1. Site visit attendance sheet 2. Request for Information Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BNJ-JHK_COMMUNICATIONS_UPGRADE3_-_FINAL.pdf | ||
| DRAWING-Kerr_Communications_Install_-_2016.pdf | ||
| W912PM-16-R-0019-_SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
RFI ANSWERS/ SITE VISIT ATTENDANCE
1. Site visit attendance sheet attached.
2. Request for Information (RFI) answ ers sheet attached.
3. The response date and time for questions is NOT extended as a result of this amendment.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-R-0019
X 9B. DATED (SEE ITEM 11)
01-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2016
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-16-R-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
(End of Summary of Changes)
Request for Information: Answers
1. Has a contractor performed similar work to this for the government in the past? If available, please provide the incumbent contract number. If you are unable to provide a contract number, is it safe to assume this is a new requirement for the government?
Answer: Yes, similar work was performed under W912PM-15-P-0061; however, this specific requirement is new
2. For ALL UG conduits showing copper and fiber to be pulled in the same conduit, our intention is to install / pull fiber rated inner duct and the copper cable in the conduit first, then pull the fiber in that inner duct. For intrinsic protection and to ensure that the fiber is not damaged, we never pull coper and fiber in the same raceways without some form of inner duct protection. Is this acceptable?
Answer: Yes.
3. Does USACE have the original design of Mays Chapel Rd? We would like to know if the material under the road near the Nature Center is fill dirt or solid rock. The road looks to be built up, but we are not sure.
Answer: No we do not. We assume it is fill dirt and not solid rocks.
4. What type of conduit material is to be used for the 10” conduit under Mays Chapel Rd at the Nature Center parking lot (steel, PVC)?
Answer: PVC.
5. Exactly where is the drop to be delivered in the vicinity of the Ranger Station? Is the drop to be delivered to the building in the middle of the road or the building closest to the pole #34?
Answer: Building closest to pole 34.
6. Can the drop to the sewage pump house (Pole 22) be underground instead of aerial? If not, can we set a pole adjacent to the pump house and a weather head going into the pump house?
Answer: Yes, it can be installed underground but in conduit.
7. What size junction boxes are required or desired?
Answer: The contractor shall propose the size of the junction box for the types of cable and hardware required in the box.
8. P.4 By “pole mounted type boxes” do they mean splice cases? If not, what is the intended “pole mounted type box”? Is there a spec / supplier that the USACOE prefers?
Answer: It must be in a junction box that is mounted on the pole. The contractor must choose the manufacturer for the junction box.
9. P. 4 “all work must be completed by 120 of the Notice to proceed” – the time interval is not specified. Is this business days?
Answer: Calendar days.
10. There will need to be a significant amount of utility locating where trenching, boring and digging is required, will the USACOE have the utility locating done or is that also part of our scope? Is there a Utility Locating service that the USACOE prefers / requires on this property?
Answer: This is the contractor’s responsibility for the location services.
11. Is firestop required on all interior wall penetrations where we will be entering a building / installing either conduit or cables? If so, what is the rating required?
Answer: No.
12. In the nature center, visitors center and maintenance facility, once we get the coper and fiber into the building, can we run the cables / secure them with straps or do we need to run ¾’ conduits to pull the coper and fiber in? Currently all cables installed in those buildings are just secured with straps / no conduits.
Answer: Must be installed in an appropriate sized conduit for the cables, according to the NEC. We are not sure that ¾” is appropriate for the sized cables involved.