B01_24B0009 Abstract of Bids signed.pdf

PDF 944 KB Posted

Attached to
Solicitation for Wappapello Lake Facility Infrastructure Construction & Maintenance IDIQ
Solicitation number
W912P924B0009
Issued by

About this file

This solicitation is for an Indefinite Delivery/Indefinite Quantity construction contract to provide rehabilitation, repair, construction, and maintenance services at the Wappapello Lake Project facilities over five annual ordering periods. Services include earthwork, stonework, concrete work, utilities maintenance, and structures installation. The contract will be awarded as fixed price with delivery schedules in individual task orders. Bids are due on February 5, 2024 with award shortly after. Payment will be made by EFT. A pre-bid site visit will be held on January 18, 2024 to view the project site. Questions are due by January 25, 2024 with answers provided in an amendment. The estimated work quantities are for bidding purposes only. The Corps of Engineers will evaluate bids based on price alone in accordance with FAR Part 14 sealed bidding procedures. The contractor must be determined responsible per the FAR prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W912P924B0009 Date Issued: 1/4/2024

Amendment 0001 Posted 1/30/2024

Contracting Officer Bids Due: 2/5/2024 @ 9AM CST Rebekah Lamb Public Bid Opening: 2/5/2024 @ 2PM CST

Pre-Priced Line Item Description

Estimated Quantity Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0001 Concrete Slab: 4-inch 200 $22.30 4,460.00$ $23.00 4,600.00$ $60.45 12,090.00$ $26.58 5,316.22$ 0002 Concrete Slab: 6-inch 200 $23.50 4,700.00$ $24.00 4,800.00$ $63.91 12,782.00$ $27.28 5,456.75$ 0003 Concrete Slab: 8-inch 100 $25.00 2,500.00$ $27.00 2,700.00$ $112.27 11,227.00$ $27.66 2,765.75$ 0004 Concrete Slab: 10-inch 100 $26.40 2,640.00$ $28.00 2,800.00$ $115.73 11,573.00$ $29.60 2,960.10$ 0005 Concrete Ditch: 4-inch 200 $22.30 4,460.00$ $28.00 5,600.00$ $65.64 13,128.00$ $92.84 18,567.90$ 0006 Concrete Curb & Gutter 1000 $20.00 20,000.00$ $49.00 49,000.00$ $82.91 82,910.00$ $24.33 24,327.12$ 0007 Concrete Barrier Curbs 1000 $52.10 52,100.00$ $29.00 29,000.00$ $77.73 77,730.00$ $24.97 24,966.50$ 0008 Concrete Mountable Curbs 1000 $41.90 41,900.00$ $35.00 35,000.00$ $82.91 82,910.00$ $26.70 26,697.23$ 0009 Reinforcement 500 $1.80 900.00$ $5.00 2,500.00$ $6.91 3,455.00$ $4.78 2,392.00$ 0010 Miscellaneous Concrete Work TBD 0011 Clearing and Grubbing: Light 5000 $1.70 8,500.00$ $3.00 15,000.00$ $18.14 90,700.00$ $1.64 8,186.18$ 0012 Clearing and Grubbing: Heavy 5000 $3.90 19,500.00$ $6.00 30,000.00$ $27.32 136,600.00$ $3.62 18,089.50$ 0013 Fill Material 1000 $32.40 32,400.00$ 46.00$ 46,000.00$ $65.12 65,120.00$ $37.90 37,898.25$ 0014 Earthwork - Berm Construction 2000 $12.30 24,600.00$ $28.00 56,000.00$ $13.89 27,780.00$ $17.24 34,479.92$ 0015 Earthwork - Light Field/Site Grading 2000 $18.20 36,400.00$ $23.00 46,000.00$ $41.24 82,480.00$ $16.62 33,231.34$ 0016 Earthwork - Heavy Field/Site Grading 2000 $19.80 39,600.00$ $28.00 56,000.00$ $19.40 38,800.00$ $17.24 34,479.92$ 0017 Earthwork - Slough Construction 2000 $19.50 39,000.00$ $31.00 62,000.00$ $19.31 38,620.00$ $17.42 34,833.50$ 0018 Earthwork - Pavement Subgrade 1000 $25.80 25,800.00$ $31.00 31,000.00$ $23.56 23,560.00$ $22.75 22,746.43$ 0019 Excess Earthwork Disposal 200 $31.60 6,320.00$ $34.00 6,800.00$ $32.39 6,478.00$ $33.10 6,620.20$ 0020 Top Soil 800 $30.60 24,480.00$ $50.00 40,000.00$ $111.44 89,152.00$ $41.02 32,815.25$ 0021 Geotextile Installation - Woven 100 $1.50 150.00$ $7.00 700.00$ $12.43 1,243.00$ $6.17 617.44$ 0022 Geotextile Installation - Non Woven 100 $5.00 500.00$ $7.00 700.00$ $14.77 1,477.00$ $5.61 560.63$ 0023 Concrete Removal 200 $108.00 21,600.00$ $104.00 20,800.00$ $191.33 38,266.00$ $91.68 18,336.18$ 0024 Concrete Removal Structures & Foundations 200 $124.00 24,800.00$ $145.00 29,000.00$ $191.33 38,266.00$ $107.04 21,408.40$ 0025 Asphalt Removal 200 $49.60 9,920.00$ $17.00 3,400.00$ $114.95 22,990.00$ $56.32 11,264.83$ 0026 Removal of Aggregates 200 $40.90 8,180.00$ $16.00 3,200.00$ $62.19 12,438.00$ $35.34 7,068.70$ 0027 Disposal of Misc. 500 $6.10 3,050.00$ $5.00 2,500.00$ $21.27 10,635.00$ $8.12 4,061.00$

Wappapello Facility Infrastructure Construction & Maintenance IDIQ Bid Abstract - Construction

IGE

Geotechnical

Construction, Inc

Rindy Kinder Excavating, Inc. (DBA RKE Contractors) VuCon, LLC

Amendments Acknowledged? Yes Yes Yes Bid received by due date/time? Yes Yes Yes

Ordering Period 1 Total 2,939,543.00$ 3,881,018.00$ 6,650,899.37$ 3,912,392.63$

GRAND TOTAL PRICE 17,691,024.00$ 21,466,090.00$ 41,386,734.13$ 23,039,693.97$

Ordering Period 3 Total Ordering Period 2 Total 3,027,485.00$ 3,881,018.00$ 6,965,509.41$ 3,971,078.52$

3,132,453.00$ 3,881,018.00$ 7,296,924.97$ 4,118,267.41$

Ordering Period 5 Total 3,351,065.00$ 3,881,018.00$ 8,008,946.89$ 4,333,013.15$ Ordering Period 4 Total 3,241,853.00$ 3,881,018.00$ 7,644,151.91$ 4,268,978.47$

Optional 6 Month Extension Total 1,998,625.00$ 2,061,000.00$ 4,820,301.58$ 2,435,963.78$

ORDERING PERIOD 1

0028 Right of Way Clearing 50 $51.70 2,585.00$ $4,416.00 220,800.00$ $7,225.46 361,273.00$ $2,242.50 112,125.00$ 0029 Tree Trimming TBD 0029 Tree Trimming Low 20 $218.00 4,360.00$ $345.00 6,900.00$ $561.37 11,227.40$ $336.38 6,727.50$ 0029 Tree Trimming High 20 $272.00 5,440.00$ $345.00 6,900.00$ $561.36 11,227.20$ $485.88 9,717.50$ 0030 Tree Removal - Light 10 $828.00 8,280.00$ $1,000.00 10,000.00$ $2,504.61 25,046.10$ $1,356.71 13,567.13$ 0031 Tree Removal - Heavy 10 $1,330.00 13,300.00$ $1,000.00 10,000.00$ $5,527.44 55,274.40$ $3,289.00 32,890.00$ 0032 Stump Removal - Light 10 $228.00 2,280.00$ $1,000.00 10,000.00$ $388.63 3,886.30$ $336.38 3,363.75$ 0033 Stump Removal - Heavy 10 $381.00 3,810.00$ $1,000.00 10,000.00$ $820.46 8,204.60$ $523.25 5,232.50$ 0034 Landscape Timbers Installation 50 $23.40 1,170.00$ $35.00 1,750.00$ $31.65 1,582.50$ $37.38 1,868.75$ 0035 Landscape Timber Removal 20 $10.90 218.00$ $6.00 120.00$ $45.01 900.20$ $22.43 448.50$ 0036 Sand Supply 100 $25.50 2,550.00$ $45.00 4,500.00$ $61.91 6,191.00$ $35.13 3,513.25$ 0037 Beach Sand Supply & Install 200 $36.50 7,300.00$ $54.00 10,800.00$ $111.20 22,240.00$ $48.59 9,717.50$ 0038 Redman Creek Beach - Maintenance 1 $750.00 750.00$ $3,450.00 3,450.00$ $10,570.53 10,570.53$ $9,455.88 9,455.88$ 0039 Rockwood Beach - Maintenance 1 $1,030.00 1,030.00$ $3,450.00 3,450.00$ $14,464.92 14,464.92$ $7,445.10 7,445.10$ 0040 Peoples Creek Beach - Maintenance 1 $1,830.00 1,830.00$ $3,450.00 3,450.00$ $25,591.75 25,591.75$ $9,941.75 9,941.75$ 0041 Greenville Berm Notch Construction 1 $3,510.00 3,510.00$ $3,450.00 3,450.00$ $22,850.08 22,850.08$ $5,606.25 5,606.25$ 0042 Greenville Berm Notch Removal 1 $1,900.00 1,900.00$ $3,450.00 3,450.00$ $8,995.96 8,995.96$ $6,727.50 6,727.50$ 0043 12" Dia Pump Mob & Demob 1 $2,280.00 2,280.00$ $5,500.00 5,500.00$ $11,227.51 11,227.51$ $3,041.10 3,041.10$ 0044 12" Dia Pump & Piping - Weekly 3 $2,180.00 6,540.00$ $7,200.00 21,600.00$ $4,119.66 12,358.98$ $1,047.80 3,143.40$ 0045 12" Dia Pump & Piping - Monthly 1 $6,520.00 6,520.00$ $21,600.00 21,600.00$ $11,881.54 11,881.54$ $9,382.35 9,382.35$ 0046 Entrance Gate - Double Arm Installation 2 $2,000.00 4,000.00$ $3,528.00 7,056.00$ $4,907.41 9,814.82$ $3,363.75 6,727.50$ 0047 Entrance Gate - Single Arm Installation 2 $1,550.00 3,100.00$ $3,191.00 6,382.00$ $4,907.41 9,814.82$ $2,167.75 4,335.50$ 0048 Entrance Gate - Double Arm Replacement 2 $3,270.00 6,540.00$ $3,602.00 7,204.00$ $6,758.66 13,517.32$ $4,111.25 8,222.50$ 0049 Entrance Gate - Single Arm Replacement 2 $2,170.00 4,340.00$ $3,266.00 6,532.00$ $6,758.66 13,517.32$ $2,765.75 5,531.50$ 0050 Entrance Gate - Painting Double Arm 5 $518.00 2,590.00$ $746.00 3,730.00$ $1,299.98 6,499.90$ $837.20 4,186.00$ 0051 Entrance Gate - Painting Single Arm 5 $353.00 1,765.00$ $746.00 3,730.00$ $1,299.98 6,499.90$ $388.70 1,943.50$ 0052 Bicyle Trail Gate Fabrication & Installation 2 $1,410.00 2,820.00$ $3,191.00 6,382.00$ $7,750.61 15,501.22$ $1,719.25 3,438.50$ 0053 Bicyle Trail Gate Fabrication & Replacement 1 $1,530.00 1,530.00$ $3,266.00 3,266.00$ $9,601.88 9,601.88$ $2,332.20 2,332.20$ 0054 Concrete Dome Post Installation 5 $887.00 4,435.00$ $690.00 3,450.00$ $3,065.63 15,328.15$ $852.15 4,260.75$ 0055 Engineered Wood Chip - Supply 10 $55.00 550.00$ $56.00 560.00$ $85.48 854.80$ $57.56 575.58$ 0056 Engineered Wood Chip - Supply and Placement 20 $95.80 1,916.00$ $90.00 1,800.00$ $265.68 5,313.60$ $64.29 1,285.70$ 0057 Hardwood Landscape Mulch - Supply 10 $163.00 1,630.00$ $56.00 560.00$ $126.79 1,267.90$ $97.18 971.75$ 0058 Hardwood Landscape Mulch - Supply & Placement 20 $186.00 3,720.00$ $90.00 1,800.00$ $306.98 6,139.60$ $112.13 2,242.50$ 0059 Decorative Boulder Supply and Placement 3 $392.00 1,176.00$ $780.00 2,340.00$ $628.03 1,884.09$ $622.92 1,868.75$

Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" 10 $733.00 7,330.00$ $318.00 3,180.00$ $402.71 4,027.10$ $897.00 8,970.00$

Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" 10 $913.00 9,130.00$ $387.00 3,870.00$ $428.83 4,288.30$ $1,121.25 11,212.50$

0062 Painting 300 $268.00 80,400.00$ $17.00 5,100.00$ $257.25 77,175.00$ $7.48 2,242.50$ 0063 Seamless Epoxy Coatings - Flooring 100 $24.20 2,420.00$ $17.00 1,700.00$ $29.25 2,925.00$ $26.61 2,661.10$ 0064 Seamless Epoxy Coatings - Walls & Ceiling 100 $10.80 1,080.00$ $17.00 1,700.00$ $49.65 4,965.00$ $12.71 1,270.75$ 0065 Pavement Raising Portland Cement 200 $31.50 6,300.00$ $35.00 7,000.00$ $8.64 1,728.00$ $16.07 3,214.25$ 0066 Stockpiling - Crushed Stone 100 $29.00 2,900.00$ $45.00 4,500.00$ $43.63 4,363.00$ $59.80 5,980.00$ 0067 Stockpiling - Gravel 100 $28.40 2,840.00$ $46.00 4,600.00$ $43.63 4,363.00$ $39.62 3,961.75$ 0068 Stockpiling - Fine Aggregates 100 $29.00 2,900.00$ $45.00 4,500.00$ $45.87 4,587.00$ $37.38 3,737.50$ 0069 Stockpiling - Drainage Aggregate 10 $39.30 393.00$ $45.00 450.00$ $46.90 469.00$ $38.87 388.70$ 0070 Stockpiling - Type 1 or 5 Aggregate 100 $30.00 3,000.00$ $50.00 5,000.00$ $43.63 4,363.00$ $38.57 3,857.10$ 0071 Stockpiling - Quarry Run Limestone 100 $30.70 3,070.00$ $53.00 5,300.00$ $48.29 4,829.00$ $37.38 3,737.50$ 0072 Stockpiling - Limestone 500 $30.70 15,350.00$ $52.00 26,000.00$ $46.90 23,450.00$ $37.38 18,687.50$ 0073 Placement - Crushed Stone 200 $39.00 7,800.00$ $57.00 11,400.00$ $70.71 14,142.00$ $64.29 12,857.00$ 0074 Placement - Gravel 200 $38.30 7,660.00$ $53.00 10,600.00$ $70.71 14,142.00$ $77.25 15,450.83$ 0075 Placement - Fine Aggregates 50 $45.00 2,250.00$ $58.00 2,900.00$ $72.95 3,647.50$ $72.88 3,644.06$ 0076 Placement - Drainage Aggregate 10 $79.30 793.00$ $61.00 610.00$ $155.22 1,552.20$ $75.80 757.97$ 0077 Placement - Type 1 or 5 Aggregate 1000 $40.00 40,000.00$ $68.00 68,000.00$ $70.71 70,710.00$ $75.21 75,213.45$ 0078 Placement - Quarry Run Limestone 100 $42.60 4,260.00$ $42.00 4,200.00$ $75.38 7,538.00$ $72.88 7,288.13$ 0079 Placement - Limestone 1000 $40.60 40,600.00$ $42.00 42,000.00$ $73.98 73,980.00$ $72.88 72,881.25$

0080 Stockpiling - USACE 3" Bedding 500 $24.90 12,450.00$ $42.00 21,000.00$ $46.90 23,450.00$ $37.82 18,911.75$ 0081 Stockpiling - USACE 50lb Rip Rap 500 $30.80 15,400.00$ $56.00 28,000.00$ $60.47 30,235.00$ $45.90 22,948.25$ 0082 Stockpiling - USACE 90lb Rip Rap 500 $31.80 15,900.00$ $68.00 34,000.00$ $61.59 30,795.00$ $52.47 26,237.25$ 0083 Stockpiling - USACE 140lb Rip Rap 500 $33.80 16,900.00$ $78.00 39,000.00$ $62.99 31,495.00$ $53.69 26,842.73$ 0084 Stockpiling - USACE 400lb Rip Rap 500 $37.30 18,650.00$ $78.00 39,000.00$ $63.46 31,730.00$ $54.09 27,044.55$ 0085 Stockpiling - USACE 650lb Rip Rap 500 $43.00 21,500.00$ $81.00 40,500.00$ $72.10 36,050.00$ $54.09 27,044.55$ 0086 Stockpiling - USACE 1000lb Rip Rap 500 $43.00 21,500.00$ $81.00 40,500.00$ $81.66 40,830.00$ $54.90 27,448.20$ 0087 Placement - USACE 3" Bedding 1000 $34.80 34,800.00$ $53.00 53,000.00$ $72.07 72,070.00$ $73.76 73,755.83$ 0088 Placement - USACE 50lb Rip Rap 1000 $43.90 43,900.00$ $67.00 67,000.00$ $85.65 85,650.00$ $89.50 89,498.18$ 0089 Placement - USACE 90lb Rip Rap 1000 $45.00 45,000.00$ $79.00 79,000.00$ $86.77 86,770.00$ $102.33 102,325.28$ 0090 Placement - USACE 140lb Rip Rap 1000 $47.00 47,000.00$ $86.00 86,000.00$ $88.17 88,170.00$ $104.69 104,686.63$ 0091 Placement - USACE 400lb Rip Rap 1000 $50.50 50,500.00$ $86.00 86,000.00$ $88.64 88,640.00$ $105.47 105,473.75$ 0092 Placement - USACE 650lb Rip Rap 1000 $56.20 56,200.00$ $94.00 94,000.00$ $105.67 105,670.00$ $105.47 105,473.75$ 0093 Placement - USACE 1000lb Rip Rap 1000 $56.20 56,200.00$ $94.00 94,000.00$ $132.02 132,020.00$ $107.05 107,047.98$ 0094 Patching 150 $138.00 20,700.00$ $308.00 46,200.00$ $385.18 57,777.00$ $95.28 14,292.20$ 0095 Road Widening 150 $50.60 7,590.00$ $315.00 47,250.00$ $393.82 59,073.00$ $149.50 22,425.00$ 0096 Asphaltic Concrete Surface 2000 $205.00 410,000.00$ $221.00 442,000.00$ $269.45 538,900.00$ $299.00 598,000.00$ 0097 Seal Coat 1000 $4.70 4,700.00$ $7.00 7,000.00$ $7.25 7,250.00$ $6.05 6,054.75$ 0098 Crack Fill/Sealing 500 $72.10 36,050.00$ $141.00 70,500.00$ $60.45 30,225.00$ $82.23 41,112.50$ 0099 Scrub Seal 500 $4.70 2,350.00$ $12.00 6,000.00$ $34.55 17,275.00$ $5.23 2,616.25$ 0100 Bituminous Fog Sealing 500 $4.70 2,350.00$ $12.00 6,000.00$ $34.55 17,275.00$ $40.37 20,182.50$ 0101 Guardrail Replacement 200 $81.70 16,340.00$ $118.00 23,600.00$ $210.90 42,180.00$ $80.73 16,146.00$ 0102 Guardrail Installation 100 $76.70 7,670.00$ $132.00 13,200.00$ $229.93 22,993.00$ $68.77 6,877.00$ 0103 Traffic Striping 50000 $1.50 75,000.00$ $2.00 100,000.00$ $1.45 72,500.00$ $0.37 18,687.50$ 0104 Parking Area Traffic Striping Layout 3000 $0.30 900.00$ $2.00 6,000.00$ $1.17 3,510.00$ $0.75 2,242.50$ 0105 Traffic Marking Arrows 3 $207.00 621.00$ $207.00 621.00$ $72.54 217.62$ $299.00 897.00$ 0106 Traffic Marking Disable Symbol 70 $116.00 8,120.00$ $207.00 14,490.00$ $145.09 10,156.30$ $193.28 13,529.75$ 0107 Traffic Marking No Parking 4 $141.00 564.00$ $207.00 828.00$ $181.36 725.44$ $194.35 777.40$ 0108 Traffic Marking 5 Minute Parking 5 $185.00 925.00$ $207.00 1,035.00$ $81.18 405.90$ $216.78 1,083.88$ 0109 Traffic Marking 10 Minute Parking 5 $185.00 925.00$ $207.00 1,035.00$ $81.18 405.90$ $230.23 1,151.15$ 0110 Traffic Marking Tie-Down Only 5 $141.00 705.00$ $207.00 1,035.00$ $81.18 405.90$ $218.27 1,091.35$ 0111 Parking Block Removal and Reinstallation 50 $49.00 2,450.00$ $173.00 8,650.00$ $198.63 9,931.50$ $43.36 2,167.75$ 0112 Parking Block Replacement 10 $158.00 1,580.00$ $207.00 2,070.00$ $328.18 3,281.80$ $201.83 2,018.25$ 0113 Parking Block Installation 10 $133.00 1,330.00$ $173.00 1,730.00$ $302.27 3,022.70$ $164.45 1,644.50$ 0114 Establishment of Turf - Large Scale 20 $4,830.00 96,600.00$ $6,210.00 124,200.00$ $3,398.22 67,964.40$ $67.28 1,345.50$ 0115 Establishment of Turf - Small Scale 100 $26.00 2,600.00$ $9.00 900.00$ $59.13 5,913.00$ $8.97 897.00$ 0116 Road Bore Drill Setup and Staging 1 $3,620.00 3,620.00$ $3,450.00 3,450.00$ $3,454.64 3,454.64$ $3,289.00 3,289.00$ 0117 Road Bore Sleeve 2-inch Dia. HDPE 30 $120.00 3,600.00$ $43.00 1,290.00$ $163.30 4,899.00$ $49.14 1,474.07$ 0118 Road Bore Sleeve 3-inch Dia. HDPE 30 $121.00 3,630.00$ $46.00 1,380.00$ $183.28 5,498.40$ $54.82 1,644.50$ 0119 Road Bore Sleeve 4-inch Dia. HDPE 30 $123.00 3,690.00$ $47.00 1,410.00$ $203.75 6,112.50$ $61.05 1,831.38$ 0120 Road Bore Sleeve 6-inch Dia. HDPE 30 $129.00 3,870.00$ $61.00 1,830.00$ $230.62 6,918.60$ $61.64 1,849.32$ 0121 Road Bore Sleeve 8-inch Dia. HDPE 30 $137.00 4,110.00$ $75.00 2,250.00$ $279.83 8,394.90$ $63.79 1,913.60$ 0122 Frost Proof Yard Hydrant Replacement 5 $2,360.00 11,800.00$ $1,104.00 5,520.00$ $2,590.99 12,954.95$ $1,143.68 5,718.38$ 0123 Frost Proof Yard Hydrant Installation 5 $1,610.00 8,050.00$ $1,104.00 5,520.00$ $2,590.99 12,954.95$ $980.72 4,903.60$ 0124 Water Valve Replacement - 1" curb stop ball valve 2 $1,090.00 2,180.00$ $690.00 1,380.00$ $777.28 1,554.56$ $269.10 538.20$

0125 Water Valve Replacement - 1.5" curb stop ball valve 2 $1,330.00 2,660.00$ $828.00 1,656.00$ $1,295.47 2,590.94$ $589.03 1,178.06$

0126 Water Valve Replacement - 2" square nut ball valve 2 $1,900.00 3,800.00$ $966.00 1,932.00$ $1,727.32 3,454.64$ $986.70 1,973.40$

0127 Water Valve Replacement - 3" square nut ball valve 2 $2,340.00 4,680.00$ $1,104.00 2,208.00$ $2,590.99 5,181.98$ $1,382.88 2,765.75$

0128 Water Valve Replacement - 4" square nut ball valve 2 $2,590.00 5,180.00$ $1,242.00 2,484.00$ $3,454.64 6,909.28$ $2,691.00 5,382.00$ 0129 3/4 Inch Water Line Tap 2 $1,750.00 3,500.00$ $1,380.00 2,760.00$ $3,886.47 7,772.94$ $2,048.15 4,096.30$ 0130 1 Inch Water Line Tap 2 $1,750.00 3,500.00$ $1,518.00 3,036.00$ $3,886.47 7,772.94$ $2,055.63 4,111.25$ 0131 1-1/2 Inch Water Line Tap 2 $1,960.00 3,920.00$ $1,656.00 3,312.00$ $3,886.47 7,772.94$ $2,261.19 4,522.38$

