W912PF-16-T-0043-U0002.pdf

PDF 61 KB Posted

Attached to
MAINTENANCE IN GOVERNMENT LEASED QUARTERS (GLQ)
Solicitation number
W912PF-16-T-0043
Issued by

About this file

Amendment to add correct Performance Work Statement

View the file

Other files

File Type Posted
W912PF-16-T-0043-conformed.pdf PDF
W912PF-16-T-0043-0001.pdf PDF
Combinedsynopsissolicitation.pdf PDF
Attachment3Pastperformancequestionnaire.pdf PDF
Attachment1solicitation.pdf PDF
Attachment4.pdf PDF
Attachment2experiencequestionnaire.pdf PDF
combinedsynopsissolicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010857193

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add the correct Performance Work Statement (PWS)

1. CONTRACT ID CODE PAGE OF PAGES

Y 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF-16-T-0043

X 9B. DATED (SEE ITEM 11)

30-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2016

CODE

414TH CSB RCO ITALY SUBOFFICE LIVORNO

VIA AURELIA, EDIFICIO 5131

ZONA DEPOSITO

56128 TIRRENIA (PISA)

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PF-16-T-0043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

FOR

MINOR MAINTENANCE IN GLQ

GOVERNMENT LEASED QUARTERS

USAG LIVORNO, ITALY

April 2016

TABLE OF CONTENTS

SECTION PARAGRAPH TITLE

I DESCRIPTION OF SERVICES

1.1. Scope of Work

1.2. Location of Services

1.3. Hours of Operation

1.4. General Contract Services

1.5. Specific Tasks Plumbing

1.6. Specific Tasks Electricity

1.7. Specific Tasks Woodworks

1.8. Specific Tasks Multi-Functions

1.9.

1.10 1.11 1.12

Specific Tasks Screens Contractor Manpower Reporting (CMR) iWATCH/iSALUTE and OPSEC Training AT Level I Training

II SERVICE DELIVERY SUMMARY

III

3.1.

3.2.

3.3.

3.4.

3.5.

GOVERNMENT-FURNISHED PROPERTY & SERVICES

“RESERVED” this section if not Use General Information ( Reserved) Government-Furnished Property (Reserved) Contractor-Furnished Property (Reserved) Government-Furnished Services (Reserved) Government Provided Training (Reserved)

IV

GENERAL INFORMATION

4.1. Acceptance of Performance

4.2. Quality Control

4.3. Safety Plan

4.4. Physical Security

4.5 Contractor Identification

4.6.

Hours of operations

V TECHNICAL EXHIBITS

5.1

5.2 Workload Estimates (Reserved Publication & Forms (Reserved)

5.3 5.4

Required Reports List of the apartment and location

SECTION I

DESCRIPTION OF SERVICES

1.1. SCOPE OF WORK: Maintenance and Repair (M&R) in Government Leased Quarters.

1.2. LOCATION OF SERVICES: Works shall be performed in U.S. Government Leased Housing located in Livorno and Pisa, within 35 kilometers radius of Camp Darby. A higher percentage of work requests are placed during spring-summer time. The number of apartments can increase or decrease due to a new acquisition or cancellation of lease contracts.

1.2.1. EXCEPTION: Few units In the GLQ (Government Leased Quarters) inventory have for contract agreement the minor maintenance at the Landlord responsibility and cost, anyway all the work order for the screen repairing, carbon monoxide test and replacement will be executed by the contractor, including other works not considered minor maintenance.

1.3. HOURS OF OPERATION: The Contractor shall work between 08:00 to 17:00, Monday through Friday. The availability to work for real bona fide emergency assistance with the following schedule: Monday to Friday between 18:00 to 06:00, and during the Weekends, Holydays and Festivities 24 Hours assistance if requested by the Housing personnel in “on call” status. Emergencies MUST be only a real and bona fide Emergency, which may include the following situations: No electrical power, electric short circuit, no heat, no hot or cold water, water flooding, inoperative main door locks, gas leaking. All the other type of maintenance considered NOT AN EMERGENCY will be scheduled and resolved starting from the first duty day.

1.4. GENERAL CONTRACT SERVICES: The contractor shall provide all personnel, equipment, tools, material, supervision and service necessary to perform minor maintenance in vacant and occupied quarters as defined in this PWS, to Government-Leased Housing. The contractor shall perform to the standards in this contract. The Contractor shall remove and dispose of all the garbage left in the quarters and/or basement, balconies, carports, underground parking lots, and quarter’s property, and transport and dispose of in accordance with host nation laws and the direction of the COR.

