A02_Wapp FAC Appendices 25AUG2023 (3 of 3).pdf
PDF 5 MB Posted
- Attached to
- Solicitation for Wappapello Lake Facility Infrastructure Construction & Maintenance IDIQ
- Solicitation number
- W912P924B0009
About this file
This solicitation is for an indefinite delivery/indefinite quantity construction contract to provide rehabilitation, repair, construction, and maintenance services at the Wappapello Lake Project for the U.S. Army Corps of Engineers Engineering District St Louis. Required work under task orders issued against this contract includes earthwork, borrow operations, care of water, turfing, stone surfacing and placement, concrete work, waste disposal, structure procurement and installation, and road, parking lot, trail, campground, drainage structure, utility, grounds, facility, and shoreline maintenance and repair. The single-award, firm fixed price IDIQ contract has a base period of performance of five years comprised of annual ordering periods. Bids are due on February 5, 2024 and will be evaluated for award based on price alone in accordance with FAR Part 14 sealed bidding procedures. Payment will be made by EFT. A pre-bid site visit will be held on January 18, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 32-A
BEACH MAPS
Redman Beach Sand Placement
Legend
Dump Sand Down Concrete Stairs
Equipment Access
Equipment Path
Sand Area 1,900 sq yd
800 ft
N
N
Rockwood Beach
Legend
Dump Sand from Adjacent Parking lot
Sand Area 2600 sq yd
200 ft
N
Peoples Beach
Legend
Dump sand down sloped retaining wall
Equipment Access
Sand Area 4,600 sq yd
300 ft
N
APPENDIX 32-B
GREENVILLE BERM NOTCH
Greenville Berm & Material Storage Legend
Greenville Berm
Material Storage (approximately 300 TN)
4000 ft
N
CENTER LINE OF NOTCH
GREENVILLE BERM NOTCH REPAIR
*Alignment and Dimensions are Approximate
EL: 398
EL: 390
60 LF
8 LF
15 LF
NOTCH CROSS SECTION (TYP)
B3ECCAMR
Line
B3ECCAMR
Line
B3ECCAMR
Typewritten Text
NOTCH CROSS SECTION (TYP)
APPENDIX 32-C
ENTRANCE GATE DETAILS
APPENDIX 32-D
BICYCLE GATE DETAILS
APPENDIX 32-E
PUMP REQUIREMENTS
12 inch Pump Location Legend
Gravel Access - 12 Ft Wide
Pump Location & Existing Discharge/Outlet Pipe
500 ft
N
Typical Pump Set Up
Existing Discharge/Outlet Pipe Onsite
APPENDIX 32-F
TRAFFIC MARKINGS
| Cover Appendix 1_A |
| 1_A_ Wapp Boundaries |
| Plate_1_overview_b_redo |
| plate_3_road_newtork_b |
| plate_4_allocation_b |
| Plate_5_classification_b |
| plate_6_class_operations_a |
| Cover Appendix 1_B |
| 1_B_APP_AHA |
| Cover Appendix 1_C |
| 1_C_STONE SOURCE NOV 2021 |
| Cover Appendix 1_D |
| 1_D_STANDARD TEST METHOD FOR GRADATIONS |
| 1_D_STANDARD TEST METHOD FOR GRADATIONS |
| IDIQ Stone Curves |
| 50#RIPRA |
| 90#RIPRA |
| 140#RiprapCrv |
| 400#RIPR |
| 650#RIPR |
| 1000#RIP |
| Cover Appendix 1_E |
| 1_E_Submittal Register |
| Cover Appendix 1_F |
| 1_F Submittal Tran ENG FORM 4025 |
| Cover Appendix 3-A |
| 3_A_MODOT Curbs |
| Cover Appendix 32-A |
| 32_A Beach Maps |
| Redman Beach |
| Rockwood Beach |
| Peoples Beach |
| Cover Appendix 32-B |
| 32_B Greenville Berm |
| Greenville Berm Overview |
| 32-C Not Done Greenville Berm Notch |
| 32-C_Greenville |
| Cover Appendix 32-C |
| 32_C Wapp Gate Details |
| Cover Appendix 32-D |
| 32_D_Bicycle Trail Gate |
| Cover Appendix 32-E |
| 32_E Pump Requirements |
| 32_E Not Done_12INCH Pump |
| Pump Site |
| Appendix Misc |
| Cover Appendix 32-F |
| 32_F Traffic Markings |
File details come from the government source that posted it. Updated .