Section J.pdf

PDF 7 MB Posted

Attached to
Emergency Drydock Services for Dredge Wheeler
Solicitation number
W912P823R0019
Issued by

About this file

This document contains technical specifications for heat lamps needed on various motors aboard a dredge. It lists 34 motors ranging from 10 to 800 horsepower located across the dredge in areas like the auxiliary machinery room, generator room, engine room, and pump rooms. The number of recommended heat lamps for each motor is also provided, totaling 82 lamps needed. An additional attachment provides details on maintenance requirements for the dredge under an emergency drydock services contract for Dredge Wheeler with the Department of the Army Corps of Engineers Engineering District New Orleans. The contractor will be responsible for furnishing all management, supervision, labor, equipment, materials, and other items needed to fully perform the required work items.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
01-03-06 (General Arrangements Upper Deck).pdf PDF
29-01-08 (2013 Stability Book).pdf PDF
70006-4013-903.pdf PDF
Combined SynopsisSolicitation for Emerg Wheeler Drydock.pdf PDF
11-02-01 TK TOP PLTG FRMG 114-149(2 shts).pdf PDF
70006-4013-907-v2.pdf PDF
11-04-08 (Hopper Well Center Keekson).pdf PDF
11-06-02 (Forecastle Deck Plating and Framing).pdf PDF
11-01-03 (Shell Expansion Fwd. Fr. 114).pdf PDF
11-04-09 (Hopper Well Side Keelson).pdf PDF
11-01-02 (Shell Expansion Aft. Fr. 61).pdf PDF
01-03-01 (General Arrangements Outboard Profile).pdf PDF
11-01-01 (Shell Expansion Fr. 61-114).pdf PDF
11-11-01 (Midship Section).PDF PDF
70006-2725-005.pdf PDF
43-02-01 (Stern Tube and Rope Guard Details).pdf PDF
70006-2725-008.pdf PDF
70006-4013-904-v2.pdf PDF
01-03-04 (General Arrangements 2nd Deck).pdf PDF
11-04-10 (Hopper Well Cross Keelson).pdf PDF
11-04-06 Side Frames - AFT.pdf PDF
11-03-03 TRANSV FLOORS FR 61-114 SH 1-2.pdf PDF
11-07-02 (Stack).pdf PDF
11-01-08 SH 1-4 (Hull Insert for Trunnion).pdf PDF
11-03-08 SH 1-3 TRANSV WEBS FR 16-61.pdf PDF
70006-4013-910.pdf PDF
11-06-17 (30ft-6inch flat plating - frame 61-114).PDF PDF
11-02-02 TK TOP PLATING FRAMING FR 61-114 SH 1-2.pdf PDF
11-06-16 (Upper Deck Pltg and Framing Frs 61-114).PDF PDF
01-03-03 (General Arrangements Hold).pdf PDF
11-04-04 (Shell Long Fr 34-149).pdf PDF
01-03-05 (General Arrangements Main Deck).pdf PDF
07-00-01 1-3 (Docking Plan).pdf PDF
01-03-02 (General Arrangements Inboard Profile).pdf PDF
70006-4013-902 (Rev G).pdf PDF
11-03-07 TRANSV WEBS FR 114-149 SH 1-4.pdf PDF
11-03-06 TRANSV WEBS FR 61-114.pdf PDF
70006-4013-901.pdf PDF
11-06-13.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-1

Attachment J-2

Attachment J-2

Attachment J-3

Attachment J-4

Attachment J-5

Attachment J-6

Attachment J-6

Attachment J-7

Attachment J-8

Attachment J-9

Attachment J-9

Attachment J-10

Attachment J-11

List of Motors (10 HP and Higher) That Need Heat Lamps

Service Horsepower (HP) Location Deck Level Suggested # of

Heat Lamps Steering gear hydraulic pump 1 (STBD) 50 Steering Gear Room 1 1 Steering gear hydraulic pump 2 (PORT) 50 Steering Gear Room 1 1 Control air compressor #1 30 Auxiliary Machinery Room 1 1 Control air compressor #2 30 Auxiliary Machinery Room 1 1 Starting ships service air compressor #1 75 Auxiliary Machinery Room 1 2 Starting ships service air compressor #2 75 Auxiliary Machinery Room 1 2 Starting ships service air compressor #3 75 Auxiliary Machinery Room 1 2 A/C Chilled water circulating pump #1 20 Auxiliary Machinery Room 2 1 A/C Chilled water circulating pump #2 20 Auxiliary Machinery Room 2 1 Potable water pressure pump #1 15 Auxiliary Machinery Room 2 1 Potable water pressure pump #2 15 Auxiliary Machinery Room 2 1 General seawater service pump #1 10 Auxiliary Machinery Room 3 1 General seawater service pintel bearing water lube pump standby pump 10 Auxiliary Machinery Room 3 1 Emergency fire & bilge pump 75 Generator Room 3 2 Controllable Pitch Propeller hydraulic oil pump (PORT) 25 Generator Room 3 1 Controllable Pitch Propeller hydraulic oil pump (STBD) 25 Generator Room 3 1 Controllable Pitch Propeller standby hydraulic oil pump (PORT) 25 Generator Room 3 1 Controllable Pitch Propeller standby hydraulic oil pump (STBD) 25 Generator Room 3 1 Propulsion engine reduction gear standby L.O. pump (PORT) 30 Generator Room 3 1 Propulsion engine reduction gear standby L.O. pump (STBD) 30 Generator Room 3 1 Central cooling freshwater circulation pump (PORT) 60 Engine Room 3 2 Central cooling freshwater circulation pump standby (PORT) 60 Engine Room 3 2 Central cooling freshwater circulation pump (STBD) 60 Engine Room 3 2 Central cooling freshwater circulation pump standby (STBD) 60 Engine Room 3 2 AFT bilge & ballast pump 20 Engine Room 3 1 Dredge engine reduction gear standby L.O. pump (PORT) 30 Engine Room 3 1 Dredge engine reduction gear standby L.O. pump (STBD) 30 Engine Room 3 1 Hydraulic skid pump K 15 Pump Room 1 1 Hydraulic skid pump L 15 Pump Room 1 1 Hydraulic skid pump M 15 Pump Room 1 1 Hydraulic skid pump A 75 Pump Room 2 2 Hydraulic skid pump B 75 Pump Room 2 2 Hydraulic skid pump D 75 Pump Room 2 2 Hydraulic skid pump E 75 Pump Room 2 2

Attachment J-11

Hydraulic skid pump F 75 Pump Room 2 2 Hydraulic skid pump G 75 Pump Room 2 2 Hydraulic skid pump I 75 Pump Room 2 2 Hydraulic skid pump J 75 Pump Room 2 2 Hydraulic skid pump C 10 Pump Room 2 1 Hydraulic skid pump H 10 Pump Room 2 1 Central cooling seawater circulation pump motor (PORT) 125 Pump Room 3 2 Central cooling seawater circulation pump motor (STBD) 125 Pump Room 3 2 Dredging Sluice valve flushing pump (PORT) 30 Pump Room 3 1 Dredging Sluice valve flushing pump (STBD) 30 Pump Room 3 1 Forward bilge & ballast pump 20 Pump Room 3 1 Emergency bilge & fire pump 75 Pump Room 3 2 Inboard L.P. dredge pump gland seal pump "A" 20 Pump Room 3 1 Inboard H.P. dredge pump second stage gland seal pump "D" 20 Pump Room 3 1 Inboard L.P. dredge pump standby gland seal pump "B" 15 Pump Room 3 1 Inboard H.P. dredge pump first stage gland seal pump "C" 15 Pump Room 3 1 Outboard dredge pump gland seal pump (PORT) 30 Pump Room 3 1 Outboard dredge pump gland seal pump (STBD) 30 Pump Room 3 1 Jet pump 1 (STBD) 300 Pump Motor Room 3 2 Jet pump 2 (PORT) 300 Pump Motor Room 3 2 Inboard dredge pump cooling (PORT) 15 No. 2 Void - STBD 3 1 Inboard dredge pump cooling (STBD) 15 No. 2 Void - STBD 3 1 Bow thruster CPP hydraulic unit 10 Bow Thruster Trunk 1 4 Bow thruster motor 800 Bow Thruster Trunk 1 1

Total # of Suggested Lamps = 82

A ttachm ent J-12

A ttachm ent J-13

Attachment J-1 (Undocking)
Attachment J-2 (Form 385-43R)
Attachment J-3 (Form 385-6-R)
Attachment J-4 (Form 385-7-R)
Attachment J-5 (Form 414R)
Attachment J-6 (Hazardous Control Program)
Attachment J-7 (Safe Clearance Log)
Attachment J-8 (Safe Clearance Request Form)
Attachment J-9 (Athwartship - Longitudinal Cross Section)
Attachment J-10 (Hopper-Collection-Voids)
Attachment J-11 (Electrical Motors that need Heater)
Attachment J-12 (Section Through Hinge Pin)
Attachment J-13 (Lower Push-Pull Rods)
Attachment J-14 (Hopper Door Round Bar)

File details come from the government source that posted it. Updated .