Typical Projects.doc

DOC document 31 KB Posted

Attached to
Buffalo District Construction Federal contract opportunity
Solicitation number
W912P4-09-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Example of projects for which task orders could be issued under the Multiple Award Contract

View the file

Other files for this federal contract opportunity

Other files attached to Buffalo District Construction, newest first.
File Type Posted
MATOC Amendment 3.doc DOC document
MATOC Amendment #2.doc DOC document
MATOC PreBid List.pdf PDF
BRL Full Specs FINAL.pdf PDF
Full Set - Tabloid.pdf PDF
Attachment_1_Bldg 1 Soil Borings —
97-BRL-1_2.PDF PDF
79-BLSF-1_2.PDF PDF
REGISTER.pdf PDF
Safety Attachments.pdf PDF
NYST2.PDF PDF
PROJECT.pdf PDF
97-BRL-1_13.PDF PDF
79-BLSF-1_3.PDF PDF
NYST4.PDF PDF
79-BLSF-1_1.PDF PDF
Full Set - Full Size.pdf PDF
NYST3.PDF PDF
Attachment_2_brcslip-1995 lead line.pdf PDF
NYST1.PDF PDF
W912P4-09-R-0001 17 feb 09.doc DOC document
Proposal Submission Requirments.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Typical Projects. Disciplines and related work requirements may include, but are not limited to:

(1) Architectural. Enclosures, shelters, building systems, mobile buildings, chimneys, grout, mortar, concrete, brick, concrete masonry units (CMUs), waterproofing, insulation, caulking and sealants, roofing, gutters, drains, metal decking, joists, siding and exterior surfacing, levelers, docks, ramps, stairs, shelving, windows, doors, painting, finishes, louvers, awnings, shutters, panels, grills, ceilings, acoustical areas, walls, paneling, flooring (conductive and nonconductive), carpeting, tiles, builder’s hardware, signage, metals, woods and plastics, millwork, thermal and moisture protection, fireproofing, equipment systemization layouts, building fixtures and furnishings, and handicap systemization.

(2) Civil. Topographic surveying, grading and earthwork, surface and subsurface storm drainage and drainage control structures, storm water management, erosion and sediment control, clearing and grubbing, paving and surfacing for roads, parking areas and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, dewatering, landscaping, seeding and sodding, riprap, geotechnical investigations, slope stabilization, foundations, borings, trenching, piles and caissons, spill containment, berms, demolition, wetlands delineation and storm/surface ground water management.

(3) Electrical. Electrical distribution and network balancing, transmission lines, poles (telephone and power), ducts, raceways, conduits, tubing, connectors, wires, cable, cable trays, outlet boxes, cabinets and enclosures, supports, fiber optics cable and equipment, manholes, concrete pads, insulators, lightning arrestors, transformers, capacitors, switches, relays, fuses, grounding, lightning protection, cathodic protection, service entrances, panel boards, circuit breakers, motor control centers, special equipment/systems, targeting systems, resistance heating, starters, uninterrupted power supplies (UPS), beacons, batteries, generators, solar systems, receptacles, lighting fixtures, lamps, ballasts, equipment connections, special outlets, disconnect switches, splices, terminations, control systems, security systems, IDS, utilities monitoring and control systems (UMCS), and similar micro processor environmental control systems, audio and visual communication systems, telephone systems, instrumentation systems, and fire detection and alarm systems.

(4) Mechanical. Heating, ventilation and air-conditioning (HVAC) systems and components, chillers, refrigerants, cooling towers, air handling equipment, energy conservation, heat transfer surfaces, furnaces, air distribution, valves, pumps and associated piping and ducts, conveying systems, elevators, hoists and cranes, lifts, boilers, material handling systems, dryers, steam lines, transient tubes, shredders, plumbing fixtures, special equipment/systems, , storage tanks for fuel, gas, water, and sewage, piping systems, fire suppression (water, chemical, and gas), compressed air production and distribution systems, exhaust systems, steam systems, pipe insulation, and plumbing systems involving water, solids, and hazardous waste.

(5) Safety. Life safety, fire protection systems, industrial hygiene, inflammatory gases, medical safety and hygiene, asbestos and/or lead based paint evaluation and removal/encapsulation, failure mode and effective analyses (FMEA), Occupational Safety and Hazards Act (OSHA) and American Disability Act (ADA) evaluations.

(6) Structural. Structural design and analysis of building systems and ancillary structures (concrete, masonry, steel, etc.), foundations, underwater structures, reinforced concrete, equipment mounting, shock isolation reinforced masonry, wood, steel joists, steel decks, structural steel frame systems, steel bracing, seismic design and evaluations, steel connections, non-building structures, welding procedures, detailing of structural components and hardened (protective) structures. Non-building structures such as elevated tanks, vertical tanks on ground, horizontal tanks, retaining walls and buried structures. Anchorage and support of mechanical and electrical equipment. Applications of industry building codes and standards.

(7) Systems. Quality control, operations and maintenance (O&M) manuals and procedures both preventative and breakdown, training, human factors engineering, upgrade assessments, equipment inventories and O&M documentation to obtain support, energy system surveys, O&M training efforts to support the MRR, System/equipment and life safety repair and maintenance efforts for existing systems/equipment, logistical support, accreditation surveys.

(8) Other Requirements. Demolition and/or temporary removal and reinstallation of supporting elements in the project related areas may be required. Surveys and assessments of systems/equipment may be required prior to MRR action. On-site inspection and acceptance services may be required. Ancillary work necessary to support the MRR action project or to restore the work area to the condition prior to the MRR action project may be included.

File details come from the government source that posted it. Updated .