13-B-0201-0002.pdf

PDF 287 KB Posted

Attached to
Construction Facilities Maintenance at Lake Shelbyville
Solicitation number
W912P913B0201
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
13-B-0201-0003.pdf PDF
13-B-0201-0001.pdf PDF
W912P913B0201.pdf PDF
13-B-0201_Synopsis_.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X22917341

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION

PROJECT: CONSTRUCTION FOR FACILITY MAINTENANCE AT LAKE SHELBYVILLE, SHELBYVILLE, IL.

BID OPENING DATE AND TIME: All reference to bid opening for referenced solicitation is hereby changed from January 31, 2013 at 10:00 A.M. Central Standard Time to February 5, 2013 at 10:00 A.M. Central Standard Time.

(SEE CONTINUATION PAGE 2)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 65

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jan-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-13-B-0201

X 9B. DATED (SEE ITEM 11)

19-Dec-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jan-2013

CODE

CONTRACTING DIVISION

USARMY ENGR DIST ST LOUIS

1222 SPRUCE ST RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P9-13-B-0201

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The solicitation is hereby amended to incorporate the following changes:

a. Section 00100 – Bidding Schedule/Instructions to Bidders: Contract Clause FAR 52.236-27, “Site Visit (Construction) (FEB 1995)”; an additional site visit is scheduled for Monday, January 28, 2013 at 10:00 A.M.; Lake Shelbyville Project Office, R.R. #4, Box 128B, Shelbyville, IL 6265- 0011. Point of contact is Jim Grabarczyk at 217-774-3951.

b. Section 00600 – Representations & Certifications: Contract Clause FAR 52.222.33, “Notice of

Requirement for Project Labor Agreement (MAY 2010)” is deleted in its entity.

c. Section 00700 – Contract Clauses: FAR Clause 52.228-1, “Bid Guarantee (SEP 1996)”; to clarify for this solicitation, the amount of the bid guarantee shall be 20% percent of the Base Year Guaranteed Minimum $8,000.00.

d. Section 00800 – Special Contract: Scope of Work; is deleted in its entity and replaced with the attached revised Scope of Work. (See attached Scope of Work)

2. As provided herein, all other terms and conditions remain unchanged.

SECTION 00800 – SPECIAL CONTRACT

SCOPE OF WORK

DIVISION 1 - ENVIRONMENTAL

SECTION 1 - ENVIRONMENTAL PROTECTION

1. SCOPE. This section covers prevention of environmental pollution and damage as the result of construction operations under this contract and for those measures set forth in other Technical Provisions of these specifications. For the purpose of this specification, environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic, cultural and/or historical purposes. The control of environmental pollution and damage requires consideration of air, water, and land, and includes management of visual aesthetics, noise, solid waste, radiant energy and radioactive materials, as well as other pollutants.

2. QUALITY CONTROL. The Contractor shall establish and maintain quality control for environmental protection at all times set forth herein. The Contractor shall record on daily reports any problems in complying with laws, regulations and ordinances and corrective action taken.

3. PERMITS. The Contractor shall obtain and comply with all required permits.

4. SUBMITTALS. The Contractor shall submit an Environmental Protection Plan to the Contracting Officer (CO) in accordance with provisions as herein specified.

4.1. Environmental Protection Plan shall include, but not be limited, to the following:

4.1.1. A list of Federal, State, and local laws, regulations and permits concerning environmental protection, pollution control and abatement that are applicable to the Contractor’s proposed operations and the requirements imposed by those laws, regulations and permits.

4.1.2. Methods for protection of features to be preserved within authorized work areas. The Contractor shall prepare a listing of methods to protect resources needing protection, i.e. trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archaeological and cultural resources.

4.1.3. Procedures to be implemented to provide the required environmental protection and to comply with the applicable laws and regulations. The Contractor shall set out the procedures to be followed to correct pollution of the environment due to accident, natural causes or failure to follow the procedures set out in accordance with the environmental protection plan.

4.1.4. Permit or license and the location of the solid waste disposal area.

4.1.5. Drawings showing locations of any proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or disposal materials, other than shown on the contract drawings.

4.1.6. Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.

4.1.7. Methods of protecting surface and ground water during construction activities.

4.2. Implementation. At the pre-work conference, the Contractor shall submit in writing the original and one copy of the above Environmental Protection Plan. Approval of the Contractor’s plan shall not relieve the Contractor of his responsibility for adequate and continuing control of pollutants and other environmental protection measures.

5. SUBCONTRACTORS. Assurance of compliance with this section by subcontractors shall be the responsibility of the Prime Contractor.

6. NOTIFICATION. The Contracting Officer will notify the Contractor in writing of any observed noncompliance with the aforementioned Federal, State or local laws or regulations, permits and other elements of the Contractor’s Environmental Protection Plan. The Contractor shall, after receipt of such notice, inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions shall be granted or costs or damages allowed to the Contractor for any such suspension.

7. PROTECTION OF ENVIRONMENTAL RESOURCES. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected during the entire period of this contract. The Contractor shall confine his activities to areas defined by the drawings and specifications. Environmental protection shall be as stated in the following subparagraphs.

7.1. Protection of Land Resources. Prior to the beginning of any construction, the Contractor shall identify all land resources to be preserved within the Contractor’s work area. The Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms without special permission from the Contracting Officer. No ropes, cables, or guys shall be fastened to or attached to any trees for anchorage unless specifically authorized. Where such special emergency use is permitted, the Contractor shall provide effective protection for land and vegetation resources at all times as defined in the following subparagraphs.

7.1.1. Work Area Limits. Prior to any construction, the Contractor shall mark the areas that are required to accomplish all work to be performed under this contract. Isolated areas within the general work area, which are to be saved and protected, shall also be marked or fenced. Monuments and markers shall be protected before construction operations commence. The Contractor shall convey to his personnel the purpose of marking and/or protection of all necessary objects.

7.1.2. Protection of Landscape. Trees, shrubs, vines, grasses, land forms and other landscape features either indicated by the CO and/or defined on the drawings to be preserved shall be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques.

7.1.3. Reduction of Exposure of Unprotected Erodible Soils. Earthwork brought to final grade shall be finished as indicated and specified. Side slopes and back slopes shall be protected as soon as practicable upon completion of rough grade grading. All earthwork shall be planned and conducted to minimize the duration of exposure of unprotected soils. Except in instances where the constructed feature obscures borrow areas, quarries and waste material areas, these areas shall not initially be cleared in total. Clearing of such areas shall progress in reasonable sized increments as needed to use the areas developed, as approved by the CO.

7.1.4. Temporary Protection of Disturbed Areas. Such methods as necessary shall be utilized to effectively prevent erosion and control sedimentation, including but not limited to the following:

7.1.4.1. Retardation and Control of Run-off. Run-off from the construction site shall be controlled by construction of diversion ditches, benches, and berms to retard and divert runoff to protected drainage courses, and any measures required by area-wide plans approved under Paragraph 208 of the Clean Water Act.

7.1.5. Location of Storage and Other Contractor Facilities. The Contractor’s staging areas, stockpile, storage, and temporary buildings shall be placed in areas approved by the Contracting Officer. Temporary movement or relocation of Contractor facilities shall be made only on approval by the CO.

7.1.6. Disposal of Chemical Waste. Any chemical waste shall be stored in corrosion resistant containers, removed from the work area, and disposed of in accordance with Federal, State and local regulations.

7.1.7. Disposal of Solid Wastes. Solid wastes (excluding clearing debris) shall be placed in containers, provided by the contractor, which are emptied on a regular schedule. All handling and disposal shall be conducted to prevent contamination. The Contractor shall transport all solid waste off Government property and dispose of it in compliance with Federal, State and local requirements for solid waste disposal.

7.1.8. Disposal of Discarded Materials. Discarded materials, other than those, which can be included in the solid waste category, shall be handled as directed by the CO.

7.2. Protection of Water Resource. The Contractor shall keep construction activities under surveillance, management, and control to avoid pollution of surface and ground waters. Special management techniques as set out below shall be implemented to control water pollution by the listed construction activities, which are included in this contract.

7.2.1. Monitoring of Water Areas Affected by Construction Activities shall be the responsibility of the Contractor. The Contractor shall monitor all water areas affected by construction activities.

7.3. Protection of Fish and Wildlife Resources. The Contractor shall keep construction activities under surveillance, management and control to minimize interference with, disturbance to, and damage of, fish and wildlife. Prior to the beginning of construction operations, the Contractor shall list species that require specific attention, along with measures for their protection.

7.4. Protection of Air Resources. The Contractor shall keep construction activities under surveillance, management and control to minimize pollution of air resources. All activities, equipment, processes, and work, operated or performed by the Contractor in accomplishing the specified construction, shall be in strict accordance with the State and all Federal emission and performance laws and standards. Ambient Air Quality Standards set by the Environmental Protection Agency shall be maintained.

7.4.1. Particulates. Dust particles, aerosols, and gaseous by-products from all construction activities, processing and preparation of materials, shall be controlled at all times, including weekends, holidays and hours when work is not in progress.

7.4.1.1. Particulates Control. The Contractor shall maintain all excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, disposal areas, borrow areas, and all other work areas, within or outside the project boundaries, free from particulates which would cause the air pollution standards mentioned in 1A-7.4 above to be exceeded, or which would cause a hazard or nuisance. Sprinkling, chemical treatment of an approved type, light bituminous treatment, bag house, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated at such intervals as to keep the disturbed area damp at all times. The Contractor must have sufficient competent equipment available to accomplish this task. Particulate control shall be performed as the work proceeds and whenever a particulate nuisance or hazard occurs.

7.4.2. Hydrocarbons and Carbon Monoxide. Hydrocarbons and carbon monoxide emissions from equipment shall be controlled to Federal and State allowable limits at all times.

7.4.3. Odors. Odors shall be controlled at all times for all construction activities, processing and preparation of materials.

7.4.4. Monitoring of Air Quality shall be the responsibility of the Contractor. The Contractor shall monitor all air areas affected by the construction activities.

7.5. Protection of Sound Intrusions. The Contractor shall keep construction activities under surveillance and control, to minimize damage to the environment by noise. The Contractor shall use methods and devices to control noise emitted by equipment, to the acceptable levels.

8. POST CONSTRUCTION CLEAN-UP. The Contractor shall clean-up areas used for construction.

9. RESTORATION OF LANDSCAPE DAMAGE. The Contractor shall restore all landscape features damaged or destroyed during construction operations outside the limits of the approved work areas. Such restoration shall be in accordance with the plan submitted for approval by the CO. This work shall be accomplished at the Contractor’s expense.

10. MAINTENANCE OF POLLUTION CONTROL FACILITIES. The Contractor shall maintain all constructed facilities and portable pollution control devices for the duration of the contract, or for that length of time construction activities create the particular pollutant.

11. TRAINING OF CONTRACTOR PERSONNEL IN POLLUTION CONTROL. The Contractor shall train his personnel in all phases of environmental protection. The training shall include methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, and installation and care of facilities (vegetative covers, and instruments required for monitoring purposes), to ensure adequate and continuous environmental pollution control.

12. PAYMENT. No separate payment will be made for the work covered under this section and all costs in connection therewith shall be included in other items for which payment is provided.

DIVISION 2 – SITE CONSTRUCTION

SECTION 2A

CLEARING, GRUBBING, DIPOSAL OF DEBRIS

1. SCOPE. The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for the clearing and grubbing of the work sites, for the removal and disposal of all cleared and grubbed materials, and for the filling of all holes caused by grubbing operations, as specified herein.

2. QUALITY CONTROL.

2.1. General. The Contractor shall establish and maintain quality control for clearing and grubbing operations to assure compliance with contract requirements, and maintain records of his quality control for all construction operations including but not limited to the following:

2.1.1. Clearing

2.1.2. Grubbing

2.1.3. Disposal of cleared and grubbed materials.

2.2. Reporting. A copy of these records and tests, as well as the records of corrective action taken, shall be furnished to the Government daily.

3. CLEARING.

3.1. General. Clearing, unless otherwise specified, shall consist of the complete removal above the ground surface of all trees, stumps, down timber, snags, brush, vegetation, stone, and similar debris. The CO will mark all vegetation and trees to be removed.

3.2. Areas to be Cleared. All woody vegetation to be removed will be marked by the CO.

Nothing shall be removed unless the Government has approved it.

3.3. Clearing and grubbing will be broken down into three categories:

3.3.1. Light - Woody vegetation, brush and trees less than six (6) inches at Diameter Breast Height (D.B.H.).

3.3.2. Moderate - Trees between six (6) and twelve (12) inches at D.B.H.

3.3.3. Heavy - Trees greater than twelve (12) inches at D.B.H.

3.4. Determination of the clearing and grubbing will be made for locations when a delivery order is issued.

4. GRUBBING.

4.1. General. Grubbing shall consist of the removal and disposal of stumps, roots larger than two

(2) inches in diameter, and matted roots from the areas to be cleared. This material shall be removed to a minimum depth of twelve (12) inches below the finished grade.

4.2. Filling of Holes. All holes or depressions made by grubbing shall be filled in twelve (12) inch layers to the elevation of the adjacent ground surface with Contractor-furnished borrow material, and each layer compacted to a density at least equal to that of the adjacent undisturbed material. If the grubbed area is in an area that is to be cut or filled, the finished grubbed surface shall conform to the appropriate level as determined by the Government.

5. DISPOSAL OF DEBRIS.

5.1. Removal from Site of Work. The Contractor shall remove and dispose of all debris from

Government property as specified in 2A-5.2, except trees suitable for firewood. Such disposal shall comply with all applicable Federal, State, and local laws. The Contractor shall, at his option, either retain for his own use or dispose of by sale (selling of materials is prohibited on Government owned property) or otherwise, any such material of value. The Government will not be responsible for the protection and safekeeping of any materials retained by the Contractor. Such materials shall be removed from the site of the work before the date of completion of the work. If debris from clearing operations is placed on adjacent property, the Contractor shall obtain without cost to the Government, additional right-of-way for such purposes. Such material shall be so placed as not to interfere with roads, drainage or other improvements and in such a manner as to eliminate the possibility of its entering into channels, ditches, or streams. The Contractor shall submit written evidence to the CO that he has obtained from the property owner, permission for disposal of material on the owner’s property. The written evidence shall consist of an authenticated copy of the conveyance under which the Contractor acquired the property rights and access thereto, prepared, and executed in accordance with the laws of the State of Illinois.

5.2. Disposal of Trees. All parts of trees over three (3) inches in diameter and less than twelve

(12) inches in diameter that are removed as a result of clearing and grubbing operations shall be cut into 24-inch lengths and stacked at a location in the campground designated by the CO. Trees removed from areas other than campgrounds shall be removed from Government property. Parts less than three (3) inches and greater than twelve (12) inches in diameter shall be removed from Government property.

6. MEASUREMENT AND PAYMENT. Measurement for clearing and grubbing will be made by the square yard measured on a horizontal plane at ground level prior to excavation. Payment will be made at the contract unit price per square yard for “Clearing and Grubbing: ‘Light’, ‘Moderate’, or ‘Heavy’”,” which prices and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Clearing Grubbing, Disposal of Debris.

SECTION 2B

EARTHWORK

1. SCOPE. The work covered by this section consists of furnishing all labor, equipment and materials, and performing all operations in connection with grading and fill placement associated with the installation of stone protection in accordance with the requirements of this section.

2. QUALITY CONTROL

2.1. General. The Contractor shall establish and maintain quality control for all operations to assure compliance with contract requirements, and maintain records of his/her quality control for all construction operations including but not limited to the following:

2.1.1. Excavation (lines and grades)

2.1.2. Foundation preparation.

2.1.3. Fill (materials, placement, compaction, moisture control, lines and grades)

2.2. Reporting. A copy of these records as well as records of corrective action taken shall be furnished to the Government daily when work is underway.

3. EXCAVATION

3.1. General. All material excavated as part of Section 2B shall be considered unclassified excavation; no distinction regarding payment will be made between the various types of materials encountered. Excavation shall be carried out to cut and fill to the extent practicable to produce a work site uniform in shape or as directed by the CO. All areas within the limits of the excavation shall be cleared and grubbed in accordance with Section 2A, Clearing and Grubbing, prior to beginning the excavation.

3.2. Disposition of Materials. All suitable excavated material shall be used in the stone protection foundation. All unsuitable excavated material shall be disposed of as directed by the CO. All work associated with the disposition of the excavated material shall be considered incidental to the excavation of these same materials and no additional compensation will be allowed for the performance of this work including but not limited to transporting, spreading, compaction and shaping of the excavated material.

3.3. Stone Protection Foundation. All fill material required to bring the banks to lines and grades necessary for placing the stone protection shall be placed in the dry by the method hereinafter described. Fill shall be formed in successive horizontal layers of not more than twelve (12) inches in loose depth prior to compaction. The grading operations shall be conducted to produce a soil structure as shown on delivery order drawings or as directed by the CO. Materials such as brush, roots, stumps, grass, and other organic matter shall not be incorporated or buried in the banks. Operations on the earthwork shall be suspended at any time when satisfactory results cannot be obtained because of rain, freezing, or other unsatisfactory conditions in the field.

3.4. Compaction. All fill material will be compacted to not less than 90 percent of the maximum dry density as determined by ASTM D 698-91. No compaction will be required on the top four (4) inches of fill located on all areas outside the limits of the stone protection.

4. MEASUREMENT AND PAYMENT. Measurement for excavation will include all unclassified excavation within the limits of the work area necessary for the preparation of the stone protection foundation.

Unclassified excavation will be measured for payment by the cubic yard (bank), the quantity will be determined by survey data to be obtained by the Government and using the average end area method to determine the volume of excavation. Measurement will not include the quantity of any materials excavated without authorization beyond normal slope lines, or any quantity of material used for purposes other than those directed. Payment will be made at the contract unit price per cubic yard for “Earthwork North of Bruce Findlay Road” and “Earthwork South of Bruce Findlay Road”, which prices and payments shall be full compensation for all costs of excavating the earth materials, placing, wetting, drying, scarifying, compacting and shaping the materials required.

SECTION 2C

SITE GRADING

1. SCOPE. The work covered by this section consists of furnishing all plant, labor, materials, and equipment, and performing all operations necessary for grading of living/picnic areas, concrete installation or removal, lake access/hiking trails or other identified areas, slopes outside the above-listed areas, and filling depressions from the removal of, including but not limited to, concrete, landscape timbers, grills, braziers, lantern hangers and tables at picnic areas, campsites and other approved construction services associated with project operation and maintenance activities.

