ATTACHMENT2.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Repair Multipurpose Indoor Firing Range (MIR)
Solicitation number
W912PF18R0008
Issued by

About this file

ATTACHMENT 2

View the file

Other files

File Type Posted
AMENDMENT1.pdf PDF
Enclosure2.docx DOCX document
ATTACHMENT1.pdf PDF
W912PF18R0008.pdf PDF
Enclosure3.docx DOCX document
Enclosure1.docx DOCX document
Enclosure4.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE-369

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
INDEPENDENT GOVERNMENT COST ESTIMATE
PREPARED BY:SILVANO RIZZO, MECH. ENGR.REVIEWED BY:Anthony C. Freitag, RA
DPW, EP&S Div., ESSDPW, EP&S Div., ESS Chief
silvano.rizzo.ln.asc@mail.milanthony.c.freitag.civ@mail.mil
Phone Number: 637-8258Phone Number:637-8207
Date:2nd February 2018Date:
Signature:Signature:
This IGCE was developed independently and prior to seeking any formal proposals from contractors.

The costs of subject project were based mainly on price lists of the Veneto Region and Vicenza Chamber of Commerce (labor and material).

For the materials not available in the above price books the costs were based on market surveys carried out at supplier companies.

http://www.regione.veneto.it/Ambiente+e+Territorio/Lavori+Pubblici/Prezzreg10.htm

http://www.vi.camcom.it/edili/index.php
Project # AJ - 00002 - 7J Replace Multipurpose Indoor Firing Range (MIR) Bldg #369.
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
1Total civil work - Totale lavoro civile€ 0.00€ 0.00
2Total electrical work - Totale lavoro elettrico€ 0.00€ 0.00
3Design efforts%6%6%€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
RATE€ 1.0000=$0.9329

1 CIVIL WORK-LAVORI CIVILI

1.1 Replace Bullet Trap L/S 1

1.2 Extend Target sleds L/S 1

1.3 Ballistic Sheet Metal on Side Walls L/S 1

1.4 Replace Ballistic Rubber Floor L/S 1

1.5 Replace linoleum floor L/S 1

Total civil work - Totale lavoro civile

2 ELECTRICAL WORK-LAVORI ELETTRICI

2.1 Improve Lighting System L/S 1

2.2 Wiring Target Sled System L/S 1

2.3 Modification synoptic panel L/S 1

2.4 Tests and Fire Range Certification Process L/S 1

Total electrical work - Totale lavoro elettrico
ATTACHMENT 2

Project #AJ-00002-7J Repair Multipurpose Indoor Firing Range (MIR) Bldg #369

CAMP EDERLE - VICENZA - ITALY

27 February 2018

ATTACHMENT 2