AMD 0004 W912P609B0001.pdf

PDF 23 KB Posted

Attached to
CADY MARSH DITCH IMPROVEMENTS, GRIFFITH, INDIANA
Solicitation number
W912P6-09-B-0001
Issued by

About this file

Amendment 0004 W912P6-09-B-0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6682042419

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: SOLICITATION NO W912P6-09-B-0001, CADY MARSH DITCH LOCAL FLOOD PROTECTION DITCH IMPROVEMENT, GRIFFITH, INDIANA

This Amendment Number 0004, provides USACE’s responses to Questions submitted on May 12 and 13, 2009.

1. The Bid Opening date is not extended. Bids are due to the USACE by 2:00 P.M. C.S.T. on Friday, May 15, 2009.

2. The Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-5372.

-- THIS AMENDMENT CONTINUES ON PAGE 2 –

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-May-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0001

X 9B. DATED (SEE ITEM 11)

14-Apr-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-May-2009

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-09-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Question received on May 12, 2009:

Question #1: I feel your answer to the jib question is incorrect. The operator will need to physically retract the extension and the electric winch or the electric winch on the main boom regardless in order to avoid the control boxes. If they fail to do so they will hit the control boxes with either configuration. The main boom elevation is well clear of the Electric control boxes. Therefore the main boom configuration, eliminating the jib extension should be allowed. There is a significant savings to eliminate the jib extension.

USACE RESPONSE TO QUESTION #1: The USACE concurs with your assessment that the winch will need to be retracted regardless in order to avoid the control boxes. However, the boom extension is still required to ensure safe clearances from the power pole, power lines and the power supply lines that feed in through the roof of the control boxes.

Questions received on May 13, 2009:

Question #2: Do you wish to provide generator specifications?

USACE RESPONSE TO QUESTION #2: Drawing Sheet E-06.1 is a reference drawing of "AS-BUILT" conditions. All work shown on drawing E-06.1 represents current existing conditions at the project site and is not part of the current solicitation." New work at this location is shown on Drawing Sheet E-02 (sheet 29 of 29) titled “GENIS PUMP STATION, LIGHTING PLAN”.

Question #2: On drawing E-06.1 Will the utility company provide and install the overhead power cable from the pole labeled “Note 3” to pole labeled “New Poles” just to the right of the bar screen structure? Please clarify which pole we are to run e” underground conduit to for the feed to the CT cabinet.

USACE RESPONSE TO QUESTION #3: Drawing Sheet E-06.1 is a reference drawing of "AS-BUILT" conditions. All work shown on drawing E-06.1 represents current existing conditions at the project site and is not part of the current solicitation." New work at this location is shown on Drawing Sheet E-02 (sheet 29 of 29) titled “GENIS PUMP STATION, LIGHTING PLAN”.

Question #3: On drawing E-6.01, please clarify which poles we are to provide and install. How tall are the poles if we are to provide?

USACE RESPONSE TO QUESTION #4: Drawing Sheet E-06.1 is a reference drawing of "AS-BUILT" conditions. All work shown on drawing E-06.1 represents current existing conditions at the project site and is not part of the current solicitation." New work at this location is shown on Drawing Sheet E-02 (sheet 29 of 29) titled “GENIS PUMP STATION, LIGHTING PLAN”.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .