AM0001.pdf
PDF 2 MB Posted
- Solicitation number
- W912P8-15-B-0041
About this file
Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15-B-0041AbstractPost(2).pdf | ||
| 15-B-0041AbstractPost.pdf | ||
| Am_0008.pdf | ||
| Am_0007_-_Postpone_Bid_Opening.pdf | ||
| Am_0006.pdf | ||
| Am_0005_-_Postpone_Bid_Opening.pdf | ||
| Am_0004_Re-establish_Bid_Date.pdf | ||
| AM_0003.pdf | ||
| AM_0002.pdf | ||
| W912P8-15-B-0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P8-15-B-0041
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation is hereby amended to incorporate changes on the follow ing pages and to establish a bid opening date.
A BID OPENING DATE OF 2 MARCH 2017, 11:00AM LOCAL TIME IS HEREBY ESTABLISHED.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-15-B-0041
X 9B. DATED (SEE ITEM 11)
14-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2017
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1. Cover Sheet and Standard Form 1442, DESCRIPTION AND MAGNITUDE OF WORK: At the end of the first sentence, add “and in Bayou Lafourche”.
2. GENERAL COMMENT: Delete all references to grab samples. Channel bottom grab sampling is no longer required.
3. Section 00010 “BID SCHEDULE”: Delete this section in its entirety and replace with the attached Section 00010 “BID SCHEDULE”.
4. Section 00700 “52.222-23 “Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)”: At the end of subparagraph e, add “and Lafourche Parish, LA”.
5. Section 00700 “252.236-7004 Payment for Mobilization and Demobilization (Dec 1991)”: In subparagraph (a)(1), delete “Eighty percent (80%)” and replace with “Sixty percent (60%)”.
In subparagraph (a)(2), delete “twenty percent (20%)” and replace with “forty percent (40%)”.
6. Section 00800, Paragraph 3.1a “Delivery of Plant”: In the first sentence of subparagraph a, delete “240 hours” and replace with “360 hours”.
7. Section 00800, Paragraph 3.3 “Contractor Performance Evaluations - Construction”: In the 3rd sentence, delete “Construction Contractor Appraisal Support System (CCASS)” and replace with “Contractor Performance Assessment Reporting System (CPARS)”. In the 5th sentence and last sentence, delete “CCASS” and replace with “CPARS”. Also, in the second to last sentence, replace the website with “www.cpars.gov”.
8. Section 00800: After paragraph 3.3 “Contractor Performance Evaluations - Construction”, add the following paragraph:
3.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF
ENGINEERS CONTRACTS (UAI 22.1302-100)
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and http://www.cpars.gov/ http://www.cpars.gov/ employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran Employment: http://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance:
http://www.dol.gov/vets/
Department of Veterans Affairs–VOW to Hire Heroes Act: http://benefits.va.gov/vow/
Army Wounded Warrior Program: http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation–Hiring Our Heroes:
http://www.hiringourheroes.org/
Guide to Hiring Veterans – Reference Material:
http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-
_guide_to_hiring_veterans_0.pdf
(End of special contract requirement)
9. Section 01 33 00 Attachment, “Submittal Register”: Delete Item No. 19 “Peninsula Gap(s) Plan”.
10. Section 01 35 26, Paragraph 1.3.1.1.4 “Safety Personnel Training Requirements for Dredging”: Delete the first sentence of subparagraph (a), and replace with the following:
“The SSHO, as a minimum, must produce a copy of their instructor-signed OSHA 30•hour training card (or course completion if within 90 days of having completed the training and card has not yet been issued). They will have completed:”
11. Section 01 35 26, Paragraph 1.4 “Accident Prevention Program”: Delete the 4th sentence of the first paragraph. Also, delete subparagraphs (a) through (d) and replace with the following:
a. Accident Prevention Plan Checklist (CESO Form A-02, latest edition) and the http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ http://wtc.army.mil/modules/employers/index.html http://www.hiringourheroes.org/ http://www.hiringourheroes.org/ http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-
Activity Hazard Analysis (latest edition), see Section 01.A.15 and Figure 1-2 of EM 385-1-1. A sample of each is attached at the end of this section.
b. A copy of company policy statement regarding accident prevention.
c. When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be included on MVN Form 385-10R (latest edition), Fuel Oil Transfer, (available upon request). (Refer to 33 CFR 156).
12. Section 01 35 26, Paragraph 1.11 “Hurricane Plan”: After the second sentence, add the following sentences: “Work being performed to satisfy the Hurricane Plan will not be measured for payment. Payment for all work associated with the Hurricane Plan and providing the equipment required shall be distributed throughout the existing bid items.”
13. Section 01 35 26 Attachments: Delete all attachments at the end of this section, with the exception of the Safety Sign, and replace with the attached 01 35 26 Attachments (CESO Form A-02 and the Activity Hazard Analysis).
14. Section 35 20 23.23, Paragraph 1.2.2 “Dredging and Option Dredging Items”: In the first sentence, delete “for “Dredging” and “Option Dredging”” and replace with “under the applicable “Dredging” and “Option Dredging” Items”.
15. Section 35 20 23.23, Paragraph 1.2.3 “Dredge Towing Service Item”: Delete the title of this paragraph and replace with “Dredge Towing Service and Option Dredge Towing Service Items”. Also, in the first sentence of subparagraph c, add “and “Option Dredge Towing Service”” at the end of the sentence.
16. Section 35 20 23.23, Paragraph 1.2.4 “Option Item: Additional Pumping Capability for Dredging Payment Items 0002 and 0003”: Delete this paragraph in its entirety and mark “Reserved”.
17. Section 35 20 23.23, Paragraph 1.2.5 “Option Item: Mobilization and Demobilization of Additional Pumping Capability Equipment for Payment Item 0005”: Delete this paragraph in its entirety and mark “Reserved”.
18. Section 35 20 23.23, Paragraph 1.2.6 “Option Item: Additional Pumping Capability for Dredging Payment Items 0002, 0003, and 0005”: Delete this paragraph in its entirety and mark “Reserved”.
19. Section 35 20 23.23, Paragraph 1.2.7 “Option Item: Mobilization and Demobilization of Additional Pumping Capability Equipment for Payment Item 0007”: Delete this paragraph in its entirety and mark “Reserved”.
20. Section 35 20 23.23, Paragraph 2.1.2a “Size and Equipment of Dredge Plant”: In the first sentence of subparagraph a, delete “30 feet” and replace with “34 feet”. Also, in the first and third sentence of subparagraph a, delete all references to “365 feet” and replace with “270 feet”.
21. Section 35 20 23.23, Paragraph 2.1.2d “Size and Equipment of Dredge Plant”:
Delete subparagraph d in its entirety and mark “Reserved”.
22. Section 35 20 23.23, Paragraph 2.1.2e “Size and Equipment of Dredge Plant”: In the first sentence of subparagraph e, delete “30 feet” and replace with “34 feet”. In the 3rd sentence, delete “400 feet” and replace with “310 feet”.
23. Section 35 20 23.23, Paragraph 2.1.3.3 “Crew Boats”: In the first sentence, delete “throughout the contract period, two diesel powered crew boats” and replace with “two diesel powered crew boats for the Atchafalaya River Bay and Bar Dredging Regions and one diesel powered crew boat for the Bayou Lafourche Dredging Region.”
24. Section 35 20 23.23, Paragraph 2.1.3.4 “Dredge Towing Service”: In the first sentence, delete “paragraph entitled “Dredge Towing Service Item”” and replace with “paragraph entitled “Dredge Towing Service and Option Dredge Towing Service Items””.
25. Section 35 20 23.23, Paragraph 2.1.4d “Dredge Discharge Pipeline”: Delete the first sentence of subparagraph d. In the second sentence of subparagraph d, delete the words “While in use, the” and replace with “Floating”.
26. Section 35 20 23.23, Paragraph 2.1.4f “Dredge Discharge Pipeline”: Delete this paragraph in its entirety and replace with the following: “See the paragraph entitled “Dredge Discharge Pipeline” in the Dredging Region Sections for required pipeline lengths in each dredging region.”
27. Section 35 20 23.23, Paragraph 3.1.4 “Order of Work”: At the end of this paragraph, add the following as subparagraph e:
e. Dredging will be performed in the following order:
(1) Atchafalaya River Bay and Bar
(2) Bayou Lafourche
28. Section 35 20 23.23 Attachment, “Figure 1: Minimum Dredge Plant Length”: Delete “365” and replace with “270”. Also delete “30” and replace with “34”.
29. Delete Section 35 20 23.23 09 “Hydraulic Dredging – Atchafalaya Bay Channel Dredging Region” in its entirety and replace with the attached Section 35 20 23.23 09 “Hydraulic Dredging – Atchafalaya Bay Channel Dredging Region”.
30. Delete Section 35 20 23.23 10 “Hydraulic Dredging – Atchafalaya Bar Channel Dredging Region” in its entirety and replace with the attached Section 35 20 23.23 10 “Hydraulic Dredging – Atchafalaya Bar Channel Dredging Region”.
31. After Section 35 20 23.23 10, add the attached Section 35 20 23.23 15 entitled “Hydraulic Dredging - Bayou Lafourche Dredging Region”.
32. Replace previous Wage Determination with attached updated Wage Determination, General Decision Number: LA170011 01/06/2017 LA11.
33. Standard Form 1442, Block 8: Replace with:
U.S. Army Corps of Engineers Attn: Lauren Gandolfi (Room 163 – BID BOX) New Orleans District 7400 Leake Ave.
New Orleans, LA 70118-3651
34. Standard Form 1442, Block 12b, Replace “5 Calendar Days” with “24 hours”.
General Decision Number: LA170011 01/06/2017 LA11
Superseded General Decision Number: LA20160011
State: Louisiana
Construction Type: Heavy Dredging
Counties: Louisiana Statewide.
DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE
MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
* SULA1994-001 04/01/1994
Rates Fringes
Derrick Operator.................$ 7.25
Dozer Operator...................$ 7.25
Dredge 16" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25
Dredge Under 16" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25
Welder......................$ 7.25
Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25
Marsh Buggy Dragline, Oiler......$ 7.25
Marsh Buggy Dragline, Operator...$ 7.25
Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a
FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Atch Bay, Bar, & Misc. Projects Cutterhead Rental 1-2015 OM15059AMEND001
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
1.2 BID FORM NOTES
1.3 BIDDING
1.4 EVALUATION OF BIDS
1.5 CONDITIONS OF CONTRACT AWARD
1.6 BIDDER QUALIFICATIONS
1.7 PRE-AWARD INSPECTION OF PLANT
1.8 OPTION ITEMS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 00010 Page 1
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
See bid schedules on the following pages.
SECTION 00010 Page 2
SECTION 00010 - BIDDING SCHEDULE
ATCHAFALAYA RIVER BAY, BAR, AND MISCELLANEOUS PROJECTS
CUTTERHEAD DREDGE RENTAL NO. 1-2015
ST. MARY PARISH, LOUISIANA
SOLICITATION NO. W912P8-15-B-0041
LOT ONE, 27 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 ATCHAFALAYA BAY & BAR
DREDGING: Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant including 15,000 feet of floating, submerged, or shore pipeline.
1,196 HOUR
Option
ATCHAFALAYA BAY & BAR OPTION
DREDGING: Same plant as listed in Item No. 0002 of this bid lot.
598 HOUR XXXXXXX
0004 DREDGE TOWING SERVICE: as specified herein.
130 MILE
Option
OPTION DREDGE TOWING
SERVICE: as specified herein.
65 MILE XXXXXXX
0006 FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
Option
OPTION FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
XXXXXXX
0008 BAYOU LAFOURCHE DREDGING:
Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant including 9,000 feet of floating, submerged, or shore pipeline.
288 HOUR
Option
BAYOU LAFOURCHE OPTION
DREDGING: Same plant as listed in Item No. 0008 of this bid lot.
144 HOUR XXXXXXX
Option
BIRD NESTING PREVENTION AND
AVOIDANCE MEASURES
111 DAY
TOTAL: LOT ONE BID
*SEE BID FORM NOTES FOLLOWING LAST BID LOT
SECTION 00010 Page 3
ATCHAFALAYA RIVER BAY, BAR, AND MISCELLANEOUS PROJECTS
CUTTERHEAD DREDGE RENTAL NO. 1-2015
ST. MARY PARISH, LOUISIANA
SOLICITATION NO. W912P8-15-B-0041
LOT TWO, 30 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 ATCHAFALAYA BAY & BAR
DREDGING: Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, attendant plant including 15,000 feet of floating, submerged, or shore pipeline.
969 HOUR
Option
ATCHAFALAYA BAY & BAR OPTION
DREDGING: Same plant as listed in Item No. 0002 of this bid lot.
485 HOUR XXXXXXX
0004 DREDGE TOWING SERVICE: as specified herein.
130 MILE
Option
OPTION DREDGE TOWING
SERVICE: as specified herein.
65 MILE XXXXXXX
0006 FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
Option
OPTION FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
XXXXXXX
0008 BAYOU LAFOURCHE DREDGING:
Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, attendant plant including 9,000 feet of floating, submerged, or shore pipeline.
222 HOUR
Option
BAYOU LAFOURCHE OPTION
DREDGING: Same plant as listed in Item No. 0008 of this bid lot.
111 HOUR XXXXXXX
Option
BIRD NESTING PREVENTION AND
AVOIDANCE MEASURES
89 DAY
TOTAL: LOT TWO BID
SECTION 00010 Page 4
ATCHAFALAYA RIVER BAY, BAR, AND MISCELLANEOUS PROJECTS
CUTTERHEAD DREDGE RENTAL NO. 1-2015
ST. MARY PARISH, LOUISIANA
SOLICITATION NO. W912P8-15-B-0041
LOT THREE, 30 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITH SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 ATCHAFALAYA BAY & BAR
DREDGING: Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, submerged pump, attendant plant including 15,000 feet of floating, submerged, or shore pipeline.
873 HOUR
Option
ATCHAFALAYA BAY & BAR OPTION
DREDGING: Same plant as listed in Item No. 0002 of this bid lot.
437 HOUR XXXXXXX
0004 DREDGE TOWING SERVICE: as specified herein.
130 MILE
Option
OPTION DREDGE TOWING
SERVICE: as specified herein.
65 MILE XXXXXXX
0006 FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
Option
OPTION FLOTATION CHANNEL
EXCAVATION: as specified herein.
6,000 LINEAR
FOOT
XXXXXXX
0008 BAYOU LAFOURCHE DREDGING:
Rental of one fully operated cutterhead dredge with 30-in ID pump discharge, sub pump, attendant plant including 9,000 feet of floating, submerged, or shore pipeline.
197 HOUR
Option
BAYOU LAFOURCHE OPTION
DREDGING: Same plant as listed in Item No. 0008 of this bid lot.
98 HOUR XXXXXXX
Option
BIRD NESTING PREVENTION AND
AVOIDANCE MEASURES
80 DAY
TOTAL: LOT THREE BID
SECTION 00010 Page 5
1.2 BID FORM NOTES
a. Bidders shall bid on all items including optional items (see "Evaluation of Options" FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
b. Bidders shall use the Item No. 0002 unit price to compute Option Item No. 0003 total price, Item No. 0004 unit price to compute Option Item No. 0005 total price, Item No. 0006 unit price to compute Option Item No. 0007 total price, and Item No. 0008 unit price to compute Option Item No. 0009 total price.
c. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Proposal Analysis Techniques" FAR 15.404-1(g)(3)).
d. THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within five days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Quality Control System is set-up, the Accident Prevention Program and other required submittals have been submitted and approved, and all preliminary meetings called for under the contract have been conducted.
e. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:
www.mvn.usace.army.mil/Business-With-Us/Contracting/Rapid-Vendor-Payment.
f. As per FAR 9.104-2, special standards of responsibility have been established for this acquisition. A pre-award survey will be required.
Before award, the apparent low bidder shall provide documentation to satisfy the following definitive responsibility criteria. An apparent low bidder who is not able to meet the following definitive responsibility criteria will be deemed to lack responsibility and will be ineligible for award:
(1) Bidders shall furnish in their bid package a completed "Cutterhead Dredge and Attendant Plant Data Sheet" (see Section 35 20 23.23, paragraph entitled "Cutterhead Dredge and Attendant Plant Data Sheet"). If the apparent low bidder fails to furnish the intended dredge's "Cutterhead Dredge and Attendant Plant Data Sheet" within his/her bid package, the apparent low bidder will have 24 hours after the time of the bid opening to provide the Contracting Officer a copy. If the apparent low bidder fails to furnish the intended dredge's "Cutterhead Dredge and Attendant Plant Data Sheet" to the Contracting Officer within the allotted time, the respective bid will be declared non-responsive and the next apparent low bidder will be evaluated as stated in the paragraphs below.
(2) Upon receipt of the apparent low bidder's completed
SECTION 00010 Page 6
"Cutterhead Dredge and Attendant Plant Data Sheet" for the dredge plant that is intended to perform work under this solicitation, the "Cutterhead Dredge and Attendant Plant Data Sheet" will be evaluated to ensure that the dredge meets the equipment requirements as stated in Section 35 20 23.23, paragraph entitled "Size and Equipment of Dredge Plant".
i. If, after review, the Government determines that the dredge on the "Cutterhead Dredge and Attendant Plant Data Sheet" does satisfy the equipment requirements as stated in Section 35 20 23.23, paragraph entitled "Size and Equipment of Dredge Plant", the Government will proceed with award of the contract to the apparent low bidder, provided all other requirements for award have been satisfied.
ii. If, after review, the Government determines that the dredge on the "Cutterhead Dredge and Attendant Plant Data Sheet" does not satisfy the equipment requirements as stated in Section 35 20 23.23, paragraph entitled "Size and Equipment of Dredge Plant", the Government will declare the apparent low bidder to be non-responsible and the bid non-responsive. The Government will thereafter perform the described pre-award survey on the next apparent low bidder, and will do so with each successive apparent low bidder until it is determined that the otherwise responsive, apparent low bidder, has submitted a "Cutterhead Dredge and Attendant Plant Data Sheet" that does satisfy the equipment requirements as stated in Section 35 20 23.23, paragraph entitled "Size and Equipment of Dredge Plant".
g. The unit "job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".
1.3 BIDDING
Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE
BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR
ANY REQUIRED ITEM, THE BID WILL BE DECLARED NON-RESPONSIVE.
1.4 EVALUATION OF BIDS
a. The hourly dredging quantities have been determined based on the estimated quantity of shoal material to be removed and the nominal production rates of the dredge. The production rates shown in the chart in paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s) were used to make this determination.
b. The nominal dredge production rates listed in this solicitation were conservatively estimated based on lower-bound material face availability of this solicitation's dredging regions, which have variable and dynamic shoaling conditions. It is the bidder's responsibility to make its own assessment of the actual dredging conditions in order to prepare a bid for this work.
c. Award will be made to that responsible bidder presenting the lowest
SECTION 00010 Page 7 priced responsive bid in response to this solicitation.
d. The hourly quantities shown on the bid lots are 100% pay time hours. The actual term of the dredge rental may vary as a result of fractional pay time. Refer to section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items", for additional information.
1.5 CONDITIONS OF CONTRACT AWARD
a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps or Engineers Safety and Health Requirements manual", the latest edition.
b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government is not obligated to exercise any option item(s).
c. The number of hours of rental time stated in the bidding schedule is an estimated quantity. The dredge and attendant plant will be retained for an approximate number of days shown in the table below starting no later than 360 hours after receipt of Government Notice to Proceed by the Contractor.
APPROXIMATE CUTTERHEAD DREDGE
CONTRACT DURATION
(BASE PLUS OPTION)
Bid Lot Discharge Line ID
(INCHES)
SUBMERGED PUMP Approximate Number of Rental Days
1 27 NO 164
2 30 NO 144
3 30 YES 134
d. The bidder shall be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, no later than 360 hours after receipt of Notice to Proceed by the Contractor.
SECTION 00010 Page 8
1.6 BIDDER QUALIFICATIONS
a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate for the dredging region, as listed in the table in paragraph entitled "Minimum Production Rates" located in the Dredging Regions Section(s). The dredge must have performed at, or above, the listed production rate for at least 85 percent of the total contract duration, on any contracts that are used to prove plant capability, within three years prior to the bid opening date of this solicitation. Failure to establish the dredge's capability to meet the required production rate will result in a finding of non-responsibility.
b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work described under this solicitation (see "Responsible Prospective Contractors" FAR 9.1). The bidder must also show that the dredge and attendant plant are not already obligated for the performance of other work which would delay commencement, performance, and completion of the solicited work; and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.
c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7 and DFARS 252.204-7004 Alt A.
1.7 PRE-AWARD INSPECTION OF PLANT
a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened, and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the projected contract award date.
b. Two calendar days before the projected award date, or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.
c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.
1.8 OPTION ITEMS
a. The Government may require the delivery of, in whole or part, any Option Items. The Government may exercise an Option Item by written notice to the Contractor. If the Government activates the Option Item, the activation will occur while the Contractor's equipment is in the work vicinity as described in the applicable Dredging Region
SECTION 00010 Page 9
Section(s). If Option Dredging Item work is exercised, it shall be performed as a continuance of Dredging Item work, which shall be activated first.
b. No additional mobilization/demobilization will be paid to the Contractor for Option Item work performed within the work region. The Contractor shall commence performance of optional work no more than three calendar days after the time the Contractor receives the Government's Notice to Proceed with the optional work.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 00010 Page 10
Item Description Yes No N/A
1. Signature sheet
a. Includes the name, signature, and title of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC )
b. Includes the name, signature, and title of the Plan Approver (e.g. owner, company president, regional vice president ) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).
c. Includes the name(s), signature(s), and title(s) for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project
QC. )
2. Background information
a. Includes the Contractor Name.
b. Includes the Contract Number.
c. Includes the Project Name.
d. Includes the Brief Project Description.
e. Includes the Location of the Project (map).
f. Includes the Contractor Accident Experience (Copy of OSHA
g. Includes the Listing of Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).
3. Statement of Safety and Health Policy. Includes a copy of the corporate safety policy. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention
4. Responsibilities and Lines of Authorities
a. Includes the identification and job responsibilities of personnel responsible for safety - at both corporate and project level – including their resumes.
b. Includes the lines of authority.
CESO Form A-02 Sep 13
Remarks (Any NO or N/A item)
Form A-02 U.S. Army Corps of Engineers
Accident Prevention Plan Checklist
Date of Inspection
Location (Plant or Facility) Contract Number
Contractor Name Project Name
Inspector Name (Print) Inspector Signature
This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated 30 November 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.
SECTION 01 35 26 ATTACHMENT
5. Training
a. Includes the list of subjects to be discussed with employees at safety indoctrination.
b. Includes the list of mandatory training and certifications applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE ) and any requirements for periodic retraining / recertification.
c. Includes the identity requirements for emergency response training.
d. Includes the outline requirements (who attends, when given, who will conduct, etc. ) for supervisory and employee safety
6. Safety and Health Inspections
a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees )
b. Includes proof of inspector's training / qualifications.
c. Indicates when inspections will be conducted.
d. Furnished sample forms upon which inspections will be recorded.
e. Indicates deficiency tracking system and follow-up procedures.
f. Includes the names of competent and / or qualified person(s) and proof of competency / qualification to meet specific OSHA competent / qualified person(s) requirements.
g. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard )
7. Safety and Health Expectations, Incentive Programs, and Compliance
a. Includes the company's written safety program goals, objectives, and accident experience goals.
b. Includes a brief description of the company's safety incentive programs (if any ).
c. Includes the policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements).
d. Includes the written company procedures for holding managers and supervisors accountable for safety.
8. Mishap Reporting
a. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).
b. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs.
c. The plan identifies how, when, and who shall make immediate notification of major mishaps.
CESO Form A-02 Sep 13
Remarks (Any NO or N/A item)
Form A-02 U.S. Army Corps of Engineers
Accident Prevention Plan Checklist (cont’d)
Date of Inspection
9. Plans (Programs, Procedures) required by the Safety Manual
a. Fatigue Management Plan (01.A.20)
b. Emergency response plans:
(1) Procedures & Test (01.E.01)
(2) Spill Plans (01.E.01, 06.A.02)
(3) Fire Fighting Plan (01.E.01; 19.A)
(4) Posting of Emergency Telephone Numbers (01.E.05)
(5) Man overboard/abandon ship (19.A.04)
(6) Medical Support. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (Section 03.A; 03.D)
c. Plan for prevention of alcohol and drug abuse (01.C.02)
d. Site Sanitation Plan (Section 02.B)
e. Medical Support Plan, (03.A.01; 03.A.06; 03.D)
f. Bloodborne Pathogen Plan (03.A.05)
g. Exposure Control Plan (03.A.05)
h. Site Layout Plan (04.A)
i. Access/Haul road Plan (04.B)
j. Hearing Conservation Program (05.C)
k. Respiratory Protection Plan (05.G)
l. Health Hazard Control Program (06.A)
m. Process Safety Management Plan (06.B.04)
n. Lead Abatement Plan (06.C & Specs)
o. Asbestos Abatement Plan (06.C & Specs)
p. Radiation Safety Program (06.F)
q. Abrasive Blasting Plan (06.I)
r. Heat/Cold Stress Monitoring Plan (06.J)
s. Indoor Air Quality Management Plan (06.L)
t. Mole Remediation Plan (06.L.04)
u. Chromium (VI) Exposure Evaluation (06.M)
v. Crystalline Silica Assessment (06.N)
w. Lighting Evaluation (07.A)
x. Lighting Plan for Night Operations (07.A.09)
CESO Form A-02 Sep 13
Form A-02 U.S. Army Corps of Engineers
Accident Prevention Plan Checklist (cont’d)
Date of Inspection
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:
Remarks (Any NO or N/A item)
9. Plans (Programs, Procedures) continued.
y. Traffic Control Plan (08.C.05)
z. Fire Prevention Plan (09.A.01)
aa. Wild Land Fire Management Plan (09.L)
bb. Arc Flash Hazard Analysis (11.B)
cc. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, App D)
dd. Hazardous Energy Control Plan, (12.A.01)
ee. Standard Pre-Lift Plan (LHE) (16.A.03, 16.L.15)
ff. Critical Lift Plan – LHE (16.H)
gg. Naval Architectural Analysis (16.L)
hh. Contingency Plan for Severe Weather (19.A.03)
ii. Man Overboard/Abandon Ship (19.A.04)
jj. Float Plan (19.F.04)
kk. Fall Protection Program, (21.D);
ll. Demolition/Renovation Plan (to include engineering survey), (23.A.02)
mm. Rope Access Program, (24.H.02)
nn. Excavation/Trenching Plan, (25.A.01)
oo. Underground construction fire prevention and protection Plan, (26.D.01)
pp. Compressed Air Plan, (26.I.01)
qq. Formwork and Shoring Erection and Removal plan, (27.C)
rr. PreCast Concrete Plan, (27.D) ss Lift. slab plans, (27.E)
tt. Masonry Bracing Plan, (27.F.01)
uu. Steel Erection Plan, (28.B)
vv. Explosives Safety Site Plan (ESSP) (29.A)
ww. Blasting Plan, (29.A; 26.J)
xx. Underwater Dive Operations Plan, (30.A.14, 16, )
yy. Tree Felling/Maintenance Program, (31.A)
zz. Aircraft/Airfield Construction Safety & Phasing Plan, (32.A.02) aaa. Site Safety and Health Plan (HTRW), (33.B) bbb. Confined Space Entry Program, (34.A.06, 07)
10. Risk Management Processes. Detailed project-specific hazards shall be identified and controls provided via Activity Hazard CESO Form A-02 Sep 13
Form A-02 U.S. Army Corps of Engineers
Accident Prevention Plan Checklist (cont’d)
Date of Inspection
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:
Remarks (Any NO or N/A item)
Other Remarks:
CESO Form A-02 Sep 13
Activity Hazard Analysis (AHA)
Section 01 35 26 ATTACHMENT
Activity/Work Task: Overall Risk Assessment Code (RAC) (Use highest code)
Project Location: Risk Assessment Code (RAC) Matrix
Contract Number:
Severity
Probability
Date Prepared: Frequent Likely Occasional Seldom Unlikely
Prepared by (Name/Title):
Catastrophic E E H H M
Critical E H H M L
Reviewed by (Name/Title):
Marginal H M M L L Negligible M L L L L
Notes: (Field Notes, Review Comments, etc.) Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See above)
“Probability” is the likelihood to cause an incident, near miss, or accident and identified as: Frequent, Likely, Occasional, Seldom or Unlikely. RAC Chart “Severity” is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible
E = Extremely High Risk H = High Risk
Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard” on AHA. Annotate the overall highest RAC at the top of AHA.
M = Moderate Risk L = Low Risk
Job Steps Hazards Controls RAC
Equipment to be Used Training Requirements/Competent or
Qualified Personnel name(s) Inspection Requirements
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.23 09
HYDRAULIC DREDGING - ATCHAFALAYA BAY CHANNEL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 Flotation Channel Excavation and Option Flotation Channel
Excavation Items
1.2.2 Airboat
1.3 EXISTING PIPELINES, STRUCTURES OR UTILITIES
PART 2 PRODUCTS
2.1 AIRBOAT
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Dredging Region
3.1.1.1 Atchafalaya Bay Channel
3.1.1.2 Flotation Channel(s)
3.1.1.3 Dredge Discharge Pipeline
3.2 DISPOSAL AREA SURVEYS
3.3 PREVIOUS DREDGING CONTRACTS
3.4 RIGHTS-OF-WAY
3.5 MINIMUM PRODUCTION RATE REQUIREMENTS
3.6 HORIZONTAL AND VERTICAL CONTROL POINTS
3.6.1 Horizontal Control Points
3.6.2 Vertical Control Points
ATTACHMENTS:
Atchafalaya Bay Channel Horizontal Control Points
Atchafalaya Bay Channel Disposal Area Coordinates
Atchafalaya Bay Channel Maintenance Dredging Plate
SECTION 35 20 23.23 09 Page 1
SECTION 35 20 23.23 09
HYDRAULIC DREDGING - ATCHAFALAYA BAY CHANNEL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
This section details specific requirements, which are in addition to the general requirements set forth in the specifications, for the Atchafalaya Bay Channel Dredging Region. The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all work required for dredging in the specified dredging region, except for those measures set forth in other technical portions of the specifications.
1.2 MEASUREMENT AND PAYMENT
Payment for the work covered under this section shall be included in the applicable contract unit price per hour for "Atchafalaya Bay & Bar Dredging" and "Atchafalaya Bay & Bar Option Dredging" except for "Flotation Channel Excavation" and "Option Flotation Channel Excavation".
1.2.1 Flotation Channel Excavation and Option Flotation Channel Excavation Items
All costs associated with excavating and maintaining the flotation channel(s) to access the disposal area(s) for the Atchafalaya Bay Channel shall be included in the unit price per linear foot for "Flotation Channel Excavation" and "Option Flotation Channel Excavation". Payment will not be made if in the opinion of the Contracting Officer's Representative, excavation of the flotation channel(s) is not required to access the disposal area(s).
1.2.2 Airboat
All costs associated with providing an airboat for Government use shall be included in the unit price per hour under the "Atchafalaya Bay & Bar Dredging" Item. The airboat may be used a total of 3 to 6 days. However, the days may not necessarily be concurrent.
1.3 EXISTING PIPELINES,…