Addendum 01 - Rpr Flooring.pdf
PDF 2 MB Posted
- Attached to
- Replace Flooring at the 148th
- Solicitation number
- W912LM-22R-1008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.docx | DOCX document | |
| Flooring Pic 1.jpg | JPG image | |
| Flooring Pic 3.jpg | JPG image | |
| Flooring Pic 2.jpg | JPG image | |
| Pre-Bid Roster - Rpr Flooring.pdf | ||
| B 07 Preproposal Conference Replace Floors .pptx | PPTX presentation | |
| EXHIBIT C Reference_Questionnaire_Package Rpr Floors (Attachment).docx | DOCX document | |
| EXHIBIT D Letter of Commitment Rpr Floors (Attachment).docx | DOCX document | |
| EXHIBIT B Rpr Floors(Attachment).docx | DOCX document | |
| EXHIBIT A Rpr Floors (Attachment).docx | DOCX document | |
| B 08 W912LM-22-R-1008 Replace Flooring.pdf | ||
| EXHIBIT A Rpr Floors (Attachment).docx | DOCX document | |
| A 03 Final Dwgs - Repair Flooring B211_B212_B250_B385.pdf | ||
| EXHIBIT B Rpr Floors(Attachment).docx | DOCX document | |
| EXHIBIT C Reference_Questionnaire_Package Rpr Floors (Attachment).docx | DOCX document | |
| EXHIBIT D Letter of Commitment Rpr Floors (Attachment).docx | DOCX document | |
| B 08 Release Form 66 Rpr Flooring.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Flooring 148FW 8/18/2022
FMKM222005
ADDENDUM 01
ANSWERS TO CONTRACTOR QUESTIONS:
1. Question: Q1. B211 – the existing epoxy flooring in BDOC appears to be in relatively good condition. The plan calls to remove it and replace with carpet. Removing epoxy flooring is either done by grinding or shot blasting which is a noisy and dusty process. Given the sensitive nature of this area, we suggest leaving the existing epoxy in place, applying a skim coat of material to make the floor smooth and then install the carpet. This option is cleaner, faster and less expensive than removing the epoxy.
Response: Upon further discussion, we are removing B211 from the scope of the project. See attached revised drawings.
2. Question: Q2. B212 – There are existing nose wheel lines on the floor that would be removed during the work and no mention of replacing them. Please confirm this would not be in our contract or provide clarification, layout and material if we are to include this. Plansheet A1.10 for this area shows flooring transitions at doors. The entire existing perimeter of this hangar bay slab is sealed with what appears to be Dow 890 sealant and no such transition strips exist. All the doors around the perimeter appear to have flooring of similar thickness that would not require a transition. Please confirm how to proceed.
Response: See attached revised drawings and Bid Option 01 to include repainting taxiway lines and replacing DOW 890-SL sealant at all doors openings that currently have sealant.
3. Question: Q3. B385 – the existing tile flooring joints do not align with door openings. Removing the tile and leaving a clean edge at the doorway is nearly impossible. Since the existing flooring appears to be in good repair and is bonded to the substrate, would it be possible to clean the existing tile and install the new carpet over it with transition strips at the doors?
Response: Existing floor tile shall be removed. Provide a clean edge in doorways to be covered by a transition strip prior to installing carpet tiles.
4. Question: Q4. The details 2 & 3 that show the flooring transition are not defined in any specific location. If these are to be used, please indicate which style is to be used and indicate every location they would occur. Please confirm and describe if there is existing wall base to be removed in any of these areas. It is not shown or described.
Response: Flooring transition types/locations as well as existing wall base to be removed are addressed on revised drawings.
00 1,000500 1,500
1" = 500'-0"
Scale:
LOCATION MAP
1" = 500'
REPAIR FLOORING
B212, B250 & B385
MINNESOTA AIR NATIONAL GUARD
148TH FIGHTER WING
MN ANG CONTACTS
BASE CIVIL ENGINEER
JOSEPH SOLBERG Maj 218-788-7339
DEPUTY BASE CIVIL ENGINEER
BENJAMIN HAYES Capt 218-788-7885
BASE ENVIRONMENTAL
RYAN BLAZEVIC Lt Col 218-788-7868
MR. AJ PETERSEN Civ 218-788-7720
OPERATIONS MANAGEMENT
MATT HAYES MSgt 218-788-7292
RYAN HALL MSgt 218-788-7293
MR. RYAN MARPLE Civ 218-788-7555
FACILITY MANAGER
DOUG ION CMSgt 218-788-7408
FIRE DEPARTMENT 218-788-7434
BASE DEFENSE OPERATIONS CENTER 218-788-7442
MAIN ENTRY GATE 218-788-7390
AIRPORT RD.
B U
L L
D O
G
B
L V
D
MAIN ENTRY GATE
RIDGEVIEW RD.
DULUTH
INTERNATIONAL
AIRPORT
DRAWING INDEX
TITLE SHEET & LOCATION MAPG1.00
B250 FLOORING REPAIR PLAN
A1.00
B385 FLOORING REPAIR PLAN
A1.30
A1.40
B212 1ST FLOOR FLOORING REPAIR PLAN
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG
FILES\G1.00_TITLE SHEET.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222005
DRAWING TITLE
& PROJECT
GENERAL NOTES
G1.00
EGT
BHH
01 100% 23 JUN 22
02 REV 1
17 AUG 22
AREA OF WORK
AREA OF WORK
1. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH LAWS, ORDINANCES, RULES, CODES AND REGULATIONS OF
GOVERNMENT AUTHORITIES HAVING JURISDICTION.
2. THE GENERAL CONTRACTOR, ASSOCIATED SUBCONTRACTORS, AND ALL OF THEIR SUBORDINATES (REGARDLESS OF THE TRADE INVOLVED) SHALL FAMILIARIZE THEMSELVES WITH ALL INFORMATION LOCATED WITHIN THE COMPLETE CONSTRUCTION DOCUMENT
SET (ALL DRAWINGS AND SPECIFICATIONS) PRIOR TO CONSTRUCTION.
3. CONTRACTOR(S) SHALL MAINTAIN CURRENT RECORD DRAWINGS ON SITE AT ALL TIMES.
4. BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR AND ASSOCIATED SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN IN THE CONTRACT DOCUMENTS. THIS INCLUDES REVIEW AND VERIFICATION THAT DIMENSIONS, LOCATIONS, AND REQUIREMENTS SHOWN ON THESE PLANS ARE ACCEPTABLE FOR INSTALLATION AND PROPER USE OF THEIR RESPECTIVE SYSTEMS, MATERIALS AND EQUIPMENT. ANY DEVIATIONS, DISCREPANCIES, AND/OR CONFLICTS SHALL BE REPORTED IN WRITING
TO THE GOVERNMENT.
5. PRIOR TO COMMENCEMENT OF ANY OPERATION, EACH CONTRACTOR SHALL EXAMINE WORK PERFORMED BY OTHERS TO WHICH THEIR WORK ADJOINS OR IS APPLIED, AND REPORT TO THE ARCHITECT ANY CONDITIONS PREVENTING SATISFACTORY ACCOMPLISHMENT OF THEIR WORK. STARTING WORK OF ANY OPERATION SHALL INDICATE ACCEPTANCE OF CONDITIONS.
6. DRAWINGS ARE NOT TO BE SCALED. DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN OVER SMALL SCALE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK, AND SHALL NOTIFY
GOVERNMENT IMMEDIATELY IF ANY CONFLICTS OR DISCREPANCIES OCCUR.
7. MATERIALS AND NOTES COMMON TO SEVERAL DRAWINGS MAY BE NOTED ON ONLY ONE DRAWING. CONTRACTORS SHALL BE RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN ON DRAWINGS.
8. REFERENCES SHOWN ON DRAWINGS DO NOT NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT APPLICATION OF DRAWING OR DETAIL WHERE SPECIFIC DIMENSION, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED. CONSULT THE
GOVERNMENT PRIOR TO PROCEEDING WITH WORK.
9. CONTRACTOR SHALL ARRANGE TO ACCOMMODATE "NOT IN CONTRACT" WORK. WHEN INFORMATION IS INADEQUATE, REQUEST
FURTHER INSTRUCTIONS BEFORE PROCEEDING.
10. CONTRACTOR SHALL PERFORM HIGH QUALITY WORK. MATERIALS INSTALLED TO UNIFORM ACCURATE FIT SO THEY MEET WITH NEAT, STRAIGHT LINES, FREE OF OPEN SEAMS OR OVERLAPS. INSTALL EXPOSED MATERIALS APPROPRIATELY LEVEL, PLUMB AND
AT ACCURATE RIGHT ANGLES, OR FLUSH WITH ADJOINING MATERIALS.
11. COORDINATE WITH ALL SUBCONTRACTORS, ANY REQUIRED OPENINGS, INCLUDING THOSE NOT INDICATED IN THE CONSTRUCTION
DOCUMENT.
12. CONTRACTOR SHALL MAINTAIN CLEAN AND PRESENTABLE WORK AND STORAGE AREAS, AND SHALL NOT ALLOW ANY MATERIAL AS
A RESULT OF DEMOLITION OR CONSTRUCTION TO ACCUMULATE.
13. CONTRACTOR SHALL TAKE CARE TO PROTECT NEWLY INSTALLED MATERIALS.
14. PRIOR TO FINAL INSPECTION OF AND ACCEPTANCE OF THIS PROJECT, THE CONTRACTOR SHALL HAVE PROJECT AREA FREE FROM
ALL CONSTRUCTION DEBRIS, SCRAPS, MATERIAL, AND EQUIPMENT.
15. UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS. ALL AREAS AFFECTED BY THE PROJECT
SHALL BE DELIVERED CLEAN, WHOLE, TIGHT, AND FIT FOR IMMEDIATE OCCUPANCY.
16. THE CONTRACTOR SHALL ACCEPT THE PROJECT SITE AS IT EXISTS. ALL EXISTING DIMENSIONS AND EXISTING CONDITIONS WHETHER OR NOT SPECIFICALLY NOTED ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF ANY WORK. NOTIFY THE GOVERNMENT IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.
17. GENERAL CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN & PROTECT EXISTING EQUIPMENT, SYSTEMS & FINISHES WHICH ARE TO REMAIN. ANY DAMAGES TO SUCH EQUIPMENT, SYSTEMS & FINISHES SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE OWNER'S REPRESENTATIVE. IF SATISFACTORY REPAIRS CANNOT BE MADE, CONTRACTOR SHALL REPLACE EQUIPMENT, SYSTEMS & FINISHES WITH LIKE NEW QUALITY ACCEPTABLE TO THE OWNER. ALL REPAIRS & REPLACEMENT COSTS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
18. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.
19. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.
20. CONTRACTORS TO PROVIDE TEMPORARY PARTITIONS AND DUST CONTROL AT ALL LOCATIONS WHERE WORK OCCURS IN
CORRIDORS AND/OR CANNOT BE CONTAINED WITHIN ROOMS.
21. CONTRACTOR SHALL PATCH AND REPAIR ANY AND ALL FLOORS, WALLS, BASE, CEILING, ETC. IN A WORKMANSHIP-LIKE MANNER TO MATCH THE SURROUNDING SURFACE AREAS WHERE THERE IS DAMAGE BECAUSE OF REMOVAL OR REPLACEMENT OF EXISTING
CONSTRUCTION.
22. IF NON-IDENTIFIED, POTENTIALLY HAZARDOUS MATERIAL IS ENCOUNTERED, DO NOT DISTURB. CONTACT GOVERNMENT
IMMEDIATELY.
PROJECT GENERAL NOTES
BUILDING 211 WAS REMOVED FROM THIS PROJECT.
B212 1ST FLOOR BID OPTION 1 TAXIWAY LINE REMOVAL & REPLACEMENTA1.20
B212 1ST FLOOR BID OPTION 1 DOOR THRESHOLD SEALANT REMOVAL & REPLACEMENTA1.10
BASE BID
4,158 SQ. FT.
BID OPTION 1
26,860 SQ. FT.
Scale:
BLDG. 212 1ST FLOOR PLAN
1/16" = 1'-0"
NO DATEREVISION
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.00_B212
1ST FLOOR FLOORING REPAIR PLAN.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222004
B212
1ST FLOOR
FLOORING
REPAIR PLAN
A1.00
EGT
BHH
01 100% 23 JUN 22
02 REV 1 17 AUG 22
0 4' 8' 16' 32'
1/16" = 1'-0"
09 6700 - FLUID-APPLIED FLOORING
FAF1 FLUID-APPLIED FLOORING 1 (BASE BID & OPTION)
MFG: SIKA
STYLE: MORRITEX HD
(5-COAT SYSTEM)
COLOR: WHITE
LOC: HANGAR
BASE BID:
DEMO EXISTING EPOXY FLOORING.
REPLACE WITH FAF1 FLOORING
LISTED ON THIS SHEET.
(FIELD VERIFY FOOTPRINT
LOCATION W/ GOVERNMENT.)
BID OPTION 1:
DEMO EXISTING EPOXY FLOORING.
REPLACE WITH FAF1 LISTED ON
THIS SHEET.
REMOVED FLOOR TRANSITION DETAILS. PLEASE SEE
SHEET A1.10 FOR BID OPTION 1 - DOOR
TRANSITION/CONCRETE JOINT SEALANT
REMOVAL/INSTALLATION AND SHEET A1.20 FOR NOSE
WHEEL LINE REMOVAL/INSTALLATION.
NO DATEREVISION
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.10_B212
1ST FLOOR BID OPTION 1 JOINT SEALANT.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222004
B212 1ST FLOOR
BID OPTION 1
JOINT SEALANT
REMOVAL/
INSTALLATION
A1.10
EGT
BHH
01 100% 17 AUG 22
Scale:
BLDG. 212 1ST FLOOR PLAN
3/32" = 1'-0"
3/32" = 1'-0"
0 2' 4' 8' 16'
EXPANSION JOINT
LEGEND
ts
D
W
SLAB THICKNESS
DEPTH OF SEALANT
WIDTH OF SEALANT RESERVOIR
t s
D
W
W =19
[3/4"] MIN.
Scale:
TYP. DOOR THRESHOLD JOINT
1-1/2" = 1'-0"
1. TOP OF JOINT SEALANT SHALL BE 2-6 mm [1/16-1/4"] BELOW TOP OF PAVEMENT.
JOINT SEALANT - DOW 890
SL (SEE NOTE 1)
EXIST. BACKER
MATERIAL
EXIST. JOINT FILLER
A1.10
A1.10
A1.10
A1.10
A1.10
A1.10
A1.10
BID OPTION 1:
REMOVE EXISTING DOOR THRESHOLD SEALANT.
REPLACE WITH DOW 890 SL SEALANT. SEE
DETAIL ON THIS SHEET. (TYP. 7 PLCS)
NO DATEREVISION
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.20_B212
1ST FLOOR BID OPTION 1 TAXIWAY LINE REMOVAL &
REPLACEMENT.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222004
B212 1ST FLOOR
BID OPTION 1
TAXIWAY LINE
REMOVAL &
REPLACEMENT
A1.20
EGT
BHH
01 100% 17 AUG 22
Scale:
BLDG. 212 1ST FLOOR PLAN
1/16" = 1'-0"
3/32" = 1'-0"
0 2' 4' 8' 16'
BID OPTION 1:
DEMO EXISTING TAXI LINES.
REPAINT WITH 6" YELLOW TAXI LINES.
NOTES:
1. BOLD INDICATE LINES TO BE REPAINTED.
2. REPAINT 6" TAXIWAY LINES AS SHOWN,
NON-REFLECTORIZED.
TESTING
107 SQ. FT.
I.G. OFFICE
528 SQ. FT.
SERVICES
OFFICE
120 SQ. FT.
EXISTING TILE
FLOORING
EXISTING DOOR
2-1/2" ALUMINUM HALF
SADDLE THRESHOLD
NEW CARPET TILE
FLOORING - SEE FINISH
MATERIALS KEY
Scale:
BLDG. 250 FLOOR PLAN
3/32" = 1'-0"
NO DATEREVISION
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.30_B250
FLOORING REPAIR PLAN.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222004
B250
FLOORING
REPAIR PLAN
A1.30
EGT
BHH
01 100% 23 JUN 22
02 REV 1 17 AUG 22
3/32" = 1'-0"
0 2' 4' 8' 16'
09 6813 - TILE CARPETING
CPT1 CARPET 1 (BASE BID)
MFG: INTERFACE
PATERN: DECO DIAGONAL (6230202504)
SIZE: 20x20 INCH
BACKING: GRAPHLAR
COLOR: ANTHRACITE (602391)
METHOD: QUARTER-TURN
09 6500 - RESILIENT FLOORING
RB1 RESILIENT WALL BASE 1 (BASE BID)
MFG: ROPPE
STYLE: RUBBER, STYLE B COVE
COLOR:140 FAWN
HEIGHT: 4 INCH
FINISH MATERIALS KEY
DEMO EXISTING CARPET FLOORING
& WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED
ON THIS SHEET.
DEMO EXISTING VINYL TILE FLOORING
& WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED
ON THIS SHEET.
DEMO EXISTING CARPET FLOORING &
WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED
ON THIS SHEET.
A1.30
A1.30
Scale:
FLOORING TRANSITION - TILE TO CPT
3" = 1'-0"
REMOVED FLOOR TRANSITION FAF TO CONC DETAIL &
UPDATED VINYL TO CPT DETAIL.
JOINT OFFICE
SPACE
286 SQ. FT.
OFFICE SPACE
113 SQ. FT.
BREAKROOM
464 SQ. FT.
EXISTING VINYL
TILE FLOORING,
W/ CLEAN EDGE
TO BE COVERED
UP WITH SADDLE
THRESHOLD
EXISTING DOOR
2-1/2" ALUMINUM HALF
SADDLE THRESHOLD
NEW CARPET TILE
FLOORING - SEE FINISH
MATERIALS KEY
Scale:
BLDG. 385 FLOOR PLAN
3/16" = 1'-0"
NO DATEREVISION
148TH FIGHTER WING
CIVIL ENGINEER SQUADRON
4630 MUSTANG DRIVE
DULUTH, MN 55811
THIS SQUARE APPEARS
1/2" X 1/2" ON FULL SIZE
SHEETS
DRAWING TITLE:
PROJECT NAME:
PROJECT NUMBER:
FILE:
DRAWN BY:
CHECKED BY:
DRAWING NO:
R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -
REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.40_B385
FLOORING REPAIR PLAN.DWG
REPAIR
FLOORING
B212, B250
& B385
FMKM222004
B385
FLOORING
REPAIR PLAN
A1.40
EGT
BHH
01 100% 23 JUN 22
02 REV 1 17 AUG 22
3/16" = 1'-0"
0 1' 2' 4' 8'
09 6500 - RESILIENT FLOORING
RB1 RESILIENT WALL BASE 1 (BASE BID)
MFG: ROPPE
STYLE: RUBBER, STYLE B COVE
COLOR:140 FAWN
HEIGHT: 4 INCH
FINISH MATERIALS KEY
Scale:
FLOORING TRANSITION - VINYL TO CPT
3" = 1'-0"
DEMO EXISTING CARPET FLOORING &
WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED ON
THIS SHEET.
DEMO EXISTING VINYL TILE FLOORING
& WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED
ON THIS SHEET.
DEMO EXISTING VINYL TILE FLOORING &
WALL BASE. REPLACE WITH CPT1
FLOORING & RB1 WALL BASE LISTED ON
THIS SHEET.
09 6813 - TILE CARPETING
CPT1 CARPET 1 (BASE BID)
MFG: INTERFACE
PATERN: DECO DIAGONAL (6230202504)
SIZE: 20x20 INCH
BACKING: GRAPHLAR
COLOR: ANTHRACITE (602391)
METHOD: QUARTER-TURN
REMOVED FLOOR TRANSITION FAF TO CONC DETAIL &
UPDATED VINYL TO CPT DETAIL.
A1.40
A1.40
A1.40
A1.40
| A 03 Final Dwgs - Repair Flooring B212_B250_B385_REV 1.pdf |
| G1.00_TITLE SHEET |
| Sheets and Views |
| G1.00 |
| A1.00_B212 1ST FLOOR FLOORING REPAIR PLAN |
| Sheets and Views |
| Layout1 |
| A1.10_B212 1ST FLOOR BID OPTION 1_DOOR THRESHOLD SEALANT REMOVAL & REPLACEMENT |
| Sheets and Views |
| Layout1 |
| A1.20_B212 1ST FLOOR BID OPTION 1_TAXIWAY LINE REMOVAL & REPLACEMENT |
| Sheets and Views |
| Layout1 |
| A1.30_B250 FLOORING REPAIR PLAN |
| Sheets and Views |
| Layout1 |
| A1.40_B385 FLOORING REPAIR PLAN |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .