project: Replace Overhead Doors B7+8 VBDZ112001)

In accordance with FAR 36.206, liquidated damages will be assessed for each calendar day required to complete the construction work on this project past the scheduled completion date. The contractor has complete control of the pace of work. Liquidated damages shall be in the amount as follows:

$420.00 Each day past scheduled completion date.

$300.00 One-time fixed cost.

Itemized Costs

CIVIL ENGINEER

Engineer 4.00 hrs/day @ $55.00/hr = $220.00 per day

Project Engineer 0.0 hrs/day @ $25.00/hr =

Inspector 4.0 hrs/day @ $20.00/hr = $80.00 per day

Transportation $0.00 per day

Total Civil Engineering Cost per day $300.00 per day

PROCUREMENT

Contracting Officer 2.0 hrs/day @ $30.00/hr = $60.00 per day

Contract Administrator 2.0 hrs/day @ $30.00/hr = $60.00 per day

Total Procurement Cost per day $120.00 per day

TOTAL COST PER DAY BEYOND COMPLETION DATE = $ 420.00 per day

PROBABLE ADDITIONAL LOSSES

Loss of living quarters by non-completion

Loss of use of runways/taxiways

$ N/A

$ N/A

Loss of use of building

Loss of revenue from facilities providing services, $ N/A

$ N/A

FIXED COSTS

One time transportation cost – Engineer

One time transportation cost -- Procurement

$ N/A

$ N/A

Preparation of Modification

Staff Judge Advocate Review

$125.00

$175.00

TOTAL FIXED COST $300.00

//SIGNED//

CHRISTOPHER E. TYMULA, SMSgt, NYANG

Base Contracting Officer

DAVIS BACON WAGE RATES

GENERAL DECISION: NY20100002 12/03/2010 NY2 Date: December 3, 2010 General

Decision Number: NY20100002 12/03/2010 Superseded General Decision Number:

NY20080002 State: New York Construction Types: Building, Heavy and Highway Counties:

Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington Counties in New York. BUILDING CONSTRUCTION PROJECTS (For all counties except COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 04/30/2010 3

07/23/2010 4 09/24/2010 5 10/08/2010 6 10/15/2010 7 11/12/2010 8 11/19/2010 9 12/03/2010

ASBE0040-002 05/01/2009 Rates Fringes Asbestos/Insulator Worker SCOPE OF WORK:

includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88 HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95 ---------------------------------------------------------------- BOIL0197-002

01/01/2010 Rates Fringes BOILERMAKER......................$ 30.24 20.03 ------------------------------

---------------------------------- BRNY0002-019 06/01/2009 Rates Fringes BRICKLAYER

BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS,

CAULKERS & CLEANERS....................$ 26.91 15.78 HEAVY & HIGHWAY

CONSTRUCTION CEMENT MASONS..............$ 27.87 15.04 MARBLE, TILE & TERRAZZO

FINISHERS...................$ 21.86 12.88 MARBLE, TILE & TERRAZZO

WORKERS.....................$ 27.43 15.38 ----------------------------------------------------------------

CARP0019-002 07/01/2009 Rates Fringes Carpenters: HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND GREENE COUNTIES) Carpenters, Millwrights, Pile

Drivers...............$ 24.40 15.59 ---------------------------------------------------------------- CARP0229-

003 07/01/2009 Rates Fringes Carpenters: SARATOGA COUNTY HEAVY & HIGHWAY

CONSTRUCTION: Carpenters.................$ 27.54 13.80 WASHINGTON COUNTY HEAVY &

HIGHWAY CONSTRUCTION: Carpenters.................$ 27.04 13.80 PAID HOLIDAYS: Labor

Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday. ----------------------------------------

------------------------ CARP0370-001 06/01/2010 ALBANY, FULTON, MONTGOMERY,

RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES Rates Fringes Carpenters:

BUILDING CONSTRUCTION Carpenters & Soft Floor Layers.....................$ 27.20 15.81

Piledriver.................$ 27.70 15.81 HEAVY & HIGHWAY CONSTRUCTION

Carpenters.................$ 26.39 14.95 ----------------------------------------------------------------

CARP0370-003 07/01/2009 Rates Fringes Carpenters: CARPENTERS..................$ 26.39 14.95

DIVER TENDERS...............$ 25.49 14.95 DIVERS (Dry Day)............$ 25.49 14.95

DIVERS......................$ 60.00 14.95 PILEDRIVERS.................$ 24.49 14.95 -----------------------

----------------------------------------- ELEC0236-001 06/01/2009 ALBANY; COLUMBIA;

FULTON; GREENE (that portion North of a line following the south limits of the city of

Catskill); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON Rates Fringes ELECTRICIAN......................$ 30.50 17.09 -------------------------

--------------------------------------- ELEC0363-004 04/01/2009 GREENE COUNTY (Portion of)

Rates Fringes ELECTRICIAN......................$ 37.00 23.12 -----------------------------------------------

----------------- ELEC1249-003 05/04/2009 Rates Fringes LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for

Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 22.25 13.50+6.5%+a Groundman Digging Machine

Operator....................$ 32.74 11.75+6.5%+a Groundman Truck Driver (tractor trailer unit)......$

31.52 13.50+6.5%+a Groundman Truck Driver......$ 29.66 13.50+6.5%+a Lineman &

Technician........$ 37.08 13.50+6.5%+a Mechanic....................$ 29.66 13.50+6.5%+a

FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the

President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday. -----------------------------

----------------------------------- ELEC1249-004 05/04/2009 Rates Fringes Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved): Cable

Splicer..............$ 44.67 13.50+7%+a Flagman....................$ 24.37 13.50+7%+a Groundman digging machine operator...................$ 36.55 13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 34.52 13.50+7%+a Groundman Truck driver.....$ 32.49 13.50+7%+a Lineman and Technician.....$ 40.61 13.50+7%+a Mechanic...................$ 32.49 13.50+7%+a Overhead transmission line work (where other trades are or have been involved): Cable Splicer..............$

47.44 13.50+7%+a Flagman....................$ 25.88 13.50+7%+a Groundman digging machine operator...................$ 38.82 13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 36.66

13.50+7%+a Groundman truck driver.....$ 34.50 13.50+7%+a Lineman and Technician.....$

43.13 13.50+7%+a Mechanic...................$ 34.50 13.50+7%+a Substation: Cable

Splicer..............$ 44.67 13.50+7%+a Flagman....................$ 24.37 13.50+7%+a Ground man truck driver....$ 32.49 13.50+7%+a Groundman digging machine operator...................$ 36.55

13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 34.52 13.50+7%+a Lineman &

Technician.......$ 40.61 13.50+7%+a Mechanic...................$ 32.49 13.50+7%+a Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 46.10 13.50+7%+a

Flagman....................$ 25.15 13.50+7%+a Groundman Digging Machine Operator...................$

37.72 13.50+7%+a Groundman Truck Driver (tractor-trailer unit).....$ 35.62 13.50+7%+a

Groundman Truck Driver.....$ 33.53 13.50+7%+a Lineman & Technician.......$ 38.87

11.75+7%+a Mechanic...................$ 33.53 13.50+7%+a TELEPHONE, CATV FIBEROPTICS

CABLE AND EQUIPMENT Cable splicer/Central Office Person..............$ 23.07 3.05+3%

Groundman..................$ 11.61 3.05+3% Installer Repairman- Teledata Lineman/Tecnician-

Equipment Operator.........$ 21.91 3.05+3% TREE TRIMMER................$ 18.92 4.05+3%+b

FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good

Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's

Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day. ----------------------------

------------------------------------ ELEC1249-007 05/04/2009 LINE CONSTRUCTION

(LINEMAN) LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER

OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS

COLUMBIA COUNTY Rates Fringes LINE CONSTRUCTION: Lineman

Flagman.....................$ 23.00 13.50+6.5%+a Groundman Digging Machine

Operator....................$ 34.51 13.50+6.5%+a Groundman Truck Driver (Tractor-trailer unit)......$

32.59 13.50+6.5%+a Groundman Truck Driver......$ 30.67 13.50+6.5%+a Lineman and

Technician......$ 38.34 13.50+6.5%+a Mechanic....................$ 30.67 13.50+6.5%+a PAID

HOLIDAYS: a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the

President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. -------------------------------------

--------------------------- ELEV0035-001 01/01/2010 ALBANY; COLUMBIA (Towns of

Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of Durham, Greenville, New Baltimore, Coxcsackie and Athens); MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES Rates Fringes Elevator

Constructor.............$ 37.69 20.035 FOOTNOTES: a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and the day after Thanksgiving Day, Christmas Day. b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit. ---------------------------------------------------------------- ELEV0138-004 01/01/2010

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN,

GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS

OF HUNTER AND CATSKILL) Rates Fringes ELEVATOR MECHANIC................$ 47.71

20.035+a+b FOOTNOTES: a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving

Day and Christmas Day. b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit. -------

--------------------------------------------------------- ENGI0106-001 07/01/2010 HEAVY &

HIGHWAY Rates Fringes Power equipment operators: GROUP 1.....................$ 33.87 19.65+a

GROUP 2.....................$ 33.44 19.65+a GROUP 3.....................$ 32.53 19.65+a GROUP

4.....................$ 29.96 19.65+a GROUP 5.....................$ 35.05 19.65+a GROUP 6.....................$

34.37 19.65+a GROUP 7.....................$ 34.87 19.65+a POWER EQUIPMENT OPERATOR

CLASSIFICATIONS (HEAVY & HIGHWAY) GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over 5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator

Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom Truck (5 tons and under), Cableway, Caisson Auger, Central Mix Concrete Plant

(Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-

Hydraulicly Operated) (Gradall or similar), Fork Lift (Factory Rated 15 ft. and over), Front End

Loader (4 c.y. and over), Head Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland Loader, Mine Hoist, Mucking Machine or Mole, Pavement Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer Mounted

Log Chipper (Self-Feeder), Tug Operator (Except Manned Rented Equipment), Tunnel Shovel

GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Spreader and

Mixer, Blacktop Plant (Non-Automated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage-Hoist, Central Mix Plant (Non-Automated) and All Concrete Batching

Plants, Cherry Picker (5 Tons Capacity and Under), Compressors (4 or less) Exceeding 2000

C.F.M. Combined Capacity, Concrete Paver (over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power Unit, Drill Rigs (Tractor Mounted), Front End Loader (under 4 c.y.), Hi-Pressure -

Boiler (15 lbs. and over), Hoist (One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance Engineer/Greaseman/ Welder, Mixer

(For Stabilized Base Self-Propelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Pug Mill, Pump Crete, Ready Mix Concrete Plant, Refrigeration Equipment (For Soil

Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-

Rock Drill, excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat GROUP 4:

A-Frame Winch Hoist on Truck, Ballast Regulator (Ride- On), Compressors (4 not to exceed

2000 C.F.M. Combined Capacity, or 3 or less with more than 1200 C.F.M. but not to exceed

2000 C.F.M.), Directional Drill Machine Locator Dust Collectors, Generators, Pumps, Welding

Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and

Finishers, Conveyor, Drill Core, Drill Well, Electric Pump Used In Conjunction with Well Point

System, Farm Tractor with Accessories, Fine Grade Machine, Fork Lift (under 15 ft.), Grout

Pump, Gunite Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker (Ride-On), Hydro-

Blaster Water, Post Hole Digger and Post Driver, Power Sweeper, Roller (Grade and Fill), Scarifier (Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible

Electric Pump (When Used In Lieu Of Well Point System), Tamper (Ride-On), Tie Extractor

(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer (Ride-On), Tire Repair, Track Liner, Tractor With Towed Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate

Plant, Boiler (Used In Conjunction With Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust Collectors, Generators, Pumps, Welding Machines, Light Plants (3 or less of Any Type or Combination), Concrete or Mixer

(16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump

(Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or Pavement

Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor GROUP 5: Master Mechanic GROUP 6: Crane Premium with Boom Length and

Jib 150 Ft.- 199 Ft. GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over

Tower Crane Premium .50 Hazmat Work Premium 2.50 Hydrographic .50 FOOTNOTE: a. PAID

HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, Lincoln's Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day ----------------------------------------------------------------

ENGI0106-002 07/01/2010 BUILDING Rates Fringes Power equipment operators: GROUP

1.....................$ 33.88 19.79+a GROUP 2.....................$ 33.44 19.79+a GROUP 3.....................$

32.53 19.79+a GROUP 4.....................$ 29.96 19.79+a GROUP 5 1..........................$ 34.38

19.79+a 2..........................$ 34.88 19.79+a GROUP 6.....................$ 34.38 19.79+a GROUP

7.....................$ 35.43 19.79+a GROUP 8.....................$ 37.93 19.79+a Hazardous work -

Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate. FOOTNOTE: a. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day. POWER EQUIPMENT OPERATOR

CLASSIFICATIONS (BUILDING) GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons) GROUP 2:

Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under) GROUP

3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8

cu. yd. or smaller GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps GROUP 5: Crane Premiums: 1 over 150' 2 over 200' GROUP 6: Tower Crane

GROUP 7: Master mechanic (other than nuclear work) GROUP 8: Master mechanic on nuclear work ---------------------------------------------------------------- IRON0012-011 05/01/2009

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY (Amsterdam, Charleston, Florida, Glen, Mohawk and

Root); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES: Rates Fringes Ironworkers: Sheeter, Bucker-up..........$ 25.78 17.96

Sheeter.....................$ 26.50 17.39 Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen..................$ 26.25 17.39 ------------------------------

---------------------------------- IRON0440-007 05/01/2009 FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford); MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville): Rates Fringes Ironworkers: Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 23.63 19.16 ------------

---------------------------------------------------- LABO0017-001 06/01/2010 COLUMBIA COUNTY

(Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson) Rates Fringes Laborers:

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)

(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work)

HEAVY & HIGHWAY GROUP 1:...................$ 32.75 17.95+a GROUP 2:...................$ 36.65

17.95+a GREENE COUNTY (Township of Catskill) HEAVY & HIGHWAY: GROUP

1:...................$ 28.40 17.95+a GROUP 2:...................$ 32.75 17.95+a GROUP 3:...................$

36.65 17.95+a GROUP 4:...................$ 39.15 17.95+a TUNNEL, SHAFT & CAISSON WORK

GROUP 1....................$ 39.15 17.95+a For HEAVY & HIGHWAY CLASSIFICATIONS in

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required For HEAVY

& HIGHWAY CLASSIFICATIONS in GREENE COUNTY (Township of Catskill)

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving

Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons. GROUP 1: Flagperson, gateperson GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter;

permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men. Ground man on milling machine GROUP 3 Ingersoll Rand heavy duty crawler-master

HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman GROUP 4:

Asbestos, toxic, lead or hazardous material abatement foreman For TUNNEL, SHAFT &

CAISSON WORK CLASSIFICATIONS FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and Powderman; Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air ---------------------------------------------------------------- LABO0035-001

06/01/2010 FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST.

JOHNSVILLE) Rates Fringes Laborers Building Construction Asbestos Removal............$ 21.50

13.44 Blasters, Form Setters, MotorBuggy Operator (Rider Type)......................$ 20.50 13.44

Hazardous Waste Removal Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 21.50 13.44 HEAVY & HIGHWAY: GROUP

1:...................$ 24.30 16.54 GROUP 2:...................$ 24.50 16.54 GROUP 3:...................$ 24.70

16.54 GROUP 4:...................$ 24.90 16.54 Laborers....................$ 20.00 13.44 Pipelayers, Motor

Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)...............$ 20.15 13.44

Wagon Drill Operator........$ 20.40 13.44 FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. GROUP

1: Common Laborers, Flagman, Outboard and Hand boats GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers GROUP 3: All rock or drilling machine operators

(except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters ----------------------

------------------------------------------ LABO0157-001 07/01/2009 FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of

Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton

Park); SCHENECTADY and SCHOHARIE COUNTIES. Rates Fringes LABORER BUILDING:

GROUP 1....................$ 22.88 13.65 GROUP 2....................$ 24.23 13.65 HEAVY &

HIGHWAY: GROUP 1:...................$ 24.34 14.40+a GROUP 2:...................$ 24.54 14.40+a

GROUP 3:...................$ 24.74 14.40+a GROUP 4:...................$ 24.94 14.40+a GROUP

5:...................$ 26.34 14.40+a LABORER CLASSIFICATIONS Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply FOOTNOTE: a. PAID

HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day LABORER CLASSIFICATIONS GROUP 1: Common laborers, flagman, outboard & hand boats GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman GROUP 4: Blasterers, form setters, stone or granite curb setters GROUP 5: Hazardous waste removal ------------------------------------------------

---------------- LABO0190-001 07/01/2010 ALBANY; RENSSELAER COUNTY,

WASHINGTON COUNTY, SARATOGA COUNTY (Townships of Stillwater, Halfmoon, Saratoga) Rates Fringes Laborers: BUILDING: GROUP 1....................$ 22.46 14.94 GROUP

2....................$ 23.81 14.94 LABORERS CLASSIFICATIONS GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply --------------------------

-------------------------------------- LABO0190-002 07/01/2010 ALBANY; RENSSELAER;

COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz). GREENE (except Catskill Township). WASHINGTON COUNTY.

SARATAGO COUNTY (Townships of Stillwater, Halfmoon Saratoga) Rates Fringes Laborers:

HEAVY & HIGHWAY: GROUP 1:...................$ 24.89 14.85 GROUP 2:...................$ 25.09

14.85 GROUP 3:...................$ 25.29 14.85 GROUP 4:...................$ 25.49 14.85 GROUP

5:...................$ 25.89 14.85 FOOTNOTE: PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. LABORERS

CLASSIFICATIONS GROUP 1: Common laborers, flagmen, outboard and hand boats GROUP

2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1

1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman GROUP 4: Blasterers, form setters, stone or granite curb setters GROUP 5:

Hazardous waste removal ---------------------------------------------------------------- LABO1000-005

05/01/2009 COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram): Rates Fringes Laborers: HEAVY &

HIGHWAY GROUP 1....................$ 24.20 18.75+a GROUP 2....................$ 27.96 18.75+a

GROUP 3....................$ 28.96 18.75+a LABORERS CLASSIFICATIONS (HEAVY &

HIGHWAY) GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders; tool rooms GROUP 2: General Laborers, Dumpman, Pitman, Concrete man; Signal man; Pipelayers;

Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator; wrecking; Vibrator operator-compactor;

Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker; Asphalt Workers GROUP

3: Asphalt raker; Asphalt Screedman; Drillers (all); Laser Beam Operator; Form Setter/Aligners;

Blasters FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November

Election Day, Thanksgiving Day, and Christmas Day -----------------------------------------------------

----------- * PAIN0009-005 05/01/2010 Rates Fringes Painters: Lead Abatement Workers, Structural Steel Zone 1.....................$ 26.04 8.58 Zone 2.....................$ 24.79 9.83 Painters, Drywall Finishers, Spray Zone 1.....................$ 25.04 8.58 Zone 2.....................$ 23.79 9.83 Zone

#1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA ZONE #2 All of WASHINGTON County -------------------

--------------------------------------------- * PAIN0009-013 07/01/2010 Rates Fringes

GLAZIER..........................$ 23.10 14.59 ---------------------------------------------------------------- *

PAIN0155-002 05/01/2010 COLUMBIA AND GREENE COUNTIES Rates Fringes Painters:

Drywall Finisher............$ 27.39 16.31 Lead Abatement Work.........$ 27.39 16.31

Painter/Paperhanger.........$ 27.39 16.31 Spray Rate..................$ 28.39 16.31 -------------------------

--------------------------------------- PAIN0806-002 10/01/2010 ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY, SARATOGA

AND WASHINGTON Rates Fringes Painters: Structural Steel and Bridge.$ 46.25 31.03 ----------

------------------------------------------------------ PLUM0007-001 05/01/2009 ALBANY;

COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY;

SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and

Waterford) Rates Fringes PLUMBER/PIPEFITTER...............$ 31.41 18.33 --------------------------

-------------------------------------- PLUM0773-002 05/01/2010 SARATOGA (Remainder of

County); WASHINGTON COUNTY: Rates Fringes PLUMBER/PIPEFITTER...............$ 29.00

18.13 ---------------------------------------------------------------- ROOF0203-003 06/01/2007

SCHOHARIE COUNTY: Rates Fringes ROOFER, Including Built Up, Composition and Single

Ply Roofs............................$ 21.20 10.34 ----------------------------------------------------------------

ROOF0241-001 06/01/2006 Rates Fringes ROOFER, Including Built Up, Composition and

Single Ply Roofs............................$ 21.65 9.42 ------------------------------------------------------------

---- SFNY0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 29.90 16.30 ---

------------------------------------------------------------- SHEE0083-001 06/01/2010 Rates Fringes

Sheet metal worker...............$ 29.11 19.86+a FOOTNOTE: a. PAID HOLIDAYS: New Year's

Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday. ----------------------------------------------------------------

TEAM0294-002 05/01/2006 BUILDING CONSTRUCTION Rates Fringes Truck drivers:

GROUP 1.....................$ 22.27 9.84+a GROUP 2.....................$ 22.57 9.84+a FOOTNOTES: a.

One week vacation after 1 year; 2 weeks vacation after 5 years. TRUCK DRIVERS BUILDING

CLASSIFICATIONS GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site (including nozzle) GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers ----------------------------------------------------------------

TEAM0294-003 07/01/2010 Rates Fringes Truck drivers: HEAVY & HIGHWAY GROUP

1....................$ 25.87 14.75+a GROUP 2....................$ 25.92 14.75+a GROUP 3....................$

25.97 14.75+a GROUP 4....................$ 26.12 14.75+a GROUP 5....................$ 26.27 14.75+a

TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY) GROUP 1: Pick-ups, panel trucks, flatboy material trucks (straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman GROUP 2: Tandems, batch trucks, mechanics GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday. -------------------------------------------

--------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a)

(1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION

APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and

Hour Division letter setting forth a position on a wage determination matter * a conformance

(additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction Wage Determinations. Write to: Branch of Construction Wage Determinations

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S.

Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information

(wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).

Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.

================================================================ END

OF GENERAL DECISION

STATEMENT OF WORK

Scope of Work

Replace Overhead Door Building 7

Project Number VBDZ112001

PROJECT DESCRIPTION

The Contractor shall provide all material, labor, equipment, and supervision required to remove, dispose of, and replace a roll-up door with a wall and a standard door. The project will be constructed per the attached drawing and specification. All electrical work will be performed by a licensed electrician. The exterior door to be installed will be comprised of 16 ga metal, 3 ft wide x 7ft high, 1 ¾ thick with a pushbar exit device from the interior with a closure. The door will match the existing door located along the same wall. The Contractor will be responsible for the repair or replacement of any damages to Air

Force property that they inflict. It is highly recommended that the Contractor attend a pre-arranged site visit prior to submitting a bid.

CONTRACTOR REQUIREMENTS

1. The Contractor is responsible for the proper disposal of all rubbish off-base.

2. The Contractor is required to follow all environmental regulations including providing 109 th

Civil Engineering with all applicable MSDS sheets.

3. The Contractor will submit all warrantee information against defects in material and workmanship upon completion of installation.

4. The Contractor is responsible for accuracy of all measurements and the implementation of appropriate building codes. The Contractor must get approval from Civil Engineering before starting work and before any utility shutdowns.

5. The Contractor is responsible for site cleanliness.

6. The Contractor shall provide product submittals for materials prior to beginning work. The 109

Civil Engineering Squadron will review product submittals and return them to the Contractor.

Only materials approved by the 109

Civil Engineering Squadron will be used for this project.

PROPOSED PROJECT SCHEDULE

The project will begin 14 days following the Notice to Proceed. The project shall be completed within

14 calendar days following the start date.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum Replace Overhead Door On Building 7

FFP

Replace Overhead Door on Building 7

PROPOSED PROJECT COMPLETIION TIME: Fourteen (14) days after the notice to proceed is issued at the preconstruction meeting.

MAGNIITUDE OF CONSTRUCTION PROJECT: In accordance with FAR Part

36.204(a) the magnitude of this project is: Less than $25,000.

FOB: Destination

NSN: Z199-00-000-0000

PURCHASE REQUEST NUMBER: F9S3S40308A001

SIGNAL CODE: A

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 13-MAY-2011 TO

27-MAY-2011

N/A F9S3S4 - 109 CES RPM-SRM

MAJOR TY RANDALL

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

518-344-2440

FOB: Destination

F9S3S4

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-7 Central Contractor Registration APR 2008

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

SEP 2006

52.222-3 Convict Labor JUN 2003

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14…