River Riparian Ecosystem Restoration W912P6-17-B-0005

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT & CONTRACTING REQUIREMENTS

00010 SOLICITATION, OFFER, AND AWARD, SF 1442, BIDDING SCHEDULE

00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

00600 REPRESENTATIONS, AND CERTIFICATIONS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS

WAGE RATES

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 31 32.13 SUBSURFACE DRILLING AND SAMPLING INFORMATION

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 GENERAL PROVISIONS

01 11 00 SUMMARY OF WORK

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 QUALITY CONTROL

01 45 00.10 QUALITY CONTROL SYSTEM (QCS)

01 52 02 TEMPORARY CONSTRUCTION FACILITIES

01 55 56 26 TEMPORARY CHAIN-LINK FENCING

01 57 20.01 ENVIRONMENTAL PROTECTION FOR ILLINOIS

01 58 00 PROJECT SIGN AND SAFETY SIGN

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 10 00 CLEARING AND GRUBBING

31 31 19.13 CHEMICAL VEGETATION CONTROL

31 31 19.16 PRESCRIPTION BURNING

31 41 16 METAL SHEET PILING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 90.56 00 ESTABLISHMENT ACTIVITIES

32 10 00 HOT MIX ASHPALT (HMA)

32 31 13 CHAIN LINK FENCES AND GATES

32 31 19 PREFABRICATED ORNAMENTAL FENCES AND GATES

32 92 23 GRASS SEEDING

32 93 00 PLANTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 19.52 00 STREAM HABITAT RESTORATION

-- End of Project Table of Contents –

River Riparian Connectivity and Habitat Section 506 RIVERRIPARIAN

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

1.2 LOT or JOB PAYMENT ITEMS

1.2.1 Mobilization (Bid Item 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, & 0006AA)

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Demobilization (Bid Item 0001AB, 0002AB, 0003AB, 0004AB, 0005AB

&, 0006AB)

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Temporary Construction Facilities (Bid Item 0001AC)

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Maintenance Of Traffic (Bid Item 0001AD, 0002AC, 0003AC, 0004AC, 0005AC, & 0006AC )

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.5 Demolition and Removal (Bid Item 0001AE, 0002AD, 0004AD, 0005AD

& 0006AD )

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.6 Clearing and Grubbing (Bid Item 0002AE, 0004AE, 0005AE, &

0006AE )

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.7 Earthwork (Bid Items 0001AF, 0002AF, 0004AF, 0005AF, & 0006AF)

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.8 Debris Removal (Bid Item 0003AF)

1.2.8.1 Payment

1.2.8.2 Unit of Measure

1.2.9 Ornamental Gate and Fence (Bid Items 0001AQ & 0004BA)

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.10 1.1.13 Site Preparation, Invasive Species Control, and

Establishment Activities (Bid Items 0002BA, 0003AP, 0004BB, 0005AV, & 0006BA)

1.2.10.1 1.1.13.1 Payment

1.2.10.2 1.1.13.2 Unit of Measure

1.2.11 Flagstone Observation and Access (Bid Itemm 0002AZ)

1.2.11.1 Payment

1.2.11.2 Unit of Measure

1.2.12 Adaptive Management (Bid Items 0007)

1.2.12.1 Payment

SECTION 01 22 00.00 10 Page 1

AMD0001

1.2.12.2 Unit of Measure

1.2.13 Debris Removal (Bid Item 0003AF)

1.2.13.1 Payment

1.2.13.2 Unit of Measure

1.2.14 Performance & Payment Bond (Bid Item 0001AT, 0002BB, 0003AQ, 0004BC, 0005AW, & 0006BB)

1.2.14.1 Payment

1.2.14.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

1.3.1 Soil Placement at Big Marsh (Bid Items 0001AG, 0002AG, 0004AG, 0005AG, & 0006AG)

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.2 Excess Material Disposal Offsite (Bid Items 0005AH)

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 Channel Sediment Seeding (Bid Item 0001AH)

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

1.3.4 Channel Improvement - Sand and Pea Gravel Mix (Bid Item 0001AJ)

1.3.4.1 Payment

1.3.4.2 Measurement

1.3.4.3 Unit of Measure

1.3.5 Channel Improvement - Cobble (Bid Item 0001AK)

1.3.5.1 Payment

1.3.5.2 Measurement

1.3.5.3 Unit of Measure

1.3.6 Channel Improvement - IDOT RR-3 (Bid Item 0001AL)

1.3.6.1 Payment

1.3.6.2 Measurement

1.3.6.3 Unit of Measure

1.3.7 Channel Improvement - IDOT CA-6 (Bid Item 0001AM)

1.3.7.1 Payment

1.3.7.2 Measurement

1.3.7.3 Unit of Measure

1.3.8 Natural Fiber Logs (Bid Item 0001AN)

1.3.8.1 Payment

1.3.8.2 Measurement

1.3.8.3 Unit of Measure

1.3.9 Playground Asphalt Path and Asphalt Trail Replacement (Bid Item

0001AP & 0006AN)

1.3.9.1 Payment

1.3.9.2 Measurement

1.3.9.3 Unit of Measure

1.3.10 Steel Sheet Piling PZ-22 (Bid Item 0001AR)

1.3.10.1 Payment

1.3.10.2 Measurement

1.3.10.3 Unit of Measure

1.3.11 Woody Bank Habitat (Bid Item 0002AJ, 0002AK, 0002AL, 0006AJ, 0006AK, & 0006AL)

1.3.11.1 Payment

1.3.11.2 Measurement

1.3.11.3 Unit of Measure

1.3.12 Water Willow Cobble Bar (Bid Item 0002AM, 0004AL, & 0006AG)

1.3.12.1 Payment

1.3.12.2 Measurement

SECTION 01 22 00.00 10 Page 2

1.3.12.3 Unit of Measure

1.3.13 2FT Mulch Trail (Bid Item 0002AH, 0003AE, 0004AM, 0005AJ, &

0006AM)

1.3.13.1 Payment

1.3.13.2 Measurement

1.3.13.3 Unit of Measure

1.3.14 Prescribed Burn (Bid Items 0002AN, 0003AD, 0004AN, 0005AK, &

0006AP)

1.3.14.1 Payment

1.3.14.2 Measurement

1.3.14.3 Unit of Measure

1.3.15 Seeds (Bid Items 0001AS, 0002AP, 0002AQ, 0002AR, 0003AG, 0003AH, 0004AP, 0004AQ, 0004AR, 0005AL, 0005AM, 0005AN, 0006AQ, 0006AR, & 0006AS)

1.3.15.1 Payment

1.3.15.2 Measurement

1.3.15.3 Unit of Measure

1.3.16 Plugs (Bid Items 0002AS, 0002AT, 0002AU, 0002AV 0003AJ, 0003AK, 0004AS, 0004AT, 0004AU, 0004AV, 0005AP, 0005AQ, 0005AR, 0006AT, 0006AU, 0006AV, & 0006AW)

1.3.16.1 Payment

1.3.16.2 Measurement

1.3.16.3 Unit of Measure

1.3.17 1.5" Caliper Trees (Bid Items 0002AW, 0003AL, 0004AW, 0005AS &

0006AX)

1.3.17.1 Payment

1.3.17.2 Measurement

1.3.17.3 Unit of Measure

1.3.18 5 Gallon Shrubs/Trees (Bid Items 0002AX, 0003AM, 0004AX, 0005AT & 0006AY)

1.3.18.1 Payment

1.3.18.2 Measurement

1.3.18.3 Unit of Measure

1.3.19 Landscape Fence (Bid Items 0002AY, 0003AN, 0004AY, 0005AU &

0006AZ)

1.3.19.1 Payment

1.3.19.2 Measurement

1.3.19.3 Unit of Measure

1.3.20 Flagstone Retaining Walls (Bid Items 0004AH)

1.3.20.1 Payment

1.3.20.2 Measurement

1.3.20.3 Unit of Measure

1.3.21 IDOT CA-7 Stones (Bid Items 0004AJ & 0004AK)

1.3.21.1 Payment

1.3.21.2 Measurement

1.3.21.3 Unit of Measure

1.3.22 Permanent Chainlink Fence (Bid Item 0004AY)

1.3.22.1 Payment

1.3.22.2 Measurement

1.3.22.3 Unit of Measure

1.3.23 Vernal Pool Erosion Protection (Bid Item 0008AA & 0008AB)

1.3.23.1 Payment

1.3.23.2 Measurement

1.3.23.3 Unit of Measure

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 22 00.00 10 Page 3

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 4

SECTION 01 22 00

MEASUREMENT AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data Weight Certificates; G,CN

1.2 LOT or JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract cost and job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular cost, job, or unit price payment item, shall be included in the listed item most closely associated with the work involved. The price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization (Bid Item 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, &

0006AA)

1.2.1.1 Payment

Payment will be made at the applicable lump sum price for mobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with mobilization. Costs associated with daily mobilization will not be included in this cost. Daily mobilization will be included in the unit prices of materials being provided.

1.2.1.2 Unit of Measure

Unit of measure: Job

SECTION 01 22 00.00 10 Page 5

1.2.2 Demobilization (Bid Item 0001AB, 0002AB, 0003AB, 0004AB, 0005AB &, 0006AB)

1.2.2.1 Payment

Payment will be made at the applicable lump sum price for demobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with demobilization. Costs associated with daily demobilization will not be included in this cost. Daily demobilization will be included in the unit prices of materials being removed

1.2.2.2 Unit of Measure

Unit of measure: Job

1.2.3 Temporary Construction Facilities (Bid Item 0001AC)

1.2.3.1 Payment

Payment will be made at the contract lump sum price for all labor, equipment and materials for the contractor's temporary field office, temporary fencing and gates, restoration, project and safety signs, and other incidental items as described in SECTION 01 52 02, TEMPORARY CONSTRUCTION FACILITIES, and SECTION 01 58 00, PROJECT SIGN AND SAFETY SIGN.

1.2.3.2 Unit of Measure

TUnit of measure: Job

1.2.4 Maintenance Of Traffic (Bid Item 0001AD, 0002AC, 0003AC, 0004AC, 0005AC, & 0006AC )

1.2.4.1 Payment

Payment will be made at the contract lump sum price for the maintenance of traffic including traffic control equipment and signs, flaggers, placement of traffic detour paths and all associated costs as described in SECTION 01 52 02 TEMPORARY CONSTRUCTION FACILITIES and as shown on the drawings.

Payment constitutes full compensation for all plant, labor, equipment, materials, and incidentals necessary to complete the work.

1.2.4.2 Unit of Measure

Unit of measure: Job.

1.2.5 Demolition and Removal (Bid Item 0001AE, 0002AD, 0004AD, 0005AD &

0006AD )

1.2.5.1 Payment

Payment will be made at the contract lump sum price for the demolition and removal of the concrete dam, concrete liner and slab, fence (including post

SECTION 01 22 00.00 10 Page 6 foundations), asphalt paths, concrete structures, and other items shown for demolition and removal in the contract drawings and as described in SECTION 02 41 00 DEMOLITION. The installation of cofferdams, erosion and sediment controls, and existing structure protections, will be incidental under this bid item. Handling and placement of concrete pieces removed from the channel into the scour hole downstream of the dam will also be incidental to this bid item. Excess concrete that cannot be used to fill the scour hole must be disposed offsite. It is estimated that approximately 30CY of concrete material can be used to fill the scour hole. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.5.2 Unit of Measure

Unit of measure: Job.

1.2.6 Clearing and Grubbing (Bid Item 0002AE, 0004AE, 0005AE, & 0006AE )

1.2.6.1 Payment

Payment will be made at the contract lump sum price for clearing and grubbing the grading boundaries and up to the river including handling, transporting, on-site stockpiling, and disposal, in accordance to Section 31 11 00 CLEARING AND GRUBBING. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work. The refilling of holes resulting from clearing and grubbing operations will not be measured for payment but will be considered as a incidental under the above item.

1.2.6.2 Unit of Measure

Unit of measure: Job

1.2.7 Earthwork (Bid Items 0001AF, 0002AF, 0004AF, 0005AF, & 0006AF)

1.2.7.1 Payment

Full compensation for all labor, equipment and materials for stripping topsoil, excavating, stockpiling, and placing soil material to the lines and grades shown on the drawings must be included at the contract lump sum price for this bid item of the Bidding Schedule. All work shall be in accordance with the drawings and Section 31 00 00, EARTHWORK. The hauling of excess material to the Big Marsh soil placement site or at a disposal location will be paid under the "Soil Placement at Big Marsh" and "Excess Material Disposal Offsite" respective Bid Items. Placement of erosion control measures will be incidental to this bid item.

1.2.7.2 Unit of Measure

Unit of measure: Job

1.2.8 Debris Removal (Bid Item 0003AF)

1.2.8.1 Payment

Payment will be made at the contract lump sum price for the removal and disposal of concrete debris located at the east bank of Ronan Park at the

SECTION 01 22 00.00 10 Page 7 approximate location shown on the contract drawings and as described in Section 02 41 00, DEMOLITION. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.8.2 Unit of Measure

Unit of measure: Job

1.2.9 Ornamental Gate and Fence (Bid Items 0001AQ & 0004BA)

1.2.9.1 Payment

Payment will be made for all costs associated with installing a prefabricated ornamental gate and fence at the locations shown on the drawings and in accordance to the drawings and Section 32 31 19 PREFABRICATED ORNAMENTAL METAL FENCES AND GATES. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.9.2 Unit of Measure

Unit of measure: Job

1.2.10 1.1.13 Site Preparation, Invasive Species Control, and Establishment Activities (Bid Items 0002BA, 0003AP, 0004BB, 0005AV, & 0006BA)

1.2.10.1 1.1.13.1 Payment

Payment will be made for all costs associated with site preparation, invasive species control, establishment of seeded and planted areas including herbiciding, mowing, inspections, watering, any necessary predator control, and other activities as described in Sections 31 31 19.13 CHEMICAL VEGETATION CONTROL, 32 01 90.56 ESTABLISHMENT ACTIVITIES, and

32 93 00 PLANTS.

Payments will be made yearly and based on the performance criteria described in the above sections; however, monthly progress payments will be allowed with prior approval by the COR and after a monthly Invasive Species Control Report has been approved as described in Section 32 01 90.56 ESTABLISHMENT ACTIVITIES. Equal yearly payments will be made of the lump sum price for the years of establishment, 5 years or less. If the Contractor fails to establish the performance criteria in any year, none of the payment percentage will be paid to the contractor. The balance withheld from the previous year will then be paid the following year, if the performance criteria is met.

1.2.10.2 1.1.13.2 Unit of Measure

Unit of measure: Job.

SECTION 01 22 00.00 10 Page 8

1.2.11 Flagstone Observation and Access (Bid Itemm 0002AZ)

1.2.11.1 Payment

Payment will be made for all costs associated with the placement of flagstones for the two observation areas and access steps at the locations shown on the drawings. Cost associated with the placement of the IDOT CA-6 base layer will be incidential to this bid item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.11.2 Unit of Measure

Unit of measure: Job.

1.2.12 Adaptive Management (Bid Items 0007)

1.2.12.1 Payment

Payment will be made for all costs associated with remedial actions to address significant deficiences of the instream habitat features as described in Section 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. This bid item is a cost-reimbursable item. The Contractor will be paid for the actual costs incurred and not to exceed the bid price of $25,000.

1.2.12.2 Unit of Measure

Unit of measure: Job.

1.2.13 Debris Removal (Bid Item 0003AF)

1.2.13.1 Payment

Full compensation for all labor, equipment and materials will be made for the removal and disposal of concrete debris located on the east bank of Ronan Park at the contract lump sum price for this bid item of the Bidding Schedule.

1.2.13.2 Unit of Measure

Unit of measure: Lot.

1.2.14 Performance & Payment Bond (Bid Item 0001AT, 0002BB, 0003AQ, 0004BC, 0005AW, & 0006BB)

1.2.14.1 Payment

Payment will be made at the contract lump sum price for the performance and payment bond that is required as part of this contract. All costs associated with this item shall be included in the lump sum contract price.

1.2.14.2 Unit of Measure

Unit of measure: Lot.

SECTION 01 22 00.00 10 Page 9

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.3.1 Soil Placement at Big Marsh (Bid Items 0001AG, 0002AG, 0004AG, 0005AG, & 0006AG)

1.3.1.1 Payment

Full compensation for all labor, equipment and materials for the hauling and placement of excess soil material at the Big Marsh soil placement site shall be included at the contract unit price for this bid item of the Bidding Schedule. All work must be in accordance with the drawings and Section 31 00 00, EARTHWORK. All incidentals necessary to complete the work, including placement of geotextiles and erosion control blankets, will be incidentals to this bid item.

1.3.1.2 Measurement

Measurement will be made per cubic yard of material placed at Big Marsh.

The means of measurement must be approved by the COR.

1.3.1.3 Unit of Measure

Unit of measure: Cubic Yard (CY)

1.3.2 Excess Material Disposal Offsite (Bid Items 0005AH)

1.3.2.1 Payment

Full compensation for all labor, equipment and materials for the hauling and placement of excess soil material at a disposal site shall be included at the contract lump sum price for this bid item of the Bidding Schedule.

All work must be in accordance with the drawings and Section 31 00 00, EARTHWORK and Section 01 57 20.01 03, ENVIRONMENTAL PROTECTION FOR ILLINOIS.

1.3.2.2 Measurement

Measurement will be made per cubic yard of material placed at the disposal site. The means of measurement must be approved by the COR.

1.3.2.3 Unit of Measure

Unit of measure: Cubic Yard (CY)

1.3.3 Channel Sediment Seeding (Bid Item 0001AH)

1.3.3.1 Payment

Payment will be made at the contract unit price for sand and pea gravel mix placed in the North Branch Chicago River for channel sediment seeding and

SECTION 01 22 00.00 10 Page 10 as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Note that the quantity provided in the bid schedule covers the total material needed for the four years of placement.

1.3.3.2 Measurement

Sand and pea gravel mix for channel sediment seeding will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.3.3 Unit of Measure

Unit of measure: Ton

1.3.4 Channel Improvement - Sand and Pea Gravel Mix (Bid Item 0001AJ)

1.3.4.1 Payment

Payment will be made at the contract unit price for sand and pea gravel mix placed in the North Branch Chicago River within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.4.2 Measurement

Sand and pea gravel mix will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.4.3 Unit of Measure

Unit of measure: Ton

1.3.5 Channel Improvement - Cobble (Bid Item 0001AK)

1.3.5.1 Payment

Payment will be made at the contract unit price for cobble stones placed in the North Branch Chicago River for the stone placement, J-hooks, and riffle construction as described on the drawings and SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.5.2 Measurement

Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.5.3 Unit of Measure

Unit of measure: Ton

SECTION 01 22 00.00 10 Page 11

1.3.6 Channel Improvement - IDOT RR-3 (Bid Item 0001AL)

1.3.6.1 Payment

Payment will be made at the contract unit price for IDOT RR-3 stones placed in the North Branch Chicago River within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.6.2 Measurement

Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.6.3 Unit of Measure

Unit of measure: Ton

1.3.7 Channel Improvement - IDOT CA-6 (Bid Item 0001AM)

1.3.7.1 Payment

Payment will be made at the contract unit price for IDOT CA-6 stones placed in the North Branch Chicago River within the limits, lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.7.2 Measurement

Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.7.3 Unit of Measure

Unit of measure: Ton

1.3.8 Natural Fiber Logs (Bid Item 0001AN)

1.3.8.1 Payment

Payment will be made at the contract unit price for the installation of natural fiber logs along the river banks to protect the silt bars in the restoration area. Payment shall include full compensation for all plant, labor, materials, and incidentals necessary to complete the work as described in the drawings and SECTION 02 41 00 DEMOLITION.

1.3.8.2 Measurement

Natural Fiber Logs shall be measured per the linear foot installed and accepted.

1.3.8.3 Unit of Measure

Unit of Measure: Linear Foot (FT)

SECTION 01 22 00.00 10 Page 12

1.3.9 Playground Asphalt Path and Asphalt Trail Replacement (Bid Item

0001AP & 0006AN)

1.3.9.1 Payment

Payment will be made at the contract unit price for the placement of the asphalt trail for the playground access and asphalt trail replacement as describe in the drawings and Section 32 10 00, HOT-MIX ASPHALT (HMA).

Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.9.2 Measurement

Playgroung Asphalt Path will be measured per the linear foot installed and accepted.

1.3.9.3 Unit of Measure

Unit of Measure: Linear Foot (FT)

1.3.10 Steel Sheet Piling PZ-22 (Bid Item 0001AR)

1.3.10.1 Payment

Payment shall cover all costs of furnishing, handling, storing and installing the steel sheet piling including, clearing the drive line, placing, driving, splicing, cutting holes, connections, and other appurtenant materials and work incident thereto as described in SECTION 31 41 16 METAL SHEET PILING. Payment for steel sheet piling shall be made at the contract unit price per the linear foot of sheet pile installed to the tip elevation indicated on the drawings. The cost of splices made to reach the design tip elevations shown on the drawings shall be incidental to this bid item.

Contractor furnished pilings which have been installed and are pulled at the direction of the COR and found to be in good condition will be paid for at the applicable contract unit price per linear foot to re-drive the sheet pile in their initial position. This additional price constitutes payment for redriving only. The cost of furnishing, initial driving and pulling the pilings is to be paid for as specified herein. When pilings are pulled and found to be damaged no payment will be made for the initial furnishing and driving or for the pulling of such pilings. Pilings replacing damaged pilings will be paid for at the applicable contract unit prices.

1.3.10.2 Measurement

Steel Sheet Pile shall be measured for payment by linear foot of pile driven to the tip elevation indicated on the drawings and accepted by the COR. No separate payment will be made for installed pilings directed to be cut off before reaching the penetration depth shown on drawings.

1.3.10.3 Unit of Measure

SECTION 01 22 00.00 10 Page 13

Unit of measure: Linear Foot (LF)1.3.11 Woody Bank Habitat (Bid Item

0002AJ, 0002AK, 0002AL, 0006AJ, 0006AK, & 0006AL)

1.3.11.1 Payment

Payment will be made at the contract unit price for the placement of IDOT RR-3, IDOT RR-7, and cobble stones at the river bank in River and Legion Parks, at the locations shown on the drawings. Trees needed for the revetment must be provided from trees removed from the project area.

Placement of the woody features will be incidential to this bid item.

Excavation of the bank for the placement of the stones and trees will also be incidental to this bid item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.11.2 Measurement

Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.11.3 Unit of Measure

Unit of measure: Ton

1.3.12 Water Willow Cobble Bar (Bid Item 0002AM, 0004AL, & 0006AG)

1.3.12.1 Payment

Payment will be made at the contract unit price for cobble stones placed in the river for the Water Willow Cobble Bar habitat at the locations shown on the drawings and in accordance SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.12.2 Measurement

Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.12.3 Unit of Measure

Unit of measure: Ton

1.3.13 2FT Mulch Trail (Bid Item 0002AH, 0003AE, 0004AM, 0005AJ, & 0006AM)

1.3.13.1 Payment

Payment will be made at the contract unit price for the placement of the 2' mulch trail in accordance with drawings. Payment for the timber edging will be considered incidental to this pay item. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.13.2 Measurement

2FT mulch trail will be measured per the linear foot installed and accepted.

SECTION 01 22 00.00 10 Page 14

1.3.13.3 Unit of Measure

Unit of Measure: Linear Foot (FT)

1.3.14 Prescribed Burn (Bid Items 0002AN, 0003AD, 0004AN, 0005AK, & 0006AP)

1.3.14.1 Payment

Payment for prescribed burns in the restoration area shall be made at the contract unit price and shall include full compensation for all plant, labor, materials, and incidentals necessary to complete the work as described in SECTION 31 31 19.16 PRESCRIPTION BURNING. Notes that the quantity provided in the bid scheudule reflects the restoration areas. The frequency of burns per project areas are outlined in the above specifications.

1.3.14.2 Measurement

The results of the PRESCRIBED BURN will be documented with a map of PRESCRIBED BURN to be submitted with payment invoice. The map shall be created using either GIS or CADD delineating the areas that were treated.

The areas shall be delineated with a handheld GPS unit with a minimum of three meter accuracy. The Contracting Officer's Representative will review the submittal for payment and may elect to verify the completed work in the field. Performance criteria is contained in SECTION 31 31 19.16 PRESCRIPTION BURNING. The Contractor will be paid for the actual area completed, not to exceed the quantity in the bid schedule.

1.3.14.3 Unit of Measure

Unit of measure: Acre (AC)

1.3.15 Seeds (Bid Items 0001AS, 0002AP, 0002AQ, 0002AR, 0003AG, 0003AH, 0004AP, 0004AQ, 0004AR, 0005AL, 0005AM, 0005AN, 0006AQ, 0006AR, & 0006AS)

1.3.15.1 Payment

Payment for native seeding shall be made at the contract lump sum price and shall include full compensation for all plant, labor, materials, and other components appropriate to complete the work as described in SECTION 32 93 00, PLANTS. The Contractor shall reuse stripped on-site topsoil for seeding in accordance with SECTION 31 00 00.

1.3.15.2 Measurement

Quantities of seeds are provided in SECTION 32 93 00, PLANTS. A bill of material delivery must accompany the seeds to verify and substantiate the quantity of seeds delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.

Seed plantings will be measured by the ounce of seed installed and accepted by the COR. Performance criteria is contained in SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. However, not withstanding this or any other contract requirement, the contractor shall not be paid for any quantity of native seeds that exceeds the quantity listed in the SECTION 32 93 00, PLANTS. The contractor shall bear the cost of any native seeds

SECTION 01 22 00.00 10 Page 15 installed in excess of the quantity listed in SECTION

32 93 00, PLANTS.