1.4.1. Maintenance and Repair (M&R) Works – Scheduled & Emergency The Government will ask the contractor to perform work of maintenance and repair of the following type of work as:

- Electricity assistance (see details in paragraph 1.5)

- Plumbing assistance (see details in paragraph 1.6)

- Woodworks (see details in paragraph 1.7)

- Multi-Functions (see details in paragraph 1.8)

- Screens repair (see details in paragraph 1.9)

For any request, the Contractor shall prepare within one day a proposal which includes man-hours and material costs, that shall be submitted to the Contracting officer (KO) and to the COR for his final check and approval. Only after have received the KO final approval, the contractor might start to work. Any activity on work area must be coordinated and scheduled with the support of the Housing office. The Contractor shall start the repairing work within two days from the approval of the proposal.

Calls for emergency repair can placed at any time required including duty hours, non-duty hours and Italian Holidays. For the M&R requests in EMERGENCY, the Contractor shall provide a verbal cost estimation for the M&R assistance to the Housing Personnel and provide estimation or full cost after the execution during the next duty day. For additional M&R found in the work area the Contractor shall contact the Housing Office for evaluation and approval prior the execution. The Contractor shall respond to the emergency request within four hours.

The Contractor shall have the work order dated and signed by the Customer at the end of the Maintenance and Repair (M&R) service.

Material: The COR and KO shall make all efforts to request and obtain post-award discount for materials used and to encourage the Contractor to maximize competition wherever practical.

The Contractor shall be reimbursed for the actual cost (less any available discount) of the approved material. Each quote must contain the market price for material listed in standard price lists, indicating the applied discount. In case of material not included inside standard price lists, each quote must be detailed.

1.4.2. CONDUCT: The Contractor shall wear a name (provided at Contractor cost) identifying her/himself as a Contractor, and ensure that in all correspondence the Contractor identifies her/himself as a Contractor in accordance with D. Leg #81/9 April 2008 Art. 20 par.3.

1.4.3. SAFETY: The Contractor shall be aware of local safety requirements and ensure that all reasonable efforts are made to protect all persons from harm and U.S. Government property from damage.

1.4.4. DISPOSAL: All the material replaced shall not be left in the area after work execution but properly disposed by the Contractor.

1.4.5. PAYMENT: The Contractor will submit invoices to the COR who will certify the services provided and submit invoice for the payments.

1.5. SPECIFIC TASKS PLUMBING:

1.5.1. Rate of Work: Plumbing, Minor maintenance service must be executed IAW from paragraphs 1.5.1 to 1.5.2.

1.5.1.1. Vacant Quarter and During the Occupancy Maintenance and Repair These works shall be completed in the quarter during the occupancy (by request of HO) and during the VQS (Vacant Quarter Status).

1.5.1.2. PERFORMANCE PLUMBING MINOR MAINTENANCE STANDARDS

For the purpose of these PLUMBING Minor Maintenance Standards, the term defined as:

Test all the house and balcony drain systems if properly working, Inspect pipe and drain lines for suspected leaking, Repair and replace corroded and/or leaking pipes, Replace toilet seat, faucets filters, and shower heads if clogged, old or contaminated by the calcium, Provide metal water stoppers where missing. Unclog sink and pipes.

Remove the old seal and apply new silicone seal to every shower plates and tub borders, Test, repair and/or replace flushing system box, Install soap dishes, tissue holder, towel bars where missing. Install curtain rods over the tubs and engage to the ceilings. Test, annual cleaning and gas refilling for the A/C system for the houses indicated by the Housing Office.

In the house equipped the with the water tank (Autoclave): Test, repair or replace the floating valve at the water pump, Cleaning and disinfect the water tank, Test operating of the engine (and replace engine when requested by the HO), replace the star-matic when necessary.

In the house equipped with the irrigation system: Test and set up the system, repair or replace the sprinklers, Test the pump for operating.

In the house equipped with the sump pump: Test the system if correctly working, Replace pumps when burned or inoperative, Test and replace floating valves when not working, Test battery backup system for operating and proceed with repair or parts replacement when requested by the HO.