0132 2 Inch Water Line Tap 2 $2,030.00 4,060.00$ $1,794.00 3,588.00$ $4,318.31 8,636.62$ $2,728.38 5,456.75$ 0133 3 Inch Water Line Tap 2 $2,520.00 5,040.00$ $1,932.00 3,864.00$ $4,318.31 8,636.62$ $3,251.63 6,503.25$ 0134 4 Inch Water Line Tap 2 $2,660.00 5,320.00$ $2,070.00 4,140.00$ $4,318.31 8,636.62$ $4,186.00 8,372.00$ 0135 6 Inch Water Line Tap 2 $2,900.00 5,800.00$ $2,208.00 4,416.00$ $6,045.65 12,091.30$ $4,111.25 8,222.50$ 0136 3/4 Inch Water Line Installation 100 $25.50 2,550.00$ $23.00 2,300.00$ $146.82 14,682.00$ $11.93 1,193.01$ 0137 1 Inch Water Line Installation 100 $26.00 2,600.00$ $24.00 2,400.00$ $164.09 16,409.00$ $12.18 1,218.43$ 0138 1-1/2 Inch Water Line Installation 100 $28.00 2,800.00$ $25.00 2,500.00$ $207.27 20,727.00$ $14.29 1,429.22$ 0139 2 Inch Water Line Installation 100 $28.90 2,890.00$ $27.00 2,700.00$ $259.09 25,909.00$ $15.73 1,572.74$ 0140 2-1/2 Inch Water Line Installation 100 $30.40 3,040.00$ $28.00 2,800.00$ $302.27 30,227.00$ $17.79 1,779.05$ 0141 3 Inch Water Line Installation 100 $42.00 4,200.00$ $29.00 2,900.00$ $345.45 34,545.00$ $20.18 2,018.25$ 0142 4 Inch Water Line Installation 50 $53.50 2,675.00$ $46.00 2,300.00$ $518.19 25,909.50$ $49.34 2,466.75$ 0143 6 Inch Water Line Installation 50 $58.00 2,900.00$ $56.00 2,800.00$ $604.55 30,227.50$ $53.82 2,691.00$ 0144 Sewer Line Tap 2-5 Feet Deep 2 $1,590.00 3,180.00$ $1,242.00 2,484.00$ $7,772.99 15,545.98$ $2,093.00 4,186.00$ 0145 Sewer Line Tap 5.1-10 Feet Deep 2 $1,880.00 3,760.00$ $1,656.00 3,312.00$ $9,500.35 19,000.70$ $2,429.38 4,858.75$ 0146 Sewer Line Tap 10.1-15 Feet Deep 1 $2,360.00 2,360.00$ $2,070.00 2,070.00$ $12,955.04 12,955.04$ $2,765.75 2,765.75$ 0147 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $58.40 5,840.00$ $54.00 5,400.00$ $466.36 46,636.00$ $56.81 5,681.00$ 0148 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $64.60 3,230.00$ $63.00 3,150.00$ $492.27 24,613.50$ $59.80 2,990.00$ 0149 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $77.70 1,554.00$ $76.00 1,520.00$ $518.19 10,363.80$ $82.23 1,644.50$ 0150 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $102.00 10,200.00$ $58.00 5,800.00$ $518.19 51,819.00$ $112.13 11,212.50$ 0151 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $108.00 5,400.00$ $67.00 3,350.00$ $535.46 26,773.00$ $101.66 5,083.00$ 0152 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $121.00 2,420.00$ $83.00 1,660.00$ $561.37 11,227.40$ $134.55 2,691.00$ 0153 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $146.00 14,600.00$ $69.00 6,900.00$ $604.55 60,455.00$ $149.50 14,950.00$ 0154 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $152.00 7,600.00$ $76.00 3,800.00$ $630.46 31,523.00$ $164.45 8,222.50$ 0155 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $165.00 3,300.00$ $90.00 1,800.00$ $665.00 13,300.00$ $186.88 3,737.50$ 0156 2 Inch Dia. Pressure Sewer Force Main Install 50 $37.20 1,860.00$ $49.00 2,450.00$ $431.81 21,590.50$ $37.38 1,868.75$ 0157 3 Inch Dia. Pressure Sewer Force Main Install 50 $43.40 2,170.00$ $56.00 2,800.00$ $475.00 23,750.00$ $46.35 2,317.25$ 0158 4 Inch Dia. Pressure Sewer Force Main Install 50 $48.90 2,445.00$ $67.00 3,350.00$ $518.19 25,909.50$ $56.51 2,825.55$ 0159 6 Inch Dia. Pressure Sewer Force Main Install 20 $85.50 1,710.00$ $76.00 1,520.00$ $647.73 12,954.60$ $104.65 2,093.00$ 0160 Manhole Install 1-4 Feet Deep 2 $2,950.00 5,900.00$ $4,968.00 9,936.00$ $9,456.08 18,912.16$ $4,186.00 8,372.00$ 0161 Manhole Install 4.1-10 Feet Deep 2 $3,820.00 7,640.00$ $6,348.00 12,696.00$ $14,621.03 29,242.06$ $4,858.75 9,717.50$ 0162 Manhole Install 10.1-15 Feet Deep 2 $5,700.00 11,400.00$ $8,970.00 17,940.00$ $20,940.34 41,880.68$ $6,690.13 13,380.25$ 0163 CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $74.50 1,490.00$ $50.00 1,000.00$ $152.82 3,056.40$ $104.65 2,093.00$ 0164 CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $84.80 1,696.00$ $54.00 1,080.00$ $447.82 8,956.40$ $112.13 2,242.50$ 0165 CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $106.00 2,120.00$ $58.00 1,160.00$ $821.91 16,438.20$ $127.08 2,541.50$ 0166 CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $88.30 1,766.00$ $57.00 1,140.00$ $177.93 3,558.60$ $134.55 2,691.00$ 0167 CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $98.60 1,972.00$ $61.00 1,220.00$ $481.72 9,634.40$ $134.55 2,691.00$ 0168 CMP 18 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $120.00 2,400.00$ $65.00 1,300.00$ $873.39 17,467.80$ $156.98 3,139.50$ 0169 CMP 24 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $103.00 2,060.00$ $71.00 1,420.00$ $201.98 4,039.60$ $138.29 2,765.75$ 0170 CMP 24 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $115.00 2,300.00$ $78.00 1,560.00$ $516.75 10,335.00$ $156.98 3,139.50$ 0171 CMP 24 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $141.00 2,820.00$ $82.00 1,640.00$ $930.39 18,607.80$ $168.19 3,363.75$ 0172 CMP 30 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $156.00 3,120.00$ $86.00 1,720.00$ $232.42 4,648.40$ $179.40 3,588.00$ 0173 CMP 30 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $168.00 3,360.00$ $92.00 1,840.00$ $561.32 11,226.40$ $201.83 4,036.50$ 0174 CMP 30 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $194.00 3,880.00$ $103.00 2,060.00$ $1,003.20 20,064.00$ $242.94 4,858.75$ 0175 CMP 36 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $161.00 3,220.00$ $100.00 2,000.00$ $267.57 5,351.40$ $198.09 3,961.75$ 0176 CMP 36 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $175.00 3,500.00$ $110.00 2,200.00$ $615.30 12,306.00$ $209.30 4,186.00$ 0177 CMP 36 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $205.00 4,100.00$ $114.00 2,280.00$ $1,094.86 21,897.20$ $239.20 4,784.00$ 0178 CMP 48 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $198.00 3,960.00$ $129.00 2,580.00$ $323.32 6,466.40$ $242.94 4,858.75$ 0179 CMP 48 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $214.00 4,280.00$ $143.00 2,860.00$ $697.41 13,948.20$ $261.63 5,232.50$ 0180 CMP 48 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $249.00 4,980.00$ $156.00 3,120.00$ $1,229.69 24,593.80$ $287.79 5,755.75$ 0181 CMP 12 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $49.30 986.00$ $50.00 1,000.00$ $135.55 2,711.00$ $123.34 2,466.75$ 0182 CMP 12 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $59.60 1,192.00$ $54.00 1,080.00$ $430.55 8,611.00$ $232.38 4,647.53$ 0183 CMP 12 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $80.80 1,616.00$ $58.00 1,160.00$ $804.64 16,092.80$ $309.37 6,187.37$ 0184 CMP 18 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $60.40 1,208.00$ $57.00 1,140.00$ $160.66 3,213.20$ $199.27 3,985.48$ 0185 CMP 18 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $70.70 1,414.00$ $61.00 1,220.00$ $464.44 9,288.80$ $273.38 5,467.68$ 0186 CMP 18 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $91.90 1,838.00$ $65.00 1,300.00$ $856.12 17,122.40$ $363.96 7,279.26$ 0187 CMP 24 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $69.60 1,392.00$ $71.00 1,420.00$ $184.70 3,694.00$ $234.44 4,688.80$

0188 CMP 24 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $81.60 1,632.00$ $78.00 1,560.00$ $499.47 9,989.40$ $321.63 6,432.57$ 0189 CMP 24 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $108.00 2,160.00$ $82.00 1,640.00$ $913.12 18,262.40$ $428.19 8,563.84$ 0190 CMP 30 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $99.60 1,992.00$ $86.00 1,720.00$ $215.15 4,303.00$ $260.49 5,209.78$ 0191 CMP 30 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $112.00 2,240.00$ $92.00 1,840.00$ $544.05 10,881.00$ $357.36 7,147.30$ 0192 CMP 30 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $138.00 2,760.00$ $103.00 2,060.00$ $985.93 19,718.60$ $475.77 9,515.38$ 0193 CMP 36 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $105.00 2,100.00$ $100.00 2,000.00$ $250.30 5,006.00$ $289.43 5,788.64$ 0194 CMP 36 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $119.00 2,380.00$ $110.00 2,200.00$ $598.03 11,960.60$ $397.07 7,941.44$ 0195 CMP 36 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $149.00 2,980.00$ $114.00 2,280.00$ $1,077.58 21,551.60$ $528.63 10,572.64$ 0196 CMP 48 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 $131.00 2,620.00$ $129.00 2,580.00$ $306.04 6,120.80$ $631.64 12,632.75$ 0197 CMP 48 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 $147.00 2,940.00$ $143.00 2,860.00$ $680.14 13,602.80$ $717.60 14,352.00$ 0198 CMP 48 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 $182.00 3,640.00$ $156.00 3,120.00$ $1,212.42 24,248.40$ $859.63 17,192.50$ 0199 12 Inch Dia. End Section Replace 4 $424.00 1,696.00$ $212.00 848.00$ $2,735.95 10,943.80$ $601.74 2,406.95$ 0200 18 Inch Dia. End Section Replace 4 $495.00 1,980.00$ $314.00 1,256.00$ $3,126.06 12,504.24$ $766.79 3,067.14$ 0201 24 Inch Dia. End Section Replace 4 $775.00 3,100.00$ $380.00 1,520.00$ $3,469.09 13,876.36$ $911.20 3,644.81$ 0202 30 Inch Dia. End Section Replace 4 $965.00 3,860.00$ $483.00 1,932.00$ $5,940.00 23,760.00$ $1,191.44 4,765.76$ 0203 36 Inch Dia. End Section Replace 4 $1,250.00 5,000.00$ $552.00 2,208.00$ $7,939.71 31,758.84$ $1,801.77 7,207.10$ 0204 12 Inch Dia. End Section New Install 4 $272.00 1,088.00$ $212.00 848.00$ $2,735.95 10,943.80$ $654.06 2,616.25$ 0205 18 Inch Dia. End Section New Install 4 $318.00 1,272.00$ $314.00 1,256.00$ $3,126.06 12,504.24$ $833.46 3,333.85$ 0206 24 Inch Dia. End Section New Install 4 $506.00 2,024.00$ $380.00 1,520.00$ $3,469.09 13,876.36$ $990.44 3,961.75$ 0207 30 Inch Dia. End Section New Install 4 $697.00 2,788.00$ $483.00 1,932.00$ $5,940.00 23,760.00$ $1,295.04 5,180.18$ 0208 36 Inch Dia. End Section New Install 4 $909.00 3,636.00$ $552.00 2,208.00$ $7,939.71 31,758.84$ $1,958.45 7,833.80$

0209 EQUIPMENT RENTAL WITH OPERATOR TBD

0209a Track-Type Bulldozers 90HP w/OP 100 $177.00 17,700.00$ $165.00 16,500.00$ $292.51 29,251.00$ $294.49 29,448.51$ 0209b Track-Type Bulldozers 190HP w/OP 100 $297.00 29,700.00$ $263.00 26,300.00$ $446.24 44,624.00$ $315.04 31,504.14$ 0209c Motor Grader w/OP 100 $178.00 17,800.00$ $165.00 16,500.00$ $529.10 52,910.00$ $300.09 30,009.14$ 0209d Backhoe 60HP w/OP 100 $151.00 15,100.00$ $165.00 16,500.00$ $273.78 27,378.00$ $251.19 25,119.24$ 0209e Backhoe 95HP w/OP 100 $159.00 15,900.00$ $165.00 16,500.00$ $374.95 37,495.00$ $257.61 25,760.84$ 0209f Rubber Tire Front End Loader 120HP w/OP 100 $182.00 18,200.00$ $165.00 16,500.00$ $299.27 29,927.00$ $262.09 26,209.34$ 0209g Rubber Tire Front End Loader 275HP w/OP 100 $241.00 24,100.00$ $165.00 16,500.00$ $490.15 49,015.00$ $299.78 29,977.99$ 0209h Dump Truck (Tandem) w/OP 100 $160.00 16,000.00$ $137.00 13,700.00$ $253.81 25,381.00$ $252.75 25,274.97$ 0209i Dump Truck (Single) w/OP 100 $111.00 11,100.00$ $119.00 11,900.00$ $242.79 24,279.00$ $237.80 23,779.97$ 0209j Semi-Tractor Trailer w/OP 100 $167.00 16,700.00$ $165.00 16,500.00$ $309.10 30,910.00$ $645.81 64,581.01$ 0209k Bucket Truck w/OP. 100 $170.00 17,000.00$ $165.00 16,500.00$ $457.31 45,731.00$ $234.69 23,468.51$ 0209l Truck Crane w/OP 100 $155.00 15,500.00$ $224.00 22,400.00$ $444.19 44,419.00$ $237.80 23,779.97$

0209m Mini-Excavator w/OP 100 $145.00 14,500.00$ $158.00 15,800.00$ $235.04 23,504.00$ $242.16 24,216.01$ 0209n Excavator 50hp w/OP 100 $153.00 15,300.00$ $165.00 16,500.00$ $272.63 27,263.00$ $248.39 24,838.93$ 0209o Excavator 155hp w/OP 100 $198.00 19,800.00$ $165.00 16,500.00$ $550.76 55,076.00$ $281.09 28,109.24$ 0209p Excavator 242hp w/OP 100 $243.00 24,300.00$ $236.00 23,600.00$ $610.72 61,072.00$ $300.09 30,009.14$ 0209q Walk behind Concrete Saw w/OP 100 $126.00 12,600.00$ $165.00 16,500.00$ $133.31 13,331.00$ $204.79 20,478.51$ 0209r Self-propelled Drum Vibrating Roller w/OP 100 $164.00 16,400.00$ $165.00 16,500.00$ $238.29 23,829.00$ $226.28 22,627.57$ 0209s Self-propelled Sheepsfoot Roller w/OP 100 $288.00 28,800.00$ $165.00 16,500.00$ $240.23 24,023.00$ $226.46 22,646.26$ 0209t Skid Steer Loader w/OP 100 $143.00 14,300.00$ $165.00 16,500.00$ $280.91 28,091.00$ $232.19 23,219.34$ 0209u Tractor with Boom Mower w/OP 100 $147.00 14,700.00$ $165.00 16,500.00$ $476.64 47,664.00$ $238.27 23,826.69$ 0209v Small Tractor w/OP 100 $134.00 13,400.00$ $158.00 15,800.00$ $219.91 21,991.00$ $237.92 23,792.43$ 0209w Large Tractor w/OP 100 $226.00 22,600.00$ $165.00 16,500.00$ $438.69 43,869.00$ $242.47 24,247.16$ 0209x Tractor & Pan w/OP 100 $202.00 20,200.00$ $198.00 19,800.00$ $367.13 36,713.00$ $232.50 23,250.49$ 0209y Asphalt Miller w/OP 100 $485.00 48,500.00$ $656.00 65,600.00$ $345.45 34,545.00$ $261.63 26,162.50$ 0210 Rental of Miscellaneous Equipment with Operator TBD

0211 SPECIALTY EQUIPMENT TBD

0211a Portable Diesel Air Compressor 100 $37.10 3,710.00$ $49.00 4,900.00$ $47.91 4,791.00$ $34.88 3,488.33$ 0211b Trailer Mounted Concrete Pump 100 $85.20 8,520.00$ $49.00 4,900.00$ $731.52 73,152.00$ $112.13 11,212.50$ 0211c Trencher 100 $37.10 3,710.00$ $28.00 2,800.00$ $94.27 9,427.00$ $28.03 2,803.13$ 0211d Light Towers 100 $33.30 3,330.00$ $104.00 10,400.00$ $34.43 3,443.00$ $28.65 2,865.42$ 0211e Chainsaw 100 $27.50 2,750.00$ $28.00 2,800.00$ $4.78 478.00$ $3.49 348.83$ 0211f Power Washer 100 $26.30 2,630.00$ $28.00 2,800.00$ $29.95 2,995.00$ $4.05 404.90$ 0211g Hand Operated Electric Power Jack Hammer 100 $26.30 2,630.00$ $104.00 10,400.00$ $8.66 866.00$ $5.36 535.71$

0211h Hand Operated Air Powered Jack Hammer 100 $26.40 2,640.00$ $28.00 2,800.00$ $5.47 547.00$ $7.79 778.65$ 0211i Hand Operated Air Powered Chipping Hammer 100 $26.30 2,630.00$ $28.00 2,800.00$ $5.57 557.00$ $8.47 847.17$ 0211j Vibratory Plate Tamper 100 $28.50 2,850.00$ $7.00 700.00$ $12.89 1,289.00$ $5.29 529.48$ 0211k Hand Operated Power Cutoff Saw 100 $27.80 2,780.00$ $28.00 2,800.00$ $11.10 1,110.00$ $5.17 517.02$ 0211l Hand Operated Power Hammer Drill w/Bits 100 $25.80 2,580.00$ $104.00 10,400.00$ $7.35 735.00$ $5.29 529.48$

0211m Hand Operated Air Powered Core Drill w/Bits 100 $36.00 3,600.00$ $28.00 2,800.00$ $9.22 922.00$ $16.51 1,650.73$ 0211n Concrete Saw 100 $55.50 5,550.00$ $28.00 2,800.00$ $34.34 3,434.00$ $7.79 778.65$

0212 Rental of Miscellaneous Equipment without Operator TBD

0213 LABOR SUPPORT TBD

0213a Surveyor 100 $115.00 11,500.00$ $137.00 13,700.00$ $276.36 27,636.00$ $149.50 14,950.00$ 0213b General Engineer 100 $148.00 14,800.00$ $219.00 21,900.00$ $302.27 30,227.00$ $142.03 14,202.50$ 0213c Drafter/CADD Technician 100 $90.60 9,060.00$ $119.00 11,900.00$ $146.82 14,682.00$ $127.08 12,707.50$ 0213d Plumber 100 $96.40 9,640.00$ $119.00 11,900.00$ $276.36 27,636.00$ $97.16 9,716.01$ 0213e Electrician 100 $100.00 10,000.00$ $119.00 11,900.00$ $345.45 34,545.00$ $107.64 10,764.00$ 0213f HVAC Technician 100 $35.40 3,540.00$ $116.00 11,600.00$ $276.36 27,636.00$ $88.95 8,895.25$ 0213g Laborer 100 $68.30 6,830.00$ $116.00 11,600.00$ $107.38 10,738.00$ $72.66 7,265.70$ 0213h Iron Worker 100 $97.30 9,730.00$ $116.00 11,600.00$ $126.32 12,632.00$ $61.18 6,117.54$ 0213i Carpenter 100 $76.80 7,680.00$ $116.00 11,600.00$ $116.97 11,697.00$ $79.38 7,938.45$ 0213j Cement Mason 100 $70.60 7,060.00$ $116.00 11,600.00$ $111.63 11,163.00$ $75.77 7,576.66$ 0213k Welder Type I with Welding Equipment 100 $97.30 9,730.00$ $116.00 11,600.00$ $242.60 24,260.00$ $92.68 9,267.51$ 0213l Welder Type II with Welding Equipment 100 $104.00 10,400.00$ $116.00 11,600.00$ $328.96 32,896.00$ $106.58 10,657.63$

0214 Procurement and Delivery of Miscellaneous Materials TBD

1001 Concrete Slab: 4-inch 200 $23.10 4,620.00$ $23.00 4,600.00$ $63.47 12,694.00$ $26.98 5,395.96$ 1002 Concrete Slab: 6-inch 200 $24.40 4,880.00$ $24.00 4,800.00$ $67.11 13,422.00$ $27.69 5,538.60$ 1003 Concrete Slab: 8-inch 100 $25.90 2,590.00$ $27.00 2,700.00$ $117.88 11,788.00$ $28.07 2,807.24$ 1004 Concrete Slab: 10-inch 100 $27.40 2,740.00$ $28.00 2,800.00$ $121.52 12,152.00$ $30.05 3,004.50$ 1005 Concrete Ditch: 4-inch 200 $23.10 4,620.00$ $28.00 5,600.00$ $68.92 13,784.00$ $94.23 18,846.42$ 1006 Concrete Curb & Gutter 1000 $20.80 20,800.00$ $49.00 49,000.00$ $87.06 87,060.00$ $24.69 24,692.03$ 1007 Concrete Barrier Curbs 1000 $54.00 54,000.00$ $29.00 29,000.00$ $81.62 81,620.00$ $25.34 25,341.00$ 1008 Concrete Mountable Curbs 1000 $43.40 43,400.00$ $35.00 35,000.00$ $87.06 87,060.00$ $27.10 27,097.69$ 1009 Reinforcement 500 $1.90 950.00$ $5.00 2,500.00$ $7.26 3,630.00$ $4.86 2,427.88$ 1010 Miscellaneous Concrete Work TBD 1011 Clearing and Grubbing: Light 5000 $1.70 8,500.00$ $3.00 15,000.00$ $19.05 95,250.00$ $1.66 8,308.97$ 1012 Clearing and Grubbing: Heavy 5000 $4.00 20,000.00$ $6.00 30,000.00$ $28.69 143,450.00$ $3.67 18,360.84$ 1013 Fill Material 1000 $33.60 33,600.00$ 46.00$ 46,000.00$ $68.38 68,380.00$ $38.47 38,466.72$ 1014 Earthwork - Berm Construction 2000 $12.70 25,400.00$ $28.00 56,000.00$ $14.58 29,160.00$ $17.50 34,997.12$ 1015 Earthwork - Light Field/Site Grading 2000 $18.80 37,600.00$ $23.00 46,000.00$ $43.30 86,600.00$ $16.86 33,729.81$ 1016 Earthwork - Heavy Field/Site Grading 2000 $20.50 41,000.00$ $28.00 56,000.00$ $20.37 40,740.00$ $17.50 34,997.12$ 1017 Earthwork - Slough Construction 2000 $20.20 40,400.00$ $31.00 62,000.00$ $20.28 40,560.00$ $17.68 35,356.00$ 1018 Earthwork - Pavement Subgrade 1000 $26.80 26,800.00$ $31.00 31,000.00$ $24.74 24,740.00$ $23.09 23,087.62$ 1019 Excess Earthwork Disposal 200 $32.80 6,560.00$ $34.00 6,800.00$ $34.01 6,802.00$ $33.60 6,719.50$ 1020 Top Soil 800 $31.70 25,360.00$ $50.00 40,000.00$ $117.01 93,608.00$ $41.63 33,307.48$ 1021 Geotextile Installation - Woven 100 $1.50 150.00$ $7.00 700.00$ $13.05 1,305.00$ $6.27 626.70$ 1022 Geotextile Installation - Non Woven 100 $5.20 520.00$ $7.00 700.00$ $15.51 1,551.00$ $5.69 569.03$ 1023 Concrete Removal 200 $112.00 22,400.00$ $104.00 20,800.00$ $200.90 40,180.00$ $93.06 18,611.22$ 1024 Concrete Removal Structures & Foundations 200 $129.00 25,800.00$ $145.00 29,000.00$ $200.90 40,180.00$ $108.65 21,729.53$ 1025 Asphalt Removal 200 $51.40 10,280.00$ $17.00 3,400.00$ $120.70 24,140.00$ $57.17 11,433.80$ 1026 Removal of Aggregates 200 $42.40 8,480.00$ $16.00 3,200.00$ $65.30 13,060.00$ $35.87 7,174.73$ 1027 Disposal of Misc. 500 $6.30 3,150.00$ $5.00 2,500.00$ $22.33 11,165.00$ $8.24 4,121.91$ 1028 Right of Way Clearing 50 $53.60 2,680.00$ $4,416.00 220,800.00$ $7,586.73 379,336.50$ $2,276.14 113,806.88$ 1029 Tree Trimming TBD 1029 Tree Trimming Low 20 $226.00 4,520.00$ $345.00 6,900.00$ $589.44 11,788.80$ $341.42 6,828.41$

ORDERING PERIOD 2

1029 Tree Trimming High 20 $282.00 5,640.00$ $345.00 6,900.00$ $589.43 11,788.60$ $493.16 9,863.26$ 1030 Tree Removal - Light 10 $859.00 8,590.00$ $1,000.00 10,000.00$ $2,629.84 26,298.40$ $1,377.06 13,770.63$ 1031 Tree Removal - Heavy 10 $1,380.00 13,800.00$ $1,000.00 10,000.00$ $5,803.81 58,038.10$ $3,338.34 33,383.35$ 1032 Stump Removal - Light 10 $237.00 2,370.00$ $1,000.00 10,000.00$ $408.06 4,080.60$ $341.42 3,414.21$ 1033 Stump Removal - Heavy 10 $395.00 3,950.00$ $1,000.00 10,000.00$ $861.48 8,614.80$ $531.10 5,310.99$ 1034 Landscape Timbers Installation 50 $24.30 1,215.00$ $35.00 1,750.00$ $33.23 1,661.50$ $37.94 1,896.78$ 1035 Landscape Timber Removal 20 $11.30 226.00$ $6.00 120.00$ $47.26 945.20$ $22.76 455.23$ 1036 Sand Supply 100 $26.40 2,640.00$ $45.00 4,500.00$ $65.01 6,501.00$ $35.66 3,565.95$ 1037 Beach Sand Supply & Install 200 $37.80 7,560.00$ $54.00 10,800.00$ $116.76 23,352.00$ $49.32 9,863.26$ 1038 Redman Creek Beach - Maintenance 1 $778.00 778.00$ $3,450.00 3,450.00$ $11,099.06 11,099.06$ $9,597.71 9,597.71$ 1039 Rockwood Beach - Maintenance 1 $1,070.00 1,070.00$ $3,450.00 3,450.00$ $15,188.17 15,188.17$ $7,556.78 7,556.78$ 1040 Peoples Creek Beach - Maintenance 1 $1,900.00 1,900.00$ $3,450.00 3,450.00$ $26,871.34 26,871.34$ $10,090.88 10,090.88$ 1041 Greenville Berm Notch Construction 1 $3,640.00 3,640.00$ $3,450.00 3,450.00$ $23,992.58 23,992.58$ $5,690.34 5,690.34$ 1042 Greenville Berm Notch Removal 1 $1,970.00 1,970.00$ $3,450.00 3,450.00$ $9,445.76 9,445.76$ $6,828.41 6,828.41$ 1043 12" Dia Pump Mob & Demob 1 $2,370.00 2,370.00$ $5,500.00 5,500.00$ $11,788.89 11,788.89$ $3,086.72 3,086.72$ 1044 12" Dia Pump & Piping - Weekly 3 $2,260.00 6,780.00$ $7,200.00 21,600.00$ $4,325.64 12,976.92$ $1,063.52 3,190.55$ 1045 12" Dia Pump & Piping - Monthly 1 $6,770.00 6,770.00$ $21,600.00 21,600.00$ $12,475.62 12,475.62$ $9,523.09 9,523.09$ 1046 Entrance Gate - Double Arm Installation 2 $2,070.00 4,140.00$ $3,528.00 7,056.00$ $5,152.78 10,305.56$ $3,414.21 6,828.41$ 1047 Entrance Gate - Single Arm Installation 2 $1,600.00 3,200.00$ $3,191.00 6,382.00$ $5,152.78 10,305.56$ $2,200.27 4,400.53$ 1048 Entrance Gate - Double Arm Replacement 2 $3,390.00 6,780.00$ $3,602.00 7,204.00$ $7,096.59 14,193.18$ $4,172.92 8,345.84$ 1049 Entrance Gate - Single Arm Replacement 2 $2,250.00 4,500.00$ $3,266.00 6,532.00$ $7,096.59 14,193.18$ $2,807.24 5,614.47$ 1050 Entrance Gate - Painting Double Arm 5 $538.00 2,690.00$ $746.00 3,730.00$ $1,364.98 6,824.90$ $849.76 4,248.79$ 1051 Entrance Gate - Painting Single Arm 5 $366.00 1,830.00$ $746.00 3,730.00$ $1,364.98 6,824.90$ $394.53 1,972.65$ 1052 Bicyle Trail Gate Fabrication & Installation 2 $1,460.00 2,920.00$ $3,191.00 6,382.00$ $8,138.14 16,276.28$ $1,745.04 3,490.08$ 1053 Bicyle Trail Gate Fabrication & Replacement 1 $1,580.00 1,580.00$ $3,266.00 3,266.00$ $10,081.97 10,081.97$ $2,367.18 2,367.18$ 1054 Concrete Dome Post Installation 5 $919.00 4,595.00$ $690.00 3,450.00$ $3,218.91 16,094.55$ $864.93 4,324.66$ 1055 Engineered Wood Chip - Supply 10 $57.00 570.00$ $56.00 560.00$ $89.75 897.50$ $58.42 584.21$ 1056 Engineered Wood Chip - Supply and Placement 20 $99.40 1,988.00$ $90.00 1,800.00$ $278.96 5,579.20$ $65.25 1,304.99$ 1057 Hardwood Landscape Mulch - Supply 10 $169.00 1,690.00$ $56.00 560.00$ $133.13 1,331.30$ $98.63 986.33$ 1058 Hardwood Landscape Mulch - Supply & Placement 20 $193.00 3,860.00$ $90.00 1,800.00$ $322.33 6,446.60$ $113.81 2,276.14$ 1059 Decorative Boulder Supply and Placement 3 $407.00 1,221.00$ $780.00 2,340.00$ $659.43 1,978.29$ $632.26 1,896.78$

Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" 10 $760.00 7,600.00$ $318.00 3,180.00$ $422.85 4,228.50$ $910.46 9,104.55$

Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" 10 $946.00 9,460.00$ $387.00 3,870.00$ $450.27 4,502.70$ $1,138.07 11,380.69$

1062 Painting 300 $278.00 83,400.00$ $17.00 5,100.00$ $270.11 81,033.00$ $7.59 2,276.14$ 1063 Seamless Epoxy Coatings - Flooring 100 $25.10 2,510.00$ $17.00 1,700.00$ $30.71 3,071.00$ $27.01 2,701.02$ 1064 Seamless Epoxy Coatings - Walls & Ceiling 100 $11.20 1,120.00$ $17.00 1,700.00$ $52.13 5,213.00$ $12.90 1,289.81$ 1065 Pavement Raising Portland Cement 200 $32.70 6,540.00$ $35.00 7,000.00$ $9.07 1,814.00$ $16.31 3,262.46$ 1066 Stockpiling - Crushed Stone 100 $30.10 3,010.00$ $45.00 4,500.00$ $45.81 4,581.00$ $60.70 6,069.70$ 1067 Stockpiling - Gravel 100 $29.40 2,940.00$ $46.00 4,600.00$ $45.81 4,581.00$ $40.21 4,021.18$ 1068 Stockpiling - Fine Aggregates 100 $30.10 3,010.00$ $45.00 4,500.00$ $48.16 4,816.00$ $37.94 3,793.56$ 1069 Stockpiling - Drainage Aggregate 10 $40.80 408.00$ $45.00 450.00$ $49.25 492.50$ $39.45 394.53$ 1070 Stockpiling - Type 1 or 5 Aggregate 100 $31.20 3,120.00$ $50.00 5,000.00$ $45.81 4,581.00$ $39.15 3,914.96$ 1071 Stockpiling - Quarry Run Limestone 100 $31.80 3,180.00$ $53.00 5,300.00$ $50.70 5,070.00$ $37.94 3,793.56$ 1072 Stockpiling - Limestone 500 $31.80 15,900.00$ $52.00 26,000.00$ $49.25 24,625.00$ $37.94 18,967.81$ 1073 Placement - Crushed Stone 200 $40.50 8,100.00$ $57.00 11,400.00$ $74.25 14,850.00$ $65.25 13,049.86$ 1074 Placement - Gravel 200 $39.80 7,960.00$ $53.00 10,600.00$ $74.25 14,850.00$ $78.41 15,682.59$ 1075 Placement - Fine Aggregates 50 $46.70 2,335.00$ $58.00 2,900.00$ $76.60 3,830.00$ $73.97 3,698.72$ 1076 Placement - Drainage Aggregate 10 $82.20 822.00$ $61.00 610.00$ $162.98 1,629.80$ $76.93 769.33$ 1077 Placement - Type 1 or 5 Aggregate 1000 $41.50 41,500.00$ $68.00 68,000.00$ $74.25 74,250.00$ $76.34 76,341.65$ 1078 Placement - Quarry Run Limestone 100 $44.20 4,420.00$ $42.00 4,200.00$ $79.15 7,915.00$ $73.97 7,397.45$ 1079 Placement - Limestone 1000 $42.20 42,200.00$ $42.00 42,000.00$ $77.68 77,680.00$ $73.97 73,974.47$ 1080 Stockpiling - USACE 3" Bedding 500 $25.80 12,900.00$ $42.00 21,000.00$ $49.25 24,625.00$ $38.39 19,195.43$ 1081 Stockpiling - USACE 50lb Rip Rap 500 $31.90 15,950.00$ $56.00 28,000.00$ $63.49 31,745.00$ $46.58 23,292.47$ 1082 Stockpiling - USACE 90lb Rip Rap 500 $33.00 16,500.00$ $68.00 34,000.00$ $64.67 32,335.00$ $53.26 26,630.81$

1083 Stockpiling - USACE 140lb Rip Rap 500 $35.10 17,550.00$ $78.00 39,000.00$ $66.14 33,070.00$ $54.49 27,245.37$ 1084 Stockpiling - USACE 400lb Rip Rap 500 $38.60 19,300.00$ $78.00 39,000.00$ $66.63 33,315.00$ $54.90 27,450.22$ 1085 Stockpiling - USACE 650lb Rip Rap 500 $44.60 22,300.00$ $81.00 40,500.00$ $75.71 37,855.00$ $54.90 27,450.22$ 1086 Stockpiling - USACE 1000lb Rip Rap 500 $44.60 22,300.00$ $81.00 40,500.00$ $85.74 42,870.00$ $55.72 27,859.92$ 1087 Placement - USACE 3" Bedding 1000 $36.10 36,100.00$ $53.00 53,000.00$ $75.67 75,670.00$ $74.86 74,862.16$ 1088 Placement - USACE 50lb Rip Rap 1000 $45.60 45,600.00$ $67.00 67,000.00$ $89.93 89,930.00$ $90.84 90,840.65$ 1089 Placement - USACE 90lb Rip Rap 1000 $46.60 46,600.00$ $79.00 79,000.00$ $91.11 91,110.00$ $103.86 103,860.15$ 1090 Placement - USACE 140lb Rip Rap 1000 $48.80 48,800.00$ $86.00 86,000.00$ $92.58 92,580.00$ $106.26 106,256.93$ 1091 Placement - USACE 400lb Rip Rap 1000 $52.30 52,300.00$ $86.00 86,000.00$ $93.07 93,070.00$ $107.06 107,055.85$ 1092 Placement - USACE 650lb Rip Rap 1000 $58.30 58,300.00$ $94.00 94,000.00$ $110.95 110,950.00$ $107.06 107,055.85$ 1093 Placement - USACE 1000lb Rip Rap 1000 $58.30 58,300.00$ $94.00 94,000.00$ $138.62 138,620.00$ $108.65 108,653.70$ 1094 Patching 150 $143.00 21,450.00$ $308.00 46,200.00$ $392.30 58,845.00$ $96.71 14,506.58$ 1095 Road Widening 150 $52.50 7,875.00$ $315.00 47,250.00$ $402.62 60,393.00$ $151.74 22,761.38$ 1096 Asphaltic Concrete Surface 2000 $212.00 424,000.00$ $221.00 442,000.00$ $275.30 550,600.00$ $303.49 606,970.00$ 1097 Seal Coat 1000 $4.90 4,900.00$ $7.00 7,000.00$ $7.40 7,400.00$ $6.15 6,145.57$ 1098 Crack Fill/Sealing 500 $74.70 37,350.00$ $141.00 70,500.00$ $61.94 30,970.00$ $83.46 41,729.19$ 1099 Scrub Seal 500 $4.90 2,450.00$ $12.00 6,000.00$ $36.28 18,140.00$ $5.31 2,655.49$ 1100 Bituminous Fog Sealing 500 $4.90 2,450.00$ $12.00 6,000.00$ $36.28 18,140.00$ $40.97 20,485.24$ 1101 Guardrail Replacement 200 $84.70 16,940.00$ $118.00 23,600.00$ $221.45 44,290.00$ $81.94 16,388.19$ 1102 Guardrail Installation 100 $79.50 7,950.00$ $132.00 13,200.00$ $241.43 24,143.00$ $69.80 6,980.16$ 1103 Traffic Striping 50000 $1.60 80,000.00$ $2.00 100,000.00$ $1.55 77,500.00$ $0.38 18,967.81$ 1104 Parking Area Traffic Striping Layout 3000 $0.30 900.00$ $2.00 6,000.00$ $1.29 3,870.00$ $0.76 2,276.14$ 1105 Traffic Marking Arrows 3 $215.00 645.00$ $207.00 621.00$ $80.87 242.61$ $303.49 910.46$ 1106 Traffic Marking Disable Symbol 70 $120.00 8,400.00$ $207.00 14,490.00$ $153.13 10,719.10$ $196.18 13,732.70$ 1107 Traffic Marking No Parking 4 $146.00 584.00$ $207.00 828.00$ $189.27 757.08$ $197.27 789.06$ 1108 Traffic Marking 5 Minute Parking 5 $192.00 960.00$ $207.00 1,035.00$ $89.47 447.35$ $220.03 1,100.13$ 1109 Traffic Marking 10 Minute Parking 5 $192.00 960.00$ $207.00 1,035.00$ $89.47 447.35$ $233.68 1,168.42$ 1110 Traffic Marking Tie-Down Only 5 $146.00 730.00$ $207.00 1,035.00$ $89.47 447.35$ $221.54 1,107.72$ 1111 Parking Block Removal and Reinstallation 50 $50.80 2,540.00$ $173.00 8,650.00$ $208.56 10,428.00$ $44.01 2,200.27$ 1112 Parking Block Replacement 10 $163.00 1,630.00$ $207.00 2,070.00$ $344.59 3,445.90$ $204.85 2,048.52$ 1113 Parking Block Installation 10 $138.00 1,380.00$ $173.00 1,730.00$ $317.38 3,173.80$ $166.92 1,669.17$ 1114 Establishment of Turf - Large Scale 20 $5,010.00 100,200.00$ $6,210.00 124,200.00$ $3,568.13 71,362.60$ $68.28 1,365.68$ 1115 Establishment of Turf - Small Scale 100 $27.00 2,700.00$ $9.00 900.00$ $62.09 6,209.00$ $9.10 910.46$ 1116 Road Bore Drill Setup and Staging 1 $3,750.00 3,750.00$ $3,450.00 3,450.00$ $3,627.37 3,627.37$ $3,338.34 3,338.34$ 1117 Road Bore Sleeve 2-inch Dia. HDPE 30 $124.00 3,720.00$ $43.00 1,290.00$ $171.47 5,144.10$ $49.87 1,496.18$ 1118 Road Bore Sleeve 3-inch Dia. HDPE 30 $126.00 3,780.00$ $46.00 1,380.00$ $192.44 5,773.20$ $55.64 1,669.17$ 1119 Road Bore Sleeve 4-inch Dia. HDPE 30 $128.00 3,840.00$ $47.00 1,410.00$ $213.94 6,418.20$ $61.96 1,858.85$ 1120 Road Bore Sleeve 6-inch Dia. HDPE 30 $134.00 4,020.00$ $61.00 1,830.00$ $242.15 7,264.50$ $62.57 1,877.05$ 1121 Road Bore Sleeve 8-inch Dia. HDPE 30 $142.00 4,260.00$ $75.00 2,250.00$ $293.82 8,814.60$ $64.74 1,942.30$ 1122 Frost Proof Yard Hydrant Replacement 5 $2,450.00 12,250.00$ $1,104.00 5,520.00$ $2,720.54 13,602.70$ $1,160.83 5,804.15$ 1123 Frost Proof Yard Hydrant Installation 5 $1,670.00 8,350.00$ $1,104.00 5,520.00$ $2,720.54 13,602.70$ $995.43 4,977.15$ 1124 Water Valve Replacement - 1" curb stop ball valve 2 $1,130.00 2,260.00$ $690.00 1,380.00$ $816.14 1,632.28$ $273.14 546.27$

1125 Water Valve Replacement - 1.5" curb stop ball valve 2 $1,380.00 2,760.00$ $828.00 1,656.00$ $1,360.24 2,720.48$ $597.87 1,195.73$

1126 Water Valve Replacement - 2" square nut ball valve 2 $1,970.00 3,940.00$ $966.00 1,932.00$ $1,813.69 3,627.38$ $1,001.50 2,003.00$

1127 Water Valve Replacement - 3" square nut ball valve 2 $2,420.00 4,840.00$ $1,104.00 2,208.00$ $2,720.54 5,441.08$ $1,403.62 2,807.24$

1128 Water Valve Replacement - 4" square nut ball valve 2 $2,680.00 5,360.00$ $1,242.00 2,484.00$ $3,627.37 7,254.74$ $2,731.37 5,462.73$ 1129 3/4 Inch Water Line Tap 2 $1,820.00 3,640.00$ $1,380.00 2,760.00$ $4,080.79 8,161.58$ $2,078.87 4,157.74$ 1130 1 Inch Water Line Tap 2 $1,820.00 3,640.00$ $1,518.00 3,036.00$ $4,080.79 8,161.58$ $2,086.46 4,172.92$ 1131 1-1/2 Inch Water Line Tap 2 $2,030.00 4,060.00$ $1,656.00 3,312.00$ $4,080.79 8,161.58$ $2,295.11 4,590.21$ 1132 2 Inch Water Line Tap 2 $2,100.00 4,200.00$ $1,794.00 3,588.00$ $4,534.23 9,068.46$ $2,769.30 5,538.60$ 1133 3 Inch Water Line Tap 2 $2,610.00 5,220.00$ $1,932.00 3,864.00$ $4,534.23 9,068.46$ $3,300.40 6,600.80$ 1134 4 Inch Water Line Tap 2 $2,760.00 5,520.00$ $2,070.00 4,140.00$ $4,534.23 9,068.46$ $4,248.79 8,497.58$

1135 6 Inch Water Line Tap 2 $3,010.00 6,020.00$ $2,208.00 4,416.00$ $6,347.93 12,695.86$ $4,172.92 8,345.84$ 1136 3/4 Inch Water Line Installation 100 $26.40 2,640.00$ $23.00 2,300.00$ $154.16 15,416.00$ $12.11 1,210.91$ 1137 1 Inch Water Line Installation 100 $26.90 2,690.00$ $24.00 2,400.00$ $172.29 17,229.00$ $12.37 1,236.70$ 1138 1-1/2 Inch Water Line Installation 100 $29.00 2,900.00$ $25.00 2,500.00$ $217.63 21,763.00$ $14.51 1,450.66$ 1139 2 Inch Water Line Installation 100 $30.00 3,000.00$ $27.00 2,700.00$ $272.04 27,204.00$ $15.96 1,596.33$ 1140 2-1/2 Inch Water Line Installation 100 $31.50 3,150.00$ $28.00 2,800.00$ $317.38 31,738.00$ $18.06 1,805.74$ 1141 3 Inch Water Line Installation 100 $43.60 4,360.00$ $29.00 2,900.00$ $362.72 36,272.00$ $20.49 2,048.52$ 1142 4 Inch Water Line Installation 50 $55.50 2,775.00$ $46.00 2,300.00$ $544.10 27,205.00$ $50.08 2,503.75$ 1143 6 Inch Water Line Installation 50 $60.20 3,010.00$ $56.00 2,800.00$ $634.78 31,739.00$ $54.63 2,731.37$ 1144 Sewer Line Tap 2-5 Feet Deep 2 $1,650.00 3,300.00$ $1,242.00 2,484.00$ $8,161.64 16,323.28$ $2,124.40 4,248.79$ 1145 Sewer Line Tap 5.1-10 Feet Deep 2 $1,950.00 3,900.00$ $1,656.00 3,312.00$ $9,975.37 19,950.74$ $2,465.82 4,931.63$ 1146 Sewer Line Tap 10.1-15 Feet Deep 1 $2,450.00 2,450.00$ $2,070.00 2,070.00$ $13,602.79 13,602.79$ $2,807.24 2,807.24$ 1147 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $60.60 6,060.00$ $54.00 5,400.00$ $489.68 48,968.00$ $57.66 5,766.22$ 1148 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $67.00 3,350.00$ $63.00 3,150.00$ $516.88 25,844.00$ $60.70 3,034.85$ 1149 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $80.60 1,612.00$ $76.00 1,520.00$ $544.10 10,882.00$ $83.46 1,669.17$ 1150 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $106.00 10,600.00$ $58.00 5,800.00$ $544.10 54,410.00$ $113.81 11,380.69$ 1151 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $112.00 5,600.00$ $67.00 3,350.00$ $562.23 28,111.50$ $103.18 5,159.25$ 1152 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $126.00 2,520.00$ $83.00 1,660.00$ $589.44 11,788.80$ $136.57 2,731.37$ 1153 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 $151.00 15,100.00$ $69.00 6,900.00$ $634.78 63,478.00$ $151.74 15,174.25$ 1154 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 $157.00 7,850.00$ $76.00 3,800.00$ $661.98 33,099.00$ $166.92 8,345.84$ 1155 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 $171.00 3,420.00$ $90.00 1,800.00$ $698.25 13,965.00$ $189.68 3,793.56$ 1156 2 Inch Dia. Pressure Sewer Force Main Install 50 $38.50 1,925.00$ $49.00 2,450.00$ $453.40 22,670.00$ $37.94 1,896.78$ 1157 3 Inch Dia. Pressure Sewer Force Main Install 50 $45.00 2,250.00$ $56.00 2,800.00$ $498.75 24,937.50$ $47.04 2,352.01$ 1158 4 Inch Dia. Pressure Sewer Force Main Install 50 $50.70 2,535.00$ $67.00 3,350.00$ $544.10 27,205.00$ $57.36 2,867.93$ 1159 6 Inch Dia. Pressure Sewer Force Main Install 20 $88.60 1,772.00$ $76.00 1,520.00$ $680.12 13,602.40$ $106.22 2,124.40$ 1160 Manhole Install 1-4 Feet Deep 2 $3,060.00 6,120.00$ $4,968.00 9,936.00$ $9,928.88 19,857.76$ $4,248.79 8,497.58$ 1161 Manhole Install 4.1-10 Feet Deep 2 $3,960.00 7,920.00$ $6,348.00 12,696.00$ $15,352.08 30,704.16$ $4,931.63 9,863.26$ 1162 Manhole Install 10.1-15 Feet Deep 2 $5,910.00 11,820.00$ $8,970.00 17,940.00$ $21,987.36 43,974.72$ $6,790.48 13,580.95$ 1163 CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $61.90 1,238.00$ $50.00 1,000.00$ $160.46 3,209.20$ $106.22 2,124.40$ 1164 CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $69.90 1,398.00$ $54.00 1,080.00$ $470.21 9,404.20$ $113.81 2,276.14$ 1165 CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 $86.40 1,728.00$ $58.00 1,160.00$ $863.01 17,260.20$ $128.98 2,579.62$ 1166 CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 $74.80 1,496.00$ $57.00 1,140.00$ $186.83 3,736.60$ $136.57 2,731.37$ 1167 CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 $82.80 1,656.00$ $61.00 1,220.00$ $505.81 10,116.20$ $136.57 2,731.37$ 1168 CMP 18 Inch Dia.