W912P609B0001 AMENDMENT 0002.pdf

PDF 347 KB Posted

Attached to
CADY MARSH DITCH IMPROVEMENTS, GRIFFITH, INDIANA
Solicitation number
W912P6-09-B-0001
Issued by

About this file

Amendment 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6682042419

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: SOLICITATION NO. W912P6-09-B-0001, CADY MARSH DITCH LOCAL FLOOD PROTECTION DITCH IMPROVEMENT, GRIFFITH, INDIANA

This Amendment Number 0002, incorporates revisions to various Solicitation Sections, Draw ing Sheets; it contains the Pre-Bid Meeting Notes and Attendance list from the Pre-Bid Meeting, held on April 28, 2009; Questions submitted on April 29, 2009, May 4, 2009 and May 5, 2009 and USACE's responses are provided; and to incorporate current Davis Bacon Wage Rates.

1. The Bid Opening date is not extended. Bids are due to the USACE by 2:00 P.M. C.S.T. on Friday, May 15, 2009.

2. The Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-4372.

--THIS AMENDMENT CONTINES ON PAGE 2—

1. CONTRACT ID CODE PAGE OF PAGES

J 1 46

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-May-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0001

X 9B. DATED (SEE ITEM 11)

14-Apr-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-May-2009

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-09-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

3. The most current Davis Bacon Wage Rates IN080001, dated 05/01/2009, REV (23) is applicable to the work required under this project. The Contractor shall remove and replace wages issued with the original Invitation for Bids with the most current wages attached hereto.

4. Changes to Solicitation Section 00010 are as follows:

a. Solicitation Section 00010 “SOLICITATION CONTRACT FORM” (BID SCHEDULE) 00010 is revised. Line Item 0027 is deleted from the Bid Schedule by way of this Amendment. The Bidder shall remove and replace this Section in its entirety with the revised Section attached hereto.

b. “IMPORTANT NOTES” found on page 16 of 55 of the Solicitation package has been revised by way of this Amendment 0002. Paragraph 2c. “BID CONDITIONS” is changed to read “Bidders are required to complete the entire Bid Schedule (except Line Item 0027, which is deleted by way of this Amendment); therefore, any bidder who does not complete the entire Bid Schedule may be considered non-responsive to the solicitation and ineligible for award.”

5. Changes to Specification Sections are as follows:

a. The Project Table of Contents is changed by way of this Amendment. The Contractor shall remove and replace this Section in its entirety with the revised Section attached hereto.

b. Specification Section 01 33 00 “SUBMITTAL PROCEDURES” is changed by way of this Amendment. The Bidder shall remove and replace this Section in its entirety with the revised Section attached hereto.

c. Specification Section 35 49 13.10 “METAL SHEET PILING” is changed by way of this Amendment. The Bidder shall remove ans replace this Section in its entirety with the revised Section attahed hererto.

d. Specification Section 01 22 00.00 “MEASUREMENT AND PAYMENT ” is changed by way of this Amendment. The Bidder shall remove and replace this Section in its entirety with the revised Section attached hereto.

6. Changes to Drawing Sheets are as follows:

a. Drawing Sheet C-06: On Drawing Sheet C-06, on the "Profile Along Drain Outlet No.

4" and "Plan At Drain Outlet No. 4" views, Delete "32" H x 49" W Elliptical RCP" and Replace with "32" H x 49" W Or 34" H x 53" W Elliptical RCP". A modified copy of Drawing Sheet C-06 will be incorporated into the conformed Contract document.

b. Drawing Sheet C-07: On Drawing Sheet C-07, on the "Profile Along Drain Outlet No.

5" and "Plan At Drain Outlet No. 5" views, Delete "27" H x 42" W Elliptical RCP" and Replace with "27" H x 42" W Or 29" H x 45" W Elliptical RCP". A modified copy of Drawing Sheet C-07 will be incorporated into the conformed Contract document.

c. Drawing Sheet C-15:

1. On Drawing Sheet C-15, Delete Trash Rack Note 5 in its entirety, and replace with "EXACT TRASH RACK RAKER RAIL LOCATIONS SHALL BE FIELD

DETERMINED."