The Contractor will replace the following items following a specific request done by the Housing Office: Kitchen metal sink, bathroom porcelain sink, commode and bidet, shower partitions, kitchen wall cabinets, kitchen sink cabinet, medicine cabinets.

Items damaged by the Contractor during the cleaning process shall be repaired or replaced at no additional cost to the Government.

1.6. SPECIFIC TASKS ELECTRICITY:

1.6.1. Rate of Work: Electricity, Minor maintenance service must be executed IAW from paragraphs 1.6.1 to 1.6.2

1.6.1.1. Vacant Quarter and During the Occupancy Maintenance and Repair

1.6.1.2. PERFORMANCE ELECTRICITY MINOR MAINTENANCE STANDARDS

For the purpose of these ELECTRICITY Minor Maintenance Standards, the term defined as:

Test electrical system to resolve short circuit, Replace circuit breaker when burned or inoperative, Test and replace electric sockets and switches when burned or inoperative, Test the carbon monoxide and smoke alarm detectors and replace when expired and not functioning, Replace medicine cabinets when requested, Test alarm system and replace inner batteries when requested, Replace the electrical gate lock when requested, Test and repair automatic gate, Repair ceiling fans, providing glass globes when missing and remote control if missing, Repair or replace light fixtures, chandeliers and ceiling fans, Provide coded remote control for automatic gate, Test Air Conditioning system (electrical parts) and provide coded remote control if missing.

Test Hood/fan in the kitchen for functioning, Replace the internal light bulbs and the filters.

Satellite Systems: Test, diagnosis and repair sat system components to provide clear AFN signal, Test signal reception inside the apartments, Re-align the sat dish moved by wind, Replace sat dish or LNB when not working or inoperative.

Items damaged by the Contractor during the cleaning process shall be repaired or replaced at no additional cost to the Government.

1.7. SPECIFIC TASKS WOODWORKS:

1.7.1. Rate of Work: Woodworks, Minor maintenance service must be executed IAW from paragraphs 1.7.1 to 1.7.2

1.7.1.1. Vacant Quarter and During the Occupancy Maintenance and Repair during the VQS (Vacant Quarter Status).

1.7.1.2. PERFORMANCE WOODWORK MINOR MAINTENANCE STANDARDS

For the purpose of these WOODWORK Minor Maintenance Standards, the term defined as:

Replace door locks and keys duplicating, Replace windows or doors glasses, Replacement of damaged door panels, Repair and/or replace curtain rods at windows and balcony doors, Shutters to be fixed or adjusted including lock replacement, Repair doors and frames scratched by pets, Door panels to be replaced when heavily scratched or damaged, Test all the internal door lock, Replace locks when not working and provide missing keys, Repair or adjust wall cabinets doors and hinges, Replace wall cabinets including material disposal when requested by the HO, Loose parts of baseboards to be re-glued, External wooden box shed to be varnished when needed and requested by the HO, Adjust internal doors when drag on the floors.

Rolling Shades: Repair boxes and covers, replace dirty and old cords, Replace metal aluminum and/or wooden racks, Install racks with security hoods when requested by the HO.

Repair and adjust external wooden and aluminum doors and shutters. Items damaged by the Contractor during the cleaning process shall be repaired or replaced at no additional cost to the Government. 3

1.8. SPECIFIC TASKS MULTI-FUNCTIONS:

1.8.1. Rate of Work: Multi-Functions, Minor maintenance service must be executed IAW from paragraphs 1.8.1 to 1.8.2

1.8.1. Vacant Quarter and During the Occupancy Maintenance and Repair

1.8.2. PERFORMANCE MULTI-FUNCTIONS MINOR MAINTENANCE

STANDARDS.

For the purpose of these MULTI-FUNCTIONS Minor Maintenance Standards, the term defined as: Remove and properly dispose of abandoned material in the common areas, Test, repair, paint and varnish play ground equipment (metal and wood material), Parking spaces lines re-painting, Cut grass in the yard and properly disposal of material including abandoned barbeque, toys and play equipment, Walls painting restored and mold removal and cleaning, Stairwell step assembly to be repaired, Test and maintenance to diesel engine of sump pump assembly, Entomology service for yards and basements and attics. Items damaged by the Contractor during the cleaning process shall be repaired or replaced at no additional cost to the Government.

1.9. SPECIFIC TASKS SCREENS:

1.9.1. Rate of Work: Screens, Minor maintenance service must be executed IAW from paragraphs 1.9.1 to 1.9.2

1.9.1.1. Vacant Quarter and During the Occupancy Maintenance and Repair during the VQS (Vacant Quarter Status).

1.9.1.2. PERFORMANCE SCREENS MINOR MAINTENANCE STANDARDS

For the purpose of these SCREENS Minor Maintenance Standards, the term defined as:

Repair and/or replace insect screens panels, repair or replace hooks at screens panels, Reinstall screen (door) panels, Replace ripped screens, Repair external balcony rolling curtains or replace the assembly if requested by the HO. Items damaged by the Contractor during the cleaning process shall be repaired or replaced at no additional cost to the Government.

1.10.CONTRACTOR MANPOWER REPORTING (CMR) (CLINS 7500): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the subject contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2016. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website Reference CDRL 0005 under exhibit 5.3 of this PWS for further direction on submission

1.11. iWATCH/iSALUTE and OPSEC Training: The Contractor and all associated sub- Contractors shall brief all employees on the local OPSEC and iWATCH/iSALUTE program.

This local developed training will be used to inform employees of the types of behavior to Watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after Contract award and within 30 calendar days after new employees commence Contract performance, with the results reported to the COR.

1.12 AT Level I Training: All Contractor employees, including Subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level I awareness training within 30 calendar days after the Contract start-date. The Contractor will submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR or to the Contracting Officer, prior to issuance of Installation Access Passes. AT Level I awareness training is available online at https://atlevel1.dtic.mil/at.

SECTION II

SERVICE DELIVERY SUMMARY

REQUIRED

SERVICE

PWS

PERFORMANCE

STANDARD

Acceptable Quality Level

Monitoring Method

Remedy

Plumbing Service

1.5.1.2 Professional

Performance

No Defects 100%

Inspection

Contractor will re-perform services if found to be unaccepted

Electricity Service

1.6.1.2 Professional

Performance

No Defects 100%

Inspection

Contractor will re-perform services if found to be unaccepted

Woodworks Service

1.7.1.2 Professional

Performance

No Defects perform services if found to be unaccepted

Multi-Functions Service

1.8.1.2 Professional

Performance

No Defects perform services if found to be unaccepted

Screens Service 1.9.1.2 Professional Performance

No Defects perform services if found to be unaccepted

Quality Control Plan Implement effective Quality Management System-Provide maximum customer satisfaction, strive to improve the provided service, maintain effective process control and preventive action, perform internal quality audits, inspection and testing, and provide satisfactory documents and data control.

Ensure Quality Control (QRC) follow the Quality Control Plan and Managers, Supervisors and Employees are effectively involved in Quality Control for their sections.

4.3 Meet PWS

minimum requirements and follow QC Plan.

Item damaged by Contractor will be fixed at no cost for

US GVT.

Verification 95% Withholding 5% from each monthly invoice until performance is in compliance

CDRL Technical Exhibit 5.1

In Accordance With Technical Exhibit 5.1

Verification 95% Withholding 5% from each monthly invoice until performance is in compliance

Section III-Reserved

SECTION IV

GENERAL INFORMATION

4.1. Acceptance of Performance

The Contractor shall ensure performance to acceptable standards through the quality control system. The Contractor shall re-perform all defective work disclosed by the U.S. Government inspection. Where the U.S. Government so determines, the Contractor will be notified by the COR at the time of inspection, promptly after inspection that specified services shall be re-performed and completed.

4.2 Quality Control

The contractor shall provide a Quality Control Plan. This plan shall describe in detail the contractor’s Quality Control Program shall be submitted no later than 10 calendar days after contract start. The plan shall become a compliance document after review and acceptance by the Contracting Officer. Reference CDRL 0002 under Exhibit 5.3. of this PWS for further direction on submission.

4.2.1. The quality control plan will include the following as a minimum.

4.2.2. A method of obtaining feedback from clients on a predetermined basis.

4.2.3. A means to ensure client confidentiality.

4.2.4. Procedures covering key control and lock combination control

4.3 Safety

The Contractor shall be aware of local safety requirements and ensure that all reasonable efforts are made to protect all persons from harm and U.S. Government property from damage. The

Contractor shall provide Safety Plan within 10 days after contract awarded. Reference CDRL 0003 under Exhibit 5.3 of this PWS for further direction on submission

4.3.1. Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

4.4. Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

4.5. Contractor Identification: Prior to commencement of Contract performance, the Contractor shall furnish the COR in writing and in triplicate a list of the personnel identified for work under the Contract. The list shall contain:

A. Name and address of each employee.

B. Identification Document of each employee.

C. Copy of personnel register.

D. “Centro per l’impiego” Identification Document E. A valid Chamber of Commerce certificate updated (no more than 3 months).

4.6. HOURS OF OPERATIONS

4.6.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours: Monday through Friday, 0800 – 1700 hours.

4.6.2. Extended Service Hours. RESERVED

4.6.3. Recognized Holidays. Reference contract clause CCE 204-4000, “U.S. AND HOST

NATION HOLIDAYS”

4.6.4. EMERGENCY; Monday to Friday between 18:00 to 06:00, and during the Weekends, Holydays and Festivities 24 Hours assistance if requested by the Housing personnel in “on call” status.

TECHNICAL EXHIBIT

5.3 REQUIRED REPORTS

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM

NO.

B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA

ITEM NO.

2. TITLE OF DATA ITEM

CMR

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

1.10

6. REQUIRING OFFICE

7. DD 250

REQ

9. DIST

STATEMENT

10. FREQUENCY

ONCE PER YEAR

12. DATE OF FIRST

SUBMISSION

WITHIN 31 OCTOBER

14. DISTRIBUTION

8. APP

CODE

11. AS OF DATE

13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

b. COPIES

Draf t

Final

Reg Repr o

16. REMARKS

Reporting must be completed no later than 31 October for fiscal year

15. TOTAL 0 1 0

1. DATA

ITEM NO.

2. TITLE OF DATA ITEM

QUALITY CONTROL PLAN

3. SUBTITLE

4.2

NO

9. DIST

ONCE

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

b. COPIES

Draf t

Final

Reg Repr o

The Contractor shall submit quality Control Plan after 10 days from the award date

COR

0 1 0

15. TOTAL 0 1 0

1. DATA

ITEM NO.

2. TITLE OF DATA ITEM

SAFETY PLAN

3. SUBTITLE

4.3

9. DIST

12. DATE OF FIRST

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draf t

Final

Reg Repr o

The Contractor shall submit safety plant after 10 days form award date

15. TOTAL 0 1 0

D FORM 1423, AUG 96

TECHNICAL EXHIBIT

5.4 List of the apartment and location

Location Bldg Apt Major Maint

Minor Maint

A/C Maint.

Unit

QTY

Avane(Pisa) 20 L/L U.S. U.S. 1 Avane(Pisa) 10 L/L U.S. L/L 1 La Gabella(Pisa) 41 U L/L L/L L/L 1 La Vettola (Pisa) 703 A L/L U.S. L/L 1 La Vettola (Pisa) 703 B L/L U.S. L/L 1 La Vettola (Pisa) 703 C L/L U.S. L/L 1 Livorno 161 L/L U.S. L/L 12 Livorno 35 L/L U.S. 7 Livorno 10 L/L U.S. L/L 5 Migliarino (Pisa) 23 B L/L L/L L/L 1 Migliarino (Pisa) 23 C L/L L/L U.S. 1 Pappiana 15 M L/L L/L L/L 1

(Pisa) Pappiana (Pisa) 50 B L/L U.S. L/L 1 Pappiana (Pisa) 10 A L/L U.S. U.S. 1 Pontasserchio (Pisa) 2 L/L U.S. L/L 6 S.Andrea Pesc.

(Pisa) 118 G L/L U.S. 1 Valtriano (Pisa) 13 L/L U.S. U.S. 1 Vecchiano (Pisa) 2 L/L U.S. 1 Vecchiano (Pisa 6 L/L U.S. L/L 1

Location Bldg. Apt Major Maint

Minor Maint

A/C Maint

Unit

QTY

Vecchiano (Pisa) 71 L/L U.S. U.S.

Vecchiano (Pisa) 12 L/L L/L L/L 1 Vecchiano (Pisa) 22 L/L U.S. U.S. 1 Vecchiano (Pisa) 24 L/L U.S. U.S. 1

The following have been deleted:

252.232-7007 Limitation Of Government's Obligation APR 2014

(End of Summary of Changes)

File details come from the government source that posted it. Updated .