00 1,000500 1,500

1" = 500'-0"

Scale:

LOCATION MAP

1" = 500'

REPAIR FLOORING

B211, B212, B250 & B385

MINNESOTA AIR NATIONAL GUARD

148TH FIGHTER WING

MN ANG CONTACTS

BASE CIVIL ENGINEER

JOSEPH SOLBERG Maj 218-788-7339

DEPUTY BASE CIVIL ENGINEER

BENJAMIN HAYES Capt 218-788-7885

BASE ENVIRONMENTAL

RYAN BLAZEVIC Lt Col 218-788-7868

MR. AJ PETERSEN Civ 218-788-7720

OPERATIONS MANAGEMENT

MATT HAYES MSgt 218-788-7292

RYAN HALL MSgt 218-788-7293

MR. RYAN MARPLE Civ 218-788-7555

FACILITY MANAGER

DOUG ION CMSgt 218-788-7408

FIRE DEPARTMENT 218-788-7434

BASE DEFENSE OPERATIONS CENTER 218-788-7442

MAIN ENTRY GATE 218-788-7390

AIRPORT RD.

B U

L L

D O

G

B

L V

D

MAIN ENTRY GATE

RIDGEVIEW RD.

DULUTH

INTERNATIONAL

AIRPORT

AREA OF WORK

DRAWING INDEX

TITLE SHEET & LOCATION MAPG1.00

B211 1ST FLOOR FLOORING REPAIR PLANA1.00

B250 FLOORING REPAIR PLAN

A1.10

B385 FLOORING REPAIR PLAN

A1.20

A1.30

B212 1ST FLOOR FLOORING REPAIR PLAN

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG

FILES\G1.00_TITLE SHEET.DWG

REPAIR

FLOORING

B211, B212, B250 & B385

FMKM222005

DRAWING TITLE

& PROJECT

GENERAL NOTES

G1.00

EGT

BHH

01 100% 23 JUN 22

AREA OF WORK

AREA OF WORK

1. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH LAWS, ORDINANCES, RULES, CODES AND REGULATIONS OF

GOVERNMENT AUTHORITIES HAVING JURISDICTION.

2. THE GENERAL CONTRACTOR, ASSOCIATED SUBCONTRACTORS, AND ALL OF THEIR SUBORDINATES (REGARDLESS OF THE TRADE INVOLVED) SHALL FAMILIARIZE THEMSELVES WITH ALL INFORMATION LOCATED WITHIN THE COMPLETE CONSTRUCTION DOCUMENT

SET (ALL DRAWINGS AND SPECIFICATIONS) PRIOR TO CONSTRUCTION.

3. CONTRACTOR(S) SHALL MAINTAIN CURRENT RECORD DRAWINGS ON SITE AT ALL TIMES.

4. BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR AND ASSOCIATED SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN IN THE CONTRACT DOCUMENTS. THIS INCLUDES REVIEW AND VERIFICATION THAT DIMENSIONS, LOCATIONS, AND REQUIREMENTS SHOWN ON THESE PLANS ARE ACCEPTABLE FOR INSTALLATION AND PROPER USE OF THEIR RESPECTIVE SYSTEMS, MATERIALS AND EQUIPMENT. ANY DEVIATIONS, DISCREPANCIES, AND/OR CONFLICTS SHALL BE REPORTED IN WRITING

TO THE GOVERNMENT.

5. PRIOR TO COMMENCEMENT OF ANY OPERATION, EACH CONTRACTOR SHALL EXAMINE WORK PERFORMED BY OTHERS TO WHICH THEIR WORK ADJOINS OR IS APPLIED, AND REPORT TO THE ARCHITECT ANY CONDITIONS PREVENTING SATISFACTORY ACCOMPLISHMENT OF THEIR WORK. STARTING WORK OF ANY OPERATION SHALL INDICATE ACCEPTANCE OF CONDITIONS.

6. DRAWINGS ARE NOT TO BE SCALED. DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN OVER SMALL SCALE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK, AND SHALL NOTIFY

GOVERNMENT IMMEDIATELY IF ANY CONFLICTS OR DISCREPANCIES OCCUR.

7. MATERIALS AND NOTES COMMON TO SEVERAL DRAWINGS MAY BE NOTED ON ONLY ONE DRAWING. CONTRACTORS SHALL BE RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN ON DRAWINGS.

8. REFERENCES SHOWN ON DRAWINGS DO NOT NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT APPLICATION OF DRAWING OR DETAIL WHERE SPECIFIC DIMENSION, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED. CONSULT THE

GOVERNMENT PRIOR TO PROCEEDING WITH WORK.

9. CONTRACTOR SHALL ARRANGE TO ACCOMMODATE "NOT IN CONTRACT" WORK. WHEN INFORMATION IS INADEQUATE, REQUEST

FURTHER INSTRUCTIONS BEFORE PROCEEDING.

10. CONTRACTOR SHALL PERFORM HIGH QUALITY WORK. MATERIALS INSTALLED TO UNIFORM ACCURATE FIT SO THEY MEET WITH NEAT, STRAIGHT LINES, FREE OF OPEN SEAMS OR OVERLAPS. INSTALL EXPOSED MATERIALS APPROPRIATELY LEVEL, PLUMB AND

AT ACCURATE RIGHT ANGLES, OR FLUSH WITH ADJOINING MATERIALS.

11. COORDINATE WITH ALL SUBCONTRACTORS, ANY REQUIRED OPENINGS, INCLUDING THOSE NOT INDICATED IN THE CONSTRUCTION

DOCUMENT.

12. CONTRACTOR SHALL MAINTAIN CLEAN AND PRESENTABLE WORK AND STORAGE AREAS, AND SHALL NOT ALLOW ANY MATERIAL AS

A RESULT OF DEMOLITION OR CONSTRUCTION TO ACCUMULATE.

13. CONTRACTOR SHALL TAKE CARE TO PROTECT NEWLY INSTALLED MATERIALS.

14. PRIOR TO FINAL INSPECTION OF AND ACCEPTANCE OF THIS PROJECT, THE CONTRACTOR SHALL HAVE PROJECT AREA FREE FROM

ALL CONSTRUCTION DEBRIS, SCRAPS, MATERIAL, AND EQUIPMENT.

15. UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS. ALL AREAS AFFECTED BY THE PROJECT

SHALL BE DELIVERED CLEAN, WHOLE, TIGHT, AND FIT FOR IMMEDIATE OCCUPANCY.

16. THE CONTRACTOR SHALL ACCEPT THE PROJECT SITE AS IT EXISTS. ALL EXISTING DIMENSIONS AND EXISTING CONDITIONS WHETHER OR NOT SPECIFICALLY NOTED ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF ANY WORK. NOTIFY THE GOVERNMENT IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.

17. GENERAL CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN & PROTECT EXISTING EQUIPMENT, SYSTEMS & FINISHES WHICH ARE TO REMAIN. ANY DAMAGES TO SUCH EQUIPMENT, SYSTEMS & FINISHES SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE OWNER'S REPRESENTATIVE. IF SATISFACTORY REPAIRS CANNOT BE MADE, CONTRACTOR SHALL REPLACE EQUIPMENT, SYSTEMS & FINISHES WITH LIKE NEW QUALITY ACCEPTABLE TO THE OWNER. ALL REPAIRS & REPLACEMENT COSTS

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

18. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.

19. ADJACENT AREAS WILL BE OCCUPIED FOR THE DURATION OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFE ACCESS AND EGRESS IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL COORDINATE SCHEDULING OF DISRUPTIVE ACTIVITIES WITH THE GOVERNMENT.

20. CONTRACTORS TO PROVIDE TEMPORARY PARTITIONS AND DUST CONTROL AT ALL LOCATIONS WHERE WORK OCCURS IN

CORRIDORS AND/OR CANNOT BE CONTAINED WITHIN ROOMS.

21. CONTRACTOR SHALL PATCH AND REPAIR ANY AND ALL FLOORS, WALLS, BASE, CEILING, ETC. IN A WORKMANSHIP-LIKE MANNER TO MATCH THE SURROUNDING SURFACE AREAS WHERE THERE IS DAMAGE BECAUSE OF REMOVAL OR REPLACEMENT OF EXISTING

CONSTRUCTION.

22. IF NON-IDENTIFIED, POTENTIALLY HAZARDOUS MATERIAL IS ENCOUNTERED, DO NOT DISTURB. CONTACT GOVERNMENT

IMMEDIATELY.

PROJECT GENERAL NOTES

SAFE

SAFE

BDOC

345 SQ. FT.

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

EXISTING FLOORING

MATERIAL, HEIGHT

VARIES

EXISTING DOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

ADA 2-1/2" ALUMINUM

SADDLE THRESHOLD

EXISTING

FINISHED FLOOR

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.00_B211

1ST FLOOR FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B211, B212, B250 & B385

FMKM222005

B211

1ST FLOOR

FLOORING

REPAIR PLAN

A1.00

EGT

BHH

01 100% 23 JUN 22

Scale:

BLDG. 211 1ST. FLOOR PLAN

3/32" = 1'-0"

3/32" = 1'-0"

0 2' 4' 8' 16'

DEMO EXISTING EPOXY FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

Scale:

FLOORING TRANSITION - FAF TO CONC

3" = 1'-0" Scale:

FLOORING TRANSITION - FAF TO CPT

3" = 1'-0"

09 6500 - RESILIENT FLOORING

RB1 RESILIENT WALL BASE 1 (BASE BID)

MFG: ROPPE

STYLE: RUBBER, STYLE B COVE

COLOR:140 FAWN

HEIGHT: 4 INCH

FINISH MATERIALS KEY

09 6813 - TILE CARPETING

CPT1 CARPET 1 (BASE BID)

MFG: INTERFACE

PATERN: DECO DIAGONAL (6230202504)

SIZE: 20x20 INCH

BACKING: GRAPHLAR

COLOR: ANTHRACITE (602391)

METHOD: QUARTER-TURN

1/ 4"

EXISTING DOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

ADA 2-1/2" ALUMINUM

SADDLE THRESHOLD

EXISTING

FINISHED FLOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

EXISTING FLOORING

MATERIAL, HEIGHT

VARIES

BASE BID

4,158 SQ. FT.

BID OPTION 1

26,860 SQ. FT.

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

EXISTING FLOORING

MATERIAL, HEIGHT

VARIES

EXISTING DOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

ADA 2-1/2" ALUMINUM

SADDLE THRESHOLD

EXISTING

FINISHED FLOOR

Scale:

BLDG. 212 1ST FLOOR PLAN

1/16" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.10_B212

1ST FLOOR FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B211, B212, B250 & B385

FMKM222004

B212

1ST FLOOR

FLOORING

REPAIR PLAN

A1.10

EGT

BHH

01 100% 23 JUN 22

0 4' 8' 16' 32'

1/16" = 1'-0"

09 6700 - FLUID-APPLIED FLOORING

FAF1 FLUID-APPLIED FLOORING 1 (BASE BID & OPTION)

MFG: SIKA

STYLE: MORRITEX HD

(5-COAT SYSTEM)

COLOR: WHITE

LOC: HANGAR

BASE BID:

DEMO EXISTING EPOXY FLOORING.

REPLACE WITH FAF1 FLOORING

LISTED ON THIS SHEET.

(FIELD VERIFY FOOTPRINT

LOCATION W/ GOVERNMENT.)

BID OPTION 1:

DEMO EXISTING EPOXY FLOORING.

REPLACE WITH FAF1 LISTED ON

THIS SHEET.

Scale:

FLOORING TRANSITION - FAF TO CONC

3" = 1'-0" Scale:

FLOORING TRANSITION - FAF TO CPT

3" = 1'-0"

TESTING

107 SQ. FT.

I.G. OFFICE

528 SQ. FT.

SERVICES

OFFICE

120 SQ. FT.

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

EXISTING FLOORING

MATERIAL, HEIGHT

VARIES

1 4

EXISTING DOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

ADA 2-1/2" ALUMINUM

SADDLE THRESHOLD

EXISTING

FINISHED FLOOR

Scale:

BLDG. 250 FLOOR PLAN

3/32" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.20_B250

FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B211, B212, B250 & B385

FMKM222004

B250

FLOORING

REPAIR PLAN

A1.20

EGT

BHH

01 100% 23 JUN 22

3/32" = 1'-0"

0 2' 4' 8' 16'

09 6813 - TILE CARPETING

CPT1 CARPET 1 (BASE BID)

MFG: INTERFACE

PATERN: DECO DIAGONAL (6230202504)

SIZE: 20x20 INCH

BACKING: GRAPHLAR

COLOR: ANTHRACITE (602391)

METHOD: QUARTER-TURN

09 6500 - RESILIENT FLOORING

RB1 RESILIENT WALL BASE 1 (BASE BID)

MFG: ROPPE

STYLE: RUBBER, STYLE B COVE

COLOR:140 FAWN

HEIGHT: 4 INCH

FINISH MATERIALS KEY

Scale:

FLOORING TRANSITION - FAF TO CONC

3" = 1'-0"

Scale:

FLOORING TRANSITION - FAF TO CPT

3" = 1'-0"

DEMO EXISTING CARPET FLOORING.

REPLACE WITH CPT1 FLOORING &

RB1 WALL BASE LISTED ON THIS

SHEET.

DEMO EXISTING VINYL TILE FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

DEMO EXISTING CARPET FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

JOINT OFFICE

SPACE

286 SQ. FT.

OFFICE SPACE

113 SQ. FT.

BREAKROOM

464 SQ. FT.

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

EXISTING DOOR

2-1/2" ALUMINUM HALF

SADDLE THRESHOLD

EXISTING FLOORING

MATERIAL, HEIGHT

VARIES

EXISTING DOOR

NEW FINISHED

FLUID APPLIED

FLOOR - SEE

FINISH

MATERIALS KEY

ADA 2-1/2" ALUMINUM

SADDLE THRESHOLD

EXISTING

FINISHED FLOOR

Scale:

BLDG. 385 FLOOR PLAN

3/16" = 1'-0"

NO DATEREVISION

148TH FIGHTER WING

CIVIL ENGINEER SQUADRON

4630 MUSTANG DRIVE

DULUTH, MN 55811

THIS SQUARE APPEARS

1/2" X 1/2" ON FULL SIZE

SHEETS

DRAWING TITLE:

PROJECT NAME:

PROJECT NUMBER:

FILE:

DRAWN BY:

CHECKED BY:

DRAWING NO:

R:\MSG\CES\CE\47 - COMPREHENSIVE PLANS\2 - DESIGN\22005 -

REPAIR FLOORING B211_B212_B250_B385\DWG FILES\A1.30_B385

FLOORING REPAIR PLAN.DWG

REPAIR

FLOORING

B211, B212, B250 & B385

FMKM222004

B385

FLOORING

REPAIR PLAN

A1.30

EGT

BHH

01 100% 23 JUN 22

3/16" = 1'-0"

0 1' 2' 4' 8'

09 6500 - RESILIENT FLOORING

RB1 RESILIENT WALL BASE 1 (BASE BID)

MFG: ROPPE

STYLE: RUBBER, STYLE B COVE

COLOR:140 FAWN

HEIGHT: 4 INCH

FINISH MATERIALS KEY

Scale:

FLOORING TRANSITION - FAF TO CONC

3" = 1'-0" Scale:

FLOORING TRANSITION - FAF TO CPT

3" = 1'-0"

DEMO EXISTING CARPET FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

DEMO EXISTING VINYL TILE FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

DEMO EXISTING VINYL TILE FLOORING.

REPLACE WITH CPT1 FLOORING & RB1

WALL BASE LISTED ON THIS SHEET.

09 6813 - TILE CARPETING

CPT1 CARPET 1 (BASE BID)

MFG: INTERFACE

PATERN: DECO DIAGONAL (6230202504)

SIZE: 20x20 INCH

BACKING: GRAPHLAR

COLOR: ANTHRACITE (602391)

METHOD: QUARTER-TURN

G1.00_TITLE SHEET
Sheets and Views
G1.00
A1.00_B211 1ST FLOOR FLOORING REPAIR PLAN
Sheets and Views
Layout1
A1.10_B212 1ST FLOOR FLOORING REPAIR PLAN
Sheets and Views
Layout1
A1.20_B250 FLOORING REPAIR PLAN
Sheets and Views
Layout1
A1.30_B385 FLOORING REPAIR PLAN
Sheets and Views
Layout1