This document provides details for a federal contract solicitation to construct Phase II of the Alcoa Dike in Corona, Riverside County, California. The Army Corps of Engineers seeks to build approximately 3,000 linear feet of earthen dike flood control structure with an average height of 22 feet above existing ground and width of crest at 15 feet. Key aspects of the project include installing a 15-inch layer of riprap and 12-inch bedding on the upstream slope, hydroseeding the downstream slope, and constructing a concrete floodwall and floodgate across Auburndale Street. The solicitation period of performance is 1,095 calendar days, with completion of initial bid items required within 730 days and landscape establishment and borrow area closure finalized within 365 days prior to the end of the period of performance. The estimated cost range for this procurement is $10-25 million and it has been set aside as 100% for small businesses. The NAICS code is 237990 for other heavy and civil engineering construction, with a size standard of $39.5 million.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(SEE ITEM 13)

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II W912PL21B0004 Riverside County, CA

SF 30 CONTINUATION PAGE 1 OF 2

19 July 2021 Amendment 0001

SF 30 BLOCK 14 CONTINUATION

SUMMARY OF CHANGES

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Number Section Title

SF-1442 SOLICITATION OFFER AND AWARD

Solicitation due date has been changed to 30 July 2021

00 01 10 TABLE OF CONTENTS

00 10 00 CONTRACT LINE ITEM (CLIN) SCHEDULE

Removed “Estimated” under the Column for Quantities

00 21 00 INSTRUCTIONS

Update entire Section 00 21 00 Added clauses:

5152.211‐9000 Evaluation of Subline Items 52.204‐22 Alternative Line Item Proposal

00 21 13 INSTRUCTION TO BIDDERS

Updated Section 00 21 13 Replace page 5 of 7 in section 00 21 13: Updated bid opening date and added call in number for virtual bid opening

00 70 00 CONDITIONS OF THE CONTRACT

Updated Entire Section 00 70 00 Added clause: 52.232‐13 Notice of Progress Payments

00 73 00 SUPPLEMENTARY CONDITIONS

Updated Entire Section 00 73 00 Duplicate clauses, the following clauses were removed from this section 52.211‐18 Variation in Estimated Quantities 52.236‐2 Differing Site Conditions 52.236‐3 Site investigation and Condition Affecting the Work 52.236‐6 Superintendence by the Contractor 52.236‐8 Other Contracts 52.236‐9 Protection of Existing Vegetation, Structures, Equipment, utilities and Improvements 52.236‐11 Use and Possession Prior to Completion 52.236‐14 Availability and Use of Utility Services 52.236‐15 Schedules for Construction Contracts 52.236‐21 Specification and Drawings for Construction

00 73 46 WAGE RATES

DIVISION 01 – 48 - TECHNICAL SPECIFICATIONS

Section Number Section Title 01 33 00

ATTACHMENT SUBMITTAL REGISTER

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II W912PL21B0004

SF 30 CONTINUATION PAGE 2 OF 2

19 July 2021 Amendment 0001

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DRAWINGS

Sheet Number

Sheet Title

G-002 INDEX TO CONTRACT DRAWINGS

1 to 23 of 23

IMPROVEMENT PLANS FOR RINCON STREET AND BUTTERFIELD

CONNECTOR ALCOA DIKE PROJECT CITY OF CORONA

1 to 3 of

CITY OF CORONA ALCOA DIKE 8” SEWER RELOCATION &

PROTECTION PLAN

1 to 2 of

CITY OF CORONA ALCOA DIKE 12” DOMESTIC WATER STEEL CASING

ANNULAR SPACE FILL

1 to 3 of

CITY OF CORONA ALCOA DIKE 24” EFFLUENT FORCE MAIN

RELOCATION & PROTECTION PLAN

1 to 11 of 11

SANTA ANA RIVER TRAIL – PHASE 4 CLASS 1 MULTI-USE PATH AND

NATURAL SURFACE TRAIL

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE

9. FOR INFORMATION CALL

B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour)

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912PL21B0004 x

3. DATE ISSUED

1 OF

U.S.Army Corps of Engineers, Los Angeles Dist Attn:Contracting Division CESPL-CT-W 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401

A. NAME

Michael G Robinson 213-452-3311

10 see 00 73 00

X X *Section 00 73 00

X 10

1 Digital 1:00 PM

30 july 2021 If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

X

8. ADDRESS OFFER TO

Bids are to be submitted electronically, DoD Secure Access File Exchange (DoD Safe) at https://safe.apps.mil/ in accordance with Section 00 21 13, Instructions Pertaining to Submission of Electronic Bids (APR 2020).

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

Alcoa Dike Phase 2, Corona, Riverside County, CA

The project is approximately 3,000 linear feet earthen filled dike flood control structure. The elevation of the top of the dike varies between elevations 569.50 and 573.50. The dike will have the following basic characteristics: average height of 22 feet above existing ground, width of crest is 15 feet, 2.25 horizontal to 1 vertical (2.25H:1V) side slopes, upstream slope will be protected with 15-inch layer of riprap over a 12-inch layer of bedding, downstream slope will be hydroseeded. Butterfield Drive, W. Rincon Street, and Auburndale Street will be impacted by the construction of the dike. A concrete floodwall and floodgate will be constructed across Auburndale Street. Butterfield Drive will be modified and a new connector road constructed to connect to Rincon Street.

Total Period of Performance is 1095 Calendar Days. Completion of Bid Item’s 0001 through 0032, 0034, and 0036 through 0038 will be within the first 730 Calendar Days. Completion of Bid Item 0033 and 0035 Landscape Establishment and 0034 Borrow Area Closure will be 365 Calendar Days and be completed prior to the end of the Total Period of Performance period.”

The Estimate cost range for this procurement is $10,000,000 - $25,000,000

This procurement is a 100% total Small Business Set Aside. The NAICS Code is 237990 "Other Heavy and Civil Engineering Construction. The size Standard is $39,500,000.00.

Be advised this project may delayed, postponed, canceled or revised at any time prior to award.

Amendment 0001

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule

Santa Ana Dams Resident Office 2493 Pomona Riccon Rd.

Corona, CA 92880

USACE, Finance Center

ATTN: CEFCO-AO-D

5722 Integrity Drive Millington, TN 38054-5005

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

W912PL21B0004

SF-1442 - SOLICITATION AND AWARD Am1

00 01 05 CERTIFICATION PAGE

00 01 10 Am1 00 10 00 Am1 00 21 00 INSTRUCTIONS Am1 00 21 13 INSTRUCTIONS TO BIDDERS Am1

00 45 00 REPRESENTATION AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT Am1 00 73 00 SUPPLEMENTARY CONDITIONS Am1 00 73 46 WAGE RATES Am1

01 11 00 01 22 00 01 32 01 01 33 00 01 35 26 01 42 00 01 45 00 01 45 01 01 50 00

01 57 19

01 57 30 CONSTRUCTION DEWATERING AND CONTROL OF SURFACE WATER

01 74 19 CONSTRUCTION AND WASTE MANAGEMENT AND DISPOSAL

01 78 00

03 30 00 03 30 57

05 12 00 05 50 13 05 50 15 05 59 20

09 96 23 09 97 02 Am1

31 00 00

TEMPORARY ENVIRONMENTAL CONTROLS (RIVERSIDE LEVEES REHABILITATION

PROJECT)

EARTHWORK

DIVISION 09 - FINISHES

GRAFFITI-RESISTANT COATINGS

DIVISION 05 - METALS

STRUCTURAL STEEL

MISCELLANEOUS METAL FABRICATIONS

CIVIL WORKS FABRICATIONS

DIVISION 31 - EARTHWORK

FABRICATION OF HYDRAULIC STEEL STRUCTURES

PAINTING: HYDRAULIC STRUCTURES

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SUMMARY OF WORK

PRICE AND PAYMENT PROCEDURES

PROJECT SCHEDULE

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

TABLE OF CONTENTS

SECTION 00 01 10

RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

SUBMITTAL PROCEDURES

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

CLOSEOUT SUBMITTALS

DIVISION 03 - CONCRETE

CAST-IN-PLACE CONCRETE

CONTROLLED LOW-STRENGTH MATERIAL (CLSM)

19 July 2021

TABLE OF CONTENTS PAGE 1

W912PL21B0004

31 09 13 31 11 00

31 56 14 SOIL-CEMENT-BENTONITE (SCB) CUTOFF WALL - DEEP MIXING METHOD

32 11 23 32 12 16 32 31 13 32 92 19 32 93 00

33 40 00 33 46 16

35 31 19

-- End of Project Table of Contents --

APPENDIX B - SANTA ANA RIVER TRAIL

DIVISION 32 - EXTERIOR IMPROVEMENTS

AGGREGATE BASE COURSE

SUBDRAINAGE PIPING

DIVISION 35 - STONE PROTECTION

STONE PROTECTION

HOT-MIX ASPHALT (HMA) FOR ROADS

CHAIN LINK FENCES AND GATES

SEEDING

EXTERIOR PLANTING

STORM DRAINAGE UTILITIES

GEOTECHNICAL INSTRUMENTATION AND MONITORING

CLEARING AND GRUBBING

APPENDIX A - UTILITIES AND STREET IMPROVEMENTS

DIVISION 33 - UTILITIES

19 July 2021

TABLE OF CONTENTS PAGE 2

W912PL21B0004

Item Description Quantity Unit Unit Price

Amount

0001 Construction Dewatering of Groundwater 1 Job JA -$

0002 Treatment of Dewatering Effluent 1 Job JA -$

0003 Control of Surface Water 1 Job JA -$

0004 Well Abandonment 2 EA $ -$

0005 Clear Site and Remove Obstructions 16 AC $ -$

0006 Stripping 25,000 CY $ -$

0007 Excavation 126,000 CY $ -$

0008 Overexcavation

0008AA First 4,000 CY 4,000 CY $ -$

0008BB Over 4,000 CY 4,000 CY $ -$

0009 General Fill 10,300 CY $ -$

0010 Zone I Material 306,600 CY $ -$

0011 Select Zone I Material 7,000 TON $ -$

0012 Zone II Material 79,000 CY $ -$

0013 15 Inch Riprap 19,800 TON $ -$

0014 Bedding 17,400 TON $ -$

CONTRACTOR MUST FURNISH ALL PLANT, LABOR, MATERIAL,

EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT

ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE

CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

SECTION 00 10 00

Solicitation Contract Line Item (CLIN) Schedule

Bidding Schedule

19 July 2021 SECTION 00 10 00 Page 1

W912PL21B0004

Item Description Quantity Unit Unit Price

Amount

0015 Aggregate Base Course 5,700 TON $ -$

0016 Floodgate 1 Job JA -$

0017 Floodwall 130 LF $ -$

0018 Culvert 1 - Station 91+44.45 1 Job JA -$

0019 Culvert 2 - Station 119+60 1 Job JA -$

0020 AC Paving 130 TON $ -$

0021 4 Foot Wide Concrete Swale 710 LF $ -$

0022 10 Foot Wide Concrete Swale 380 LF $ -$

0023 Test Trench 6 EA $ -$

0024 Settlement Monuments 25 EA $ -$

0025 Settlement Bases 2 EA $ -$

0026 Geotechnical Instrumentation 1 Job JA -$

0027 Soil-Cement-Bentonite (SCB) Cutoff Wall

8,600 SF $ -$

0028 CIP Wall Section 1 Job JA -$

0029 Sound Wall 10,000 LF $ -$

0030 Swing Gate 1 Job JA -$

0031 Landscape Planting and Hydroseeding 7 AC $ -$

0032 Temporary Irrigation 7 AC $ -$

0033 Landscape Establishment 7 AC $ -$

0034 City of Corona 12 Inch Domestic Water Steel Casing Annular Space Fill 1 Job JA -$

0035 Borrow Area Closure 1 Job JA -$

19 July 2021 SECTION 00 10 00 Page 2

W912PL21B0004

Item Description Quantity Unit Unit Price

Amount

0036 City of Corona Street Improvements 1 Job JA -$

0037 City of Corona Sewer and Force Main Relocation and Protection 1 Job JA -$

0038 Santa Ana River Trail - Phase 4 1 Job JA -$

-$ TOTAL AMOUNT:

(Line Items 0001 through 0038)

19 July 2021 SECTION 00 10 00 Page 3

Section 00 21 00 Instructions

Table of Contents

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

52.204-16 Commercial and Government Entity Code Reporting (AUG 2020) 52.204-22 Alternative Line Item Proposal. (Jan 2017)

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)

52.214-5 SUBMISSION OF BIDS (DEC 2016)

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

52.214-34 Submission of Offers in the English Language. (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991)

52.216-1 TYPE OF CONTRACT (APR 1984)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements-Alternate II (2009)

52.228-1 BID GUARANTEE (SEP 1996)

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

5152.211-9000 EVALUATION OF SUBLINE ITEMS (DEC 2019)

52.252-5 Authorized Deviations in Provisions. (Nov 2020)

252.215-7008 ONLY ONE OFFER (JUL 2019)

252.204-7008 Compliance with Safeguarding Covered Defense Information Controls (OCT 2016)

W912PL21B0004

19 July 2021

SECTION 00 70 00 Page 1 of 13

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

SECTION 00 70 00 Page 2 of 13 Amendment 0001 http://www.sam.gov/ http://www.sam.gov/

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.204-16 Commercial and Government Entity Code Reporting (AUG 2020)

(a) Definition. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

(b) The Offeror shall provide its CAGE code with its offer with its name and location address or otherwise include it prominently in its proposal. The CAGE code must be for that name and location address. Insert the word "CAGE" before the number. The CAGE code is required prior to award.

(c) CAGE codes may be obtained via--

(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).

(2) The DLA Commercial and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the Offeror does not otherwise register in SAM, an Offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.

(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity's country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.

SECTION 00 70 00 Page 3 of 13 Amendment 0001 https://www.sam.gov/ http://www.sam.gov/ https://cage.dla.mil/ https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx http://www.nato.int/structur/AC/135/main/links/contacts.htm

(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.

(e) When a CAGE code is required for the immediate owner and/or the highest-level owner by Federal Acquisition Regulation (FAR) 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE code from that entity to supply the CAGE code to the Government.

(f) Do not delay submission of the offer pending receipt of a CAGE code.

(g) If the solicitation includes FAR clause 52.204-2, Security Requirements, a subcontractor requiring access to classified information under a contract shall be identified with a CAGE code on the DD Form 254. The Contractor shall require a subcontractor requiring access to classified information to provide its CAGE code with its name and location address or otherwise include it prominently in the proposal. Each location of subcontractor performance listed on the DD Form 254 is required to reflect a corresponding unique CAGE code for each listed location unless the work is being performed at a Government facility, in which case the agency location code shall be used. The CAGE code must be for that name and location address. Insert the word "CAGE" before the number. The CAGE code is required prior to award.

52.204-22 Alternative Line Item Proposal. (Jan 2017)

(a) The Government recognizes that the line items established in this solicitation may not conform to the Offeror’s practices. Failure to correct these issues can result in difficulties in acceptance of deliverables and processing payments. Therefore, the Offeror is invited to propose alternative line items for which bids, proposals, or quotes are requested in this solicitation to ensure that the resulting contract is economically and administratively advantageous to the Government and the Offeror.

(b) The Offeror may submit one or more additional proposals with alternative line items, provided that alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation. However, acceptance of an alternative proposal is a unilateral decision made solely at the discretion of the Government. Offers that do not comply with the line items specified in this solicitation may be determined to be nonresponsive or unacceptable.

(End of provision)

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) (1) Bidders shall acknowledge receipt of any amendment to this solicitation--

(i) By signing and returning the amendment;

(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;

(iii) By letter;

(iv) By facsimile, if facsimile bids are authorized in the solicitation; or

(v) By email, if email bids are authorized in the solicitation.

SECTION 00 70 00 Page 4 of 13 https://cage.dla.mil/

(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of bids.

52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)

Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.

The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.

52.214-5 SUBMISSION OF BIDS (DEC 2016)

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(d) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV

1999)

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

SECTION 00 70 00 Page 5 of 13 in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

SECTION 00 70 00 Page 6 of 13 submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

(End of provison)

52.214-34 Submission of Offers in the English Language. (Apr 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.

52.214-35 Submission of Offers in U.S. Currency (Apr 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

(End of provision

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

SECTION 00 70 00 Page 7 of 13

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK

(MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

19% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

SECTION 00 70 00 Page 8 of 13 excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is City of Corona, Riverside County, California

52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements-Alternate II (2009)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material,"and “Bahrainian, Mexican, or Omani construction materials” used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

SECTION 00 70 00 Page 9 of 13

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FARclause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be __20%__ percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Contracting Office 915 Wilshire Blvd Suite 930 Los Angeles, CA 90017

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

SECTION 00 70 00 Page 10 of 13

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/content/regulations

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

N/A

5152.211-9000 EVALUATION OF SUBLINE ITEMS (DEC 2019)

Item No. 0008 is subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.

52.252-5 Authorized Deviations in Provisions. (Nov 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS(48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

252.215-7008 ONLY ONE OFFER (JUL 2019)

(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to--

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

SECTION 00 70 00 Page 11 of 13

(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3); and

(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.

(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

252.204-7008 Compliance with Safeguarding Covered Defense Information Controls (OCT 2016)

(a) Definitions. As used in this provision—

“Controlled technical information,” “covered contractor information system,” “covered defense information,” “cyber incident,” “information system,” and “technical information” are defined in clause 252.204-7012 , Safeguarding Covered Defense Information and Cyber Incident Reporting.

(b) The security requirements required by contract clause 252.204-7012 , shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.

(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012 (b)(2)—

SECTION 00 70 00 Page 12 of 13

(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 “Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations” (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.

(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—

(A) Why a particular security requirement is not applicable; or

(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.

(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.

(End of provision

-END OF SECTION-

SECTION 00 70 00 Page 13 of 13

RECEIPT OF SUBMISSIONS:

For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. For bids larger than the 8GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Bidders are responsible for ensuring that bids are submitted so as to reach the designated recipient. Bidders are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

(End of statement)

VIRTUAL BID OPENING PROCEDURES AND INSTRUCTIONS FOR BIDDER’S PARTICIPATON

The electronic bids for this project are due on 30 July 2021 at 1:00 PM Local time.

In order to allow the bid opening officer sufficient time to download the bids after bids are due, the virtual bid opening will be held at 2:15 PM local time on 30 July 2021.

At the bid opening teleconference, bids and the Independent Government Estimate will be read aloud, just as in a traditional bid opening.

Following the bid opening a copy of the bid abstract and any bid can be made available for public inspection by interested persons by emailing a copy of the abstract and requested bids to those who participated in the virtual bid opening. In addition, in accordance with established practices, the Abstract of Bids will be available at sam.gov for all interested parties.

To participate in the Virtual Bid Opening, the following information is provided:

1-844-800-2712 US Toll Free Access code: 199 827 1077

(End of statement)

CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY INFORMATION TO BE SUBMITTED

WITH BID

Amendment 0001 - Section 00 21 13

SARM Phase II Prado Dam Alcoa Aluminum Plant Dike Phase II

Section 00 70 00 Conditions of the Contract

Table of Contents

52.202-1 DEFINITIONS (JUN 2020)

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

52.203-7 Anti-Kickback Procedures (JUN 2020)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .