B7-1_Pre-Bid_Conference.pptx
PPTX presentation 67 KB Posted
- Attached to
- Phase 2 Security Mobile Armory Infrastructure Federal contract opportunity
- Solicitation number
- W912NS-19-B-6004
- Issued by
- Department of the Army National Guard
About this file
PowerPoint
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C4-1_CONSTRUCTION_1419_-_Bid_Abstract.pdf | ||
| B8-3_Released_Amendment_3.pdf | ||
| B8-3_PWS_Revised_-_Drawings_extracted.pdf | ||
| B8-3_Released_Amendment_2.pdf | ||
| B8-3_Questions_and_Answers__1.docx | DOCX document | |
| A2-11_Bldg_205_Master_Model_Fence_Plan.pdf | ||
| A2-11_Bldg_205_Master_Model_Site_Work.pdf | ||
| A2-11_Bldg_205_Master_Model_Concrete_Plan.pdf | ||
| B8-3_Released_Amendment_1.pdf | ||
| A2-11_PWS.doc | DOC document | |
| B7-1_Sign-In_Sheet.pdf | ||
| B7-1_Pre-bid_conference_meeting_minutes.pdf | ||
| B8-2_W912NS19B6004_Solicitation.pdf | ||
| bid_bond_checklist.doc | DOC document | |
| A2-9_JA_Under_SAT_-_Advantor.pdf | ||
| A2-9_JA_Under_SAT_FAR_-_Automated_Logic.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Conference 2 July 2019 Phase II Mobile Armory Infrastructure 139th Airlift Wing, St. Joseph, MO Solicitation W912NS19B6004
Points of Contact Contracting Officer (KO): 2d Lt Adam Danner (816) 236-3256 Contract Specialist: TSgt Talia Guess (816) 236-3259 BCE: Maj Matthew Neil (816) 236-3230 Deputy BCE: Capt Krista Abernethy (816) 236-3531 Project Manager: Mr. Tony Bahr (816) 236-3040 (Contract Employee – Prescient Technologies) Assistant project Manager: TSgt Bryan Kern (816) 236-3197
SUBMIT ALL QUESTIONS IN WRITING
100% Small Business Set-Aside (SB) Magnitude of Construction is between $100,000.00 and $250,000.00
SAM Registered https://www.sam.gov/portal/public/SAM/ You must be SAM registered to do work with us.
Project Management Safety Environmental & Bio Environmental Security Police Fire Department Real Property Worksheet Base Operations/Airport Communications Flight
Safety Comply with any applicable OSHA requirements while on the job-site.
Motor Vehicle safety: seatbelts, speed limits, hands-free cell use.
Confined Space entry requires confined space certified. Coordinate all confined space entries with Base Fire House (816-236-3301) Speed limit is 15 MPH on Base unless posted differently.
Environmental & Bio-Environmental Off site dumping/removal – Contractor’s dumpsters only.
Hazard Material usage/storage – see Hazardous Material Notification Form.
a. Review process for filling out and submitting forms.
Suspect contamination - notify EMO or COTR immediately.
Hazardous Storage containers shall be used if storing HAZ-MAT on base.
Security Police Police checks – allow 14 calendar days for approval.
| a. Submit background checks by e-mail to; | ||
| i. SSgt Amber Robison – amber.d.robison.mil@mail.mil or the project | manager. | |
| b. After a background check is approved, obtain an AF Form 75 at Security’s | Visitor Center located in building 205 east of the main Base. | |
| c. Present AF 75 at main gate for entry on Base and keep on your person at | all times. |
Contractor responsible for securing site material/tools.
Fire Department Burning/Welding Permit – will be required if any open flames or sparks will be generated by the contractor’s work – obtain at Base Fire Department (816-236-3301).
Emergency Response: Dial 911 from any Base phone, or 911 from your cell phone.
Real Property Worksheet Contractor is responsible for filling out the Real Property Worksheet 1354 and turn in to Base Real Property Manager at the end of the project (Part of Contract Close out in Base Standards).
Keep track of quantities of materials and all costs associated with each item.
Base Operation/Airport FOD – Foreign object debris. Keep all FOD from the airfield.
Communications Flight If radios are used, submit the frequency you will use for approval before operating on Base.
Project Overview Install a 1150 SF metal shed roof system over the existing armory.
Cut in a new 3’0” x 7’0” metal door and frame into existing facility 205.
Provide fencing and gates per layout.
Demo some existing concrete and pour concrete new slabs per layout.
Pull 100 Amp, 208v feed from Firing Range service, upgrade existing service.
Anchor and ground existing Armory.
Provide communications drops to inside of armory.
DDC monitoring of armory temperature.
Install Advantor camera and duress button.
Dirt work, gravel drive and river rock landscaping with metal edging.
Completed bid package
a. Offer, Standard Form (SF) 1442 signed (Blocks 20(a), 20(b), and 20(c))
b. Section 00010 Line Items- all items must be priced
c. An Original Bid Bond and Original Power of Attorney is required along with the bid on the due date. The bid bond must be on a Standard Form 24.
d. Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
e. When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.
f. All amendments to the solicitation must be acknowledged.
g. Mark the front of the envelope with the following: “BID No. W912NS-19-B-6003”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
SF 1442 front and back Block #17 – acceptance (look at #13D) Acknowledge Amendments (Block #19) Sign SF 1442 (back) (Block 20A and 20B)
BID BOND (SF 24)
FAR Clause 52.228-1 Bid Guarantee Use Bid Bond Checklist to ensure compliance
RECAP
All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov.
Check FBO on a regular basis Discuss receipt of bids/getting on site/late is late Bids due 30 July 2019 at 1:00 p.m.
Project is tax exempt Must have a site supervisor on site at all times.
QUESTIONS????