REGISTER.pdf

PDF 34 KB Posted

Attached to
Buffalo District Construction Federal contract opportunity
Solicitation number
W912P4-09-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

project attachments

View the file

Other files for this federal contract opportunity

Other files attached to Buffalo District Construction, newest first.
File Type Posted
MATOC Amendment 3.doc DOC document
MATOC Amendment #2.doc DOC document
MATOC PreBid List.pdf PDF
BRL Full Specs FINAL.pdf PDF
Full Set - Tabloid.pdf PDF
Attachment_1_Bldg 1 Soil Borings —
97-BRL-1_2.PDF PDF
79-BLSF-1_2.PDF PDF
Safety Attachments.pdf PDF
NYST3.PDF PDF
Attachment_2_brcslip-1995 lead line.pdf PDF
NYST1.PDF PDF
W912P4-09-R-0001 17 feb 09.doc DOC document
NYST2.PDF PDF
PROJECT.pdf PDF
97-BRL-1_13.PDF PDF
79-BLSF-1_3.PDF PDF
NYST4.PDF PDF
79-BLSF-1_1.PDF PDF
Full Set - Full Size.pdf PDF
Proposal Submission Requirments.doc DOC document
Typical Projects.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Black Rock Lock - Water and Sewer Replacement Project

01 35 29 SD-01 Preconstruction Submittals

1.6 G AOFAccident Prevention Plan (APP)

1.7 G AOFActivity Hazard Analysis (AHA)

1.6.1 G AOFCrane Critical Lift Plan

1.6.1 G AOFCrane Work Plan

3.5.3 G AOFProof of qualification

SD-06 Test Reports 1.11Reports

1.11.1 G AOFAccident Reports

1.11.4Monthly Exposure Reports

1.11.5 G AOFCrane Reports

1.11.3 G AOFRegulatory Citations and

Violations SD-07 Certificates

1.8 G AOFConfined Space Entry Permit

1.8 G AOFHot work permit

1.11.6 G AOFCertificate of Compliance

01 45 04.00 10 SD-01 Preconstruction Submittals

3.2 G AOFQuality Control Plan

3.4.3 G AOFQuality Control Plan

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 78 00 SD-03 Product Data 1.2.2As-Built Record of Equipment and Materials 1.4.1Warranty Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 78 00 1.4.5Warranty Tags SD-08 Manufacturer’s Instructions

1.3Preventative Maintenance 1.3Condition Monitoring (Predictive

Testing) 1.3Inspection 1.4.1Instructions

SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.2.1Record Drawings

1.7 GForm DD1354

1.7 GChecklist for Form DD1354

03 30 00 SD-03 Product Data

2.4.9 G TSDJoint filler

2.4.1 G TSDCement

2.4.1.2 G TSDPortland Cement

2.3.2 G TSDReady-Mix Concrete

2.4.6.1Water-Vapor Barrier Subgrade

Cover 2.6Bonding Materials

2.3.3 G TSDConcrete Curing Materials

2.5 G TSDReinforcement

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

03 30 00 1.6.2.1 G TSDConcrete Mix Design SD-06 Test Reports

1.6.2.1 G TSDConcrete mix design

1.6.2.2Fly ash 1.6.2.2Pozzolan 1.6.2.3Aggregates

3.11.2.3 G TSDCompressive strength tests

3.11.2.4Air Content

2.7.4 G AOFSlump

2.7.1 G AOFAir Entrainment

SD-07 Certificates 1.6.1.1Curing concrete elements 1.6.1.2Pumping concrete 2.4.12Biodegradable Form Release

Agent 1.6.1.3Material Safety Data Sheets

22 00 00 SD-03 Product Data

2.1 G TSDMaterials

3.3.1.1 G AOFBackflow prevention assemblies

1.5.1 G AOFWelding

SD-06 Test Reports

3.3 G AOFTests, Flushing and Disinfection

3.3.1.1 G AOFTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3 G AOFMaterials and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

22 07 10.00 20 SD-03 Product Data

2.1 G TSDInsulation

SD-08 Manufacturer’s Instructions

1.1 G AOFfield-applied insulation

26 05 00.00 40 SD-01 Preconstruction Submittals 1.4Material, Equipment, and Fixture

Lists 3.4Conduits, Raceway sand Fittings 2.3Splices and Connectors 2.4Switches 2.5Receptacles 3.5.1Receptacles 2.6Outlets, Outlet Boxes, and Pull

Boxes 2.8Circuit Breakers 1.2.1Detail Drawings

SD-03 Product Data 3.4Conduits, Raceway sand Fittings 2.3Splices and Connectors 2.4Switches 2.5Receptacles 3.5.1Receptacles 2.6Outlets, Outlet Boxes, and Pull

Boxes 2.8Circuit Breakers 1.3Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

26 05 00.00 40 2.2 G TSDCable;

2.2.1 G TSDLow Voltage Cable;

2.9 G TSDGrounding and Bonding;

SD-08 Manufacturer’s Instructions 1.4Manufacturer's Instructions

31 23 00.00 20 SD-01 Preconstruction Submittals

1.6.1 G TSDShoring and Sheeting Plan

1.6.2 G AOFDewatering work plan

SD-06 Test Reports

3.13.2.1 G TSDFill and backfill

3.13.2.2 G TSDSelect material

33 11 00 SD-03 Product Data

2.1.1 G TSDPiping Materials

2.1 G TSDWater service line

SD-06 Test Reports

2.1.2.4 G AOFDisinfection

SD-07 Certificates

2.1 G AOFWater service line

SD-08 Manufacturer’s Instructions

1.5 G AOFDelivery, storage, and handling

3.1.1 G AOFInstallation

33 30 00 SD-03 Product Data

2.1 G TSDPipeline materials

SD-06 Test Reports

2.4 G TSDReports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

33 30 00 2.2.2 G TSDPortland Cement

1.5.1.1 G TSDGaskets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .