A21 - 24Q0024 - Questions and Answers.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
CFLD Security Fence Installation
Solicitation number
W912PM24Q0024
Issued by

About this file

This document contains Questions and Answers related to Solicitation Number W912PM24Q0024 for the CFLD Security Fence Installation project. The solicitation is for the removal and replacement of approximately 373 feet of 9-gauge chain link security fence with angled 3-strand galvanized barb wire, as well as the installation of 200 feet of removable 12-gauge chain link fence panels around the Cape Fear Lock and Dam 3 in Bladen County, North Carolina. The period of performance is 90 days after contract award, and work must be scheduled between 6:00 AM and 3:00 PM Monday through Thursday, excluding federal holidays. The solicitation is a 100% small business set-aside under NAICS code 238990, with a size standard of $19,000,000. Interested contractors must be registered in the System for Award Management (SAM) to be eligible for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation Question's and Responses
10-Apr-24
Solicitation Number: W912PM24Q0024
CFLD Security Fence Installation
Question #QuestionResponse
1what size is the double-drive gateIV.B.h. Two (2) 8 foot swing gates.
2what thickness do you need for the fence?IV.B.d. The contractor shall supply galvanized commercial grade with 9-gage, chain link 2” wire mesh fences with angled, 3-strand galvanized barb wire top.
3will the fence require top rail and or tension wire?IV.B. g. The contractor shall supply a minimum grade of 15/8” SF20 Premium Commercial Grade Galvanized Top Rail.
4how many of feet of wire is being removed?I.B.a.1. (1) Lock 1 approximately 440’ minimum 9-gauge wire chain link fence.
5Is there a layout of the 300ft of fence so can see how many times it stops and turns?IV.A.b. Contractor is responsible for inspecting the site and for determining the exact dimensions, equipment, material, and hardware necessary for the project as specified in the SOW and contract documents. The contractor shall obtain all permits, licenses, and inspections required by all local, state, and federal authorities.
6Can we obtain the specifications and drawings associated with this request.There are no specifications and drawings other than what is in the solicitation's SOW.
7Just to confirm the installation address is Cape Fear Lock & Dam 3 1248 Bill Hall Road Fayetteville, NC 28306 right? The posting shows Riegelwood, NC 28456.Correct. Revised in SAM.gov.
8Can you please let us know if we can provide past performance and proof of satisfactory performance of our Subcontractor who will perform the installation phase in this project?Yes, you may provide the subcontractor’s past performance as long as that specific subcontractor would ultimately be performing the work.
9I would like to ask if there are going to be any additional documents that give more information about the size and existing conditions, as well as the location that will be uploaded for the project mentioned above?There are no additional documents other than what is in the solicitation's SOW. The location is also provided in the SOW.
10Can I still bid on this without attending the site visit?Yes, you can still provide a quote. The site visit was not mandatory.
11Are there any plans or drawings you may be able to send me to get an idea of what will be installed? If bids aren't due for a couple of weeks, would it be possible to make a site visit the week of the 15th?There are no plans or drawings other than what is in the solicitation's SOW. There will be no other organized site visits. If you would like to see the site, you may go without any correlation with USACE, any time the area is open to the public.