A02_24B0009 Wapp Bid Schedule Jan 3 Protected.xlsx
XLSX spreadsheet 87 KB Posted
- Attached to
- Solicitation for Wappapello Lake Facility Infrastructure Construction & Maintenance IDIQ
- Solicitation number
- W912P924B0009
About this file
This document outlines a solicitation for an indefinite delivery/indefinite quantity construction contract to provide facility infrastructure construction and maintenance services at Wappapello Lake Project in Missouri. Services include earthwork, borrow operations, concrete work, drainage structures maintenance, utilities maintenance, grounds maintenance, and more. The contract has a total estimated value of $0 with five one-year ordering periods and an optional six-month extension. Bids are due on February 5, 2024 and will be evaluated for price alone using sealed bidding procedures. The award will be a single-award IDIQ to the responsible bidder offering the lowest price. Payment will be made by EFT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
BID SCHEDULE - BASE YEAR - ORDERING PERIOD 1
FACILITY INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE IDIQ
ORDERING PERIOD DURATION: 1 MAR 2024 - 28 FEB 2025
| BASE YEAR - ORDERING PERIOD 1 | ||||
| Pre-Priced Line Item | Description | Estimated | ||
| Quantity | UOM | Unit Price | Estimated | |
| Amount | Technical |
Section
| 1 | Concrete Slab: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 2 | Concrete Slab: 6-inch | 200 | SF | $0.00 | 03 30 00 | |
| 3 | Concrete Slab: 8-inch | 100 | SF | $0.00 | 03 30 00 | |
| 4 | Concrete Slab: 10-inch | 100 | SF | $0.00 | 03 30 00 | |
| 5 | Concrete Ditch: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 6 | Concrete Curb & Gutter | 1000 | LF | $0.00 | 03 30 00 | |
| 7 | Concrete Barrier Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 8 | Concrete Mountable Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 9 | Reinforcement | 500 | LB | $0.00 | 03 30 00 | |
| 10 | Miscellaneous Concrete Work | TBD | TBD | 03 30 00.99 | ||
| 11 | Clearing and Grubbing: Light | 5000 | SY | $0.00 | 31 00 00 | |
| 12 | Clearing and Grubbing: Heavy | 5000 | SY | $0.00 | 31 00 00 | |
| 13 | Fill Material | 1000 | CY | $0.00 | 31 00 00 | |
| 14 | Earthwork - Berm Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 15 | Earthwork - Light Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 16 | Earthwork - Heavy Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 17 | Earthwork - Slough Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 18 | Earthwork - Pavement Subgrade | 1000 | CY | $0.00 | 31 00 00 | |
| 19 | Excess Earthwork Disposal | 200 | CY | $0.00 | 31 00 00 | |
| 20 | Top Soil | 800 | CY | $0.00 | 31 00 00 | |
| 21 | Geotextile Installation - Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 22 | Geotextile Installation - Non Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 23 | Concrete Removal | 200 | CY | $0.00 | 32 00 00 | |
| 24 | Concrete Removal Structures & Foundations | 200 | CY | $0.00 | 32 00 00 | |
| 25 | Asphalt Removal | 200 | CY | $0.00 | 32 00 00 | |
| 26 | Removal of Aggregates | 200 | CY | $0.00 | 32 00 00 | |
| 27 | Disposal of Misc. | 500 | LB | $0.00 | 32 00 00 | |
| 28 | Right of Way Clearing | 50 | MILE | $0.00 | 32 00 00 | |
| 29 | Tree Trimming | TBD | JOB | 32 00 00 | ||
| 29 | a | Tree Trimming Low | 20 | HR | $0.00 | 32 00 00 |
| 29 | b | Tree Trimming High | 20 | HR | $0.00 | 32 00 00 |
| 30 | Tree Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 31 | Tree Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 32 | Stump Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 33 | Stump Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 34 | Landscape Timbers Installation | 50 | LF | $0.00 | 32 00 00 | |
| 35 | Landscape Timber Removal | 20 | LF | $0.00 | 32 00 00 | |
| 36 | Sand Supply | 100 | TN | $0.00 | 32 00 00 | |
| 37 | Beach Sand Supply & Install | 200 | TN | $0.00 | 32 00 00 | |
| 38 | Redman Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 39 | Rockwood Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 40 | Peoples Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 41 | Greenville Berm Notch Construction | 1 | JB | $0.00 | 32 00 00 | |
| 42 | Greenville Berm Notch Removal | 1 | JB | $0.00 | 32 00 00 | |
| 43 | 12" Dia Pump Mob & Demob | 1 | JB | $0.00 | 32 00 00 | |
| 44 | 12" Dia Pump & Piping - Weekly | 3 | WK | $0.00 | 32 00 00 | |
| 45 | 12" Dia Pump & Piping - Monthly | 1 | MO | $0.00 | 32 00 00 | |
| 46 | Entrance Gate - Double Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 47 | Entrance Gate - Single Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 48 | Entrance Gate - Double Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 49 | Entrance Gate - Single Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 50 | Entrance Gate - Painting Double Arm | 5 | EA | $0.00 | 32 00 00 | |
| 51 | Entrance Gate - Painting Single Arm | 5 | EA | $0.00 | 32 00 00 | |
| 52 | Bicyle Trail Gate Fabrication & Installation | 2 | EA | $0.00 | 32 00 00 | |
| 53 | Bicyle Trail Gate Fabrication & Replacement | 1 | EA | $0.00 | 32 00 00 | |
| 54 | Concrete Dome Post Installation | 5 | EA | $0.00 | 32 00 00 | |
| 55 | Engineered Wood Chip - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 56 | Engineered Wood Chip - Supply and Placement | 20 | CY | $0.00 | 32 00 00 | |
| 57 | Hardwood Landscape Mulch - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 58 | Hardwood Landscape Mulch - Supply & Placement | 20 | CY | $0.00 | 32 00 00 | |
| 59 | Decorative Boulder Supply and Placement | 3 | EA | $0.00 | 32 00 00 | |
| 60 | Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" | 10 | EA | $0.00 | 32 00 00 | |
| 61 | Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" | 10 | EA | $0.00 | 32 00 00 | |
| 62 | Painting | 300 | SQ | $0.00 | 32 00 00 | |
| 63 | Seamless Epoxy Coatings - Flooring | 100 | SF | $0.00 | 32 00 00 | |
| 64 | Seamless Epoxy Coatings - Walls & Ceiling | 100 | SF | $0.00 | 32 00 00 | |
| 65 | Pavement Raising Portland Cement | 200 | LB | $0.00 | 32 01 29.62 | |
| 66 | Stockpiling - Crushed Stone | 100 | TN | $0.00 | 32 22 30 | |
| 67 | Stockpiling - Gravel | 100 | TN | $0.00 | 32 22 30 | |
| 68 | Stockpiling - Fine Aggregates | 100 | TN | $0.00 | 32 22 30 | |
| 69 | Stockpiling - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 70 | Stockpiling - Type 1 or 5 Aggregate | 100 | TN | $0.00 | 32 22 30 | |
| 71 | Stockpiling - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 72 | Stockpiling - Limestone | 500 | TN | $0.00 | 32 22 30 | |
| 73 | Placement - Crushed Stone | 200 | TN | $0.00 | 32 22 30 | |
| 74 | Placement - Gravel | 200 | TN | $0.00 | 32 22 30 | |
| 75 | Placement - Fine Aggregates | 50 | TN | $0.00 | 32 22 30 | |
| 76 | Placement - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 77 | Placement - Type 1 or 5 Aggregate | 1000 | TN | $0.00 | 32 22 30 | |
| 78 | Placement - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 79 | Placement - Limestone | 1000 | TN | $0.00 | 32 22 30 | |
| 80 | Stockpiling - USACE 3" Bedding | 500 | TN | $0.00 | 32 22 40 | |
| 81 | Stockpiling - USACE 50lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 82 | Stockpiling - USACE 90lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 83 | Stockpiling - USACE 140lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 84 | Stockpiling - USACE 400lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 85 | Stockpiling - USACE 650lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 86 | Stockpiling - USACE 1000lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 87 | Placement - USACE 3" Bedding | 1000 | TN | $0.00 | 32 22 40 | |
| 88 | Placement - USACE 50lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 89 | Placement - USACE 90lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 90 | Placement - USACE 140lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 91 | Placement - USACE 400lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 92 | Placement - USACE 650lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 93 | Placement - USACE 1000lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 94 | Patching | 150 | SY | $0.00 | 32 25 15 | |
| 95 | Road Widening | 150 | SY | $0.00 | 32 25 15 | |
| 96 | Asphaltic Concrete Surface | 2000 | TN | $0.00 | 32 25 15 | |
| 97 | Seal Coat | 1000 | SY | $0.00 | 32 25 15 | |
| 98 | Crack Fill/Sealing | 500 | GL | $0.00 | 32 25 15 | |
| 99 | Scrub Seal | 500 | SY | $0.00 | 32 25 15 | |
| 100 | Bituminous Fog Sealing | 500 | SY | $0.00 | 32 25 15 | |
| 101 | Guardrail Replacement | 200 | LF | $0.00 | 32 25 15 | |
| 102 | Guardrail Installation | 100 | LF | $0.00 | 32 25 15 | |
| 103 | Traffic Striping | 50000 | LF | $0.00 | 32 25 15 | |
| 104 | Parking Area Traffic Striping Layout | 3000 | LF | $0.00 | 32 25 15 | |
| 105 | Traffic Marking Arrows | 3 | EA | $0.00 | 32 25 15 | |
| 106 | Traffic Marking Disable Symbol | 70 | EA | $0.00 | 32 25 15 | |
| 107 | Traffic Marking No Parking | 4 | EA | $0.00 | 32 25 15 | |
| 108 | Traffic Marking 5 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 109 | Traffic Marking 10 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 110 | Traffic Marking Tie-Down Only | 5 | EA | $0.00 | 32 25 15 | |
| 111 | Parking Block Removal and Reinstallation | 50 | EA | $0.00 | 32 25 15 | |
| 112 | Parking Block Replacement | 10 | EA | $0.00 | 32 25 15 | |
| 113 | Parking Block Installation | 10 | EA | $0.00 | 32 25 15 | |
| 114 | Establishment of Turf - Large Scale | 20 | ACRE | $0.00 | 32 29 35 | |
| 115 | Establishment of Turf - Small Scale | 100 | SY | $0.00 | 32 29 35 | |
| 116 | Road Bore Drill Setup and Staging | 1 | JOB | $0.00 | 33 05 23.13 | |
| 117 | Road Bore Sleeve 2-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 118 | Road Bore Sleeve 3-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 119 | Road Bore Sleeve 4-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 120 | Road Bore Sleeve 6-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 121 | Road Bore Sleeve 8-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 122 | Frost Proof Yard Hydrant Replacement | 5 | EA | $0.00 | 33 11 00 | |
| 123 | Frost Proof Yard Hydrant Installation | 5 | EA | $0.00 | 33 11 00 | |
| 124 | Water Valve Replacement - 1" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 125 | Water Valve Replacement - 1.5" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 126 | Water Valve Replacement - 2" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 127 | Water Valve Replacement - 3" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 128 | Water Valve Replacement - 4" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 129 | 3/4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 130 | 1 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 131 | 1-1/2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 132 | 2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 133 | 3 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 134 | 4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 135 | 6 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 136 | 3/4 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 137 | 1 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 138 | 1-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 139 | 2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 140 | 2-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 141 | 3 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 142 | 4 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 143 | 6 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 144 | Sewer Line Tap 2-5 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 145 | Sewer Line Tap 5.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 146 | Sewer Line Tap 10.1-15 Feet Deep | 1 | EA | $0.00 | 33 11 00 | |
| 147 | 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 148 | 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 149 | 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 150 | 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 151 | 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 152 | 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 153 | 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 154 | 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 155 | 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 156 | 2 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 157 | 3 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 158 | 4 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 159 | 6 Inch Dia. Pressure Sewer Force Main Install | 20 | LF | $0.00 | 33 11 00 | |
| 160 | Manhole Install 1-4 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 161 | Manhole Install 4.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 162 | Manhole Install 10.1-15 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 163 | CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 164 | CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 165 | CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 166 | CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 167 | CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 168 | CMP 18 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 169 | CMP 24 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 170 | CMP 24 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 171 | CMP 24 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 172 | CMP 30 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 173 | CMP 30 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 174 | CMP 30 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 175 | CMP 36 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 176 | CMP 36 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 177 | CMP 36 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 178 | CMP 48 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 179 | CMP 48 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 180 | CMP 48 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 181 | CMP 12 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 182 | CMP 12 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 183 | CMP 12 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 184 | CMP 18 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 185 | CMP 18 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 186 | CMP 18 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 187 | CMP 24 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 188 | CMP 24 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 189 | CMP 24 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 190 | CMP 30 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 191 | CMP 30 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 192 | CMP 30 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 193 | CMP 36 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 194 | CMP 36 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 195 | CMP 36 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 196 | CMP 48 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 197 | CMP 48 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 198 | CMP 48 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 199 | 12 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 200 | 18 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 201 | 24 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 202 | 30 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 203 | 36 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 204 | 12 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 205 | 18 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 206 | 24 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 207 | 30 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 208 | 36 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 209 | EQUIPMENT RENTAL WITH OPERATOR | TBD | JOB | 32 40 00 | ||
| 209 | a | Track-Type Bulldozers 90HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | b | Track-Type Bulldozers 190HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | c | Motor Grader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | d | Backhoe 60HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | e | Backhoe 95HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | f | Rubber Tire Front End Loader 120HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | g | Rubber Tire Front End Loader 275HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | h | Dump Truck (Tandem) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | i | Dump Truck (Single) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | j | Semi-Tractor Trailer w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | k | Bucket Truck w/OP. | 100 | HR | $0.00 | 32 40 00 |
| 209 | l | Truck Crane w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | m | Mini-Excavator w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | n | Excavator 50hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | o | Excavator 155hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | p | Excavator 242hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | q | Walk behind Concrete Saw w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | r | Self-propelled Drum Vibrating Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | s | Self-propelled Sheepsfoot Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | t | Skid Steer Loader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | u | Tractor with Boom Mower w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | v | Small Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | w | Large Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | x | Tractor & Pan w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | y | Asphalt Miller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 210 | Rental of Miscellaneous Equipment with Operator | TBD | TBD | 32 40 00 | ||
| 211 | SPECIALTY EQUIPMENT | TBD | JOB | 32 40 00 | ||
| 211 | a | Portable Diesel Air Compressor | 100 | HR | $0.00 | 32 40 00 |
| 211 | b | Trailer Mounted Concrete Pump | 100 | HR | $0.00 | 32 40 00 |
| 211 | c | Trencher | 100 | HR | $0.00 | 32 40 00 |
| 211 | d | Light Towers | 100 | HR | $0.00 | 32 40 00 |
| 211 | e | Chainsaw | 100 | HR | $0.00 | 32 40 00 |
| 211 | f | Power Washer | 100 | HR | $0.00 | 32 40 00 |
| 211 | g | Hand Operated Electric Power Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | h | Hand Operated Air Powered Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | i | Hand Operated Air Powered Chipping Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | j | Vibratory Plate Tamper | 100 | HR | $0.00 | 32 40 00 |
| 211 | k | Hand Operated Power Cutoff Saw | 100 | HR | $0.00 | 32 40 00 |
| 211 | l | Hand Operated Power Hammer Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | m | Hand Operated Air Powered Core Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | n | Concrete Saw | 100 | HR | $0.00 | 32 40 00 |
| 212 | Rental of Miscellaneous Equipment without Operator | TBD | TBD | 32 40 00 | ||
| 213 | LABOR SUPPORT | TBD | JOB | 32 40 00 | ||
| 213 | a | Surveyor | 100 | HR | $0.00 | 32 40 00 |
| 213 | b | General Engineer | 100 | HR | $0.00 | 32 40 00 |
| 213 | c | Drafter/CADD Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | d | Plumber | 100 | HR | $0.00 | 32 40 00 |
| 213 | e | Electrician | 100 | HR | $0.00 | 32 40 00 |
| 213 | f | HVAC Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | g | Laborer | 100 | HR | $0.00 | 32 40 00 |
| 213 | h | Iron Worker | 100 | HR | $0.00 | 32 40 00 |
| 213 | i | Carpenter | 100 | HR | $0.00 | 32 40 00 |
| 213 | j | Cement Mason | 100 | HR | $0.00 | 32 40 00 |
| 213 | k | Welder Type I with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 213 | l | Welder Type II with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 214 | Procurement and Delivery of Miscellaneous Materials | TBD | TBD | 32 40 00 | ||
| TOTAL ORDERING PERIOD 1 | $0.00 |
BID SCHEDULE - ORDERING PERIOD 2
FACILITY INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE IDIQ
ORDERING PERIOD DURATION: 1 MAR 2025 - 28 FEB 2026
| ORDERING PERIOD 2 | ||||
| Pre-Priced Line Item | Description | Estimated | ||
| Quantity | UOM | Unit Price | Estimated | |
| Amount | Technical |
Section
| 1 | Concrete Slab: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 2 | Concrete Slab: 6-inch | 200 | SF | $0.00 | 03 30 00 | |
| 3 | Concrete Slab: 8-inch | 100 | SF | $0.00 | 03 30 00 | |
| 4 | Concrete Slab: 10-inch | 100 | SF | $0.00 | 03 30 00 | |
| 5 | Concrete Ditch: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 6 | Concrete Curb & Gutter | 1000 | LF | $0.00 | 03 30 00 | |
| 7 | Concrete Barrier Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 8 | Concrete Mountable Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 9 | Reinforcement | 500 | LB | $0.00 | 03 30 00 | |
| 10 | Miscellaneous Concrete Work | TBD | TBD | 03 30 00.99 | ||
| 11 | Clearing and Grubbing: Light | 5000 | SY | $0.00 | 31 00 00 | |
| 12 | Clearing and Grubbing: Heavy | 5000 | SY | $0.00 | 31 00 00 | |
| 13 | Fill Material | 1000 | CY | $0.00 | 31 00 00 | |
| 14 | Earthwork - Berm Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 15 | Earthwork - Light Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 16 | Earthwork - Heavy Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 17 | Earthwork - Slough Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 18 | Earthwork - Pavement Subgrade | 1000 | CY | $0.00 | 31 00 00 | |
| 19 | Excess Earthwork Disposal | 200 | CY | $0.00 | 31 00 00 | |
| 20 | Top Soil | 800 | CY | $0.00 | 31 00 00 | |
| 21 | Geotextile Installation - Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 22 | Geotextile Installation - Non Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 23 | Concrete Removal | 200 | CY | $0.00 | 32 00 00 | |
| 24 | Concrete Removal Structures & Foundations | 200 | CY | $0.00 | 32 00 00 | |
| 25 | Asphalt Removal | 200 | CY | $0.00 | 32 00 00 | |
| 26 | Removal of Aggregates | 200 | CY | $0.00 | 32 00 00 | |
| 27 | Disposal of Misc. | 500 | LB | $0.00 | 32 00 00 | |
| 28 | Right of Way Clearing | 50 | MILE | $0.00 | 32 00 00 | |
| 29 | Tree Trimming | TBD | JOB | 32 00 00 | ||
| 29 | a | Tree Trimming Low | 20 | HR | $0.00 | 32 00 00 |
| 29 | b | Tree Trimming High | 20 | HR | $0.00 | 32 00 00 |
| 30 | Tree Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 31 | Tree Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 32 | Stump Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 33 | Stump Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 34 | Landscape Timbers Installation | 50 | LF | $0.00 | 32 00 00 | |
| 35 | Landscape Timber Removal | 20 | LF | $0.00 | 32 00 00 | |
| 36 | Sand Supply | 100 | TN | $0.00 | 32 00 00 | |
| 37 | Beach Sand Supply & Install | 200 | TN | $0.00 | 32 00 00 | |
| 38 | Redman Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 39 | Rockwood Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 40 | Peoples Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 41 | Greenville Berm Notch Construction | 1 | JB | $0.00 | 32 00 00 | |
| 42 | Greenville Berm Notch Removal | 1 | JB | $0.00 | 32 00 00 | |
| 43 | 12" Dia Pump Mob & Demob | 1 | JB | $0.00 | 32 00 00 | |
| 44 | 12" Dia Pump & Piping - Weekly | 3 | WK | $0.00 | 32 00 00 | |
| 45 | 12" Dia Pump & Piping - Monthly | 1 | MO | $0.00 | 32 00 00 | |
| 46 | Entrance Gate - Double Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 47 | Entrance Gate - Single Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 48 | Entrance Gate - Double Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 49 | Entrance Gate - Single Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 50 | Entrance Gate - Painting Double Arm | 5 | EA | $0.00 | 32 00 00 | |
| 51 | Entrance Gate - Painting Single Arm | 5 | EA | $0.00 | 32 00 00 | |
| 52 | Bicyle Trail Gate Fabrication & Installation | 2 | EA | $0.00 | 32 00 00 | |
| 53 | Bicyle Trail Gate Fabrication & Replacement | 1 | EA | $0.00 | 32 00 00 | |
| 54 | Concrete Dome Post Installation | 5 | EA | $0.00 | 32 00 00 | |
| 55 | Engineered Wood Chip - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 56 | Engineered Wood Chip - Supply and Placement | 20 | CY | $0.00 | 32 00 00 | |
| 57 | Hardwood Landscape Mulch - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 58 | Hardwood Landscape Mulch - Supply & Placement | 20 | CY | $0.00 | 32 00 00 | |
| 59 | Decorative Boulder Supply and Placement | 3 | EA | $0.00 | 32 00 00 | |
| 60 | Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" | 10 | EA | $0.00 | 32 00 00 | |
| 61 | Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" | 10 | EA | $0.00 | 32 00 00 | |
| 62 | Painting | 300 | SQ | $0.00 | 32 00 00 | |
| 63 | Seamless Epoxy Coatings - Flooring | 100 | SF | $0.00 | 32 00 00 | |
| 64 | Seamless Epoxy Coatings - Walls & Ceiling | 100 | SF | $0.00 | 32 00 00 | |
| 65 | Pavement Raising Portland Cement | 200 | LB | $0.00 | 32 01 29.62 | |
| 66 | Stockpiling - Crushed Stone | 100 | TN | $0.00 | 32 22 30 | |
| 67 | Stockpiling - Gravel | 100 | TN | $0.00 | 32 22 30 | |
| 68 | Stockpiling - Fine Aggregates | 100 | TN | $0.00 | 32 22 30 | |
| 69 | Stockpiling - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 70 | Stockpiling - Type 1 or 5 Aggregate | 100 | TN | $0.00 | 32 22 30 | |
| 71 | Stockpiling - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 72 | Stockpiling - Limestone | 500 | TN | $0.00 | 32 22 30 | |
| 73 | Placement - Crushed Stone | 200 | TN | $0.00 | 32 22 30 | |
| 74 | Placement - Gravel | 200 | TN | $0.00 | 32 22 30 | |
| 75 | Placement - Fine Aggregates | 50 | TN | $0.00 | 32 22 30 | |
| 76 | Placement - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 77 | Placement - Type 1 or 5 Aggregate | 1000 | TN | $0.00 | 32 22 30 | |
| 78 | Placement - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 79 | Placement - Limestone | 1000 | TN | $0.00 | 32 22 30 | |
| 80 | Stockpiling - USACE 3" Bedding | 500 | TN | $0.00 | 32 22 40 | |
| 81 | Stockpiling - USACE 50lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 82 | Stockpiling - USACE 90lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 83 | Stockpiling - USACE 140lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 84 | Stockpiling - USACE 400lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 85 | Stockpiling - USACE 650lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 86 | Stockpiling - USACE 1000lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 87 | Placement - USACE 3" Bedding | 1000 | TN | $0.00 | 32 22 40 | |
| 88 | Placement - USACE 50lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 89 | Placement - USACE 90lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 90 | Placement - USACE 140lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 91 | Placement - USACE 400lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 92 | Placement - USACE 650lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 93 | Placement - USACE 1000lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 94 | Patching | 150 | SY | $0.00 | 32 25 15 | |
| 95 | Road Widening | 150 | SY | $0.00 | 32 25 15 | |
| 96 | Asphaltic Concrete Surface | 2000 | TN | $0.00 | 32 25 15 | |
| 97 | Seal Coat | 1000 | SY | $0.00 | 32 25 15 | |
| 98 | Crack Fill/Sealing | 500 | GL | $0.00 | 32 25 15 | |
| 99 | Scrub Seal | 500 | SY | $0.00 | 32 25 15 | |
| 100 | Bituminous Fog Sealing | 500 | SY | $0.00 | 32 25 15 | |
| 101 | Guardrail Replacement | 200 | LF | $0.00 | 32 25 15 | |
| 102 | Guardrail Installation | 100 | LF | $0.00 | 32 25 15 | |
| 103 | Traffic Striping | 50000 | LF | $0.00 | 32 25 15 | |
| 104 | Parking Area Traffic Striping Layout | 3000 | LF | $0.00 | 32 25 15 | |
| 105 | Traffic Marking Arrows | 3 | EA | $0.00 | 32 25 15 | |
| 106 | Traffic Marking Disable Symbol | 70 | EA | $0.00 | 32 25 15 | |
| 107 | Traffic Marking No Parking | 4 | EA | $0.00 | 32 25 15 | |
| 108 | Traffic Marking 5 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 109 | Traffic Marking 10 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 110 | Traffic Marking Tie-Down Only | 5 | EA | $0.00 | 32 25 15 | |
| 111 | Parking Block Removal and Reinstallation | 50 | EA | $0.00 | 32 25 15 | |
| 112 | Parking Block Replacement | 10 | EA | $0.00 | 32 25 15 | |
| 113 | Parking Block Installation | 10 | EA | $0.00 | 32 25 15 | |
| 114 | Establishment of Turf - Large Scale | 20 | ACRE | $0.00 | 32 29 35 | |
| 115 | Establishment of Turf - Small Scale | 100 | SY | $0.00 | 32 29 35 | |
| 116 | Road Bore Drill Setup and Staging | 1 | JOB | $0.00 | 33 05 23.13 | |
| 117 | Road Bore Sleeve 2-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 118 | Road Bore Sleeve 3-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 119 | Road Bore Sleeve 4-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 120 | Road Bore Sleeve 6-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 121 | Road Bore Sleeve 8-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 122 | Frost Proof Yard Hydrant Replacement | 5 | EA | $0.00 | 33 11 00 | |
| 123 | Frost Proof Yard Hydrant Installation | 5 | EA | $0.00 | 33 11 00 | |
| 124 | Water Valve Replacement - 1" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 125 | Water Valve Replacement - 1.5" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 126 | Water Valve Replacement - 2" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 127 | Water Valve Replacement - 3" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 128 | Water Valve Replacement - 4" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 129 | 3/4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 130 | 1 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 131 | 1-1/2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 132 | 2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 133 | 3 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 134 | 4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 135 | 6 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 136 | 3/4 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 137 | 1 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 138 | 1-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 139 | 2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 140 | 2-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 141 | 3 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 142 | 4 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 143 | 6 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 144 | Sewer Line Tap 2-5 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 145 | Sewer Line Tap 5.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 146 | Sewer Line Tap 10.1-15 Feet Deep | 1 | EA | $0.00 | 33 11 00 | |
| 147 | 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 148 | 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 149 | 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 150 | 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 151 | 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 152 | 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 153 | 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 154 | 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 155 | 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 156 | 2 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 157 | 3 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 158 | 4 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 159 | 6 Inch Dia. Pressure Sewer Force Main Install | 20 | LF | $0.00 | 33 11 00 | |
| 160 | Manhole Install 1-4 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 161 | Manhole Install 4.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 162 | Manhole Install 10.1-15 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 163 | CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 164 | CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 165 | CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 166 | CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 167 | CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 168 | CMP 18 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 169 | CMP 24 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 170 | CMP 24 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 171 | CMP 24 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 172 | CMP 30 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 173 | CMP 30 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 174 | CMP 30 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 175 | CMP 36 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 176 | CMP 36 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 177 | CMP 36 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 178 | CMP 48 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 179 | CMP 48 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 180 | CMP 48 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 181 | CMP 12 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 182 | CMP 12 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 183 | CMP 12 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 184 | CMP 18 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 185 | CMP 18 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 186 | CMP 18 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 187 | CMP 24 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 188 | CMP 24 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 189 | CMP 24 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 190 | CMP 30 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 191 | CMP 30 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 192 | CMP 30 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 193 | CMP 36 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 194 | CMP 36 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 195 | CMP 36 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 196 | CMP 48 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 197 | CMP 48 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 198 | CMP 48 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 199 | 12 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 200 | 18 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 201 | 24 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 202 | 30 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 203 | 36 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 204 | 12 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 205 | 18 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 206 | 24 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 207 | 30 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 208 | 36 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 209 | EQUIPMENT RENTAL WITH OPERATOR | TBD | JOB | 32 40 00 | ||
| 209 | a | Track-Type Bulldozers 90HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | b | Track-Type Bulldozers 190HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | c | Motor Grader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | d | Backhoe 60HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | e | Backhoe 95HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | f | Rubber Tire Front End Loader 120HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | g | Rubber Tire Front End Loader 275HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | h | Dump Truck (Tandem) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | i | Dump Truck (Single) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | j | Semi-Tractor Trailer w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | k | Bucket Truck w/OP. | 100 | HR | $0.00 | 32 40 00 |
| 209 | l | Truck Crane w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | m | Mini-Excavator w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | n | Excavator 50hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | o | Excavator 155hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | p | Excavator 242hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | q | Walk behind Concrete Saw w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | r | Self-propelled Drum Vibrating Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | s | Self-propelled Sheepsfoot Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | t | Skid Steer Loader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | u | Tractor with Boom Mower w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | v | Small Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | w | Large Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | x | Tractor & Pan w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | y | Asphalt Miller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 210 | Rental of Miscellaneous Equipment with Operator | TBD | TBD | 32 40 00 | ||
| 211 | SPECIALTY EQUIPMENT | TBD | JOB | 32 40 00 | ||
| 211 | a | Portable Diesel Air Compressor | 100 | HR | $0.00 | 32 40 00 |
| 211 | b | Trailer Mounted Concrete Pump | 100 | HR | $0.00 | 32 40 00 |
| 211 | c | Trencher | 100 | HR | $0.00 | 32 40 00 |
| 211 | d | Light Towers | 100 | HR | $0.00 | 32 40 00 |
| 211 | e | Chainsaw | 100 | HR | $0.00 | 32 40 00 |
| 211 | f | Power Washer | 100 | HR | $0.00 | 32 40 00 |
| 211 | g | Hand Operated Electric Power Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | h | Hand Operated Air Powered Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | i | Hand Operated Air Powered Chipping Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | j | Vibratory Plate Tamper | 100 | HR | $0.00 | 32 40 00 |
| 211 | k | Hand Operated Power Cutoff Saw | 100 | HR | $0.00 | 32 40 00 |
| 211 | l | Hand Operated Power Hammer Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | m | Hand Operated Air Powered Core Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | n | Concrete Saw | 100 | HR | $0.00 | 32 40 00 |
| 212 | Rental of Miscellaneous Equipment without Operator | TBD | TBD | 32 40 00 | ||
| 213 | LABOR SUPPORT | TBD | JOB | 32 40 00 | ||
| 213 | a | Surveyor | 100 | HR | $0.00 | 32 40 00 |
| 213 | b | General Engineer | 100 | HR | $0.00 | 32 40 00 |
| 213 | c | Drafter/CADD Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | d | Plumber | 100 | HR | $0.00 | 32 40 00 |
| 213 | e | Electrician | 100 | HR | $0.00 | 32 40 00 |
| 213 | f | HVAC Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | g | Laborer | 100 | HR | $0.00 | 32 40 00 |
| 213 | h | Iron Worker | 100 | HR | $0.00 | 32 40 00 |
| 213 | i | Carpenter | 100 | HR | $0.00 | 32 40 00 |
| 213 | j | Cement Mason | 100 | HR | $0.00 | 32 40 00 |
| 213 | k | Welder Type I with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 213 | l | Welder Type II with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 214 | Procurement and Delivery of Miscellaneous Materials | TBD | TBD | 32 40 00 | ||
| TOTAL ORDERING PERIOD 2 | $0.00 |
BID SCHEDULE - ORDERING PERIOD 3
FACILITY INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE IDIQ
ORDERING PERIOD DURATION: 1 MAR 2026 - 28 FEB 2027
| ORDERING PERIOD 3 | ||||
| Pre-Priced Line Item | Description | Estimated | ||
| Quantity | UOM | Unit Price | Estimated | |
| Amount | Technical |
Section
| 1 | Concrete Slab: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 2 | Concrete Slab: 6-inch | 200 | SF | $0.00 | 03 30 00 | |
| 3 | Concrete Slab: 8-inch | 100 | SF | $0.00 | 03 30 00 | |
| 4 | Concrete Slab: 10-inch | 100 | SF | $0.00 | 03 30 00 | |
| 5 | Concrete Ditch: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 6 | Concrete Curb & Gutter | 1000 | LF | $0.00 | 03 30 00 | |
| 7 | Concrete Barrier Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 8 | Concrete Mountable Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 9 | Reinforcement | 500 | LB | $0.00 | 03 30 00 | |
| 10 | Miscellaneous Concrete Work | TBD | TBD | 03 30 00.99 | ||
| 11 | Clearing and Grubbing: Light | 5000 | SY | $0.00 | 31 00 00 | |
| 12 | Clearing and Grubbing: Heavy | 5000 | SY | $0.00 | 31 00 00 | |
| 13 | Fill Material | 1000 | CY | $0.00 | 31 00 00 | |
| 14 | Earthwork - Berm Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 15 | Earthwork - Light Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 16 | Earthwork - Heavy Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 17 | Earthwork - Slough Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 18 | Earthwork - Pavement Subgrade | 1000 | CY | $0.00 | 31 00 00 | |
| 19 | Excess Earthwork Disposal | 200 | CY | $0.00 | 31 00 00 | |
| 20 | Top Soil | 800 | CY | $0.00 | 31 00 00 | |
| 21 | Geotextile Installation - Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 22 | Geotextile Installation - Non Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 23 | Concrete Removal | 200 | CY | $0.00 | 32 00 00 | |
| 24 | Concrete Removal Structures & Foundations | 200 | CY | $0.00 | 32 00 00 | |
| 25 | Asphalt Removal | 200 | CY | $0.00 | 32 00 00 | |
| 26 | Removal of Aggregates | 200 | CY | $0.00 | 32 00 00 | |
| 27 | Disposal of Misc. | 500 | LB | $0.00 | 32 00 00 | |
| 28 | Right of Way Clearing | 50 | MILE | $0.00 | 32 00 00 | |
| 29 | Tree Trimming | TBD | JOB | 32 00 00 | ||
| 29 | a | Tree Trimming Low | 20 | HR | $0.00 | 32 00 00 |
| 29 | b | Tree Trimming High | 20 | HR | $0.00 | 32 00 00 |
| 30 | Tree Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 31 | Tree Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 32 | Stump Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 33 | Stump Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 34 | Landscape Timbers Installation | 50 | LF | $0.00 | 32 00 00 | |
| 35 | Landscape Timber Removal | 20 | LF | $0.00 | 32 00 00 | |
| 36 | Sand Supply | 100 | TN | $0.00 | 32 00 00 | |
| 37 | Beach Sand Supply & Install | 200 | TN | $0.00 | 32 00 00 | |
| 38 | Redman Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 39 | Rockwood Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 40 | Peoples Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 41 | Greenville Berm Notch Construction | 1 | JB | $0.00 | 32 00 00 | |
| 42 | Greenville Berm Notch Removal | 1 | JB | $0.00 | 32 00 00 | |
| 43 | 12" Dia Pump Mob & Demob | 1 | JB | $0.00 | 32 00 00 | |
| 44 | 12" Dia Pump & Piping - Weekly | 3 | WK | $0.00 | 32 00 00 | |
| 45 | 12" Dia Pump & Piping - Monthly | 1 | MO | $0.00 | 32 00 00 | |
| 46 | Entrance Gate - Double Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 47 | Entrance Gate - Single Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 48 | Entrance Gate - Double Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 49 | Entrance Gate - Single Arm Replacement | 2 | EA | $0.00 | 32 00 00 | |
| 50 | Entrance Gate - Painting Double Arm | 5 | EA | $0.00 | 32 00 00 | |
| 51 | Entrance Gate - Painting Single Arm | 5 | EA | $0.00 | 32 00 00 | |
| 52 | Bicyle Trail Gate Fabrication & Installation | 2 | EA | $0.00 | 32 00 00 | |
| 53 | Bicyle Trail Gate Fabrication & Replacement | 1 | EA | $0.00 | 32 00 00 | |
| 54 | Concrete Dome Post Installation | 5 | EA | $0.00 | 32 00 00 | |
| 55 | Engineered Wood Chip - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 56 | Engineered Wood Chip - Supply and Placement | 20 | CY | $0.00 | 32 00 00 | |
| 57 | Hardwood Landscape Mulch - Supply | 10 | CY | $0.00 | 32 00 00 | |
| 58 | Hardwood Landscape Mulch - Supply & Placement | 20 | CY | $0.00 | 32 00 00 | |
| 59 | Decorative Boulder Supply and Placement | 3 | EA | $0.00 | 32 00 00 | |
| 60 | Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" | 10 | EA | $0.00 | 32 00 00 | |
| 61 | Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" | 10 | EA | $0.00 | 32 00 00 | |
| 62 | Painting | 300 | SQ | $0.00 | 32 00 00 | |
| 63 | Seamless Epoxy Coatings - Flooring | 100 | SF | $0.00 | 32 00 00 | |
| 64 | Seamless Epoxy Coatings - Walls & Ceiling | 100 | SF | $0.00 | 32 00 00 | |
| 65 | Pavement Raising Portland Cement | 200 | LB | $0.00 | 32 01 29.62 | |
| 66 | Stockpiling - Crushed Stone | 100 | TN | $0.00 | 32 22 30 | |
| 67 | Stockpiling - Gravel | 100 | TN | $0.00 | 32 22 30 | |
| 68 | Stockpiling - Fine Aggregates | 100 | TN | $0.00 | 32 22 30 | |
| 69 | Stockpiling - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 70 | Stockpiling - Type 1 or 5 Aggregate | 100 | TN | $0.00 | 32 22 30 | |
| 71 | Stockpiling - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 72 | Stockpiling - Limestone | 500 | TN | $0.00 | 32 22 30 | |
| 73 | Placement - Crushed Stone | 200 | TN | $0.00 | 32 22 30 | |
| 74 | Placement - Gravel | 200 | TN | $0.00 | 32 22 30 | |
| 75 | Placement - Fine Aggregates | 50 | TN | $0.00 | 32 22 30 | |
| 76 | Placement - Drainage Aggregate | 10 | TN | $0.00 | 32 22 30 | |
| 77 | Placement - Type 1 or 5 Aggregate | 1000 | TN | $0.00 | 32 22 30 | |
| 78 | Placement - Quarry Run Limestone | 100 | TN | $0.00 | 32 22 30 | |
| 79 | Placement - Limestone | 1000 | TN | $0.00 | 32 22 30 | |
| 80 | Stockpiling - USACE 3" Bedding | 500 | TN | $0.00 | 32 22 40 | |
| 81 | Stockpiling - USACE 50lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 82 | Stockpiling - USACE 90lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 83 | Stockpiling - USACE 140lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 84 | Stockpiling - USACE 400lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 85 | Stockpiling - USACE 650lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 86 | Stockpiling - USACE 1000lb Rip Rap | 500 | TN | $0.00 | 32 22 40 | |
| 87 | Placement - USACE 3" Bedding | 1000 | TN | $0.00 | 32 22 40 | |
| 88 | Placement - USACE 50lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 89 | Placement - USACE 90lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 90 | Placement - USACE 140lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 91 | Placement - USACE 400lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 92 | Placement - USACE 650lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 93 | Placement - USACE 1000lb Rip Rap | 1000 | TN | $0.00 | 32 22 40 | |
| 94 | Patching | 150 | SY | $0.00 | 32 25 15 | |
| 95 | Road Widening | 150 | SY | $0.00 | 32 25 15 | |
| 96 | Asphaltic Concrete Surface | 2000 | TN | $0.00 | 32 25 15 | |
| 97 | Seal Coat | 1000 | SY | $0.00 | 32 25 15 | |
| 98 | Crack Fill/Sealing | 500 | GL | $0.00 | 32 25 15 | |
| 99 | Scrub Seal | 500 | SY | $0.00 | 32 25 15 | |
| 100 | Bituminous Fog Sealing | 500 | SY | $0.00 | 32 25 15 | |
| 101 | Guardrail Replacement | 200 | LF | $0.00 | 32 25 15 | |
| 102 | Guardrail Installation | 100 | LF | $0.00 | 32 25 15 | |
| 103 | Traffic Striping | 50000 | LF | $0.00 | 32 25 15 | |
| 104 | Parking Area Traffic Striping Layout | 3000 | LF | $0.00 | 32 25 15 | |
| 105 | Traffic Marking Arrows | 3 | EA | $0.00 | 32 25 15 | |
| 106 | Traffic Marking Disable Symbol | 70 | EA | $0.00 | 32 25 15 | |
| 107 | Traffic Marking No Parking | 4 | EA | $0.00 | 32 25 15 | |
| 108 | Traffic Marking 5 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 109 | Traffic Marking 10 Minute Parking | 5 | EA | $0.00 | 32 25 15 | |
| 110 | Traffic Marking Tie-Down Only | 5 | EA | $0.00 | 32 25 15 | |
| 111 | Parking Block Removal and Reinstallation | 50 | EA | $0.00 | 32 25 15 | |
| 112 | Parking Block Replacement | 10 | EA | $0.00 | 32 25 15 | |
| 113 | Parking Block Installation | 10 | EA | $0.00 | 32 25 15 | |
| 114 | Establishment of Turf - Large Scale | 20 | ACRE | $0.00 | 32 29 35 | |
| 115 | Establishment of Turf - Small Scale | 100 | SY | $0.00 | 32 29 35 | |
| 116 | Road Bore Drill Setup and Staging | 1 | JOB | $0.00 | 33 05 23.13 | |
| 117 | Road Bore Sleeve 2-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 118 | Road Bore Sleeve 3-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 119 | Road Bore Sleeve 4-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 120 | Road Bore Sleeve 6-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 121 | Road Bore Sleeve 8-inch Dia. HDPE | 30 | LF | $0.00 | 33 05 23.13 | |
| 122 | Frost Proof Yard Hydrant Replacement | 5 | EA | $0.00 | 33 11 00 | |
| 123 | Frost Proof Yard Hydrant Installation | 5 | EA | $0.00 | 33 11 00 | |
| 124 | Water Valve Replacement - 1" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 125 | Water Valve Replacement - 1.5" curb stop ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 126 | Water Valve Replacement - 2" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 127 | Water Valve Replacement - 3" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 128 | Water Valve Replacement - 4" square nut ball valve | 2 | EA | $0.00 | 33 11 00 | |
| 129 | 3/4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 130 | 1 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 131 | 1-1/2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 132 | 2 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 133 | 3 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 134 | 4 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 135 | 6 Inch Water Line Tap | 2 | EA | $0.00 | 33 11 00 | |
| 136 | 3/4 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 137 | 1 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 138 | 1-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 139 | 2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 140 | 2-1/2 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 141 | 3 Inch Water Line Installation | 100 | LF | $0.00 | 33 11 00 | |
| 142 | 4 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 143 | 6 Inch Water Line Installation | 50 | LF | $0.00 | 33 11 00 | |
| 144 | Sewer Line Tap 2-5 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 145 | Sewer Line Tap 5.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 146 | Sewer Line Tap 10.1-15 Feet Deep | 1 | EA | $0.00 | 33 11 00 | |
| 147 | 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 148 | 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 149 | 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 150 | 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 151 | 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 152 | 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 153 | 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep | 100 | LF | $0.00 | 33 11 00 | |
| 154 | 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep | 50 | LF | $0.00 | 33 11 00 | |
| 155 | 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep | 20 | LF | $0.00 | 33 11 00 | |
| 156 | 2 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 157 | 3 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 158 | 4 Inch Dia. Pressure Sewer Force Main Install | 50 | LF | $0.00 | 33 11 00 | |
| 159 | 6 Inch Dia. Pressure Sewer Force Main Install | 20 | LF | $0.00 | 33 11 00 | |
| 160 | Manhole Install 1-4 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 161 | Manhole Install 4.1-10 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 162 | Manhole Install 10.1-15 Feet Deep | 2 | EA | $0.00 | 33 11 00 | |
| 163 | CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 164 | CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 165 | CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 166 | CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 167 | CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 168 | CMP 18 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 169 | CMP 24 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 170 | CMP 24 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 171 | CMP 24 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 172 | CMP 30 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 173 | CMP 30 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 174 | CMP 30 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 175 | CMP 36 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 176 | CMP 36 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 177 | CMP 36 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 178 | CMP 48 Inch Dia. Pipe Replace, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 179 | CMP 48 Inch Dia. Pipe Replace, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 180 | CMP 48 Inch Dia. Pipe Replace, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 181 | CMP 12 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 182 | CMP 12 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 183 | CMP 12 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 184 | CMP 18 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 185 | CMP 18 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 186 | CMP 18 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 187 | CMP 24 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 188 | CMP 24 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 189 | CMP 24 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 190 | CMP 30 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 191 | CMP 30 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 192 | CMP 30 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 193 | CMP 36 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 194 | CMP 36 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 195 | CMP 36 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 196 | CMP 48 Inch Dia. Pipe New Install, 0-4.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 197 | CMP 48 Inch Dia. Pipe New Install, 5-9.9 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 198 | CMP 48 Inch Dia. Pipe New Install, 10-15 Ft Depth | 20 | LF | $0.00 | 33 40 00 | |
| 199 | 12 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 200 | 18 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 201 | 24 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 202 | 30 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 203 | 36 Inch Dia. End Section Replace | 4 | EA | $0.00 | 33 40 00 | |
| 204 | 12 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 205 | 18 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 206 | 24 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 207 | 30 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 208 | 36 Inch Dia. End Section New Install | 4 | EA | $0.00 | 33 40 00 | |
| 209 | EQUIPMENT RENTAL WITH OPERATOR | TBD | JOB | 32 40 00 | ||
| 209 | a | Track-Type Bulldozers 90HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | b | Track-Type Bulldozers 190HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | c | Motor Grader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | d | Backhoe 60HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | e | Backhoe 95HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | f | Rubber Tire Front End Loader 120HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | g | Rubber Tire Front End Loader 275HP w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | h | Dump Truck (Tandem) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | i | Dump Truck (Single) w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | j | Semi-Tractor Trailer w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | k | Bucket Truck w/OP. | 100 | HR | $0.00 | 32 40 00 |
| 209 | l | Truck Crane w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | m | Mini-Excavator w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | n | Excavator 50hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | o | Excavator 155hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | p | Excavator 242hp w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | q | Walk behind Concrete Saw w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | r | Self-propelled Drum Vibrating Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | s | Self-propelled Sheepsfoot Roller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | t | Skid Steer Loader w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | u | Tractor with Boom Mower w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | v | Small Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | w | Large Tractor w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | x | Tractor & Pan w/OP | 100 | HR | $0.00 | 32 40 00 |
| 209 | y | Asphalt Miller w/OP | 100 | HR | $0.00 | 32 40 00 |
| 210 | Rental of Miscellaneous Equipment with Operator | TBD | TBD | 32 40 00 | ||
| 211 | SPECIALTY EQUIPMENT | TBD | JOB | 32 40 00 | ||
| 211 | a | Portable Diesel Air Compressor | 100 | HR | $0.00 | 32 40 00 |
| 211 | b | Trailer Mounted Concrete Pump | 100 | HR | $0.00 | 32 40 00 |
| 211 | c | Trencher | 100 | HR | $0.00 | 32 40 00 |
| 211 | d | Light Towers | 100 | HR | $0.00 | 32 40 00 |
| 211 | e | Chainsaw | 100 | HR | $0.00 | 32 40 00 |
| 211 | f | Power Washer | 100 | HR | $0.00 | 32 40 00 |
| 211 | g | Hand Operated Electric Power Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | h | Hand Operated Air Powered Jack Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | i | Hand Operated Air Powered Chipping Hammer | 100 | HR | $0.00 | 32 40 00 |
| 211 | j | Vibratory Plate Tamper | 100 | HR | $0.00 | 32 40 00 |
| 211 | k | Hand Operated Power Cutoff Saw | 100 | HR | $0.00 | 32 40 00 |
| 211 | l | Hand Operated Power Hammer Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | m | Hand Operated Air Powered Core Drill w/Bits | 100 | HR | $0.00 | 32 40 00 |
| 211 | n | Concrete Saw | 100 | HR | $0.00 | 32 40 00 |
| 212 | Rental of Miscellaneous Equipment without Operator | TBD | TBD | 32 40 00 | ||
| 213 | LABOR SUPPORT | TBD | JOB | 32 40 00 | ||
| 213 | a | Surveyor | 100 | HR | $0.00 | 32 40 00 |
| 213 | b | General Engineer | 100 | HR | $0.00 | 32 40 00 |
| 213 | c | Drafter/CADD Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | d | Plumber | 100 | HR | $0.00 | 32 40 00 |
| 213 | e | Electrician | 100 | HR | $0.00 | 32 40 00 |
| 213 | f | HVAC Technician | 100 | HR | $0.00 | 32 40 00 |
| 213 | g | Laborer | 100 | HR | $0.00 | 32 40 00 |
| 213 | h | Iron Worker | 100 | HR | $0.00 | 32 40 00 |
| 213 | i | Carpenter | 100 | HR | $0.00 | 32 40 00 |
| 213 | j | Cement Mason | 100 | HR | $0.00 | 32 40 00 |
| 213 | k | Welder Type I with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 213 | l | Welder Type II with Welding Equipment | 100 | HR | $0.00 | 32 40 00 |
| 214 | Procurement and Delivery of Miscellaneous Materials | TBD | TBD | 32 40 00 | ||
| TOTAL ORDERING PERIOD 3 | $0.00 |
BID SCHEDULE - ORDERING PERIOD 4
FACILITY INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE IDIQ
ORDERING PERIOD DURATION: 1 MAR 2027 - 29 FEB 2028
| ORDERING PERIOD 4 | ||||
| Pre-Priced Line Item | Description | Estimated | ||
| Quantity | UOM | Unit Price | Estimated | |
| Amount | Technical |
Section
| 1 | Concrete Slab: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 2 | Concrete Slab: 6-inch | 200 | SF | $0.00 | 03 30 00 | |
| 3 | Concrete Slab: 8-inch | 100 | SF | $0.00 | 03 30 00 | |
| 4 | Concrete Slab: 10-inch | 100 | SF | $0.00 | 03 30 00 | |
| 5 | Concrete Ditch: 4-inch | 200 | SF | $0.00 | 03 30 00 | |
| 6 | Concrete Curb & Gutter | 1000 | LF | $0.00 | 03 30 00 | |
| 7 | Concrete Barrier Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 8 | Concrete Mountable Curbs | 1000 | LF | $0.00 | 03 30 00 | |
| 9 | Reinforcement | 500 | LB | $0.00 | 03 30 00 | |
| 10 | Miscellaneous Concrete Work | TBD | TBD | 03 30 00.99 | ||
| 11 | Clearing and Grubbing: Light | 5000 | SY | $0.00 | 31 00 00 | |
| 12 | Clearing and Grubbing: Heavy | 5000 | SY | $0.00 | 31 00 00 | |
| 13 | Fill Material | 1000 | CY | $0.00 | 31 00 00 | |
| 14 | Earthwork - Berm Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 15 | Earthwork - Light Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 16 | Earthwork - Heavy Field/Site Grading | 2000 | CY | $0.00 | 31 00 00 | |
| 17 | Earthwork - Slough Construction | 2000 | CY | $0.00 | 31 00 00 | |
| 18 | Earthwork - Pavement Subgrade | 1000 | CY | $0.00 | 31 00 00 | |
| 19 | Excess Earthwork Disposal | 200 | CY | $0.00 | 31 00 00 | |
| 20 | Top Soil | 800 | CY | $0.00 | 31 00 00 | |
| 21 | Geotextile Installation - Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 22 | Geotextile Installation - Non Woven | 100 | SY | $0.00 | 31 05 19.13 | |
| 23 | Concrete Removal | 200 | CY | $0.00 | 32 00 00 | |
| 24 | Concrete Removal Structures & Foundations | 200 | CY | $0.00 | 32 00 00 | |
| 25 | Asphalt Removal | 200 | CY | $0.00 | 32 00 00 | |
| 26 | Removal of Aggregates | 200 | CY | $0.00 | 32 00 00 | |
| 27 | Disposal of Misc. | 500 | LB | $0.00 | 32 00 00 | |
| 28 | Right of Way Clearing | 50 | MILE | $0.00 | 32 00 00 | |
| 29 | Tree Trimming | TBD | JOB | 32 00 00 | ||
| 29 | a | Tree Trimming Low | 20 | HR | $0.00 | 32 00 00 |
| 29 | b | Tree Trimming High | 20 | HR | $0.00 | 32 00 00 |
| 30 | Tree Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 31 | Tree Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 32 | Stump Removal - Light | 10 | EA | $0.00 | 32 00 00 | |
| 33 | Stump Removal - Heavy | 10 | EA | $0.00 | 32 00 00 | |
| 34 | Landscape Timbers Installation | 50 | LF | $0.00 | 32 00 00 | |
| 35 | Landscape Timber Removal | 20 | LF | $0.00 | 32 00 00 | |
| 36 | Sand Supply | 100 | TN | $0.00 | 32 00 00 | |
| 37 | Beach Sand Supply & Install | 200 | TN | $0.00 | 32 00 00 | |
| 38 | Redman Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 39 | Rockwood Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 40 | Peoples Creek Beach - Maintenance | 1 | JB | $0.00 | 32 00 00 | |
| 41 | Greenville Berm Notch Construction | 1 | JB | $0.00 | 32 00 00 | |
| 42 | Greenville Berm Notch Removal | 1 | JB | $0.00 | 32 00 00 | |
| 43 | 12" Dia Pump Mob & Demob | 1 | JB | $0.00 | 32 00 00 | |
| 44 | 12" Dia Pump & Piping - Weekly | 3 | WK | $0.00 | 32 00 00 | |
| 45 | 12" Dia Pump & Piping - Monthly | 1 | MO | $0.00 | 32 00 00 | |
| 46 | Entrance Gate - Double Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 47 | Entrance Gate - Single Arm Installation | 2 | EA | $0.00 | 32 00 00 | |
| 48 | Entrance Gate - Double Arm Replacement | 2 | EA | $0.00 | 32 00 00 |
This is the start of the file's text. The full file is on GovTribe.