A02_Wapp FAC Appendices 25AUG2023 (3 of 3).pdf

PDF 5 MB Posted

Attached to
Solicitation for Wappapello Lake Facility Infrastructure Construction & Maintenance IDIQ
Solicitation number
W912P924B0009
Issued by

About this file

This solicitation is for an indefinite delivery/indefinite quantity construction contract to provide rehabilitation, repair, construction, and maintenance services at the Wappapello Lake Project for the U.S. Army Corps of Engineers Engineering District St Louis. Required work under task orders issued against this contract includes earthwork, borrow operations, care of water, turfing, stone surfacing and placement, concrete work, waste disposal, structure procurement and installation, and road, parking lot, trail, campground, drainage structure, utility, grounds, facility, and shoreline maintenance and repair. The single-award, firm fixed price IDIQ contract has a base period of performance of five years comprised of annual ordering periods. Bids are due on February 5, 2024 and will be evaluated for award based on price alone in accordance with FAR Part 14 sealed bidding procedures. Payment will be made by EFT. A pre-bid site visit will be held on January 18, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 32-A

BEACH MAPS

Redman Beach Sand Placement

Legend

Dump Sand Down Concrete Stairs

Equipment Access

Equipment Path

Sand Area 1,900 sq yd

800 ft

N

N

Rockwood Beach

Legend

Dump Sand from Adjacent Parking lot

Sand Area 2600 sq yd

200 ft

N

Peoples Beach

Legend

Dump sand down sloped retaining wall

Equipment Access

Sand Area 4,600 sq yd

300 ft

N

APPENDIX 32-B

GREENVILLE BERM NOTCH

Greenville Berm & Material Storage Legend

Greenville Berm

Material Storage (approximately 300 TN)

4000 ft

N

CENTER LINE OF NOTCH

GREENVILLE BERM NOTCH REPAIR

*Alignment and Dimensions are Approximate

EL: 398

EL: 390

60 LF

8 LF

15 LF

NOTCH CROSS SECTION (TYP)

B3ECCAMR

Line

B3ECCAMR

Line

B3ECCAMR

Typewritten Text

NOTCH CROSS SECTION (TYP)

APPENDIX 32-C

ENTRANCE GATE DETAILS

APPENDIX 32-D

BICYCLE GATE DETAILS

APPENDIX 32-E

PUMP REQUIREMENTS

12 inch Pump Location Legend

Gravel Access - 12 Ft Wide

Pump Location & Existing Discharge/Outlet Pipe

500 ft

N

Typical Pump Set Up

Existing Discharge/Outlet Pipe Onsite

APPENDIX 32-F

TRAFFIC MARKINGS

Cover Appendix 1_A
1_A_ Wapp Boundaries
Plate_1_overview_b_redo
plate_3_road_newtork_b
plate_4_allocation_b
Plate_5_classification_b
plate_6_class_operations_a
Cover Appendix 1_B
1_B_APP_AHA
Cover Appendix 1_C
1_C_STONE SOURCE NOV 2021
Cover Appendix 1_D
1_D_STANDARD TEST METHOD FOR GRADATIONS
1_D_STANDARD TEST METHOD FOR GRADATIONS
IDIQ Stone Curves
50#RIPRA
90#RIPRA
140#RiprapCrv
400#RIPR
650#RIPR
1000#RIP
Cover Appendix 1_E
1_E_Submittal Register
Cover Appendix 1_F
1_F Submittal Tran ENG FORM 4025
Cover Appendix 3-A
3_A_MODOT Curbs
Cover Appendix 32-A
32_A Beach Maps
Redman Beach
Rockwood Beach
Peoples Beach
Cover Appendix 32-B
32_B Greenville Berm
Greenville Berm Overview
32-C Not Done Greenville Berm Notch
32-C_Greenville
Cover Appendix 32-C
32_C Wapp Gate Details
Cover Appendix 32-D
32_D_Bicycle Trail Gate
Cover Appendix 32-E
32_E Pump Requirements
32_E Not Done_12INCH Pump
Pump Site
Appendix Misc
Cover Appendix 32-F
32_F Traffic Markings

File details come from the government source that posted it. Updated .