1.3.15.3 Unit of Measure

Unit of Measure: Job

1.3.16 Plugs (Bid Items 0002AS, 0002AT, 0002AU, 0002AV 0003AJ, 0003AK, 0004AS, 0004AT, 0004AU, 0004AV, 0005AP, 0005AQ, 0005AR, 0006AT, 0006AU, 0006AV, & 0006AW)

1.3.16.1 Payment

Payment will be made at the contract lump sum price for plugs planted in the areas shown on the drawings and as described in SECTION 32 93 00 PLANTS to include handling, storing, loading, hauling, placing, watering, etc., as well as labor, materials, equipment, tools, and incidentals necessary to complete the work.

After all plantings have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, at least one month after all plantings have been installed for that particular year, the COR will make an inspection, at which time all areas planted in accordance with SECTION 32 93 00 PLANTS will be accepted.

1.3.16.2 Measurement

Quantities of plugs are provided in SECTION 32 93 00, PLANTS. A bill of material delivery must accompany the material to verify and substantiate the quantity of plugs delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.

Planting will be measured by the number of plugs installed and accepted by the COR at least one month after all plantings have been installed for that particular year. Performance criteria is contained in 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of native plugs installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of native plugs that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any native plugs installed in excess of the quantity listed in the bid schedule.

1.3.16.3 Unit of Measure

Unit of measure: Each (EA)

1.3.17 1.5" Caliper Trees (Bid Items 0002AW, 0003AL, 0004AW, 0005AS &

0006AX)

1.3.17.1 Payment

Payment for planting 1.5" caliper trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. After all trees have been installed, the

SECTION 01 22 00.00 10 Page 16

Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES will be accepted for payment.

1.3.17.2 Measurement

A bill of material delivery must accompany the material to verify and substantiate the quantity of the caliper trees delivered to the site.

Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.

Planting will be measured by the number of caliper trees installed and accepted by the COR. Performance criteria is contained in SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of caliper trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of caliper trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any caliper trees installed in excess of the quantity listed in the bid schedule.

1.3.17.3 Unit of Measure

Unit of measure: Each (EA)

1.3.18 5 Gallon Shrubs/Trees (Bid Items 0002AX, 0003AM, 0004AX, 0005AT &

0006AY)

1.3.18.1 Payment

Payment for planting larger containerized shrubs and trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES. After all larger containerized shrubs and trees have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 93 00 PLANTS and SECTION 32 01 90.56 ESTABLISHMENT ACTIVITIES will be accepted for payment.

1.3.18.2 Measurement

A bill of material delivery must accompany the material to verify and substantiate the quantity of larger containerized shrubs and trees delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.

Planting will be measured by the number of larger containerized shrubs and trees installed and accepted by the COR. Performance criteria is contained in 32 01 90.56 ESTABLISHMENT ACTIVITIES. The Contractor will be paid for the actual quantity of larger containerized shrubs and trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of larger containerized shrubs and trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any larger containerized shrubs and trees installed in excess of the quantity listed in the bid schedule.

SECTION 01 22 00.00 10 Page 17

1.3.18.3 Unit of Measure

Unit of Measure: Each (EA)

1.3.19 Landscape Fence (Bid Items 0002AY, 0003AN, 0004AY, 0005AU & 0006AZ)

1.3.19.1 Payment

Payment will be made at the contract unit price for the placement of landscape fence along all planted areas as shown on the drawings. Grass seeding for the establishment for 2' wide turf along the unprotected side of the fence will be incidential to this bid and in accordance to Section 32 92 23 GRASS SEEDING. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.19.2 Measurement

Landscape fence will be measured per the linear foot of fence installed and accepted. A 20% retainage will be held until final acceptance of the successful establishment of turf.

1.3.19.3 Unit of Measure

Unit of Measure: Linear Foot (LF)

1.3.20 Flagstone Retaining Walls (Bid Items 0004AH)

1.3.20.1 Payment

Payment will be made at the contract unit price for flagstones placed as retaining wall at the locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.20.2 Measurement

Flagstone will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.20.3 Unit of Measure

Unit of measure: Ton (TN)

1.3.21 IDOT CA-7 Stones (Bid Items 0004AJ & 0004AK)

1.3.21.1 Payment

Payment will be made at the contract unit price for IDOT CA-7 stones placed for the flagstone retaining wall base layer at locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.52 STREAM HABITAT RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

SECTION 01 22 00.00 10 Page 18

1.3.21.2 Measurement

IDOT CA-7 stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.21.3 Unit of Measure

Unit of measure: Ton (TON)

1.3.22 Permanent Chainlink Fence (Bid Item 0004AY)

1.3.22.1 Payment

Payment will be made at the contract unit price for the placement of permanent chainlink fence along the bank and behind the baseball parks in Legion Park South in accordance to Section 32 31 13 CHAIN LINK FENCES AND GATES. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.22.2 Measurement

Permanent chainlink fence will be measured per the linear foot of fence installed and accepted.

1.3.22.3 Unit of Measure

Unit of Measure: Linear Foot (LF)

1.3.23 Vernal Pool Erosion Protection (Bid Item 0008AA & 0008AB)

1.3.23.1 Payment

Payment will be made at the contract unit price for cobble placed for vernal pool erosion protection as described in Section 35 31 19.52 STREAM HABITAT RESTORATION, within the lines and dimensions indicated on the drawings. The placement of IDOT CA-7 bedding stones shall be an incidental cost of the cobble placement. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.3.23.2 Measurement

Cobble will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.

1.3.23.3 Unit of Measure

Unit of measure: Ton

PART 2 PRODUCTS

Not Used

SECTION 01 22 00.00 10 Page 19

PART 3 EXECUTION

Not Used -- End of Section --

SECTION 01 22 00.00 10 Page 20

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 56 26

TEMPORARY CHAIN-LINK FENCING

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Chain Link Fence

2.1.1.1 Fabric

2.1.2 Gates

2.1.3 Posts

2.1.3.1 Line Posts

2.1.3.2 Other posts

2.1.4 Brace and Top Rails

2.1.5 Tension wire

2.1.6 Accessories/Fittings

2.1.7 Heavy Duty Breathable Mesh/Windscreen

2.1.8 Concrete

2.1.9 Padlocks

PART 3 EXECUTION

3.1 GENERAL

3.2 EXCAVATION

3.3 POSTS

3.4 BRACES AND TRUSS RODS

3.5 TOP RAILS

3.6 CHAIN-LINK FABRIC

3.7 GATES

3.8 HEAVY DUTY BREATHABLE MESH/WINDSCREEN

3.9 GROUNDING

3.9.1 Resistance Testing

3.10 FENCE REPAIR

3.11 QUALITY CONTROL

-- End of Section Table of Contents --

SECTION 01 56 26 Page 1

SECTION 01 56 26

TEMPORARY CHAIN-LINK FENCING

PART 1 GENERAL

1.1 SUMMARY

This specification section will be used for installation and removal of temporary security fencing for the work site.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A824 (2001; R 2012) Standard Specification for Metallic-Coated Steel Marcelled Tension Wire for Use With Chain Link Fence

ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A491 (2011) Standard Specification for Aluminum-Coated Steel Chain-Link Fence Fabric

ASTM F883 (2013) Padlocks

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with SECTION

01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Chain Link Fence

Drawings showing post sizes and sections; post setting and bracing; details of attachment of fabric to support members; and any other details required to erect the fence.

SD-03 Product Data

SECTION 01 56 26 Page 2

Chain Link Fence

Data consisting of catalog cuts, product data, and printed information in sufficient detail to verify compliance with the specification requirements.

SD-04 Samples

Heavy Duty Breathable Mesh/Windscreen; G, C

Submit three color samples of the Mesh/Windscreen as specified.

SD-07 Certificates

Chain-Link Fence Materials

Certified copies of test reports demonstrating conformance to applicable specifications must be delivered to the Contracting Officer before fencing is installed.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Chain Link Fence

Posts and rails must be hot dipped galvanized or galvanized standard weight pipe. All fittings must be pressed steel or malleable iron and must be hot dip galvanized conforming to ASTM A153/A153M. Tie wires must be minimum 9-gauge aluminum or 11-gauge galvanized steel. All posts, except for posts set at existing revetmentpavement or within the tree protection zone, to be of sufficient length to allow for approximately 36-inch settings into soil or concrete as specified. Diameter of footings must be 10 inches for line posts, and 12 inches for terminal posts. Maximum spacing of line posts must be 10'0" unless noted otherwise. Fence must follow ground line unless noted otherwise. The height of the temporary fence must be [8] feet.

2.1.1.1 Fabric

Wire must be Type II, aluminum-coated steel wire according to ASTM A491.

Fabric must be fabricated of 9-gauge or 11-gauge wire woven in 2-inch or 2 1/4" mesh. Fence fabric height must be [8] feet.

2.1.2 Gates

Gate frames must be constructed of Class 1 Grade A or B, steel pipe, size SP2. Gate fabric must be as specified for chain-link fabric. Gate leaves more than 8 feet wide must have either intermediate members and diagonal truss rods or must have tubular members as necessary to provide rigid construction, free from sag or twist. Gate leaves less than 8 feet wide must have truss rods or intermediate braces. Gate fabric must be attached to the gate frame by method standard with the manufacturer except that welding will not be permitted. Latches, hinges, stops, keepers, rollers, and other hardware items must be furnished as required for the operation of the gate. Arrange latches for padlocking so the padlock will be accessible from both sides of the gate. Provide stops for holding the gates in the open position.

SECTION 01 56 26 Page 3

2.1.3 Posts

2.1.3.1 Line Posts

Line posts must be 2 3/8" O.D. standard weight galvanized pipe with minimum bending strength of 201 pounds under a 6-foot cantilever load coated with

2.0 ounces of hot dipped zinc in accordance with ASTM A123/A123M.

2.1.3.2 Other posts

Posts located across the existing revetment, beachpavement, and within the tree protection zone, as indicated, must be supported with cross bases and sand bags.

All terminal posts end, corner, and pull posts must be 2 7/8" O.D.

galvanized standard weight pipe with minimum bending strength of 381 pounds on 6-foot cantilever load coated with 2.0 ounces of hot dipped zinc in accordance with ASTM A123/A123M. Gate posts must be of the following sizes for single swing gates or one leaf of double swing gates:

Leaf Width Gate Post Lbs/Lin. Ft.

Up to 6' 3 1/2" x 3 1/2" roll formed section or 4.85 2 7/8" O.D. Pipe 5.79 Over 6' to 13' 4" O.D. Pipe 9.11 Over 13' to 18' 6 5/8" O.D. Pipe 18.97 Over 18' 8 5/8" O.D. Pipe 28.55

2.1.4 Brace and Top Rails

Brace and top rails must be 1.66" O.D. standard weight galvanized pipe with minimum vertical bending strength of 202 pounds on 10-foot span coated with

2.0 ounces of hot dipped zinc in accordance with ASTM A123/A123M. Fabric tie wire must be spaced at maximum 24-inch centers.

[2.1.5 Tension wire

Tension wire must be Type I or Type II, Class 2 coating, in accordance with

ASTM A824.

]2.1.6 Accessories/Fittings

Ferrous accessories must be zinc-coated. Provide truss rods for each terminal post. Provide truss rods with turnbuckles or other equivalent provisions for adjustment. All accessories and fittings must be pressed steel or malleable iron and must be hot-dipped galvanized conforming to

ASTM A153/A153M.

2.1.7 Heavy Duty Breathable Mesh/Windscreen

Mesh/Windscreen must be Poly "Closed Mesh" Polypropylene material, 5% ventilation, 7 oz. closed mesh woven polypropylene, 3-ply hems sewn with two rows of heavy-duty polyester threads. Space brass grommets 15 inches on center on all four sides, provide wind vents as required. The mesh must be black or dark green in color, submit three samples to the COR for approval.

SECTION 01 56 26 Page 4

2.1.8 Concrete

Concrete must be as 3000 psi, ready-mix concrete.

[2.1.9 Padlocks

ASTM F883, Type PO1, Grade 2, Size 44.4 mm (1-3/4 inch). Padlocks must be keyed alike. Provide two keys for each lock. Additional key sets must be provided for the CPD and MWRD maintenance crew.

]PART 3 EXECUTION

3.1 GENERAL

Coordinate with the COR prior to fence installation. Install fence to the lines indicated. Adjust fence line around existing trees as directed by the COR. Space line post equidistant at intervals not exceeding 10 feet.

Terminal (corner) posts must be set at abrupt changes in vertical and horizontal alignment. Fabric must be continuous between terminal (corner) posts.

3.2 EXCAVATION

Clear post holes of loose material. Spread waste material where directed.

Eliminate ground surface irregularities along the fence line to maintain a two-inch clearance between the bottom of the fabric and finish grade.

3.3 POSTS

Set fence posts plumb and in alignment. Set terminal posts, corner posts, and gateposts in concrete to a minimum depth of 36 inches, except where solid rock is encountered. Where solid rock is covered with an overburden of soil or loose rock, terminal posts, corner posts, and gate posts must be set to a minimum depth of 36 inches unless a penetration of 18 inches in solid rock is achieved before reaching the 36-inch depth, in which case depth of penetration must terminate. Grout all portions of terminal posts, corner posts, and gate posts set in rock.

Portions of terminal posts, corner posts, and gate posts set in concrete must be set in concrete from the rock to ground level. Terminal posts, corner posts, and gate posts set in concrete must be set in holes not less than 1'-0" in diameter. Diameters of holes in solid rock must be at least one inch greater than the largest cross-section of the post. Thoroughly consolidate concrete and grout around posts to be free of voids. Allow to cure for 72 hours prior to attachment of any items to the posts. Maximum spacing of line posts to be 10'. Drive line posts to a depth of 36 inches, except where solid rock is encountered. Where rock prohibits driving of the line posts, ensure the line posts are sufficiently secure to hold the fabric in position.

3.4 BRACES AND TRUSS RODS

Provide braces and truss rods as required and in conformance with the standard practice for the fence. Provide horizontal (compression) braces and diagonal truss (tension) rods on the fence. Extend braces and truss rods from terminal posts to line posts. Diagonal braces must form an angle of approximately 40 to 50 degrees with the horizontal.

SECTION 01 56 26 Page 5

3.5 TOP RAILS

Support top rails at each post to form a continuous brace between terminal posts. Join sections of top rail using sleeves or couplings that will allow expansion or contraction of the rail.

3.6 CHAIN-LINK FABRIC

Install chain-link fabric on the side of the post indicated. Attach fabric to terminal posts with stretcher bars and tension bands. Space bands at approximately 15-inch intervals. Pull fabric taut to provide a smooth uniform appearance free from sag. Fasten fabric to line posts at approximately 15-inch intervals and fasten to tension wires at approximately 6-inch intervals. Cut fabric by untwisting and removing pickets. Splice by weaving a single picket into the ends of the rolls to be joined. The bottom of the installed fabric must be within 2 inches of the ground.

3.7 GATES

Provide gates as indicated. Mount hinged gates to swing in directions indicated. Provide latches, stops, and keepers as required. Attach padlocks to gates or gate posts with chains and hinge pins, and weld hardware or otherwise secured to prevent removal. Provide two (2) sets of keys for padlocks on gate shared with others.

3.8 HEAVY DUTY BREATHABLE MESH/WINDSCREEN

Install mesh/windscreen on the interior face of the chain link fence.

Maintain the mesh/windscreen for the duration of the contract. Maintenance includes, but not limited to, repairing damaged screens and posts.

3.9 GROUNDING

Ground fences at intervals not exceeding 500 feet and within 100 feet of gates in each section of the fence adjacent to the gate. Ground conductor must consist of No. 8 AWG solid copper wire. Grounding electrodes must be 19mm (3/4-inch) by 3.05m (10-foot) long copper-clad steel rod.