2.1. General. The Contractor shall establish and maintain quality control for grading operations to assure compliance with contract requirements, and maintain records of his quality control for all

2.1.1. Grading of identified work sites

2.1.2. Filling of depressions

2.1.3. Slopes of 30 percent or less maintained outside living areas.

2.2. Reporting. A copy of these records of inspection and tests, as well as records of corrective action taken, shall be furnished to the Government daily.

3. DEPRESSIONS. Any depressions created by, including but not limited to, concrete, landscape timber, lantern hanger, grill and table removal that are outside of the living area or other sites under construction, shall be filled with suitable soil as approved by the Contracting Officer. The area shall then be seeded and fertilized in accordance with Section 2G, ESTABLISHMENT OF TURF.

4. GRADE WORK.

4.1. General. The work site or areas that require landscape timbers will be designated by stakes, wire flags, or paint placed at the work site Corners by the Government. The area inside these stakes shall designate the work site area. The Contractor-furnished material used for fill as specified in 2C-5 shall be placed at its natural moisture content, in a maximum of twelve (12) inch layers and each layer compacted with a minimum of two (2) passes of a hand-operated plate-type or other vibratory compactor that has been approved by the Government. NOTE: Areas where site grading will take place may contain large amounts of natural base rock.

4.2. Living Area/Picnic Area (Campsite/Picnic Site Rehabilitation Only). The living area/picnic area shall be prepared by constructing a level space, unless otherwise directed by the Government, to a +/-2 percent slope and to the proper elevation so that the final rock elevation is level. If a grade difference of 6 inches or more exists between the rehabilitated living area and the parking spur, a step or steps the width of the walkway shall be constructed using landscape timbers to provide safe access to and from the living area. The landscape timbers used for steps shall be placed on compacted soil.

No stacking of timbers will be allowed for steps. The details (riser height and tread width) shall be as approved by the Government.

4.3. Outside Living Area/Worksite. The cut and fill slopes outside the living area/worksite shall be constructed so that they do not exceed a 4:1 slope unless approved in advance by the Government.

Backfill shall be placed from the top of the ties and projecting away from the living area.

4.4. Any alterations to accommodate substantial grade differences within the defined living area utilizing landscape timbers must be approved in advance by the Government.

4.5. Parking Spur. The parking spur is defined as that portion of the living area on which visitors are expected to park their vehicles. The Government will define limits of the parking spur.

5. FILL MATERIALS (CONTRACTOR-FURNISHED).

5.1. General. The fill shall be earth obtained from Contractor-furnished borrow areas. Materials classified by the Unified Soil Classification System as silts (ML or MH) and clays (CL or CH) shall be used for the fill material. Fill materials shall be a friable mixture capable of supporting growth of turf.

The fill shall be free from unsuitable or frozen materials as defined in Section 2C-5.2 and 2C-5.3.

Materials shall be of the less pervious type with sands and gravels being unacceptable. The Government will approve all fill material.

5.2. Unsuitable Materials. Materials which are classified as unsuitable for use are defined as masses of organic matter, sticks, branches, roots, sod, humus, clay shales, cobbles, boulders, rock fragments, clean sands having less than twelve (12) percent passing the No. 200 sieve by weight, bedrock, and other debris. Borrow material shall contain not more than one percent (by volume) of objectionable material in the earth placed in each cubic yard.

5.3. Frozen Materials. Frozen earth, snow or ice shall not be allowed in the fill material. The CO may require the wasting of frozen material, in order that the work may proceed, at no additional cost to the Government.

6. MEASUREMENT AND PAYMENT. Measurement for site grading will be made per each based on 1200 square feet. Payment will be made at the contract unit price per each for “Site Grading”, which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Site Grading, which includes soil cut, removed, hauled and placed as fill, compacting, grading of the living area or work site, slopes outside living area or work site and filling depressions with material excavated from the site and/or additional Contractor-furnished fill and other costs incidental to the work.

SECTION 2D

STONE PROTECTION

1. SCOPE. The work covered by this section consists of furnishing all labor, equipment and materials, and performing all operations necessary for the placement of bedding material, riprap and ditch aggregate in accordance with the requirements of this section.

2. QUALITY CONTROL

assure compliance with contract requirements, and maintain records of his/her quality control for all

2.1.1. Foundation preparation (line, grade and compaction).

2.1.2. Inspection at the worksite to ensure use of specified materials.

2.1.3. Bedding material placement.

2.1.4. Riprap placement.

2.1.5. Ditch aggregate placement.

2.2. Reporting. A copy of these records as well as records of corrective action taken shall be furnished to the Government daily when work is underway.

3. MATERIALS

3.1. General. The CO prior to the time the material is delivered shall approve the source from which the Contractor proposes to obtain the material. Stone protection material shall be durable and of a suitable quality to ensure performance in the structure and in the climate in which it is to be used. It shall be free from cracks, seams, and other defects that would tend to increase unduly its deterioration from natural causes, and shall be free of dirt, sand, clay, and rock fines.

3.2. Bedding stone.

3.2.1. General. A bedding layer, composed of crushed stone, shall be placed on the prepared foundation within the limits as directed by the CO, to form a backing for the riprap protection. The bedding material shall conform to the requirements of SECTION 2D, 3.1 as to the quality and shall conform to the following gradation:

Sieve Size Percent by Weight

U.S. Std. SQ. Mesh Passing Individual Sieve

3” 100

1 ½” 53 +/- 23

No. 4 8 +/- 8

3.2.2. Placement. Bedding material shall be spread uniformly on the prepared base as directed by the CO. Where the stone protection is to be placed on steep earth slopes, the bedding layer shall be carried up the face of the slope so as to cover all earth surfaces against which the stone protection is to be placed. Placing of the material by methods that will tend to segregate particles sizes within the bedding will not be permitted. Any damage to the surface of the bedding base during placing of the bedding shall be repaired before proceeding with the work. Compaction of the bedding layer will not be required but it shall be finished to present a reasonably even surface free from mounds, windrows or depressions.

3.3. Riprap.

3.3.1. General. Riprap stone shall be placed within the limits as directed by the CO. Locations requiring riprap stone will have delivery orders issued with drawings showing the layer thickness and size of stone to be used. Riprap stone shall be reasonably well graded within the weight limits for each percentage of total weight specified below. Neither the width nor the thickness of any piece of riprap shall be less than 1/3 its length. The riprap stone shall conform to the requirements of SECTION 2D,

3.1 as to quality and shall conform to the following gradations:

For 400-Pound Topsize Stone:

Percent Lighter Limits of Stone

By Weight Weight, lb.

100 400

50+/-20 0-400

8+/-8 3-90

For 150-Pound Topsize Stone:

Percent Lighter Limits of Stone

By Weight Weight, lb.

100 150

50+/-20 40-150

8+/-8 1-40

For Ditch Aggregate Stone:

Percent Lighter Limits of Stone

By Weight Weight, lb.

100 50

50+/-20 10-50

8+/-8 1-10

3.3.2. Placement. Stone for riprap shall be placed on the bedding layer in such manner as to produce a reasonably well graded mass of rock with the minimum practicable percentage of voids, and shall be constructed within the specified tolerance to the line and grades shown on the drawings issued with delivery orders. Riprap shall be placed to its full course thickness at one operation and in such a manner as to avoid displacing the bedding material. Placement shall begin at the lower elevations and proceed up the slope. The larger stones shall be well distributed and the entire mass of stones in their final position shall be roughly graded to conform to the gradation specified in SECTION 2D, 3.3.1. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. Placing riprap by dumping into chutes or by similar methods likely to cause segregation of the various sizes will not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placing, or by other methods of placement, which produced the specified results. Rearranging of individual stones by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well-graded distribution of stone size as specified above. The Contractor shall maintain the riprap protection until accepted and any material displaced by any cause shall be replaced at his expense to the line and grades shown on delivery order drawings.

3.4. Foundation Preparation. The areas on which bedding layers is to be placed shall be trimmed and dressed to conform to the cross sections shown on delivery order drawings. Where required, the foundation area shall be cleared as specified in SECTION 2A, CLEARING AND GRUBBING. In foundation areas requiring fill, the foundation area shall be filled, graded and compacted as specified in

SECTION 2B EARTHWORK.

3.5. Breakwater Construction. Breakwater construction shall be at the location shown on delivery order drawing. The construction of the breakwater shall conform to the lines and grades indicated on these drawings. Stone for the breakwater shall conform to the gradation requirements of SECTION 2D; 3.3.1 for 500-pound and 150-pound topsize stone and shall meet the requirements of SECTION 2D, 3.1 regarding stone quality. The breakwater shall be constructed by dumping ahead of stone within the limits of the location of the proposed breakwater to form a working platform above the lakes water elevation as described on delivery order drawings. Construction of the working platform shall be continued until a platform has been formed along the entire length of the proposed breakwater to an elevation not more than two (2) feet above the elevation as shown on delivery order drawings.

4. MEASUREMENT AND PAYMENT. Bedding material, riprap, and ditch aggregate will be measured for payment by the ton (2,000 lbs.). Stone used in the construction of the breakwater will be paid for as Riprap Stone. Payment for the placement of riprap will be made at the contract unit price per ton of “ Bedding Material”, “Riprap Placement, 400 pound top size”, “ Riprap Placement, 150 pound top size”, and “Ditch Aggregate, (8-inch maximum)” and placed North of Bruce Findlay Road or South of Bruce Findlay Road.

Prices and payments shall constitute full compensation for all labor, materials, equipment, and supplies and performing all operations necessary for the delivery and placement of bedding material, riprap and ditch aggregate.

SECTION 2E

STONE AGGREGATE

1. SCOPE. The work covered by this section consists of furnishing all plant, labor, equipment and materials and performing all operations necessary for the placement of stone aggregate in campsite living/picnic or parking areas, walkway areas, lake access/hiking trails and other approved construction services associated with project operation and maintenance activities.

2.1. General. The Contractor shall establish and maintain quality control for all fine and coarse aggregate placement operations to assure compliance with contract requirements and maintain records of his quality control for all construction operations.

2.2. Reporting. A copy of these records of inspection and tests, as well as records of corrective action taken, shall be furnished to the Government daily.

3. PLACEMENT.

3.1. Living Area. The living area and steps inside the landscape timbers shall be filled with CA-6 aggregate forming a level base at the end of these specifications. The CA-6 aggregate base shall be compacted with a minimum of two passes of a vibrating compactor to a depth of six (6) inches. A two

(2) inch layer of CA-16 aggregate shall be placed evenly over the top of the base layer and also compacted with a minimum of two passes of a vibrating compactor. The finished surface of CA-16 shall be one (1) inch below the top of the landscape timbers.

3.2. Stone aggregate shall conform to the gradation specified in the Illinois Department of Transportation, “Standard Specifications for Road and Bridge Construction” latest edition.

3.3. Walkway Areas. The walkway areas inside the landscape timbers shall be filled with a minimum of four (4) inches of CA-6 forming a level base. The CA-6 aggregate shall be compacted with a minimum of two passes of a vibrating compactor and then covered with a minimum of two (2) inches of CA-16 aggregate and compacted with a minimum of two passes of a vibrating compactor.

The finished surface of CA-16 shall be one (1) inch below the top of the landscape timbers. The landscape timbers shall be installed in the same manner as specified in 2F-4.1.3

4. MEASUREMENT. The stone aggregate will be measured for payment by the ton (2,000 pounds). The weights to be paid for will be determined from certified weight certificates, which shall be furnished by the Contractor at no additional cost to the Government. A certified weight ticket shall be defined as each truck being weighed empty, and again when loaded, and the ticket, identified by the Contractor’s name and the contract number, signed by the approved quarry representative with statement “certified correct”. This procedure shall be followed for each load hauled. The Contractor shall verify the accuracy and completeness of each ticket to reflect his verification. The Contractor shall furnish certification stating the scales used were tested and approved by the local authority.

5. PAYMENT. Stone Aggregate. Stone aggregate will be paid for at the applicable contract unit price per ton for “CA-6 and CA-16”, which prices and payments shall constitute full compensation for all costs of furnishing and placing the aggregate as specified, and furnishing all labor, materials, equipment and supplies.

SECTION 2F

SITE IMPROVEMENTS AND APPURTENANCES

1. SCOPE. The work covered by this section consists of furnishing all plant, labor, materials and equipment, and performing all operations in connection with the construction of new or rehabilitation of campsites/picnic sites and other approved construction services associated with project operation and maintenance activities.

2.1. General. The Contractor shall establish and maintain quality control for all operations to assure compliance with contract requirements and maintain records of his quality control for all construction operations, including but not limited to the following:

2.1.1. Removal

2.1.2. Installation

2.1.3. Relocation.

2.2. Reporting. A copy of these records and tests, as well as corrective action taken, shall be furnished to the Government daily.

3. EXISTING MATERIALS FOR RELOCATION, REPLACEMENT AND/OR REMOVAL.

3.1. Wooden Picnic Tables with Concrete Pads. Wooden picnic tables may be attached with bolts to a concrete pad or chained to concrete anchors at some sites. The Contractor shall remove these tables during the campsite/picnic area rehabilitation work. Tables shall be replaced with vinyl-clad tables provided by the Government. Wooden tables shall be moved to a location determined by the CO (Contracting Officer).

3.2. Concrete Removal. Concrete in the form of slabs, or sidewalks and concrete picnic tables shall be removed and disposed of as specified in 2A-5.1. Depressions created by concrete removal shall be filled with suitable soil compacted to a density equal to that of the adjacent undisturbed material and as specified in Section 2C - SITE GRADING. The area shall then be seeded, fertilized, and mulched as specified in Section 2G - ESTABLISHMENT OF TURF. NOTE: Original project drawings of concrete within recreation areas show a thickness of approximately five (5) inches; however, the concrete may exceed this thickness and the entire excess concrete will be required to be removed at no additional expense to the Government.

3.3. Concrete Anchor Removal. Concrete anchors, approximately 1.5 cubic feet in size shall be removed, and disposed of as specified in 2A-5.1. Depression created by concrete anchor removal shall be filled with suitable soil compacted to a density equal to that of the adjacent undisturbed material and as specified in Section 2C - SITE GRADING. The area shall then be seeded, fertilized, and mulched as specified in Section 2G - ESTABLISHMENT OF TURF.

3.4. Asphalt Removal. Asphalt in the form of slabs or sidewalks, shall be removed and disposed of as specified in 2A-5.1. Any depressions created by asphalt removal shall be filled with suitable soil compacted to a density equal to that of the adjacent undisturbed material and as specified in Section 2C - SITE GRADING. The area shall then be seeded, fertilized, and mulched as specified in Section 2G - ESTABLISHMENT OF TURF. NOTE: Original project drawings of asphalt within recreation areas show a thickness of approximately three (3) inches; however the asphalt may exceed this thickness and the entire excess asphalt will be required to be removed at no additional expense to the Government.

3.5. Landscape Timber Removal. Landscape timbers as specified in 2F-4.1 and 2F-4.1.3, shall be removed and disposed of as specified in 2A-5.1 including all reinforcement bars and nails as determined by the Government. Depressions created by landscape timber removal shall be filled with suitable soil compacted to a density equal to that of the adjacent undisturbed material and as specified in Section 2C -

SITE GRADING. The area shall then be seeded, fertilized, and mulched as specified in Section G -

ESTABLISHMENT OF TURF.

3.6. Relocate Grills. Grills and concrete bases as shown shall be removed by the Contractor and placed in locations determined by the Government. Holes created by grill removal shall be filled with suitable soil as specified in Section 2C – SITE GRADING, compacted, seeded, fertilized and mulched as specified in Section 2G - ESTABLISHMENT OF TURF. These grills and concrete bases, after final placement, shall be level. Damaged grill bases shall be replaced. Grills that are broken due to negligence by the Contractor shall be replaced or repaired, as determined by the CO, at no cost to the Government.

3.7. Replacement of Grills. Metal grills and concrete bases shall be removed and disposed of as specified in Section 2A-5.1. Government-furnished replacement grills shall then be installed at the same location, level and including concrete bases. Voids that may remain after grill removal in impact areas shall be filled with crushed stone and topped with three (3) inches of drain aggregate.

3.8. Damaged Concrete Grill and Lantern Hanger Bases. All damaged concrete grill and lantern hanger bases (including any reinforcing wire mesh) shall be removed from the existing amenities and shall be disposed of as specified in 2A-5.1.

3.9. Removal of Coarse Aggregate. Coarse aggregate shall be removed from areas determined by the Government. Coarse aggregate shall be completely removed to existing soil. The aggregate shall then be disposed of at areas designated by the Government. Areas where aggregate had been removed shall be filled with suitable soil compacted to a density equal to that of the adjacent undisturbed material and as specified in Section 2C - SITE GRADING. The area shall then be seeded, fertilized, and mulched as specified in Section 2G - ESTABLISHMENT OF TURF. NOTE: The thickness of aggregate to be removed is approximately six (6) to eight (8) inches. If variances exist in thickness, the Contractor shall remove all the excess aggregate at no additional expense to the Government.

4. INSTALLATION.

4.1. Landscape Timbers. Landscape timbers shall be No. 2 or better yellow-pine, kiln dried after treatment, 6”X8”X8’ installed as specified in 2F-4.1.3. All timbers shall be square and free of warping at the time of installation. The Government is not responsible for lost, stolen or damaged (Government or Contractor-furnished) timbers.

4.1.1. Contractor-Furnished Landscape Timbers. The Contractor shall furnish landscape timbers as specified in 2F-4.1 to be installed as specified in 2F-4.1.3. All Contractor-furnished timbers become the property of the Government when installed. All excess timbers or pieces of timbers shall be removed from Government property upon completion of the delivery order.

4.1.2. Government-Furnished Landscape Timbers. The Government will furnish approximately 50-150 (maximum) landscape timbers as specified in 2F-4.1 to be installed as specified in 2F-4.1.3. The Contractor shall return extra timbers to the point of pickup.

4.1.3. Placement of Wooden Landscape Timbers. All timbers shall be installed end to end around the living area/picnic area and walkway beginning and ending at the existing parking spur or in configurations determined by the Government. All joints shall be flush and either toe-nailed together with a minimum of four each six (6) inch pole barn nails per joint, two (2) through the sides and two

(2) through the top, except when butting the parking spur or using truss connector plates or steel straps.

The ties shall be anchored to the ground with 5/8-inch by three (3) foot reinforcement bars (or to top of rock surface as determined by the Government) and shall be driven flush through ½-inch holes drilled within ten (10) inches, but no closer than six (6) inches, of the end of the tie. All ties over four (4) feet long shall have a third reinforcement bar anchor placed in the middle of the tie. All timbers shall be installed level (+/-2% slope) and on firm soil or rock base. All timbers shall be placed with the six (6) inch side facing down and up.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .