Drawings-ChicagoHarborBreakwater_FY17-Certified_Final_Plans.pdf
PDF 23 MB Posted
- Attached to
- CHICAGO HARBOR BREAKWATER REPAIR Federal contract opportunity
- Solicitation number
- W912P617B0010
About this file
THIS FILE CONTAINS THE PROJECT PLANS/DRAWINGS.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT-0002-17-B-0010-CHICAGO_HARBOR_BREAKWATER_REPAIR_PROJECT_-_IFB-PKG.pdf | ||
| AMENDMENT_0001-W912P6-17-B-0010-CHICAGO_HARBOR-BREAK_WATER-PKG.pdf | ||
| RTA_Package-17-B-0010-CHGO_HARBOR_BREAKWATER-IFB.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
SHEET INDEX
NN NN
LOCATION MAP VICINITY MAP
(N.T.S.) (N.T.S.)
PROJECT MANAGER
CHIEF, DESIGN BRANCH
DATE
DATEDATE
ALL DRAWINGS IN THIS SET.
INDICATE OFFICIAL RECOMMENDATION OF
REQUIRED BY ER 1110-1-8152. SIGNATURES
THE SCOPE OF THEIR EMPLOYMENT AS
ON THESE PROJECT DOCUMENTS WITHIN
TION DESIGNATIONS OF INDIVIDUALS APPEAR
INITIALS OR SIGNATURES AND REGISTRA-
CHICAGO DISTRICT CORPS OF ENGINEERS. THE
THIS PROJECT WAS DESIGNED BY THE
DRAWINGS CONTAINED IN THE SHEET INDEX.
RECOMMENDATION AND APPROVAL FOR ALL
SIGNATURE AFFIXED BELOW INDICATE OFFICIAL
REVIEWED BY:
APPROVED BY:
APPROVAL RECOMMENDED BY:
ATR TEAM LEADER
/S/
/S/ pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\COVER SHEET h6tecdb9 8/18/2017 MicroStation
A N
S I
D
G-001
F
IL
E N
A M
E
P R
O J E
C T C
O D
E
CHICAGO DISTRICT
CHICAGO, ILLINOIS
CHICAGO HARBOR
C H
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
IC
T
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
A
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
-G
-0 .d g n
R A
N A M
IS
H
R A P .E
PROJECT LOCATION
PROJECT LOCATION
W912P6-17-B-0010
W P -1
-B -0
S H
E E
T I
N D
E X
WAIVED
L O
C A
T
IO
N M
A P
V
IC
IN
IT
Y M
A P A
N D of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
BREAKWATER REPAIR REACH C - FY17
TIMBER CRIB DETAILS AND GROUT HOLE LOCATIONSC-1047.
BREAKWATER TYPICAL SECTIONC-1036.
BREAKWATER SITE PLAN RECORD OF GROUT PLACEMENT STA. 40+96 TO STA. 30+96 C-1025.
BREAKWATER WORK LIMITS STA. 40+96 TO STA. 30+96C-1014.
SURVEY CONTROLV-0013.
STAGING AND STORAGE AREA G-0022.
LOCATION MAP, VICINITY MAP AND SHEET INDEX,G-0011.
REFERENCENUMBER
TITLE SHEET SHEET
J O
H N G
R O
B O
S K I, P .E
CERTIFIED FINAL DOCUMENTS - RTA WP12PB-17-B-0010
18 AUG 2017
18 AUG 2017MIKE NGUYEN
18 AUG 2017JOSEPH J. SCHIMIDT, P.E.
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\STAGING AND STORAGE AREA h6tecdb9 8/18/2017 MicroStation
A N
S
G-002
P R
O J E
C T C
O D
E
F
IL
E N
A M
E
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
IC
T
W P -1
-B -0
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
A G
IN
G A
N D S
T O
R A
G E A
R
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
-G
-0 .d g n
AT ALL TIMES
EXISTING GATES
ALLOW ACCESS TO
BOX AT ALL TIMES
EXISTING STORAGE
ALLOW ACCESS TO
455'
CONCRETE TUNNEL
OF ANY KIND ON TOP OF
NO STAGING OR LOADING
STAGING AREA NOTES
LEGEND
ACCESS ROUTE
AREA FOR FLEETING VESSELS
AREA OFF LIMITS FOR FLEETING VESSELS
L A
K E S
H O
R E D
R
IV
E
NN
100'0 50'
LOT ACCESS ROAD
NEW PARKING
ILLINOIS STREET
WITH THE COR.
4. FLEETING OF CONSTRUCTION VESSELS SHALL BE COORDINATED
OPERATIONS AT THIS LOCATION.
3. STAGING AREA MAY BE MODIFIED BY COR TO ACCOMMODATE OTHER
PRIOR TO BEGINNING WORK.
2. ACCESS TO THIS AREA SHALL BE COORDINATED WITH THE COR
1. TRAILER/STAGING AREA MAY BE USED FOR VEHICLE PARKING.
ACCESS GATE AROUND STORAGE AREA
PROVIDE 6' CHAIN LINK FENCE WITH
200' x 50' STAGING & STORAGE AREA
N A M
IS
H
R A P .E
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
CONTROL POINT
LEGEND
LOCK PARKING LOT
CHICAGO HARBOR
CONTROL HOUSE
CHICAGO LOCK
pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SURVEY CONTROL h6tecdb9 8/18/2017 MicroStation
A N
S
V-001
IL
E N
A M
E
P R
O J E
C T C
O D
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
IC
T
W P -1
-B -0
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
-V -0
.d g n
R A
N A M
IS
H
R A P .E
NAVD88
BRASS DISK
BRASS DISK
BRASS DISK
HORIZONTAL & VERTICAL CONTROL POINTS
POINT
NORTHING (Y) EASTING (X)
DESCRIPTION
ELEV.
GENERAL NOTES
N PIER 587.9381,903,088.52 1,181,339.77
NN
TO NGS PIDS M33251, ME1961, AND AJ2806.
4. ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE REFERENCED
VERTICAL DATUM OF 1988 (NAVD88) U.S. FEET.
3. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH AMERICAN
OF 1983 (NAD83) U.S. FEET.
PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM
2. ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE
TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE BID.
NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT THE
DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL
TIME. EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND
CHICAGO DISTRICT AND REPRESENTS CONDITIONS EXISTING AT THAT
APRIL 2013 SURVEY PERFORMED BY US ARMY CORPS OF ENGINEERS,
1. THE CONTROL POINTS SHOWN ON THIS SHEET ARE FROM AN
L A
K E S
H O
R E D
R
IV
E
ILLINOIS STREET
GRAND AVENUE
NAVY PIER
N PIER
CHI-HRBR-1
CHI-HRBR-2
1,905,845.18 1,185,570.61
1,905,309.87 1,186,478.43
GATE
WEST SECTOR
GATE
EAST SECTOR
CHI-HRBR-1
CHI-HRBR-2
300 0 300 600
SCALE IN FEET
SECTION
REPAIR
BREAKWATER
584.274
584.303
6.234 LWD 6.264 LWD
S U
R V
E Y C
O N
T R
O L
IL EAST NAD83 STATE PLANE COORDINATES
550 550
560 560 560 560 560
562 562
564 5
570570570570
570570
580580580580580
580580
580 580 580
580 580 580 580 580 580
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
EL. 562
HARBOR SIDE
PLACED (CY) (FT) (INCHES)
NOTES GROUTGROUT MIXBORE HOLE BORE HOLE NORTHING EASTING ROWHOLE #
DATE QUANTITY OF DEPTH OFDIAMETER OFCOORDINATES GROUT BORING
PLACED (CY) (FT) (INCHES)
NOTES GROUTGROUT MIXBORE HOLE BORE HOLE NORTHING EASTING ROWHOLE #
DATE QUANTITY OF DEPTH OFDIAMETER OFCOORDINATES GROUT BORING
pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\BREAKWATER SITE PLAN h6tecdb9 8/18/2017 MicroStation
A N
S
C-102
O J E
C T C
O D
E
F
IL
E N
A M
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
-C -1
.d g n
R A
N A M
IS
H
R A P .E
N 1905954.75
E 1185374.28E 1184442.90
N 1906506.24
WORK LIMITS
N
100' 200'0
SCALE: 1''= 100'-0"
W P -1
-B -0
B R
E A
K W
A T
E R S
IT
E P
L A
N
R E
C O
R D O
F G
R O
U T P
L A
C E
M E
N T
S T
A T
O S
T A
A
E N
D P
R O J E
A
S T
A R
T P
R O J E
C T
HARBOR SIDE
LAKE SIDE
ADDITIONAL ROWS AS NEEDED.
CONTRACTOR SHALL COMPLETE TABLE WITH THE REQUESTED INFORMATION AND INCLUDE IN THE AS-BUILT SUBMITTAL. ADD
L.W.D. 576.8
EL. 583.4
EL. 579.6
LAKE SIDE
A
A
AT STA. 34+00
TYPICAL SECTION A-A
MEASURES AS MAY BE REQUIRED TO RESOLVE THE DISCREPANCY.
CONTRACTING OFFICER REPRESENTATIVE SHALL DETERMINE
DISCREPANCIES THAT WILL INTERFERE WITH THE WORK. THE
CONTRACTING OFFICER'S REPRESENTATIVE ANY SIGNIFICANT
THE FIELD. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE
APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR IN
STRUCTURES, UTILITIES, AND OTHER SITE FEATURES ARE
5. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING
INDICATING THE CONDITIONS EXISTING AT THAT TIME.
DURING NOVEMBER 2002, AND CAN ONLY BE CONSIDERED AS
SURVEY PERFORMED BY PINNACLE MAPPING TECHNOLOGIES, INC.
DURING SEPTEMBER AND OCTOBER 2002, AND AN AERIAL MAPPING
TOPOGRAPHIC SURVEY CONDUCTED BY PATRICK ENGINEERING INC.
SURVEYS, INC. DURING SEPTEMBER AND OCTOBER 2002, A
RESULTS OF A HYDROGRAPHIC SURVEY PERFORMED BY OCEAN
4. THE INFORMATION PRESENTED ON THIS MAP REPRESENTS THE
BY PINNACLE MAPPING TECHNOLOGIES, INC.
ENGINEERING INC. AND AN AERIAL MAPPING SURVEY PERFORMED
ARE FROM A TOPOGRAPHIC SURVEY CONDUCTED BY PATRICK
OCEAN SURVEYS, INC. DATA ABOVE APPROXIMATELY +1 FEET LWD
-1 FEET LWD ARE FROM A HYDROGRAPHIC SURVEY CONDUCTED BY
3. SURVEY DATA SHOWN FROM THE LAKE FLOOR TO APPROXIMATELY
GREAT LAKES DATUM, IGLD 1985.
THE REFERENCE PLANE AT RIMOUSKIY, QUEBEC, INTERNATIONAL
ELEVATION OF 577.5 + 0.34 HYDRAULIC CORRECTOR FEET ABOVE
WATER DATUM (LWD) FOR LAKE MICHIGAN WHICH HAS AN
2. ALL ELEVATIONS ARE IN FEET AND ARE REFERENCED TO LOW
COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM 1983.
1. GRID SYSTEM IS IN FEET AND IS THE ILLINOIS STATE PLANE
GENERAL NOTES:
ACTUAL CONDITIONS MAY VARY.
IDEALIZED SECTION SHOWN FROM AS-BUILTS,
1. ELEVATIONS PROVIDED ARE APPROXIMATE.
NOTE:
EL. 552
GROUT PLACEMENT LOG GROUT PLACEMENT LOG
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1,184,478.091,906,485.84 END OF OPTION 230+96AP04
1,184,696.421,906,363.89END OF OPTION 133+46AP03
1,184,912.571,906,238.22END PROJECT (BASE)35+96AP02
1,185,338.901,905,976.92START OF PROJECT40+96AP01
EASTING NORTHINGDESCRIPTIONSTA.POINT #
1,184,240.881,906,487.73 WP04
1,185,303.251,905,838.51 WP03
1,185,396.581,905,991.24 WP02
1,184,334.211,906,640.46 WP01
EASTING NORTHINGPOINT #
A
S T
A R
T P
R O J E
C T
BREAKWATER REPAIR.
1. SEE SHEET C-102 FOR THE SITE PLAN FOR THE
NOTE:
EXTENSION
SOUTHERLY
546'
E
102'
E-1
616'
D
4159'
C pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\BREAKWATER WORKLIMITS h6tecdb9 8/18/2017 MicroStation
A N
S
C-101
O J E
C T C
O D
E
F
IL
E N
A M
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
-C -1
.d g n
R A
N A M
IS
H
R A P .E
N
SCALE: 1''= 300'-0"
TYPICAL CROSS SECTION)
(SEE SHEET C-103 FOR
BREAKWATER STRUCTURE
WORK LIMITS
W P -1
-B -0
S T
A T
O S
T A
B R
E A
K W
A T
E R W
O R
K L
IM
IT
S
WL03
WL02
WL01
WL04
AP01
AP03
AP04
HARBOR SIDE
LAKE SIDE
AP02
ARM EXTENSION
NORTH SHORE
600'0 300'
OWNED BY THE CITY
END OF BREAKWATER
A
E N
D P
R O J E
ALIGNMENT POINTS
96'
WORK LIMITS
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
10' 7"
6'0"
SCALE: 1''= 2'-0"
0 2'2' 1'
10"X12" CROSS TIE
0.0 L.W.D.
LAKE MICHIGAN ELEV. 578.5
LOW WATER DATUM FOR
TO REMAIN
EXISTING TOE STONE
ROW A
GROUT
ROW B
GROUT ROW D
GROUT
ROW E
GROUT
ROW C
GROUT
FOR DETAILS. (SEC 35 31 25)
SEE SPECIFICATIONS
CONTAINMENT BLANKET.
OUTWARD CRUSHED STONE
BOTTOM OF PLATE
LEAKAGE.
THESE DAMAGED AREAS TO PREVENT GROUT
FOUND TO BE DAMAGED, BARRIER SHALL COVER
BEGINNING WORK. WHERE THE STEEL PLATE IS
WORKPLAN FOR APPROVAL PRIOR TO
BARRIER TYPE AND ANCHORING SYSTEM IN HIS
TIMBER AREAS. CONTRACTOR SHALL PROVIDE
ENTIRE LENGTH TO CONTAIN GROUT IN FAILED
PROVIDE GROUT CONTAINMENT BARRIER ALONG
6"X12" KEY
CONCRETE FOOT BLOCK
3/4" RD. BARS 25'-6" AND 15'-6" LONG
CONCRETE FOOT BLOCK
CONCRETE CAP BLOCK
2•"X18"
MOORING POST
EXISTING
EXISTING LONGITUDINAL TIMBER
EXISTING 6"x6" WELL
LARGE STONE FILL
RANDOM EXISTING
LAKE SIDE HARBOR SIDE
TYPICAL CROSS SECTION OF STRUCTURE
APPROX. -10 TO -15
LAKE BOTTOM
3' 0"4' 3"9' 6"4' 3"6' 0"
18' 0"
30' 0"
2' 4"2' 5"2' 4"2' 0"
10' 2 3/8 "9' 7 3/8 "10' 2 3/8 "
3' 9 1/2 " 3' 9 1/2 " 1' 6"
10' 7"
2' 4" 2' 4" 2' 4" 2' 0"
(DETERIORATED IN SOME AREAS)
PLATE ¾"X2'-6" (EXISTING)
AND 15'-6" LONG
¾" RD. BARS 25'-6"
PLATE ¾"X2'-6" (EXISTING)
(BASED ON RECORD DRAWINGS FOR REACH C)
PATTERN
FOR GROUT HOLE
SEE SHEET C-104
STRUCTURE OR DRILL THROUGH IT.
EITHER LOCATE THE EXISTING REBAR WITHIN THE
UNKNOWN AND ARE INCONSISTENT. CONTRACTOR SHALL
IN THE CONCRETE FOOT BLOCK AND CAP BLOCK ARE
7. LOCATIONS AND QUANTITIES OF EXISTING REBAR
SOME STONE.
SIDE OF THE CRIB IS ASSUMED TO BE SAND WITH
6. LAKE BOTTOM MATERIAL ADJACENT TO THE HARBOR
THE CRIBS MAY CONTAIN LARGE VOID SPACES.
5. THE EXISTING CONDTION OF THE STONE WITHIN THE
CAP BLOCK AND/OR FOOT BLOCK. (APPROX. 4')
SUFFICIENTLY PENETRATES THE EXISTING CONCRETE
4. GROUT HOLES SHALL BE DRILLED TO A DEPTH THAT
BE REMOVED AFTER ALL GROUTING IS COMPLETE.
3. BARRIER USED ALONG SHORE SIDE OF STRUCTURE SHALL
PLACE AFTER CONSTRUCTION IS COMPLETE.
FOR THE CONTAINMENT BARRIERSHALL REMAIN IN
2. STONE PLACED ALONG LAKE SIDE OF STRUCTURE
CAPS WERE CONSTRUCTED IN THE 1930'S.
CONSTRUCTED IN THE 1880'S - 1890'S. CONCRETE
1. TIMBER CRIB STRUCTURE IS ASSUMED TO HAVE BEEN
NOTE:
pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\STRUCTURE BREAKWATER TYPICAL SECTION h6tecdb9 8/18/2017 MicroStation
A N
S
C-103
O J E
C T C
O D
E
F
IL
E N
A M
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
A U
G
R U
C T
U
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
-C -1
.d g n
R A
N A M
IS
H
R A P .E
B R
E A
K W
A T
E R T
Y P
IC
A L S
E C
T
IO
N
W P -1
-B -0
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
17'-0"
4'-0"4'-0" 4'-0"
4'-0"
/4
4'-0"
34'-0"
SCALE: 1''= 4'-0"
0 4'4' 2'
(BASED ON RECORD DRAWINGS)
(BASED ON RECORD DRAWINGS)
ROW A
GROUT
ROW B
GROUT
ROW C
GROUT
ROW D
GROUT
ROW E
GROUT
(TYP)
6"X6" WELL
EXISTING
PLATE 3/4"X2'-6"
6"X6" WELL
TIMBER STRUCTURE
EXISTING
CONCRETE CAP
SLOPED PORTION OF
FOOT BLOCK
EXISTING
FOOT BLOCK
EXISTING
CAP BLOCK
EXISTING
MOORING POST
EXISTING
WITH RANDOM STONE BACKFILL
EACH "CELL" IS FILLED
PLATE 3/4"X2'-6"
(SODIUM SILICATE MIX)
GROUT LINE
OUTER SEALING-TYPE
(SODIUM SILICATE MIX)
GROUT LINE
OUTER SEALING-TYPE
(TYP)
GROUT HOLE LOCATION
PROPOSED
GROUT MIX (ROW B,C,D)
INTERIOR
34'-0"
17'-0"
8'-0"8'-0" 8'-0" 8'-0"
/4
/4
/4
~34'-0"
THROUGH IT.
FOOT BLOCKS. THE CONTRACTOR SHALL EITHER LOCATE THIS REINFORCEMENT OR DRILL
REINFORCEMENT GRID OF APPROXIMATELY 1-INCH SQUARE BARS IN BOTH THE CAP AND
10. CONTRACTOR SHALL BE AWARE THAT THERE IS AN EXISTING IRREGULARLY SPACED
RECOMMENDED.
9. BASED ON OBSERVED PREVIOUS ICE LOADING, A MAXIMUM LOADING OF 250 PSF IS
SHALL BE REPAIRED BY THE CONTRACTOR.
DAMAGE TO THE EXISTING STRUCTURE RESULTING FROM CONSTRUCTION PROCEDURES
CONTRACTOR SHALL MONITOR THE EXISTING STRUCTURE AND BRACE ACCORDINGLY. ANY
BREAKWATER STRUCTURE FROM DAMAGE DUE TO CONSTRUCTION PROCEDURES.
8. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE PROTECTION OF THE
UNATTENDED.
BE LEFT ON THE BREAKWATER STRUCTURE OR ON ANY CONSTRUCTION VESSEL
7. NO GROUT MATERIALS, FUEL, OR POTENTIAL CONTAMINATES OF THE LAKEWATER SHALL
AND SUPPLIES.
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE PROTECTION OF ALL EQUIPMENT
6. CONTRACTOR WILL BE ALLOWED TO MOOR EQUIPMENT AT THE BREAKWATER.
BLOCK AND/OR FOOT BLOCK TO PERMIT GROUTING THE STONE CRIB BACKFILL.
5. GROUT HOLES SHALL BE DRILLED TO A DEPTH THAT PENETRATES THE CONCRETE CAP
4. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION DEBRIS TO ENTER LAKE WATERS.
WATERS, CONTRACTOR SHALL IMMEDIATELY CEASE PUMPING WITHIN THAT HOLE.
PREVENTING GROUT FROM ESCAPING INTO LAKE. IF GROUT IS OBSERVED WITHIN LAKE
3. CONTRACTOR SHALL STRICTLY ADHERE TO SPECIFICATIONS WITH REGARD TO
MAINTAIN ALIGNMENT WITHIN EACH "CELL" IN THE TIMBER STRUCTURE.
2. CONTRACTOR SHALL VERIFY LOCATION OF TIMBER STRUCTURE SO THAT GROUT HOLES
LONG. PER THE SPECIFICATION, ONE REPAIR SECTION IS 100'.
1. ONE EXISTING CRIB SECTION OF BREAKWATER (AS SHOWN) IS APPROXIMATELY 24-34 FEET
NOTES:
TOP VIEW OF EXISTING CONCRETE CAP
PROPOSED GROUT HOLE LOCATIONS
TOP VIEW OF EXISTING TIMBER CRIB
X
X
HARBOR SIDE
LAKE SIDE
(TYP -APPROX 4' DEPTH)
GROUT HOLE LOCATION
PROPOSED
OF CONCRETE CAP
SLOPED PORTION
DO NOT DRILL THROUGH TIMBER MEMBERS
DO NOT DRILL THROUGH TIMBER MEMBERS
pw:\\COE-LRCPWP02CHI.lrc.ds.usace.army.mil:coe-lrcpwp02chi.lrc.ds.usace.army.mil\Documents\Projects\Chicago Harbor Breakwater\Chicago Harbor Breakwater Repair FY17 - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\TIMBER CRIBS DETAILS AND GROUT HOLE h6tecdb9 8/18/2017 MicroStation
A N
S
C-104
O J E
C T C
O D
E
F
IL
E N
A M
IC
A G
O H
A R
B O
R
B R
E A
K W
A T
E R R
E P
A
IR
F
Y
C H
IC
A G
O
IL
L
IN
O
IS
C H
IC
A G
O D
IS
T R
S
O U
T H L
A S
A L L E S
T R
E E
T S
U
IT
E
C H
IC
A G
O
IL
-C -1
.d g n
T
IM
B E
R C
R
IB
S D
E T
A
IL
S A
N D
G R
O U
T H
O L E L
O C
A T
IO
N S
W P -1
-B -0
R A
N A M
IS
H
R A P .E
A U
G
C A
R S
T E
N W
E S
T E
R N
D
B A
N K
H E
A D
J O
H N G
R O
B O
S K I, P .E
File details come from the government source that posted it. Updated .