2. On Drawing Sheet C-15, Add the following to Trash Rack Notes as Note 9: "IF

BASED ON THE MANUFACTURER'S RECOMMENDATION THE TRASH

RACK RAKER IS TO BE MOVED FURTHER LANDWARD AND

PARTIALLY OFF THE EXISTING CONCRETE STRUCTURE FROM THE

LOCATION SHOWN ON THE CONTRACT DRAWINGS, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY

REQUIRED ADDITIONAL STRUCTURAL STEEL SUPPORTING

MEMBERS AND SHALL INCREASE THE LENGTH OF THE SUPPORTING

STEEL SECTIONS SO THAT THE 3'-0" WIDTH OF THE GALVANIZED

GRATING WALKWAY IS MAINTAINED."

A modified copy of Drawing Sheet C-15 will be incorporated into the conformed Contract document.

d. Drawing Sheet S-03: Quadrant H-2 of Sheet S-03 has been revised to read "5'-0" OR LENGTH OF PILE, WHICHEVER IS SHORTER". A modified copy of Drawing Sheet S-03 will be incorporated into the conformed Contract document.

REVISED

(Amendment 0002)

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

MOBILIZATION/DEMOBILIZATION

FIRM FIXED PRICE (FFP)

PURCHASE REQUEST NUMBER: W81G6682042419

NET AMT

0002 1 Lump Sum

TEMPORARY CONSTRUCTION FACILITIES

FFP

0003 1 Lump Sum

MAINTENANCE OF TRAFFIC

0004 1 Lump Sum

CONTROL OF WATER

0005 1 Lump Sum

REMOVAL OF STRUCTURES AND DRAINAGE FACILITIES

0006 1 Lump Sum

CONCRETE NORTH I-WALL

0007 1 Lump Sum

CONCRETE SOUTH I-WALL

0008 1 Lump Sum

EXTERIOR LIGHTING – TUNNEL INLET STRUCTURE

0009 2,700 Cubic

Yard

SATISFACTORY FILL

0010 2,000 Cubic

STRIPPING

0011 2,000 Cubic

TOPSOIL

0012 13,500 Cubic

CHANNEL AND RIPRAP EXCAVATION

0013 2,700 Cubic

I-WALL EXCAVATION

0014 1 Lump Sum

CLEARING AND GRUBBING

0015 400 Net Ton

(2,000 LB)

REVETMENT RIPRAP

0016 750 Net Ton

CLASS 2 RIPRAP

0017 250 Net Ton

BEDDING MATERIAL

0018 6 Acre

TURF

0019 1 Lump Sum

DRAIN OUTLET NO. 1

0020 1 Lump Sum

DRAIN OUTLET NO. 2

0021 1 Lump Sum

DRAIN OUTLET NO. 3

0022 1 Lump Sum

DRAIN OUTLET NO. 4

0023 1 Lump Sum

DRAIN OUTLET NO. 5

0024 1 Lump Sum

DRAIN OUTLET NO. 6

0025 1 Lump Sum

DRAIN OUTLET NO. 7

0026 1 Lump Sum

DRAIN OUTLET NO. 8

ITEM NO

NOT USED

0028 18,500 Square

Foot

STEEL SHEET PILING - NORTH & SOUTH I-WALLS

0029 1 Lump Sum

TUNNEL OUTLET SHAFT WORK PLATFORM

0030 1 Lump Sum

TUNNEL INLET TRASH RACK RAKING SYSTEM

0031 1 Lump Sum

TUNNEL INLET STOPLOGS

0032 1 Lump Sum

JIB CRANE

0033 1 Lump Sum

EXISTING SEWER LINE VIDEOTAPING AND ENGINEERING

EVALUATION

0034 1 Lump Sum

HERBICIDE TREATMENT, NATIVE SEEDING AND HERBACEOUS

PLUG PLANTING AT DRAIN OUTLET NOS. 7 AND 8

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE NOT TO EXCEED

AMOUNT

0035 1 Lump Sum

PERFORMANCE AND PAYMENT BONDS

COST REIMBURSABLE ITEM:

The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

NOT TO EXCEED

TOTAL BID AMOUNT:

(LINE ITEMS 0001 THROUGH 0035): $ ____________________________

MEETING NOTES

PRE-BID MEETING

IFB# W912P6-09-B-0001 – CMD Ditch Improvements

Individuals from the USACE and local companies were in attendance (the attendance sheet is attached hereto).

The Project Manager, Imad Samara, chaired the meeting.

Mr. Samara began the meeting by introducing the USACE participants; thereafter, he provided a brief overview of the project. Ms. Blair followed by presenting an overview of the Solicitation Document (contracting-related items), noted as follows: The solicitation numbered as W912P6-09-B-0001 was issued on April 14, 2009 and is available for downloading at the Federal Business Opportunities Website. The solicitation type is an Invitation for Bids (IFB), meaning the government will award to the responsive, responsible bidder offering the lowest aggregate price to perform the work of the contract. Competition is full and open, unrestricted to business size. The estimated cost for construction is between $3M and $5M. There is a mandatory performance period of 500 calendar days. Bids are due prior to 2:p.m. CDT on 15 May 09 and shall be delivered to the address named on the first page of the Solicitation. A bid bond is required to be submitted along with the bidder’s bid and is required to be stated in the amount of 20% of $3 Million of its bid price. Performance and payment bonds are required within 10 days of contract award. The bid schedule comprises of 35 line items;

bidders are responsible for completing the entire bid schedule. Section 00010 of the IFB contains the submission requirements; all bids must be enclosed in an sealed envelope (emphasized) and must reach the Bid Opening Room no later than 2:p.m. on the day of the Bid Opening. The Bid Opening Room is located in the River Center Building (same address of the USACE-Chicago District office is located) on the first floor, lobby conference room. Split or multiple awards will not result from the solicitation. To be considered responsive to the IFB, bidders must submit to the USACE a signed SF 1442; a fully completed bid schedule, completed representations and certifications (Section 00600 of the IFB); a bid bond and acknowledge all amendments (if any). The type of contract resulting from the IFB is a firm-fixed price construction contract. The Davis Bacon Act is applicable to the acquisition. Liquidated damages will be assessed if the contract completion date is not met and will be collected in the amount of $1,645.00 per day, of each day of the delay until work is completed or accepted. The contractor will be required to perform 15% of the total amount of the contract with its own organization. A list of contract drawings are delineated on pages 46 through 52 of the IFB document. The contractor will be paid 60% of its mobilization costs upon completion of mobilization to the project site and the remaining 40% of its costs upon completion of its demobilization from the site. The incremental funding clause is incorporated into the contract; as it stands, $2M has been reserved therein and will be periodically upgraded. The contractor will be required to submit a notice to the government within 120 days prior to its anticipation of the exhaustion of funds.

After Ms. Blair completed her presentation, Contractor’s were given an opportunity to ask questions, which follow:

CONTRACTOR’S QUESTIONS:

QUESTION #1. Is there a brand name or vendor spec for the automatic trash rake (hydro-component); it’s not identified in the Spec.

USACE RESPONSE TO QUESTION #1: The requirements for the trash rack raker are given in Specification Section 11 81 00 TRASH RACK RAKER. The contractor is responsible for finding a manufacturer that is able to meet all the requirements of this section.

QUESTION #2. Will the [automatic] trash rake extend beyond Lawndale Street?

USACE RESPONSE TO QUESTION #2: Yes.

QUESTION #3. It appears as though Amendment 0001 extended the bid opening date to 15 April 2009 – Is this correct?

USACE RESPONSE TO QUESTION #3: Yes. Ms. Blair stated: I apologize; I failed to mention that an Amendment had been issued against the IFB. The gentlemen is correct; Amendment No. 0001 extended the Bid Opening Date to 15 May 09.

QUESTION #4. Who should we submit questions to? Can they be emailed?

USACE RESPONSE TO QUESTION #4: Questions should be submitted to Anita Simpkins by fax at 312-886-5475. Yes; emails are acceptable; however, we prefer faxed questions. Ms. Simpkins email address is anita.r.simpkins@usace.army.mil, which is also located on the Federal Business Opportunities Website.

QUESTION #5. Will individual responses to questions be made?

USACE RESPONSE TO QUESTION #5: No; the questions will be consolidated and answered by way of an Amendment.

QUESTION #6. When do you anticipate contract work to actually start?

USACE RESPONSE TO QUESTION #6: The goal is to award the contract during the 1st week of June 09 and issue the notice to proceed no later than the end of June 09. We would like to schedule the pre-construction conference as soon as possible after the notice to proceed, but no later than mid-July. USACE would like the field work to start as soon as possible after the notice to proceed, but as indicated in the Specifications, there are several submittals that the Contractor must prepare and submit to the Corps and/or the Lake County Soil and Water

Conservation District before field work can begin. The time until field work can begin depends on how long it takes the contractor to prepare submittals that conform to the Specifications and regulatory requirements. With that said, the Corps experience is that contractors are usually able to complete the submittal process within 60 to 90 days following the notice to proceed. It should be noted, however, that there have been cases when the contractor was able to complete the submittal process in much less than 60 days from the notice to proceed.

After the last question was responded to, contractors were escorted to the site location by the USACE.

ADDITIONAL CONTRACTOR QUESTIONS

(RECEIVED AFTER THE PRE-BID MEETING)

Question received on 4/29/2009 QUESTION #7. “Stop logs for Cady Marsh Ditch DWG. C-14. The inlet structure top plan shows 5 stop logs. Section D (C-14/C14) shows 15 required. Which is correct.”

USACE RESPONSE TO QUESTION #7: Fifteen (15) stop logs are required as indicated on Sheet C-14. The Inlet Structure Top Plan shows the locations of the stop log supports. Each support is capable of holding 3 stop logs.

Question received on May 4, 2009:

QUESTION #8. Bid Item No. 0022 – Drain Outlet No. 4 includes a 32”H x 49”W Elliptical RCP. This pipe is only made 34”H x 53”W.

Bid Item No. 0023 – Drain Outlet No. 5 includes a 27”H x 42”W Elliptical RCP. This pipe is only made 29”H x 45”W.

Please clarify the pipe sizes for these two (2) bid items.

USACE RESPONSE TO QUESTION #8: Drawing Sheets C-06 and C-07 are revised by Amendment 0002 as follows:

On contract drawing sheet C-06, on the "Profile Along Drain Outlet No. 4" and "Plan At Drain Outlet No. 4" views, Delete "32" H x 49" W Elliptical RCP" and Replace with "32" H x 49" W Or 34" H x 53" W Elliptical RCP".

On contract drawing sheet C-07, on the "Profile Along Drain Outlet No. 5" and "Plan At Drain Outlet No. 5" views, Delete "27" H x 42" W Elliptical RCP" and Replace with "27" H x 42" W Or 29" H x 45" W Elliptical RCP".

Questions received on May 5, 2009:

Question #9: The most economical and efficient way to install the sheet piling is to use a backhoe with a small vibrator on it. Will this be allowed or is there a reason vibratory hammers are not allowed?

USACE RESPONSE TO QUESTION #9: Specification Section 35 49 13.10 03 METAL SHEET PILING is revised by Amendment 0002 to allow use of vibratory hammers.

Question #10: Interlock sealant is mentioned multiple times in the specifications but not shown on the drawings. Is interlock sealant required and if so, does the full length of pile need sealant?

USACE RESPONSE TO QUESTION #10: By way of Amendment 0002 the use of interlock sealant has been deleted from the Solicitation. Interlock sealant has been deleted from Specification Section 35 49 13.10 03 and from the Submittal Register.

Question #11: Is PZ22 an acceptable alternate sheet pile to use instead of PZC13?

USACE RESPONSE TO QUESTION #11: No, see Paragraph 2.1.1 of Specification Section 35 49 13.10 03 METAL SHEET PILING.

Question #12: The drawings show a five foot stitch weld at the top of the sheets that are over the utilities. When scaled it appears that these sheets are only three and half feet long. Is there a minimum length for these piles?

USACE RESPONSE TO QUESTION #12: Dimension callout in Quadrant H-2 of Sheet S-03 that reads "5'-0" MIN." is revised by way of Amendment 0002 to read

"5'-0" OR LENGTH OF PILE, WHICHEVER IS SHORTER".

Question #13: Does the stitch weld need to be installed below the water table?

USACE RESPONSE TO QUESTION #13: Yes. "Areas where the stitch weld is below the water table must be dewatered in accordance with the requirements of Specification Section 01 57 24 CONTROL OF WATER".

Question #14: Drawing G-02 shows symbols for new fence and existing fence. Drawing C-02 shows fencing to be removed and replaced. Drawing C-13 sows existing fence.

Is there any other fencing on this site?

USACE RESPONSE TO QUESTION #14: Other required fencing is the temporary project safety fencing specified in Paragraph 1.7 Temporary Project Safety Fencing of Specification Section 01 52 02.00 10 TEMPORARY CONSTRUCTION FACILITIES. Bid Item 0027 TEMPORARY SECURITY FENCE & GATES is deleted from Section 00010 of the solicitation. By way of Amendment 0002, Section 00010, Specification Section 01 22 00.00 10 MEASUREMENT AND PAYMENT and the Submittal Register attached to Specification Section 01 33 00 SUBMITTAL PROCEDURES have been revised to reflect the deletion of this bid item.

Specification Section 32 31 13 CHAIN LINK FENCES AND GATES has been deleted from the solicitation in its entirety.

General Decision Number: IN080001 05/01/2009 IN1

Superseded General Decision Number: IN20070001

State: Indiana

Construction Types: Building, Heavy and Highway

Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.

LAKE AND PORTER COUNTIES

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/07/2008 3 03/14/2008 4 03/21/2008 5 04/04/2008 6 04/11/2008 7 05/02/2008 8 05/09/2008 9 05/23/2008 10 06/06/2008 11 06/13/2008 12 06/27/2008 13 07/04/2008 14 07/18/2008 15 07/25/2008 16 08/08/2008 17 09/19/2008 18 10/03/2008 19 01/09/2009 20 01/30/2009 21 02/06/2009 22 03/06/2009 23 05/01/2009

ASBE0017-002 06/01/2008

LAKE AND PORTER COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 39.90 19.95

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHANICAL SYSTEMS).........$ 29.93 18.75

ASBE0075-001 06/01/2008

REMAINING COUNTIES:

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 30.65 11.34

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 19.35 10.35

BOIL0001-005 07/01/2008

LAKE COUNTY, City of Hammond; North of 114th Street

Rates Fringes

BOILERMAKER......................$ 39.27 18.45

BOIL0374-003 07/01/2007

Rates Fringes

BOILERMAKER......................$ 32.00 17.72

BRIN0004-011 06/01/2008

MERRILLVILLE

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

Bricklayer, Stone Mason, Marble Mason, Terrazzo Worker, Tile Layer, Pointer, Cle..............................$ 34.05 16.37 Marble and terrazzo finisher.....$ 22.32 7.35 Marble Setter, Terrazzo Worker & Tile Setter.............$ 29.10 12.72

TILE FINISHER....................$ 21.32 7.35

BRIN0004-018 06/01/2008

SOUTH BEND

ST. JOSEPH COUNTY

Rates Fringes

BRICKLAYER

BRICKLAYER; STONE MASON;

POINTER, CAULKER, CLEANER...$ 27.00 11.19

MARBLE AND TILE FINISHER....$ 24.44 8.94

MARBLE AND TILE LAYER.......$ 26.48 9.86

TERRAZZO FINISHER...........$ 25.44 8.94

TERRAZZO WORKER.............$ 27.48 9.86

CARP0765-001 06/01/2008

HEAVY, HIGHWAY AND BUILDING CONSTRUCTION

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

CARPENTER........................$ 33.38 19.09

MILLWRIGHT.......................$ 33.48 19.09

CARP0888-001 06/01/2008

ST. JOSEPH COUNTY (Zone 1)

Rates Fringes

Carpenters

BUILDING CONSTRUCTION.......$ 25.19 11.39

HEAVY & HIGHWAY

CONSTRUCTION................$ 24.62 11.09

MILLWRIGHT

BUILDING CONSTRUCTION.......$ 23.40 14.28

ELEC0153-001 09/01/2008

ST JOSEPH COUNTY

Rates Fringes

Communication Technician.........$ 23.79 10.97

ELECTRICIAN......................$ 30.00 15.02

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0531-001 09/01/2008

LAPORTE AND PORTER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 33.60 16.95

ELEC0697-001 05/28/2007

LAKE COUNTY

Rates Fringes

ELECTRICIAN......................$ 34.30 18.34

ELEC0697-004 08/29/2005

LAKE COUNTY

Rates Fringes

Telecommunication Technician.....$ 25.34 11.71

Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).

Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC1393-003 12/01/2008

LAKE & PORTER COUNTIES

(Calumet Area, North of U.S. Hwy 30)

Rates Fringes

Line Construction:

EQUIPMENT OPERATOR

(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 34.65 4.75+27.75%

GROUNDMAN, EQUIPMENT

OPERATOR: (Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks)......$ 27.78 4.75+27.75%

GROUNDMAN...................$ 20.26 4.75+27.75%

GROUNDMAN-TRUCK DRIVER......$ 24.31 4.75+27.75%

LINEMAN.....................$ 34.65 4.75+27.75%

ELEV0002-005 01/01/2009

ELEVATOR CONSTRUCTION

LAKE AND PORTER COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 44.93 18.285+a+b

FOOTNOTES:

a. Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years. Employer contributes 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

ELEV0057-001 01/01/2005

LAPORTE AND ST. JOSEPH COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 31.77 12.015+a

FOOTNOTES:

a. Employer contributes 8% basic hourly rate for 5 years or more of service or 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

b. Eight Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veteran's Day; Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0150-001 06/01/2008

BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:

LAKE, LAPORTE, PORTER COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 39.00 17.78

GROUP 2.....................$ 38.20 17.78

GROUP 3.....................$ 34.00 17.78

GROUP 4.....................$ 31.90 17.78

GROUP 5.....................$ 26.45 17.78

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;

Concrete paver 27E cu. ft. & under; Concrete placing boom;

Concrete pump/grout pump with boom (truck mounted);

Concrete pump with boom (truck mounted); concrete tower;

Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);

Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);

Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;

Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks

GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;

Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;

Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches

GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen

GROUP 5: Fork lifts (Housing and commercial only)

ENGI0150-012 06/01/2007

BUILDING CONSTRUCTION

Power equipment operators:

GROUP 1.....................$ 24.60 16.45+a GROUP 2.....................$ 23.25 16.45+a GROUP 3.....................$ 22.45 16.45+a GROUP 4.....................$ 21.65 16.45+a GROUP 5.....................$ 19.05 16.45+a

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Fourth of July, Thanksgivng Day, Decoration Day, Labor Day and Christmas Day

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.

GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.

capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.

GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than

12 inches in width, Welding Machines (8 through 15).

GROUP 4: Bobcat (up to and including 3/4 cu. yd.).

Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4

cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8)

GROUP 5: Bobcats and forklifts (commercial or residential)

ENGI0150-014 05/01/2008

POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY

LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.30 16.90

GROUP 2.....................$ 36.85 16.90

GROUP 3.....................$ 36.40 16.90

GROUP 4.....................$ 35.20 16.90

GROUP 5.....................$ 34.15 16.90

POWER EQUITMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).

GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.

GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.

GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.

GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.

IRON0292-001 06/01/2008

ST. JOSEPH and LAPORTE (REMAINDER OF COUNTY)

IRONWORKER.......................$ 23.50 16.46

IRON0395-001 06/01/2008

LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50

MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE

ON W. TO 3 MILES E. OF IN. COUNTIES

Ironworkers:

SHEETER.....................$ 34.25 19.66

STRUCTURAL & ORNAMENTAL.....$ 34.00 19.66

LABO0041-001 06/01/2008

BUILDING CONSTRUCTION:

LAKE (Western Half)

Rates Fringes

Laborers:

BUILDING CONSTRUCTION

GROUP 1....................$ 30.28 11.30

GROUP 2....................$ 31.03 11.30

GROUP 3....................$ 31.28 11.30

CAISSON AND TUNNEL WORK

(Compressed & Free Air)

GROUP 1....................$ 31.78 11.30

LABORER CLASSIFICATIONS

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);

Portable Water, Pumps with discharge up to 3 indches;

Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;

Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;

Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;

Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;

Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.

CAISSON AND TUNNEL WORK (Compressed & Free Air)

GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.

Premium for all employees working in compressed air shall be as follows:

0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour

LABO0041-004 04/01/2008

LAKE (WESTERN HALF)

Rates Fringes

LABORERS

HEAVY AND HIGHWAY

CONSTRUCTION

GROUP 1....................$ 22.49 10.30

GROUP 2....................$ 22.79 10.30

GROUP 3....................$ 23.49 10.30

LABORERS (HEAVY AND HIGHWAY) CONSTRUCTION

GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool, and Power Equipment Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer

GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)

GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, General Laborer, concrete saw, joint control cutting

LABO0081-001 04/01/2008

HEAVY and HIGHWAY CONSTRUCTION:

LAKE (Eastern Half), LA PORTE AND PORTER COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 22.49 10.30

GROUP 2.....................$ 22.79 10.30

GROUP 3.....................$ 23.49 10.30

LABORERS (HEAVY AND HIGHWAY) GROUP DESCRIPTIONS

GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;

Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power

Tool, and Power Equipment Operator; Asphalt Raker Man;

Batch Truck Dumper; Bridge Hand Rail Erector; Handler (bulk or bag cement); Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man;

Screed Man or Screw Man on Asphalt Paver; Rebar Installer;

Sandblaster Man; Sealer Applicator for Asphalt (toxic);

Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven); Straw Blower Man; Subsurface Drain and Culvert Pipe Layer; Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.

GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).

GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;

concrete saw, joint control cutting

LABO0081-004 06/01/2008

LAKE (Eastern Half), LA PORTE AND PORTER COUNTIES

Rates Fringes

Laborers

BUILDING CONSTRUCTION

GROUP 1....................$ 30.28 11.30

GROUP 2....................$ 31.03 11.30

GROUP 3....................$ 31.28 11.30

LABORER CLASSIFICATIONS (BUILDING CONSTRUCTION)

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry Wall Workers, (interior & exterior); Roofer Tenders, Cement Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.

deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;

Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;

Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;

Chain Saw and Demolition Saw Operator; Concrete Conveyor

Assembler.

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;

Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;

Asbestos Removal; Hazardous Waste Removal

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist

LABO0645-001 06/01/2008

BUILDING CONSTRUCTION:

ST JOSEPH COUNTY:

Rates Fringes

Laborers:

GROUP 1.....................$ 19.58 9.90

GROUP 2.....................$ 19.78 9.90

GROUP 3.....................$ 20.08 9.80

GROUP 4.....................$ 20.58 9.80

BUILDING CONSTRUCTION

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Plasterers); echanic Tenders;

Window Washers and cleaners; Waterboys and Toolhousemen;

Roofers Tenders; Railroad Workers; Masonry Wall Washers (interior and exterior); Cement Finisher Tenders; Carpenter Tenders; All Portable Water pumps with discharge up to (3) inches; Plaster Tenders; Mason Tenders; Flag & Signal Person.

GROUP 2: Waterproofing; Handling of Creosot Lumber or like treated material (excluding railroad material);Asphalt Rakers and Lutemen; Kettlemen; Air Tool Operators and all Pneumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators; Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth;

Laborers working in ditches (6) ft.in depth or deeper;

Assembly of Unicrete Pump; Tile Layers (sewer or field) and Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain and Demolition Saw Operators;

Concrete Conveyor Assemblers.

GROUP 3: Water Blast Machine Operator; Mortar Mixers; Welders (Acetylene or electric); Cutting Torch or Burner; Cement Nozzle. Laborers; Cement Gun Operator; Scaffold Builders when Working for Plasterers.

GROUP 4: Dynamite Men; Drillers - Air Track or Wagon Drilling for explosives Hazardous and Toxic material handler, asbestos removal or handler.

LABO0645-002 04/01/2007

(UTILITY CONSTRUCTION)

ST JOSEPH COUNTY

Rates Fringes

Laborers:

GROUP 1:....................$ 20.22 8.90

GROUP 2:....................$ 20.52 8.90

GROUP 3:....................$ 21.22 8.90

LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;

Screed man or screw man or asphalt paver; Rebar installer;

Sandblaster man; Sealer applicator for asphalt (toxic);

Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;

Horizontal boring and jacking man; Jackman and sheetman;

Pipe grade man; winch and windlass operator

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.

GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Cutting

LABO0645-004 04/01/2007

ST. JOSEPH COUNTY

Rates Fringes

LABORERS

HEAVY AND HIGHWAY

CONSTRUCTION

GROUP 1....................$ 20.02 8.90

GROUP 2....................$ 20.32 8.90

GROUP 3....................$ 21.22 8.90

LABORER CLASSIFICATIONS (HEAVY AND HIGHWAY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .