AMENDMENT_0001-W912P6-17-B-0010-CHICAGO_HARBOR-BREAK_WATER-PKG.pdf
PDF 627 KB Posted
- Attached to
- CHICAGO HARBOR BREAKWATER REPAIR
- Solicitation number
- W912P617B0010
About this file
This File Contains Amendment 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6671708306
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: INVITATION FOR BIDS W912P6-17-B-0010, CHICAGO HARBOR BREAKWATER REPAIRS - CHICAGO, IL"
A. This amendment does not extend the bid opening date and time of 9/22/17 at 2:00pm CST. Accordingly, Bids shall be received by 2:00p.m CST. on 9/22/2017 -- see Section 00100 of the IFB for submittal details.
B. By w ay of this amendment, updated Wage Rates for General Decision IL 20160009 dated 09/15/2017 IL9 replaces rates included in the original solicitation and are enclosed hereunder - see the follow ing pages
C. This Amendment also provides the attendance sheet from the pre-bid meeting held on Tuesday, September 12, 2017 at 10:00am. -- see the follow ing pages
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P617B0010
X 9B. DATED (SEE ITEM 11)
22-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2017
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P617B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
D. CHANGES TO SPECIFICATIONS are as follows. The Revised Section pages are attached hereto.
1. Section 35 31 25 & Sheet C-103 – revised as following:
The incorrect version of the grouting specifications was mistakenly included in the solicitation. This also led to an incorrect note being placed on one of the details in the drawings. The contract does not require a mockup of the grouting methods, grout mix D is not required by the contract, and the specifications do not dictate the type of grout barriers to be used.
E. USACE RESPONSE TO CONTRACTOR’S QUESTIONS:
QUESTION 1. Adam Borelli indicated at the pre-bid that the question and answer period would be extended. What is the new deadline? Will this result in the bid date be extended and if so to what date?
A. The USACE cannot impose a deadline, however, this is a critical project and we are highly encouraging all questions be submitted by 19 September 2017 to avoid delaying the bid opening.
QUESTION 2. An addendum was mentioned yesterday the meeting yesterday, when will that addendum be issued?
A. This document serves as the addendum, which is considered an “Amendment” in terms of our procurement regulations.
QUESTION 3. Is there any underwater survey data available for the work area in question?
A. REFER to Drawing Sheet C-102.
QUESTION 4. What is the list of USACE approved labs? The URL is missing from section 01 45 00.00 paragraph 3.7.2.
A. The URL link is: https://media.defense.gov/2017/Sep/13/2001808436/-1/-
1/1/170912_CEERD-GMC_VALIDATEDLABS%20.PDF
QUESTION 5. Which bid item should the outward crushed stone containment blanket be applied to?
A. The requirement for an “outward crushed stone containment blanket” has been deleted from the project specifications.
https://media.defense.gov/2017/Sep/13/2001808436/-1/-1/1/170912_CEERD-GMC_VALIDATEDLABS%20.PDF https://media.defense.gov/2017/Sep/13/2001808436/-1/-1/1/170912_CEERD-GMC_VALIDATEDLABS%20.PDF
W912P617B0010
QUESTION 6. Which bid should the compatibility test program mock-up section be applied to?
A. The requirement for a “compatibility test program mock-up section” has been deleted from the project specifications.
QUESTION 7. The list of alignment points on sheet C-101 indicate a 500’ base bid, and two 250’ options, but the bid schedule shows three options. Please provide a corrected sheet C-101, or the starting and ending station of each option and base bid.
A. No Options Areas are shown on the drawings. The bid items are based on quantities and not length of structure.
QUESTION 8. What is the anticipated NTP?
A. The USACE anticipates an award on 30 September 2017. The successful bidder will have 10 days from contract award to submit legally sufficient bonds and insurance. Once the bonds and insurance have been approved by our legal department, the Notice to Proceed (NTP) will be issued AND subsequently acknowledged by the contractor. In consideration of this timeline, we expect the NTP to be issued on or about 30 October 2017.
F. Point of contact for this Amendment is Kim F. Hubbard at 312.846.5368 or kimberly.f.hubbard@usace.army.mil.
END OF AMENDMENT PARTICULARS (PRE-BID ATTENDANCE SHEET, UPDATED WAGE
DETERMINATION AND REVISED SPECIFICATION SECTIONS FOLLOW)
mailto:kimberly.f.hubbard@usace.army.mil
General Decision Number: IL170009 09/15/2017 IL9
Superseded General Decision Number: IL20160009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 01/27/2017 3 02/24/2017 4 04/07/2017 5 04/28/2017 6 05/05/2017 7 06/02/2017 8 06/09/2017 9 06/23/2017 10 06/30/2017 11 07/07/2017 12 07/21/2017 13 07/28/2017 14 08/04/2017 15 08/25/2017 16 09/08/2017 17 09/15/2017
* ASBE0017-001 06/01/2017
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 25.80 Fire Stop Technician.............$ 40.40 24.54
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 37.80 24.54
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.14
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 24.91
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2017
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 46.35 31.29 Heavy & Highway............$ 46.35 31.31
CARP0555-002 10/01/2016
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 36.11 30.02
ELEC0009-003 06/04/2017
Rates Fringes
Line Construction Groundman...................$ 39.39 61.37% Lineman and Equipment Operator....................$ 50.50 61.37%
ELEC0134-001 06/05/2017
Rates Fringes
ELECTRICIAN......................$ 47.40 32.21
ELEC0134-003 06/05/2017
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 43.10 23.95
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2017
ELEVATOR MECHANIC................$ 53.18 31.585+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2017
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 50.10 36.45
GROUP 2....................$ 48.80 36.45
GROUP 3....................$ 46.25 36.45
GROUP 4....................$ 44.50 36.45
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with "A" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2017
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 48.30 36.45
GROUP 2.....................$ 47.75 36.45
GROUP 3.....................$ 45.70 36.45
GROUP 4.....................$ 44.30 36.45
GROUP 5.....................$ 43.10 36.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2017
Rates Fringes
IRONWORKER
Sheeter.....................$ 47.58 37.34 Structural and Reinforcing..$ 47.33 37.34
IRON0063-001 06/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 46.75 34.44
IRON0063-002 06/01/2017
Rates Fringes
IRONWORKER
Fence Erector...............$ 39.58 27.70
IRON0136-001 07/01/2017
Rates Fringes
IRONWORKER
Machinery Movers; Riggers;
Macinery Erectors...........$ 40.17 33.04 Master Riggers..............$ 42.67 33.04
LABO0002-006 06/01/2016
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 40.20 26.30
GROUP 2....................$ 40.20 26.30
GROUP 3....................$ 40.28 26.30
GROUP 4....................$ 40.30 26.30
GROUP 5....................$ 40.40 26.30
GROUP 6....................$ 40.40 26.30
GROUP 7....................$ 40.43 26.30
GROUP 8....................$ 40.53 26.30
GROUP 9....................$ 40.55 26.30
GROUP 10....................$ 40.75 26.30
GROUP 11....................$ 40.78 26.30
GROUP 12....................$ 40.40 26.30
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2016
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 40.20 26.30
GROUP 2.....................$ 40.28 26.30
GROUP 3.....................$ 40.40 26.30
GROUP 4.....................$ 40.43 26.30
GROUP 5.....................$ 40.40 26.30
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Ashpalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2016
Rates Fringes
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 41.20 26.30
16 - 20 POUNDS..............$ 41.70 26.30
21 - 26 POUNDS..............$ 42.20 26.30
27 - 33 POUNDS..............$ 43.20 26.30
34 - AND OVER...............$ 44.20 26.30
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 40.20 26.30
GROUP 2.....................$ 40.33 26.30
GROUP 3.....................$ 40.43 26.30
GROUP 4.....................$ 40.55 26.30
GROUP 5.....................$ 40.20 26.30
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2016
Rates Fringes
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 35.00 26.30
GROUP 2.....................$ 40.40 26.30
GROUP 3.....................$ 40.40 26.30
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work
PAIN0014-001 06/01/2017
Rates Fringes
PAINTER (including taper)........$ 44.55 26.49
PAIN0027-001 06/01/2017
Rates Fringes
GLAZIER..........................$ 42.45 34.18
PLAS0005-002 07/01/2015
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.25 32.18
PLUM0130-001 06/01/2017
Rates Fringes
PLUMBER..........................$ 49.25 28.97
PLUM0597-002 06/01/2017
Rates Fringes
PIPEFITTER.......................$ 47.50 30.02
ROOF0011-001 06/01/2017
Rates Fringes
ROOFER...........................$ 42.30 21.80
SFIL0281-001 01/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 47.05 25.60
SHEE0073-001 07/01/2017
Rates Fringes
Sheet Metal Worker...............$ 43.50 35.42
SHEE0073-002 07/01/2017
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 30.57 35.42
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 03/01/2012
Rates Fringes
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 28.25 9.08
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Chicago Breakwater Repair FY17 CHICHRBRBRKWTR17
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 31 25
TIMBER CRIB BREAKWATER REPAIR
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.3 DEFINITIONS
1.3.1 General
1.3.1.1 Series
1.3.1.2 Section
1.3.1.3 Row
1.3.1.4 Cycle
1.3.1.5 Intermittent Grouting
1.3.1.6 Split Spacing
1.3.1.7 Closure
1.3.1.8 Refusal
1.3.1.9 Communication
1.3.1.10 Balanced Stable Grout
1.4 SUBMITTALS
1.5 MATERIALS DELIVERY, STORAGE, AND HANDLING
1.5.1 Grout Materials
1.6 PROJECT/SITE CONDITIONS
1.6.1 Field Conditions
1.6.2 Field Measurements
1.7 SEQUENCING AND SCHEDULING OF DRILLING AND GROUTING
1.7.1 General
1.8 Qualifications
1.8.1 Grouting Superintendent
PART 2 PRODUCTS
2.1 GROUTING MATERIAL
2.1.1 Water
2.1.2 Cement
2.1.3 Pozzolans
2.1.4 Admixtures
2.1.4.1 Water Reducer
2.1.4.2 Superplasticizer
2.1.4.3 Viscosity Modifier
2.1.5 Fluidifier
2.1.6 Anti Wash-out Agent
2.1.7 Bentonite
2.1.8 Sand
2.1.9 Sodium Silicate
2.2 CONTAINMENT BARRIERS
PART 3 EXECUTION
3.1 COMPATIBILITY TEST PROGRAM AND DRILLING AND GROUTING WORK PLANS
AND PREPARATORY ITEMS
SECTION 35 31 25 Page 1
3.1.1 General
3.1.2 Compatibilty Test Program Work Plan
3.1.3 Drilling and Grouting Work Plan
3.1.4 Grout Hole Layout
3.2 EQUIPMENT
3.2.1 General
3.2.2 Drilling Equipment
3.2.2.1 Drilling Conditions
3.2.3 Grouting Equipment
3.2.3.1 Grout Plant
3.3 GROUT CONTAINMENT
3.4 GROUT HOLE DRILLING
3.4.1 General
3.4.1.1 Drilling Log and Records
3.4.2 Location and Depth
3.4.3 Casing for Grout Holes
3.4.3.1 Casing
3.4.3.2 Casing Installation
3.4.3.3 Core Hole Drilling
3.4.3.4 Grout Data Logger
3.5 GROUTING PROCEDURES
3.5.1 Grouting
3.5.2 Grouting Lakeward and Harborside Rows
3.5.3 Grout Mixes
3.5.4 Communication
3.5.5 Grouting Pressures
3.5.6 Grout Mixes
3.5.7 Measurement Equipment
3.5.8 Mixing Procedure
3.5.9 3.5.9 Grout Injection
3.5.10 Backfilling of Holes
3.5.11 Equipment Arrangement and Operation
3.5.12 Protection to Work and Cleanup
3.5.13 Records
3.5.14 Communications
-- End of Section Table of Contents --
SECTION 35 31 25 Page 2
SECTION 35 31 25
TIMBER CRIB BREAKWATER REPAIR
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 70 (2006) Standard Test Method for Surface Moisture in Fine Aggregate
ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C 150 (2007) Standard Specification for Portland Cement
ASTM C 204 (2007) Standard Test Method for Fineness of Hydraulic Cement by Air Permeability Apparatus
ASTM C 243 (1995) Standard Test Method for Bleeding of Cement Pastes and Mortars
ASTM C 494 (2000) Chemical Admixtures for Concrete
ASTM C 618 (2008) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C 937 (2002) Grout Fluidifier for Preplaced-Aggregate Concrete
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 100 (1975) Method of Sampling Concrete Aggregate and Aggregate Sources, and Selection of Material for Testing
AMERICAN PETROLEUM INSTITUTE (API)
API RP 13B-1 (2003; Errata 2004) Standard Procedure for Field Testing Water-Based Drilling Fluids
1.2 SYSTEM DESCRIPTION
This section of the specifications covers construction of conducting pre-grouting compatibility program on land; installing grout containment barriers on both sides of the breakwater, drilling through concrete
SECTION 35 31 25 Page 3 breakwater cap, using either diamond rotary or percussion drilling equipment, making grout connections; furnishing, handling, transporting, storing, mixing and injecting the grouting materials; backfilling holes;
patching and backfilling the finished grout holes; clean up of the areas upon completion of the work and all other such operations as are incidental to the drilling and grouting. The work consists of constructing a grout curtain, the approximate locations, limits, and details which are indicated in the drawings using both quick-setting sodium silicate grouts and low-mobility consolidation grouts.
Drilling, grouting shall follow the sequence of work presented in the Contractor's Drilling and Grouting Work Plan and approved by the Contracting Officer Representative (COR). Adherence to the schedule and sequence directed by the COR will not be seen as cause for time extension or claims for additional costs beyond those specified herein.
1.3 DEFINITIONS
1.3.1 General
The drilling and grouting shall consist of a multi-line grout curtain.
The inner and outer single lines of the grout curtain shall be grouted using a fast-setting portland cement-sodium-silicate grout for containment of grout from the inner rows of grout holes. The three lines of the interior grout curtain shall be grouted using low/non-shrink balanced stabilized sanded portland cement grout with anti-washout characteristics. The drilling and grouting shall be performed on series of boreholes within sections, using the methods as described herein.
1.3.1.1 Series
A series of grout holes refers to a group of boreholes grouted simultaneously at one station aligned perpendicular to the breakwater structure within the inner three rows of the grout curtain.
1.3.1.2 Section
A section is a division along the grout curtain, not less than 50 feet up and down station from a hole being drilled or grouted within which grouting of successive series of holes shall be simultaneously grouted.
Insofar as practicable, the grout curtain shall be subdivided into sections in a manner to facilitate the Contractor's operations; however drilling within one section adjacent to a section that has yet to be grouted shall not be done except as directed by the COR.
1.3.1.3 Row
A row is defined as the line of holes parallel to the structure. There are 5 rows designed as shown on the Drawings:
Row A - the row of borings along the lake side of the structure;
Row B - the row of interior holes toward the lakeside;
Roc C - the Centerline row of interior holes;
Row D - the harbor side row of interior holes Row E - the row of holes nearest the harbor side of the structure.
SECTION 35 31 25 Page 4
1.3.1.4 Cycle
A cycle under these Specifications is defined as a period of continuous grouting of a hole from start to shut off of grout flow. Holes may be grouted for more than one cycle, following sufficient elapsed time between cycles for the grout to set, in cases where grouting was suspended prior to grout communicating with adjacent holes, or due to the appearance of grout outside of containment, or when interruption is directed by the COR.
1.3.1.5 Intermittent Grouting
Intermittent grouting under these Specifications is defined as grouting of more than one cycle applied to the same grout hole, each cycle separated by sufficient time for the grout to reach initial set.
1.3.1.6 Split Spacing
Split spacing is the procedure of locating an additional grout hole midway between two previously drilled and grouted holes.
1.3.1.7 Closure
Closure is defined as the acceptable level of void-filling of a section achieved by grouting. For this Contract, the closure criteria are:
1. Observed complete filling of voids in the stone fill within the timber crib to the designed extent, determined by the presence of grout filling or being clearly visible in adjacent holes; or
2. Cessation of grouting directed by the COR.
1.3.1.8 Refusal
Refusal is defined for this Contract as the condition where a hole accepts no grout under the pressure exerted by the grout pump.
1.3.1.9 Communication
Communication is the passage of water or grout from one hole to another or to any opening or exposed surface during the course of drilling and/or grouting.
1.3.1.10 Balanced Stable Grout
A grout mixture that exhibits minimal (less than 5 percent) bleed and retains the desired rheologic properties , viscosity, and cohesion throughout the pumping and placement processes regardless of pumping rate, turbulence or agitation.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 35 31 25 Page 5
Compatibility Test Program, Drilling and Grouting Work Plans,Grout Superintendent Qualifications ; G, DG
Submit Compatibility Test Program, Drilling and Grouting Work Plans not less than 30 Days prior to the commencement the respective portions of the work, the Contractor shall submit separate Compatibility Test Program Work Plan and Drilling and Grouting Work Plan that include but are not limited to detailed descriptions of conducting the compatibility test program, equipment, labor and staging operations for conducting overwater operations, installation of containment barriers, drilling and grouting, mobilization activities due to limited space at the lock, and overall sequence of work.
SD-02 Shop Drawings
Records ; G, DG
The Contractor shall submit complete, legible copies of DRILLING RECORDS and all photographs to the COR within 1 week after a hole is completed or at any time directed by the COR. Drill records will identify the hole number, total depth drill and the depth of the void space beneath the concrete cap.
Grouting Data Reports
The Contractor shall submit an example of the records produced by the Grouting Data Logger(s) not less than 30 days prior to the commencement of drilling and grouting holes.
Grout Production Records
The Contractor shall submit Grout Production Records from the Grouting Data Logger(s) on a daily basis.
The Contractor shall submit electronic records in Microstation and Excel Spreadsheet indicating the hole identification; type(s) and quantities of grout and grout components placed, date(s) and times of activities on a weekly basis.
Grout Hole Layout G, DG
The Contractor shall submit a layout in plan view illustrating the layout of grout hole lines of the grout curtain not less than 30 days prior to the commencement of drilling.
SD-03 Product Data
Drilling Equipment; G, DG
Grout Mixes ; G, DG
Details including, but not limited to all components, proportions, mixing procedures and sequence of additives, test results for sand gradation, grout viscosity/slump, density, set time, strength, bleed, shrinkage, and other testing as may be appropriate shall be submitted 7-days prior to commencement of use of the mixes.
Grouting Material; G, DG
SECTION 35 31 25 Page 6
The source of all grout components and a detailed list and manufacturers' descriptive literature of all components of grouts used in the work.
Grout Plant ; G, DG
Grouting Equipment G, DG
A detailed plan shall be submitted showing equipment floating plant and grout plant layout proposed for mixing and placing grout. A list, details, description and data on the grouting equipment and materials shall be submitted for conformance with the requirements of paragraph EQUIPMENT.
SD-06 Test Reports
System Calibration Reports
The Contractor shall provide calibration reports for calibration certificates for flow meters, pressure transducers, and any batch scales and/or admixture dispensing equipment, Grout Data Logger(s) and all related equipment not less than 7 days prior to the commencement using the equipment.
SD-06 Test Reports
Grout Property Tests
The Contractor shall provide laboratory testing results of grout materials properties not less than 7 days prior to the use of these materials. Field test data shall also be recorded on the daily QC reports and the daily grout reports.
SD-07 Certificates
Credentials ; G, DG
The Contractor shall submit the name and qualifications of the Grouting Superintendent(s) not less than 30 days prior to commencement of the Compatibility Test Program. Changes in personnel will require additional submittals for approval of these key personnel.
The Contractor or subcontractor performing the grouting shall have performed sodium silicate grouting on a scale comparable to this work on a minimum of 3 projects in the past 5 years, and shall have demonstrated proficiency with the materials and equipment to be used in this work. The Contractor shall submit the names and descriptions of previous projects indicating fulfillment of the experience requirement for this work with the Work Plan.
1.5 MATERIALS DELIVERY, STORAGE, AND HANDLING
1.5.1 Grout Materials
A sufficient quantity of cement, water and all other grout mix components shall be stored at or near the site of the work to insure that grouting
SECTION 35 31 25 Page 7 operations will not be delayed by shortage of grout materials or water.
In the event the cement is found to contain lumps or foreign matter of a nature and in amounts which, in the opinion of the COR, may be deleterious to the grouting operations, screening through a standard 100 mesh screen may be required. No payment will be made for such screening.
All materials are required to be adequately protected from inclement weather, including rain, snow and freezing conditions. Suitable enclosures to prevent the degradation of the various materials prior to use, will be required. Materials beyond the manufacturer's designated shelf life shall not be used in this work, and any such materials brought on site shall be disposed of at the Contractor's expense.
1.6 PROJECT/SITE CONDITIONS
1.6.1 Field Conditions
The program shown and described herein and in the Drawings is based on currently available information. Conditions encountered during construction may require additions or deletions. Grouting mixes, pressures, injection rate and the sequence in which the holes are drilled and grouted shall be submitted by the Contractor in accordance with the requirements indicated, but may be altered as field conditions dictate and approved by the COR.
1.6.2 Field Measurements
The Contractor shall produce a preliminary grout hole layout for the review and approval of the COR. The final drill hole locations will be as approved by the COR prior to the start of work. The locations of drill holes shall be surveyed by the Contractor to the nearest 0.1 ft on the NAD 83 coordinate system and elevations surveyed using the Chicago City Datum.
1.7 SEQUENCING AND SCHEDULING OF DRILLING AND GROUTING
1.7.1 General
The order in which the work is to be accomplished shall be as outlined in the Compatibility Test Program Work Plan and Drilling and Grouting Work Plans and as approved by the COR. The general requirements that shall apply are as follows:
a. Conduct an on-land Compatibility Test Program using the actual grouting equipment to develop the mix designs for the containment grout and low mobility grout. Base line rheologic and physical properties grout mixes shall be established.
b. Install the harbor side and lake side grout containment barriers for the first 100-feet to be grouted.
c. The Contractor shall verify the correct and approved location, orientation and alignment of the grout holes before drilling and installing any casings, should casings be deemed necessary. Casing may be used at the convenience of the Contractor, but no separate payment will be made for casing. Establish and layout sections of the grout curtain to be drilled and grouted in sequence and mark grout
SECTION 35 31 25 Page 8 holes and sections on the concrete breakwater cap accordingly with paint.
d. For each section of the grout curtain, drilling and grouting of the lakeward row (Row A) shall be completed before proceeding with drilling and grouting of the harborside holes (Row E) and the interior rows of the grout curtain. Monitor adjacent holes and the water lakeward and harborside of the breakwater during grouting for the presence of grout communicating. If grout appears beyond containment barrier, report this observation to the COR immediately, cease grouting and adjust grout flows, containment procedures, and/or mix to prevent recurrence before commencing grouting. Only after direction by the COR may the Contractor continue grouting a hole that has resulted in communication to the lake water. Grout each hole until:
1. Grout is detected in adjacent holes;
2. 8 cubic yards of grout has been injected, or;
3. The hole refuses to accept grout;
4. Directed by the COR to stop.
In the case of both the lakeward and harborside rows of grout holes, grouting shall be done using split-spacing on holes 8-feet apart, such that every other hole is grouted first, and then the intermediate holes are re-drilled (if necessary) and grouted, resulting in an array of holes on 4-foot spacing.
e. After both the lakeward and harborside rows of grout holes have been completely grouted, drill…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .