River Riparian Connectivity and Habitat Section 506 RIVERRIPARIAN
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LOT or JOB PAYMENT ITEMS
1.2.1 Mobilization (Bid Item 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, & 0006AA)
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Demobilization (Bid Item 0001AB, 0002AB, 0003AB, 0004AB, 0005AB
&, 0006AB)
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Temporary Construction Facilities (Bid Item 0001AC)
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.4 Maintenance Of Traffic (Bid Item 0001AD, 0002AC, 0003AC, 0004AC, 0005AC, & 0006AC )
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 Demolition and Removal (Bid Item 0001AE, 0002AD, 0004AD, 0005AD
& 0006AD )
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.2.6 Clearing and Grubbing (Bid Item 0002AE, 0004AE, 0005AE, &
0006AE )
1.2.6.1 Payment
1.2.6.2 Unit of Measure
1.2.7 Earthwork (Bid Items 0001AF, 0002AF, 0004AF, 0005AF, & 0006AF)
1.2.7.1 Payment
1.2.7.2 Unit of Measure
1.2.8 Debris Removal (Bid Item 0003AF)
1.2.8.1 Payment
1.2.8.2 Unit of Measure
1.2.9 Ornamental Gate and Fence (Bid Items 0001AQ & 0004BA)
1.2.9.1 Payment
1.2.9.2 Unit of Measure
1.2.10 1.1.13 Site Preparation, Invasive Species Control, and
Establishment Activities (Bid Items 0002BA, 0003AP, 0004BB, 0005AV, & 0006BA)
1.2.10.1 1.1.13.1 Payment
1.2.10.2 1.1.13.2 Unit of Measure
1.2.11 Flagstone Observation and Access (Bid Itemm 0002AZ)
1.2.11.1 Payment
1.2.11.2 Unit of Measure
1.2.12 Adaptive Management (Bid Items 0007)
1.2.12.1 Payment
SECTION 01 22 00.00 10 Page 1
AMD0002
1.2.12.2 Unit of Measure
1.2.13 Debris Removal (Bid Item 0003AF)
1.2.13.1 Payment
1.2.13.2 Unit of Measure
1.2.14 Performance & Payment Bond (Bid Item 0001AT, 0002BB, 0003AQ, 0004BC, 0005AW, & 0006BB)
1.2.14.1 Payment
1.2.14.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Soil Placement at Big Marsh (Bid Items 0001AG, 0002AG, 0004AG, 0005AG, & 0006AG)
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.2 Excess Material Disposal Offsite (Bid Items 0005AH)
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.3 Channel Sediment Seeding (Bid Item 0001AH)
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 Channel Improvement - Sand and Pea Gravel Mix (Bid Item 0001AJ)
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measure
1.3.5 Channel Improvement - Cobble (Bid Item 0001AK)
1.3.5.1 Payment
1.3.5.2 Measurement
1.3.5.3 Unit of Measure
1.3.6 Channel Improvement - IDOT RR-3 (Bid Item 0001AL)
1.3.6.1 Payment
1.3.6.2 Measurement
1.3.6.3 Unit of Measure
1.3.7 Channel Improvement - IDOT CA-6 (Bid Item 0001AM)
1.3.7.1 Payment
1.3.7.2 Measurement
1.3.7.3 Unit of Measure
1.3.8 Natural Fiber Logs (Bid Item 0001AN)
1.3.8.1 Payment
1.3.8.2 Measurement
1.3.8.3 Unit of Measure
1.3.9 Playground Asphalt Path and Asphalt Trail Replacement (Bid Item
0001AP & 0006AN)
1.3.9.1 Payment
1.3.9.2 Measurement
1.3.9.3 Unit of Measure
1.3.10 Steel Sheet Piling PZ-22 (Bid Item 0001AR)
1.3.10.1 Payment
1.3.10.2 Measurement
1.3.10.3 Unit of Measure
1.3.11 Woody Bank Habitat (Bid Item 0002AJ, 0002AK, 0002AL, 0006AJ, 0006AK, & 0006AL)
1.3.11.1 Payment
1.3.11.2 Measurement
1.3.11.3 Unit of Measure
1.3.12 Water Willow Cobble Bar (Bid Item 0002AM, 0004AL, & 0006AG)
1.3.12.1 Payment
1.3.12.2 Measurement
SECTION 01 22 00.00 10 Page 2
1.3.12.3 Unit of Measure
1.3.13 2FT Mulch Trail (Bid Item 0002AH, 0003AE, 0004AM, 0005AJ, &
0006AM)
1.3.13.1 Payment
1.3.13.2 Measurement
1.3.13.3 Unit of Measure
1.3.14 Prescribed Burn (Bid Items 0002AN, 0003AD, 0004AN, 0005AK, &
0006AP)
1.3.14.1 Payment
1.3.14.2 Measurement
1.3.14.3 Unit of Measure
1.3.15 Seeds (Bid Items , 0002AP, 0002AQ, , 0003AG, 0003AH, 0004AP, 0004AQ, , 0005AL, 0005AM, 0006AQ, & 0006AR, )
1.3.15.1 Payment
1.3.15.2 Measurement
1.3.15.3 Unit of Measure
1.3.16 Seeds for Big Marsh (Bid Item 0001AS, 0002AR, 0004AR, 0005AN, & 0006AS)
1.3.16.1 Payment
1.3.16.2 Measurement
1.3.16.3 Unit of Measure
1.3.17 Plugs (Bid Items 0002AS, 0002AT, 0002AU, 0002AV 0003AJ, 0003AK, 0004AS, 0004AT, 0004AU, 0004AV, 0005AP, 0005AQ, 0005AR, 0006AT, 0006AU, 0006AV, & 0006AW)
1.3.17.1 Payment
1.3.17.2 Measurement
1.3.17.3 Unit of Measure
1.3.18 1.5" Caliper Trees (Bid Items 0002AW, 0003AL, 0004AW, 0005AS &
0006AX)
1.3.18.1 Payment
1.3.18.2 Measurement
1.3.18.3 Unit of Measure
1.3.19 5 Gallon Shrubs/Trees (Bid Items 0002AX, 0003AM, 0004AX, 0005AT & 0006AY)
1.3.19.1 Payment
1.3.19.2 Measurement
1.3.19.3 Unit of Measure
1.3.20 Landscape Fence (Bid Items 0002AY, 0003AN, 0004AY, 0005AU &
0006AZ)
1.3.20.1 Payment
1.3.20.2 Measurement
1.3.20.3 Unit of Measure
1.3.21 Flagstone Retaining Walls (Bid Items 0004AH)
1.3.21.1 Payment
1.3.21.2 Measurement
1.3.21.3 Unit of Measure
1.3.22 IDOT CA-7 Stones (Bid Items 0004AJ & 0004AK)
1.3.22.1 Payment
1.3.22.2 Measurement
1.3.22.3 Unit of Measure
1.3.23 Permanent Chainlink Fence (Bid Item 0004AY)
1.3.23.1 Payment
1.3.23.2 Measurement
1.3.23.3 Unit of Measure
1.3.24 Vernal Pool Erosion Protection (Bid Item 0008AA & 0008AB)
1.3.24.1 Payment
1.3.24.2 Measurement
1.3.24.3 Unit of Measure
SECTION 01 22 00.00 10 Page 3
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 4
SECTION 01 22 00
MEASUREMENT AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data Weight Certificates; G,CN
1.2 LOT or JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract cost and job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular cost, job, or unit price payment item, shall be included in the listed item most closely associated with the work involved. The price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 Mobilization (Bid Item 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, &
0006AA)
1.2.1.1 Payment
Payment will be made at the applicable lump sum price for mobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with mobilization. Costs associated with daily mobilization will not be included in this cost. Daily mobilization will be included in the unit prices of materials being provided.
1.2.1.2 Unit of Measure
Unit of measure: Job
SECTION 01 22 00.00 10 Page 5
1.2.2 Demobilization (Bid Item 0001AB, 0002AB, 0003AB, 0004AB, 0005AB &, 0006AB)
1.2.2.1 Payment
Payment will be made at the applicable lump sum price for demobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with demobilization. Costs associated with daily demobilization will not be included in this cost. Daily demobilization will be included in the unit prices of materials being removed
1.2.2.2 Unit of Measure
Unit of measure: Job
1.2.3 Temporary Construction Facilities (Bid Item 0001AC)
1.2.3.1 Payment
Payment will be made at the contract lump sum price for all labor, equipment and materials for the contractor's temporary field office, temporary fencing and gates, restoration, project and safety signs, and other incidental items as described in SECTION 01 52 02, TEMPORARY CONSTRUCTION FACILITIES, and SECTION 01 58 00, PROJECT SIGN AND SAFETY SIGN.
1.2.3.2 Unit of Measure
TUnit of measure: Job
1.2.4 Maintenance Of Traffic (Bid Item 0001AD, 0002AC, 0003AC, 0004AC, 0005AC, & 0006AC )
1.2.4.1 Payment
Payment will be made at the contract lump sum price for the maintenance of traffic including traffic control equipment and signs, flaggers, placement of traffic detour paths and all associated costs as described in SECTION 01 52 02 TEMPORARY CONSTRUCTION FACILITIES and as shown on the drawings.
Payment constitutes full compensation for all plant, labor, equipment, materials, and incidentals necessary to complete the work.
1.2.4.2 Unit of Measure
Unit of measure: Job.
1.2.5 Demolition and Removal (Bid Item 0001AE, 0002AD, 0004AD, 0005AD &
0006AD )
1.2.5.1 Payment
Payment will be made at the contract lump sum price for the demolition and removal of the concrete dam, concrete liner and slab, fence (including post
SECTION 01 22 00.00 10 Page 6 foundations), asphalt paths, concrete structures, and other items shown for demolition and removal in the contract drawings and as described in SECTION 02 41 00 DEMOLITION. The installation of cofferdams, erosion and sediment controls, and existing structure protections, will be incidental under this bid item. Handling and placement of concrete pieces removed from the channel into the scour hole downstream of the dam will also be incidental to this bid item. Excess concrete that cannot be used to fill the scour hole must be disposed offsite. It is estimated that approximately 30CY of concrete material can be used to fill the scour hole. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.5.2 Unit of Measure
Unit of measure: Job.
1.2.6 Clearing and Grubbing (Bid Item 0002AE, 0004AE, 0005AE, & 0006AE )
1.2.6.1 Payment
Payment will be made at the contract lump sum price for clearing and grubbing the grading boundaries and up to the river including handling, transporting, on-site stockpiling, and disposal, in accordance to Section 31 11 00 CLEARING AND GRUBBING. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work. The refilling of holes resulting from clearing and grubbing operations will not be measured for payment but will be considered as a incidental under the above item.
1.2.6.2 Unit of Measure
Unit of measure: Job
1.2.7 Earthwork (Bid Items 0001AF, 0002AF, 0004AF, 0005AF, & 0006AF)
1.2.7.1 Payment
Full compensation for all labor, equipment and materials for stripping topsoil, excavating, stockpiling, and placing soil material to the lines and grades shown on the drawings must be included at the contract lump sum price for this bid item of the Bidding Schedule. All work shall be in accordance with the drawings and Section 31 00 00, EARTHWORK. The hauling of excess material to the Big Marsh soil placement site or at a disposal location will be paid under the "Soil Placement at Big Marsh" and "Excess Material Disposal Offsite" respective Bid Items. Placement of erosion control measures will be incidental to this bid item.
1.2.7.2 Unit of Measure
Unit of measure: Job
1.2.8 Debris Removal (Bid Item 0003AF)
1.2.8.1 Payment
Payment will be made at the contract lump sum price for the removal and disposal of concrete debris located at the east bank of Ronan Park at the
SECTION 01 22 00.00 10 Page 7 approximate location shown on the contract drawings and as described in Section 02 41 00, DEMOLITION. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.8.2 Unit of Measure
Unit of measure: Job
1.2.9 Ornamental Gate and Fence (Bid Items 0001AQ & 0004BA)
1.2.9.1 Payment
Payment will be made for all costs associated with installing a prefabricated ornamental gate and fence at the locations shown on the drawings and in accordance to the drawings and Section 32 31 19 PREFABRICATED ORNAMENTAL METAL FENCES AND GATES. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.9.2 Unit of Measure
Unit of measure: Job
1.2.10 1.1.13 Site Preparation, Invasive Species Control, and Establishment Activities (Bid Items 0002BA, 0003AP, 0004BB, 0005AV, & 0006BA)
1.2.10.1 1.1.13.1 Payment
Payment will be made for all costs associated with site preparation, invasive species control, establishment of seeded and planted areas including herbiciding, mowing, inspections, watering, any necessary predator control, and other activities as described in Sections 31 31 19.13 CHEMICAL VEGETATION CONTROL, 32 01 90.56 ESTABLISHMENT ACTIVITIES, and
32 93 00 PLANTS.
Payments will be made yearly and based on the performance criteria described in the above sections; however, monthly progress payments will be allowed with prior approval by the COR and after a monthly Invasive Species Control Report has been approved as described in Section 32 01 90.56 ESTABLISHMENT ACTIVITIES. Equal yearly payments will be made of the lump sum price for the years of establishment, 5 years or less. If the Contractor fails to establish the performance criteria in any year, none of the payment percentage will be paid to the contractor. The balance withheld from the previous year will then be paid the following year, if the performance criteria is met.
1.2.10.2 1.1.13.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.00 10 Page 8
1.2.11 Flagstone Observation and Access (Bid Itemm 0002AZ)
1.2.11.1 Payment
Payment will be made for all costs associated with the placement of flagstones for the two observation areas and access steps at the locations shown on the drawings. Cost associated with the placement of the IDOT CA-6 base layer will be incidential to this bid item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.11.2 Unit of Measure
Unit of measure: Job.
1.2.12 Adaptive Management (Bid Items 0007)
1.2.12.1 Payment
Payment will be made for all costs associated with remedial actions to address significant deficiences of the instream habitat features as described in Section 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. This bid item is a cost-reimbursable item. The Contractor will be paid for the actual costs incurred and not to exceed the bid price of $25,000.
1.2.12.2 Unit of Measure
Unit of measure: Job.
1.2.13 Debris Removal (Bid Item 0003AF)
1.2.13.1 Payment
Full compensation for all labor, equipment and materials will be made for the removal and disposal of concrete debris located on the east bank of Ronan Park at the contract lump sum price for this bid item of the Bidding Schedule.
1.2.13.2 Unit of Measure
Unit of measure: Lot.
1.2.14 Performance & Payment Bond (Bid Item 0001AT, 0002BB, 0003AQ, 0004BC, 0005AW, & 0006BB)
1.2.14.1 Payment
Payment will be made at the contract lump sum price for the performance and payment bond that is required as part of this contract. All costs associated with this item shall be included in the lump sum contract price.
1.2.14.2 Unit of Measure
Unit of measure: Lot.
SECTION 01 22 00.00 10 Page 9
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3.1 Soil Placement at Big Marsh (Bid Items 0001AG, 0002AG, 0004AG, 0005AG, & 0006AG)
1.3.1.1 Payment
Full compensation for all labor, equipment and materials for the hauling and placement of excess soil material at the Big Marsh soil placement site shall be included at the contract unit price for this bid item of the Bidding Schedule. All work must be in accordance with the drawings and Section 31 00 00, EARTHWORK. All incidentals necessary to complete the work, including placement of geotextiles and erosion control blankets, will be incidentals to this bid item.
1.3.1.2 Measurement
Measurement will be made per cubic yard of material placed at Big Marsh.
The means of measurement must be approved by the COR.
1.3.1.3 Unit of Measure
Unit of measure: Cubic Yard (CY)
1.3.2 Excess Material Disposal Offsite (Bid Items 0005AH)
1.3.2.1 Payment
Full compensation for all labor, equipment and materials for the hauling and placement of excess soil material at a disposal site shall be included at the contract lump sum price for this bid item of the Bidding Schedule.
All work must be in accordance with the drawings and Section 31 00 00, EARTHWORK and Section 01 57 20.01 03, ENVIRONMENTAL PROTECTION FOR ILLINOIS.
1.3.2.2 Measurement
Measurement will be made per cubic yard of material placed at the disposal site. The means of measurement must be approved by the COR.
1.3.2.3 Unit of Measure
Unit of measure: Cubic Yard (CY)
1.3.3 Channel Sediment Seeding (Bid Item 0001AH)
1.3.3.1 Payment
Payment will be made at the contract unit price for sand and pea gravel mix placed in the North Branch Chicago River for channel sediment seeding and
SECTION 01 22 00.00 10 Page 10 as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Note that the quantity provided in the bid schedule covers the total material needed for the four years of placement.
1.3.3.2 Measurement
Sand and pea gravel mix for channel sediment seeding will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.3.3 Unit of Measure
Unit of measure: Ton
1.3.4 Channel Improvement - Sand and Pea Gravel Mix (Bid Item 0001AJ)
1.3.4.1 Payment
Payment will be made at the contract unit price for sand and pea gravel mix placed in the North Branch Chicago River within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.4.2 Measurement
Sand and pea gravel mix will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.4.3 Unit of Measure
Unit of measure: Ton
1.3.5 Channel Improvement - Cobble (Bid Item 0001AK)
1.3.5.1 Payment
Payment will be made at the contract unit price for cobble stones placed in the North Branch Chicago River for the stone placement, J-hooks, and riffle construction as described on the drawings and SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.5.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.5.3 Unit of Measure
Unit of measure: Ton
SECTION 01 22 00.00 10 Page 11
1.3.6 Channel Improvement - IDOT RR-3 (Bid Item 0001AL)
1.3.6.1 Payment
Payment will be made at the contract unit price for IDOT RR-3 stones placed in the North Branch Chicago River within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.6.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.6.3 Unit of Measure
Unit of measure: Ton
1.3.7 Channel Improvement - IDOT CA-6 (Bid Item 0001AM)
1.3.7.1 Payment
Payment will be made at the contract unit price for IDOT CA-6 stones placed in the North Branch Chicago River within the limits, lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.7.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.7.3 Unit of Measure
Unit of measure: Ton
1.3.8 Natural Fiber Logs (Bid Item 0001AN)
1.3.8.1 Payment
Payment will be made at the contract unit price for the installation of natural fiber logs along the river banks to protect the silt bars in the restoration area. Payment shall include full compensation for all plant, labor, materials, and incidentals necessary to complete the work as described in the drawings and SECTION 02 41 00 DEMOLITION.
1.3.8.2 Measurement
Natural Fiber Logs shall be measured per the linear foot installed and accepted.
1.3.8.3 Unit of Measure
Unit of Measure: Linear Foot (FT)
SECTION 01 22 00.00 10 Page 12
1.3.9 Playground Asphalt Path and Asphalt Trail Replacement (Bid Item
0001AP & 0006AN)
1.3.9.1 Payment
Payment will be made at the contract unit price for the placement of the asphalt trail for the playground access and asphalt trail replacement as describe in the drawings and Section 32 10 00, HOT-MIX ASPHALT (HMA).
Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.9.2 Measurement
Playgroung Asphalt Path will be measured per the linear foot installed and accepted.
1.3.9.3 Unit of Measure
Unit of Measure: Linear Foot (FT)
1.3.10 Steel Sheet Piling PZ-22 (Bid Item 0001AR)
1.3.10.1 Payment
Payment shall cover all costs of furnishing, handling, storing and installing the steel sheet piling including, clearing the drive line, placing, driving, splicing, cutting holes, connections, and other appurtenant materials and work incident thereto as described in SECTION 31 41 16 METAL SHEET PILING. Payment for steel sheet piling shall be made at the contract unit price per the linear foot of sheet pile installed to the tip elevation indicated on the drawings. The cost of splices made to reach the design tip elevations shown on the drawings shall be incidental to this bid item.
Contractor furnished pilings which have been installed and are pulled at the direction of the COR and found to be in good condition will be paid for at the applicable contract unit price per linear foot to re-drive the sheet pile in their initial position. This additional price constitutes payment for redriving only. The cost of furnishing, initial driving and pulling the pilings is to be paid for as specified herein. When pilings are pulled and found to be damaged no payment will be made for the initial furnishing and driving or for the pulling of such pilings. Pilings replacing damaged pilings will be paid for at the applicable contract unit prices.
1.3.10.2 Measurement
Steel Sheet Pile shall be measured for payment by linear foot of pile driven to the tip elevation indicated on the drawings and accepted by the COR. No separate payment will be made for installed pilings directed to be cut off before reaching the penetration depth shown on drawings.
1.3.10.3 Unit of Measure
SECTION 01 22 00.00 10 Page 13
Unit of measure: Linear Foot (LF)1.3.11 Woody Bank Habitat (Bid Item
0002AJ, 0002AK, 0002AL, 0006AJ, 0006AK, & 0006AL)
1.3.11.1 Payment
Payment will be made at the contract unit price for the placement of IDOT RR-3, IDOT RR-7, and cobble stones at the river bank in River and Legion Parks, at the locations shown on the drawings. Trees needed for the revetment must be provided from trees removed from the project area.
Placement of the woody features will be incidential to this bid item.
Excavation of the bank for the placement of the stones and trees will also be incidental to this bid item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.11.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.11.3 Unit of Measure
Unit of measure: Ton
1.3.12 Water Willow Cobble Bar (Bid Item 0002AM, 0004AL, & 0006AG)
1.3.12.1 Payment
Payment will be made at the contract unit price for cobble stones placed in the river for the Water Willow Cobble Bar habitat at the locations shown on the drawings and in accordance SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.12.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.12.3 Unit of Measure
Unit of measure: Ton
1.3.13 2FT Mulch Trail (Bid Item 0002AH, 0003AE, 0004AM, 0005AJ, & 0006AM)
1.3.13.1 Payment
Payment will be made at the contract unit price for the placement of the 2' mulch trail in accordance with drawings. Payment for the timber edging will be considered incidental to this pay item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.13.2 Measurement
2FT mulch trail will be measured per the linear foot installed and accepted.
SECTION 01 22 00.00 10 Page 14
1.3.13.3 Unit of Measure
Unit of Measure: Linear Foot (FT)
1.3.14 Prescribed Burn (Bid Items 0002AN, 0003AD, 0004AN, 0005AK, & 0006AP)
1.3.14.1 Payment
Payment for prescribed burns in the restoration area shall be made at the contract unit price and shall include full compensation for all plant, labor, materials, and incidentals necessary to complete the work as described in SECTION 31 31 19.16 PRESCRIPTION BURNING. Notes that the quantity provided in the bid scheudule reflects the restoration areas. The frequency of burns per project areas are outlined in the above specifications.
1.3.14.2 Measurement
The results of the PRESCRIBED BURN will be documented with a map of PRESCRIBED BURN to be submitted with payment invoice. The map shall be created using either GIS or CADD delineating the areas that were treated.
The areas shall be delineated with a handheld GPS unit with a minimum of three meter accuracy. The Contracting Officer's Representative will review the submittal for payment and may elect to verify the completed work in the field. Performance criteria is contained in SECTION 31 31 19.16 PRESCRIPTION BURNING. The Contractor will be paid for the actual area completed, not to exceed the quantity in the bid schedule.
1.3.14.3 Unit of Measure
Unit of measure: Acre (AC)
1.3.15 Seeds (Bid Items 0001AS, 0002AP, 0002AQ, 0002AR, 0003AG, 0003AH, 0004AP, 0004AQ, 0004AR, 0005AL, 0005AM, 0005AN, 0006AQ, & 0006AR, & 0006AS)
1.3.15.1 Payment
Payment for native seeding shall be made at the contract lump sum price and shall include full compensation for all plant, labor, materials, and other components appropriate to complete the work as described in SECTION 32 93 00, PLANTS. The Contractor shall reuse stripped on-site topsoil for seeding in accordance with SECTION 31 00 00.
1.3.15.2 Measurement
Quantities of seeds are provided in SECTION 32 93 00, PLANTS. A bill of material delivery must accompany the seeds to verify and substantiate the quantity of seeds delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Seed plantings will be measured by the ounce of seed installed and accepted by the COR. Performance criteria is contained in SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. However, not withstanding this or any other contract requirement, the contractor shall not be paid for any quantity of native seeds that exceeds the quantity listed in the SECTION 32 93 00, PLANTS. The contractor shall bear the cost of any native seeds
SECTION 01 22 00.00 10 Page 15 installed in excess of the quantity listed in SECTION
32 93 00, PLANTS.
1.3.15.3 Unit of Measure
Unit of Measure: JobOunce (OZ)
1.3.16 Seeds for Big Marsh (Bid Item 0001AS, 0002AR, 0004AR, 0005AN, &
0006AS)
1.3.16.1 Payment
Payment for native seeding shall be made at the contract lump sum price and shall include full compensation for all plant, labor, materials, and other components appropriate to complete the work as described in the contract drawings and SECTION 32 93 00, PLANTS. There will no placement of topsoil necessary for seeding at the Big Marsh site. Seeds will be placed over graded areas and protected with erosion control blanket.
1.3.16.2 Measurement
Quantities of seeds are provided in SECTION 32 93 00, PLANTS. A bill of material delivery must accompany the seeds to verify and substantiate the quantity of seeds delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist. Seed plantings will be measured by the ounce of seed installed and accepted by the COR.
There is no establishment activities for the seeded areas at the Big Marsh site.
1.3.16.3 Unit of Measure
Unit of Measure: Ounce (OZ)
1.3.17 Plugs (Bid Items 0002AS, 0002AT, 0002AU, 0002AV 0003AJ, 0003AK, 0004AS, 0004AT, 0004AU, 0004AV, 0005AP, 0005AQ, 0005AR, 0006AT, 0006AU, 0006AV, & 0006AW)
1.3.17.1 Payment
Payment will be made at the contract lump sum price for plugs planted in the areas shown on the drawings and as described in SECTION 32 93 00 PLANTS to include handling, storing, loading, hauling, placing, watering, etc., as well as labor, materials, equipment, tools, and incidentals necessary to complete the work.
After all plantings have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, at least one month after all plantings have been installed for that particular year, the COR will make an inspection, at which time all areas planted in accordance with SECTION 32 93 00 PLANTS will be accepted.
1.3.17.2 Measurement
Quantities of plugs are provided in SECTION 32 93 00, PLANTS. A bill of material delivery must accompany the material to verify and substantiate
SECTION 01 22 00.00 10 Page 16 the quantity of plugs delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of plugs installed and accepted by the COR at least one month after all plantings have been installed for that particular year. Performance criteria is contained in 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of native plugs installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of native plugs that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any native plugs installed in excess of the quantity listed in the bid schedule.
1.3.17.3 Unit of Measure
Unit of measure: Each (EA)
1.3.18 1.5" Caliper Trees (Bid Items 0002AW, 0003AL, 0004AW, 0005AS &
0006AX)
1.3.18.1 Payment
Payment for planting 1.5" caliper trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. After all trees have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES will be accepted for payment.
1.3.18.2 Measurement
A bill of material delivery must accompany the material to verify and substantiate the quantity of the caliper trees delivered to the site.
Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of caliper trees installed and accepted by the COR. Performance criteria is contained in SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of caliper trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of caliper trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any caliper trees installed in excess of the quantity listed in the bid schedule.
1.3.18.3 Unit of Measure
Unit of measure: Each (EA)
SECTION 01 22 00.00 10 Page 17
1.3.19 5 Gallon Shrubs/Trees (Bid Items 0002AX, 0003AM, 0004AX, 0005AT &
0006AY)
1.3.19.1 Payment
Payment for planting larger containerized shrubs and trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. After all larger containerized shrubs and trees have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES will be accepted for payment.
1.3.19.2 Measurement
A bill of material delivery must accompany the material to verify and substantiate the quantity of larger containerized shrubs and trees delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of larger containerized shrubs and trees installed and accepted by the COR. Performance criteria is contained in 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of larger containerized shrubs and trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of larger containerized shrubs and trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any larger containerized shrubs and trees installed in excess of the quantity listed in the bid schedule.
1.3.19.3 Unit of Measure
Unit of Measure: Each (EA)
1.3.20 Landscape Fence (Bid Items 0002AY, 0003AN, 0004AY, 0005AU & 0006AZ)
1.3.20.1 Payment
Payment will be made at the contract unit price for the placement of landscape fence along all planted areas as shown on the drawings. Grass seeding for the establishment for 2' wide turf along the unprotected side of the fence will be incidential to this bid and in accordance to Section 32 92 23 GRASS SEEDING. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.20.2 Measurement
Landscape fence will be measured per the linear foot of fence installed and accepted. A 20% retainage will be held until final acceptance of the successful establishment of turf.
1.3.20.3 Unit of Measure
Unit of Measure: Linear Foot (LF)
SECTION 01 22 00.00 10 Page 18
1.3.21 Flagstone Retaining Walls (Bid Items 0004AH)
1.3.21.1 Payment
Payment will be made at the contract unit price for flagstones placed as retaining wall at the locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.21.2 Measurement
Flagstone will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.21.3 Unit of Measure
Unit of measure: Ton (TN)
1.3.22 IDOT CA-7 Stones (Bid Items 0004AJ & 0004AK)
1.3.22.1 Payment
Payment will be made at the contract unit price for IDOT CA-7 stones placed for the flagstone retaining wall base layer at locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.22.2 Measurement
IDOT CA-7 stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.22.3 Unit of Measure
Unit of measure: Ton (TON)
1.3.23 Permanent Chainlink Fence (Bid Item 0004AY)
1.3.23.1 Payment
Payment will be made at the contract unit price for the placement of permanent chainlink fence along the bank and behind the baseball parks in Legion Park South in accordance to Section 32 31 13 CHAIN LINK FENCES AND GATES. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.23.2 Measurement
Permanent chainlink fence will be measured per the linear foot of fence installed and accepted.
SECTION 01 22 00.00 10 Page 19
1.3.23.3 Unit of Measure
Unit of Measure: Linear Foot (LF)
1.3.24 Vernal Pool Erosion Protection (Bid Item 0008AA & 0008AB)
1.3.24.1 Payment
Payment will be made at the contract unit price for cobble placed for vernal pool erosion protection as described in Section 35 31 19.52 STREAM HABITAT RESTORATION, within the lines and dimensions indicated on the drawings. The placement of IDOT CA-7 bedding stones shall be an incidental cost of the cobble placement. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.24.2 Measurement
Cobble will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.3.24.3 Unit of Measure
Unit of measure: Ton
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used -- End of Section --
SECTION 01 22 00.00 10 Page 20
DIVISION 31 - EARTHWORK
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 MEASUREMENT PROCEDURES
1.2 PAYMENT PROCEDURES
1.3 CRITERIA FOR BIDDING
1.4 REFERENCES
1.5 DEFINITIONS
1.5.1 Satisfactory Materials
1.5.2 Unsatisfactory Materials
1.5.3 Degree of Compaction
1.5.4 Topsoil
1.6 SYSTEM DESCRIPTION
1.6.1 Classification of Excavation
1.7 SUBMITTALS
1.8 Earthwork Construction Plan
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
3.2 GENERAL EXCAVATION
3.2.1 Ditches, Gutters, and Channel Changes
3.2.2 Drainage
3.2.3 Dewatering
3.2.4 Underground Utilities
3.3 OPENING AND DRAINAGE OF EXCAVATION
3.4 GRADING AREAS
3.5 GROUND SURFACE PREPARATION
3.5.1 General Requirements
3.5.2 Frozen Material
3.6 UTILIZATION OF EXCAVATED MATERIALS
3.7 SPECIAL REQUIREMENTS
3.7.1 Natural Stone Construction
3.7.1.1 Stone Placement
3.7.2 Equipment and Machinery
3.8 FILL PLACEMENT
3.8.1 Fill Placement
3.9 FINISHING
3.9.1 Subgrade and Embankments
3.9.2 Grading Around Structures
3.10 PLACING TOPSOIL
3.11 TESTING
3.11.1 Moisture Contents
SECTION 31 00 00 Page 1
3.11.2 Optimum Moisture and Laboratory Maximum Density
3.11.3 In-Place Densities
3.12 BACKFILL FOR RETAINING STRUCTURES
3.12.1 Compaction for Retaining Structures
3.12.2 In-Place Densities for Retaining Structure Backfill
3.13 DISPOSITION OF SURPLUS MATERIAL
-- End of Section Table of Contents --
SECTION 31 00 00 Page 2
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 MEASUREMENT PROCEDURES
Measurement procedures for earthwork activities and disposal of excess satisfactory and unsatisfactory material must be in accordance Section
01 22 00.00 10, MEASUREMENT AND PAYMENT PROCEDURES.
1.1.1 Excavation
The unit of measurement for excavation and borrow will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and borrow operations, including the excavation for ditches, gutters, and channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of rock and the volume of loose, scattered rocks and boulders collected within the limits of the work. Any large stones encountered during excavation must be saved and worked into the project.
The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The volume of overburden stripped and the volume of excavation for ditches to drain borrow pits, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.
1.1.2 Topsoil Requirements
Separate excavation, hauling, and spreading or piling of topsoil and related miscellaneous operations will be considered subsidiary obligations of the Contractor, covered under the contract unit price for excavation.
1.1.3 Overhaul Requirements
Allow the unit of measurement for overhaul to be the station-yard. The overhaul distance will be the distance in stations between the center of volume of the overhaul material in its original position and the center of volume after placing, minus the free-haul distance in stations. The haul distance will be measured along the shortest route determined by the Contracting Officer as feasible and satisfactory.
1.2 PAYMENT PROCEDURES
Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete the work.Payment procedures for earthwork activities and disposal of excess satisfactory and unsatisfactory material must be in accordance Section 01 22 00.00 10, MEASUREMENT AND PAYMENT PROCEDURES.
SECTION 31 00 00 Page 3
1.2.1 Classified Excavation
Classified excavation will be paid for at the contract unit prices per cubic yard for common or rock excavation.
1.2.2 Unclassified Excavation
Unclassified excavation will be paid for at the contract unit price per cubic yard for unclassified excavation.
1.2.3 Authorized Overhaul
The number of station-yards of overhaul to be paid for will be the product of number of cubic yards of overhaul material measured in the original position, multiplied by the overhaul distance measured in stations of 100 feet and will be paid for at the contract unit price per station-yard for overhaul in excess of the free-haul limit as designated in paragraph
DEFINITIONS.
1.3 CRITERIA FOR BIDDING
Base bids on the following criteria:
a. Surface elevations are as indicated.
b. All pipe outlets and artificial obstructions are not shown in the drawings. The site was surveyed but some smaller pipes were observed in the field, that were not picked up in the survey. The contractor must locate all pipe outlets and artificial obstructions prior to grading.
c. Ground water elevations indicated by the boring log at the time subsurface investigations may be encountered.
e. Material character is indicated by the subsurface investigation report
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2010) Installation of Ductile-Iron Water Mains and Their Appurtenances
SECTION 31 00 00 Page 4
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2010; Errata 2010) Structural Welding Code - Steel
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA C2 (2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes
AWPA P5 (2009) Standard for Waterborne Preservatives
ASTM INTERNATIONAL (ASTM)
ASTM A139/A139M (2004; R 2010) Standard Specification for Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)
ASTM A252 (2010) Standard Specification for Welded and Seamless Steel Pipe Piles
ASTM C136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C33/C33M (2011a) Standard Specification for Concrete Aggregates
ASTM D1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve
ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D1557 (2009) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D1883 (2007e2) CBR (California Bearing Ratio) of Laboratory-Compacted Soils
ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D2434 (1968; R 2006) Permeability of Granular Soils (Constant Head)
ASTM D2488 (2011) Standard Practice for Description and Identification of Soils (Visual-Manual Procedure)
ASTM D2937 (2010) Density of Soil in Place by the Drive-Cylinder Method
ASTM D422 (1963; R 2007) Particle-Size Analysis of
SECTION 31 00 00 Page 5
Soils
ASTM D4318 (2010) Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes
EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-203 (Rev C; Notice 3) Paper, Kraft, Untreated
1.5 DEFINITIONS
1.5.1 Satisfactory Materials
Satisfactory materials comprise any materials classified by ASTM D2488 as
GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC,
SP-SM, SP-SC, CL, ML, CL-ML, CH, MH. Satisfactory materials for grading comprise stones less than 8 inches, except for fill material for pavements which comprise stones less than 3 inches in any dimension.
1.5.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. Notify the Contracting Officer when encountering any contaminated materials.
1.5.3 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30
SECTION 31 00 00 Page 6 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224. To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180. Soils used for planting purposes must not be compacted and are considered exempt.
1.5.4 Topsoil
Material suitable for topsoils obtained from excavation areas indicated on the drawings is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.6 SYSTEM DESCRIPTION
The subsoil investigation report represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.
1.6.1 Classification of Excavation
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.7 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Earthwork Construction Plan; G,CN
SD-06 Test Reports
Testing
SD-07 Certificates
Testing
1.8 Earthwork Construction Plan
Submit earthwork construction plan fifteen days prior to start of construction. Plan must include, but not limited to, construction equipment, schedule, and means and methods of earthwork.
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
No off-site borrow material, except topsoil, may be brought onto the
SECTION 31 00 00 Page 7 project site.
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, strip topsoil to a depth of 4 inches. Spread topsoil on areas already graded and prepared for topsoil, or…