Amendment 0001.pdf

PDF 368 KB Posted

Attached to
Emergency Drydock Services for Dredge Wheeler
Solicitation number
W912P823R0019
Issued by

About this file

This document is an amendment to a solicitation for emergency drydocking services for the dredge Wheeler. The amendment extends the proposal response date to December 13, 2023 at 12:00pm local time. It removes the requirements for a bid bond and performance and payment bonding from the solicitation. The solicitation is being issued by the US Army Corps of Engineers Engineering District New Orleans and seeks a contractor to provide all management, supervision, labor, subcontracting services, facilities, utilities, equipment, tools, lubricants, fuels, materials and articles necessary to fully execute the specified work items for emergency drydocking services for the dredge Wheeler.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
01-03-06 (General Arrangements Upper Deck).pdf PDF
29-01-08 (2013 Stability Book).pdf PDF
70006-4013-903.pdf PDF
Combined SynopsisSolicitation for Emerg Wheeler Drydock.pdf PDF
11-02-01 TK TOP PLTG FRMG 114-149(2 shts).pdf PDF
70006-4013-907-v2.pdf PDF
11-04-08 (Hopper Well Center Keekson).pdf PDF
11-06-02 (Forecastle Deck Plating and Framing).pdf PDF
11-01-03 (Shell Expansion Fwd. Fr. 114).pdf PDF
11-04-09 (Hopper Well Side Keelson).pdf PDF
11-01-02 (Shell Expansion Aft. Fr. 61).pdf PDF
01-03-01 (General Arrangements Outboard Profile).pdf PDF
11-01-01 (Shell Expansion Fr. 61-114).pdf PDF
11-11-01 (Midship Section).PDF PDF
70006-2725-005.pdf PDF
43-02-01 (Stern Tube and Rope Guard Details).pdf PDF
70006-2725-008.pdf PDF
70006-4013-904-v2.pdf PDF
01-03-04 (General Arrangements 2nd Deck).pdf PDF
11-04-10 (Hopper Well Cross Keelson).pdf PDF
Section J.pdf PDF
11-04-06 Side Frames - AFT.pdf PDF
11-03-03 TRANSV FLOORS FR 61-114 SH 1-2.pdf PDF
11-07-02 (Stack).pdf PDF
11-01-08 SH 1-4 (Hull Insert for Trunnion).pdf PDF
11-03-08 SH 1-3 TRANSV WEBS FR 16-61.pdf PDF
70006-4013-910.pdf PDF
11-06-17 (30ft-6inch flat plating - frame 61-114).PDF PDF
11-02-02 TK TOP PLATING FRAMING FR 61-114 SH 1-2.pdf PDF
11-06-16 (Upper Deck Pltg and Framing Frs 61-114).PDF PDF
01-03-03 (General Arrangements Hold).pdf PDF
11-04-04 (Shell Long Fr 34-149).pdf PDF
01-03-05 (General Arrangements Main Deck).pdf PDF
07-00-01 1-3 (Docking Plan).pdf PDF
01-03-02 (General Arrangements Inboard Profile).pdf PDF
70006-4013-902 (Rev G).pdf PDF
11-03-07 TRANSV WEBS FR 114-149 SH 1-4.pdf PDF
11-03-06 TRANSV WEBS FR 61-114.pdf PDF
70006-4013-901.pdf PDF
11-06-13.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered combined synopsis/solicitation for Emergency Drydocking Services for the Dredge Wheeler is herby amended as follow s:

1. Extend the proposal response date to 12:00pm local time, Friday, 13 December 2023.

2. Remove bid bond (i.e. Bid Guarantee) and Performance and Payment Bonding requirements from this project. FAR Clauses 52,228-1 (Bid Guarantee) and 52.228-16, (Performance and Payment Bonds-Other Than Construction) are hereby removed from the combined synopsis/solicitation.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823R0019

X 9B. DATED (SEE ITEM 11)

05-Jan-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jan-2023

CODE

USACE, CONTRACTING DIVISION

ATTN: HPO CT - ROOM 184

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P823R0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been deleted:

52.228-1 Bid Guarantee SEP 1996 52.228-16 Performance and Payment Bonds--Other Than Construction NOV 2006

(End of Summary of Changes)

File details come from the government source that posted it. Updated .