Repair Flooring 148FW 8/18/2022

FMKM222005

ADDENDUM 01

ANSWERS TO CONTRACTOR QUESTIONS:

1. Question: Q1. B211 – the existing epoxy flooring in BDOC appears to be in relatively good condition. The plan calls to remove it and replace with carpet. Removing epoxy flooring is either done by grinding or shot blasting which is a noisy and dusty process. Given the sensitive nature of this area, we suggest leaving the existing epoxy in place, applying a skim coat of material to make the floor smooth and then install the carpet. This option is cleaner, faster and less expensive than removing the epoxy.

Response: Upon further discussion, we are removing B211 from the scope of the project. See attached revised drawings.

2. Question: Q2. B212 – There are existing nose wheel lines on the floor that would be removed during the work and no mention of replacing them. Please confirm this would not be in our contract or provide clarification, layout and material if we are to include this. Plansheet A1.10 for this area shows flooring transitions at doors. The entire existing perimeter of this hangar bay slab is sealed with what appears to be Dow 890 sealant and no such transition strips exist. All the doors around the perimeter appear to have flooring of similar thickness that would not require a transition. Please confirm how to proceed.

Response: See attached revised drawings and Bid Option 01 to include repainting taxiway lines and replacing DOW 890-SL sealant at all doors openings that currently have sealant.

3. Question: Q3. B385 – the existing tile flooring joints do not align with door openings. Removing the tile and leaving a clean edge at the doorway is nearly impossible. Since the existing flooring appears to be in good repair and is bonded to the substrate, would it be possible to clean the existing tile and install the new carpet over it with transition strips at the doors?

Response: Existing floor tile shall be removed. Provide a clean edge in doorways to be covered by a transition strip prior to installing carpet tiles.

4. Question: Q4. The details 2 & 3 that show the flooring transition are not defined in any specific location. If these are to be used, please indicate which style is to be used and indicate every location they would occur. Please confirm and describe if there is existing wall base to be removed in any of these areas. It is not shown or described.

Response: Flooring transition types/locations as well as existing wall base to be removed are addressed on revised drawings.

00 1,000500 1,500

1" = 500'-0"

Scale:

LOCATION MAP

1" = 500'

REPAIR FLOORING

B212, B250 & B385

MINNESOTA AIR NATIONAL GUARD

148TH FIGHTER WING

MN ANG CONTACTS

BASE CIVIL ENGINEER

JOSEPH SOLBERG Maj 218-788-7339

DEPUTY BASE CIVIL ENGINEER

BENJAMIN HAYES Capt 218-788-7885

BASE ENVIRONMENTAL

RYAN BLAZEVIC Lt Col 218-788-7868

MR. AJ PETERSEN Civ 218-788-7720

OPERATIONS MANAGEMENT

MATT HAYES MSgt 218-788-7292

RYAN HALL MSgt 218-788-7293

MR. RYAN MARPLE Civ 218-788-7555

FACILITY MANAGER

DOUG ION CMSgt 218-788-7408

FIRE DEPARTMENT 218-788-7434

BASE DEFENSE OPERATIONS CENTER 218-788-7442

MAIN ENTRY GATE 218-788-7390

AIRPORT RD.

B U

L L

D O

G

B

L V

D

MAIN ENTRY GATE

RIDGEVIEW RD.

DULUTH

INTERNATIONAL

AIRPORT

DRAWING INDEX

TITLE SHEET & LOCATION MAPG1.00

B250 FLOORING REPAIR PLAN

A1.00

B385 FLOORING REPAIR PLAN

A1.30

A1.40

B212 1ST FLOOR FLOORING REPAIR PLAN

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG

FILES\G1.00_TITLE SHEET.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222005

DRAWING TITLE

& PROJECT

GENERAL NOTES

G1.00

EGT

BHH

01 100% 23 JUN 22

02 REV 1

17 AUG 22

AREA OF WORK

AREA OF WORK

1. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH LAWS, ORDINANCES, RULES, CODES AND REGULATIONS OF

GOVERNMENT AUTHORITIES HAVING JURISDICTION.

2. THE GENERAL CONTRACTOR, ASSOCIATED SUBCONTRACTORS, AND ALL OF THEIR SUBORDINATES (REGARDLESS OF THE TRADE INVOLVED) SHALL FAMILIARIZE THEMSELVES WITH ALL INFORMATION LOCATED WITHIN THE COMPLETE CONSTRUCTION DOCUMENT

SET (ALL DRAWINGS AND SPECIFICATIONS) PRIOR TO CONSTRUCTION.

3. CONTRACTOR(S) SHALL MAINTAIN CURRENT RECORD DRAWINGS ON SITE AT ALL TIMES.

4. BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR AND ASSOCIATED SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN IN THE CONTRACT DOCUMENTS. THIS INCLUDES REVIEW AND VERIFICATION THAT DIMENSIONS, LOCATIONS, AND REQUIREMENTS SHOWN ON THESE PLANS ARE ACCEPTABLE FOR INSTALLATION AND PROPER USE OF THEIR RESPECTIVE SYSTEMS, MATERIALS AND EQUIPMENT. ANY DEVIATIONS, DISCREPANCIES, AND/OR CONFLICTS SHALL BE REPORTED IN WRITING

TO THE GOVERNMENT.

5. PRIOR TO COMMENCEMENT OF ANY OPERATION, EACH CONTRACTOR SHALL EXAMINE WORK PERFORMED BY OTHERS TO WHICH THEIR WORK ADJOINS OR IS APPLIED, AND REPORT TO THE ARCHITECT ANY CONDITIONS PREVENTING SATISFACTORY ACCOMPLISHMENT OF THEIR WORK. STARTING WORK OF ANY OPERATION SHALL INDICATE ACCEPTANCE OF CONDITIONS.

6. DRAWINGS ARE NOT TO BE SCALED. DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN OVER SMALL SCALE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK, AND SHALL NOTIFY

GOVERNMENT IMMEDIATELY IF ANY CONFLICTS OR DISCREPANCIES OCCUR.

7. MATERIALS AND NOTES COMMON TO SEVERAL DRAWINGS MAY BE NOTED ON ONLY ONE DRAWING. CONTRACTORS SHALL BE RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN ON DRAWINGS.

8. REFERENCES SHOWN ON DRAWINGS DO NOT NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT APPLICATION OF DRAWING OR DETAIL WHERE SPECIFIC DIMENSION, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED. CONSULT THE

GOVERNMENT PRIOR TO PROCEEDING WITH WORK.

9. CONTRACTOR SHALL ARRANGE TO ACCOMMODATE "NOT IN CONTRACT" WORK. WHEN INFORMATION IS INADEQUATE, REQUEST

FURTHER INSTRUCTIONS BEFORE PROCEEDING.

10. CONTRACTOR SHALL PERFORM HIGH QUALITY WORK. MATERIALS INSTALLED TO UNIFORM ACCURATE FIT SO THEY MEET WITH NEAT, STRAIGHT LINES, FREE OF OPEN SEAMS OR OVERLAPS. INSTALL EXPOSED MATERIALS APPROPRIATELY LEVEL, PLUMB AND

AT ACCURATE RIGHT ANGLES, OR FLUSH WITH ADJOINING MATERIALS.

11. COORDINATE WITH ALL SUBCONTRACTORS, ANY REQUIRED OPENINGS, INCLUDING THOSE NOT INDICATED IN THE CONSTRUCTION

DOCUMENT.

12. CONTRACTOR SHALL MAINTAIN CLEAN AND PRESENTABLE WORK AND STORAGE AREAS, AND SHALL NOT ALLOW ANY MATERIAL AS

A RESULT OF DEMOLITION OR CONSTRUCTION TO ACCUMULATE.

13. CONTRACTOR SHALL TAKE CARE TO PROTECT NEWLY INSTALLED MATERIALS.

14. PRIOR TO FINAL INSPECTION OF AND ACCEPTANCE OF THIS PROJECT, THE CONTRACTOR SHALL HAVE PROJECT AREA FREE FROM

ALL CONSTRUCTION DEBRIS, SCRAPS, MATERIAL, AND EQUIPMENT.

15. UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS. ALL AREAS AFFECTED BY THE PROJECT

SHALL BE DELIVERED CLEAN, WHOLE, TIGHT, AND FIT FOR IMMEDIATE OCCUPANCY.

16. THE CONTRACTOR SHALL ACCEPT THE PROJECT SITE AS IT EXISTS. ALL EXISTING DIMENSIONS AND EXISTING CONDITIONS WHETHER OR NOT SPECIFICALLY NOTED ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF ANY WORK. NOTIFY THE GOVERNMENT IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.

17. GENERAL CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN & PROTECT EXISTING EQUIPMENT, SYSTEMS & FINISHES WHICH ARE TO REMAIN. ANY DAMAGES TO SUCH EQUIPMENT, SYSTEMS & FINISHES SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE OWNER'S REPRESENTATIVE. IF SATISFACTORY REPAIRS CANNOT BE MADE, CONTRACTOR SHALL REPLACE EQUIPMENT, SYSTEMS & FINISHES WITH LIKE NEW QUALITY ACCEPTABLE TO THE OWNER. ALL REPAIRS & REPLACEMENT COSTS

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

18. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.

19. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.

20. CONTRACTORS TO PROVIDE TEMPORARY PARTITIONS AND DUST CONTROL AT ALL LOCATIONS WHERE WORK OCCURS IN

CORRIDORS AND/OR CANNOT BE CONTAINED WITHIN ROOMS.

21. CONTRACTOR SHALL PATCH AND REPAIR ANY AND ALL FLOORS, WALLS, BASE, CEILING, ETC. IN A WORKMANSHIP-LIKE MANNER TO MATCH THE SURROUNDING SURFACE AREAS WHERE THERE IS DAMAGE BECAUSE OF REMOVAL OR REPLACEMENT OF EXISTING

CONSTRUCTION.

22. IF NON-IDENTIFIED, POTENTIALLY HAZARDOUS MATERIAL IS ENCOUNTERED, DO NOT DISTURB. CONTACT GOVERNMENT

IMMEDIATELY.

PROJECT GENERAL NOTES

BUILDING 211 WAS REMOVED FROM THIS PROJECT.

B212 1ST FLOOR BID OPTION 1 TAXIWAY LINE REMOVAL & REPLACEMENTA1.20

B212 1ST FLOOR BID OPTION 1 DOOR THRESHOLD SEALANT REMOVAL & REPLACEMENTA1.10

BASE BID

4,158 SQ. FT.

BID OPTION 1

26,860 SQ. FT.

Scale:

BLDG. 212 1ST FLOOR PLAN

1/16" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.00_B212

1ST FLOOR FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222004

B212

1ST FLOOR

FLOORING

REPAIR PLAN

A1.00

EGT

BHH

01 100% 23 JUN 22

02 REV 1 17 AUG 22

0 4' 8' 16' 32'

1/16" = 1'-0"

09 6700 - FLUID-APPLIED FLOORING

FAF1 FLUID-APPLIED FLOORING 1 (BASE BID & OPTION)

MFG: SIKA

STYLE: MORRITEX HD

(5-COAT SYSTEM)

COLOR: WHITE

LOC: HANGAR

BASE BID:

DEMO EXISTING EPOXY FLOORING.

REPLACE WITH FAF1 FLOORING

LISTED ON THIS SHEET.

(FIELD VERIFY FOOTPRINT

LOCATION W/ GOVERNMENT.)

BID OPTION 1:

DEMO EXISTING EPOXY FLOORING.

REPLACE WITH FAF1 LISTED ON

THIS SHEET.

REMOVED FLOOR TRANSITION DETAILS. PLEASE SEE

SHEET A1.10 FOR BID OPTION 1 - DOOR

TRANSITION/CONCRETE JOINT SEALANT

REMOVAL/INSTALLATION AND SHEET A1.20 FOR NOSE

WHEEL LINE REMOVAL/INSTALLATION.

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.10_B212

1ST FLOOR BID OPTION 1 JOINT SEALANT.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222004

B212 1ST FLOOR

BID OPTION 1

JOINT SEALANT

REMOVAL/

INSTALLATION

A1.10

EGT

BHH

01 100% 17 AUG 22

Scale:

BLDG. 212 1ST FLOOR PLAN

3/32" = 1'-0"

3/32" = 1'-0"

0 2' 4' 8' 16'

EXPANSION JOINT

LEGEND

ts

D

W

SLAB THICKNESS

DEPTH OF SEALANT

WIDTH OF SEALANT RESERVOIR

t s

D

W

W =19

[3/4"] MIN.

Scale:

TYP. DOOR THRESHOLD JOINT

1-1/2" = 1'-0"

1. TOP OF JOINT SEALANT SHALL BE 2-6 mm [1/16-1/4"] BELOW TOP OF PAVEMENT.

JOINT SEALANT - DOW 890

SL (SEE NOTE 1)

EXIST. BACKER

MATERIAL

EXIST. JOINT FILLER

A1.10

A1.10

A1.10

A1.10

A1.10

A1.10

A1.10

BID OPTION 1:

REMOVE EXISTING DOOR THRESHOLD SEALANT.

REPLACE WITH DOW 890 SL SEALANT. SEE

DETAIL ON THIS SHEET. (TYP. 7 PLCS)

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.20_B212

1ST FLOOR BID OPTION 1 TAXIWAY LINE REMOVAL &

REPLACEMENT.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222004

B212 1ST FLOOR

BID OPTION 1

TAXIWAY LINE

REMOVAL &

REPLACEMENT

A1.20

EGT

BHH

01 100% 17 AUG 22

Scale:

BLDG. 212 1ST FLOOR PLAN

1/16" = 1'-0"

3/32" = 1'-0"

0 2' 4' 8' 16'

BID OPTION 1:

DEMO EXISTING TAXI LINES.

REPAINT WITH 6" YELLOW TAXI LINES.

NOTES:

1. BOLD INDICATE LINES TO BE REPAINTED.

2. REPAINT 6" TAXIWAY LINES AS SHOWN,

NON-REFLECTORIZED.

TESTING

107 SQ. FT.

I.G. OFFICE

528 SQ. FT.

SERVICES

OFFICE

120 SQ. FT.

EXISTING TILE

FLOORING

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

NEW CARPET TILE

FLOORING - SEE FINISH

MATERIALS KEY

Scale:

BLDG. 250 FLOOR PLAN

3/32" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.30_B250

FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222004

B250

FLOORING

REPAIR PLAN

A1.30

EGT

BHH

01 100% 23 JUN 22

02 REV 1 17 AUG 22

3/32" = 1'-0"

0 2' 4' 8' 16'

09 6813 - TILE CARPETING

CPT1 CARPET 1 (BASE BID)

MFG: INTERFACE

PATERN: DECO DIAGONAL (6230202504)

SIZE: 20x20 INCH

BACKING: GRAPHLAR

COLOR: ANTHRACITE (602391)

METHOD: QUARTER-TURN

09 6500 - RESILIENT FLOORING

RB1 RESILIENT WALL BASE 1 (BASE BID)

MFG: ROPPE

STYLE: RUBBER, STYLE B COVE

COLOR:140 FAWN

HEIGHT: 4 INCH

FINISH MATERIALS KEY

DEMO EXISTING CARPET FLOORING

& WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED

ON THIS SHEET.

DEMO EXISTING VINYL TILE FLOORING

& WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED

ON THIS SHEET.

DEMO EXISTING CARPET FLOORING &

WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED

ON THIS SHEET.

A1.30

A1.30

Scale:

FLOORING TRANSITION - TILE TO CPT

3" = 1'-0"

REMOVED FLOOR TRANSITION FAF TO CONC DETAIL &

UPDATED VINYL TO CPT DETAIL.

JOINT OFFICE

SPACE

286 SQ. FT.

OFFICE SPACE

113 SQ. FT.

BREAKROOM

464 SQ. FT.

EXISTING VINYL

TILE FLOORING,

W/ CLEAN EDGE

TO BE COVERED

UP WITH SADDLE

THRESHOLD

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

NEW CARPET TILE

FLOORING - SEE FINISH

MATERIALS KEY

Scale:

BLDG. 385 FLOOR PLAN

3/16" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.40_B385

FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B212, B250

& B385

FMKM222004

B385

FLOORING

REPAIR PLAN

A1.40

EGT

BHH

01 100% 23 JUN 22

02 REV 1 17 AUG 22

3/16" = 1'-0"

0 1' 2' 4' 8'

09 6500 - RESILIENT FLOORING

RB1 RESILIENT WALL BASE 1 (BASE BID)

MFG: ROPPE

STYLE: RUBBER, STYLE B COVE

COLOR:140 FAWN

HEIGHT: 4 INCH

FINISH MATERIALS KEY

Scale:

FLOORING TRANSITION - VINYL TO CPT

3" = 1'-0"

DEMO EXISTING CARPET FLOORING &

WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED ON

THIS SHEET.

DEMO EXISTING VINYL TILE FLOORING

& WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED

ON THIS SHEET.

DEMO EXISTING VINYL TILE FLOORING &

WALL BASE. REPLACE WITH CPT1

FLOORING & RB1 WALL BASE LISTED ON

THIS SHEET.

09 6813 - TILE CARPETING

CPT1 CARPET 1 (BASE BID)

MFG: INTERFACE

PATERN: DECO DIAGONAL (6230202504)

SIZE: 20x20 INCH

BACKING: GRAPHLAR

COLOR: ANTHRACITE (602391)

METHOD: QUARTER-TURN

REMOVED FLOOR TRANSITION FAF TO CONC DETAIL &

UPDATED VINYL TO CPT DETAIL.

A1.40

A1.40

A1.40

A1.40

A 03 Final Dwgs - Repair Flooring B212_B250_B385_REV 1.pdf
G1.00_TITLE SHEET
Sheets and Views
G1.00
A1.00_B212 1ST FLOOR FLOORING REPAIR PLAN
Sheets and Views
Layout1
A1.10_B212 1ST FLOOR BID OPTION 1_DOOR THRESHOLD SEALANT REMOVAL & REPLACEMENT
Sheets and Views
Layout1
A1.20_B212 1ST FLOOR BID OPTION 1_TAXIWAY LINE REMOVAL & REPLACEMENT
Sheets and Views
Layout1
A1.30_B250 FLOORING REPAIR PLAN
Sheets and Views
Layout1
A1.40_B385 FLOORING REPAIR PLAN
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .