Base_Wide_Cooling_Systems_Site_Visit_Slides_26_July_2018.ppt

PPT presentation 438 KB Posted

Attached to
Add-Repair Multiple Cooling Systems Base Wide Federal contract opportunity
Solicitation number
W912L7-18-B-5007
Issued by
Department of the Army Tennessee Army National Guard

About this file

Power Point Slides

View the file

Other files for this federal contract opportunity

Other files attached to Add-Repair Multiple Cooling Systems Base Wide, newest first.
File Type Posted
18B5007_Abstract_of_Bids_FBO.pdf PDF
Bid_Opening_Sigin_Sheet.pdf PDF
QA_Multiple_Cooling_Syst_Base_Wide.pdf PDF
W912L7-18-B-5007-0001_Amendment_PoP.pdf PDF
Preproposal_minutes_W912L718B5007.pdf PDF
Signin_Sheet_W912L718B5007.pdf PDF
B720_Recirculation_Drawings.pdf PDF
W912L7-18-B-5007_Base_Wide_Cooling_Solictation.pdf PDF
B720_Recirculation_Specification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADD-REPAIR COOLING SYSTEMS BASE WIDE

AT BERRY FIELD ANG BASE, TN

Pre-Bid Conference 26 July 2018

118 MSC, BERRY FIELD ANG BASE, TN

INTRODUCTION

2d Lt Greg Allen– Contracting Officer

MSgt Jonathan Forren– Contract Specialist

Maj Nathan Smith– Technical Representative

SYNOPSIS

Add-Repair Multiple Cooling Systems Base Wide at Berry Field Air National Guard Base, TN. W912L7-18-B-5007
The estimated cost range -$250,000 and $500,000.
A firm-fixed price contract will be awarded.
Award is set aside for small businesses (NAICS – 238220)
Small Business Size Standard is $15 Million
The contract will be awarded based on lowest price.

SOLICITATION, PLANS

& SPECIFICATIONS

On the web: https://www.fbo.gov/ Solicitation Performance Work Statement Plans and Specifications Questions & Answers document Pre-Bid presentation Amendments check regularly & refresh web page

IFB

In the invitation for bid (IFB), FAR Part 14, process, a public bid opening occurs when the bids are due and the prices are read to the public There can be no discussion No correction of mistakes in most cases Award is always to the low responsible bidder

WHAT IS THE CONTRACT PERIOD

Construction period is 45 calendar days after receiving the Notice to Proceed

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11

Offer, Standard Form (SF) 1442 front and back signed Section 00010 Line Items- all items must be priced A valid Bid Bond. Standard Form 24. Section 0700 – Clause 52.228-1.

Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at https://www.sam.gov see 52.204-8 in solicitation ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature. Section 00010 Line Items- all items must be priced All amendments to the solicitation must be acknowledged.

Mark the front of the envelope with the following: “BID No. W912L7-18-B-5001” and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued ALL ITEMS ON THE PREVIOUS SLIDES ARE IN THE SOLICITATION INSTRUCTIONS. IT IS THE RESPONSIBILITY OF THE BIDDER TO MAKE SURE THAT THEIR BID CONFORMS TO THE SOLICITATION.

BID DUE DATES

W912L7-18-B-5007 - Bids are due 2:00 P.M. (CST) 13 August 2018 Proposal must be signed by officer of your company No facsimile or electronic offers will be accepted

IMPORTANT REMINDERS

W912L7-17-B-5001 Questions concerning these project must be received by close of business 6 August 2018. Section 00100 Paragraph 5 for format.

Contractor must submit information listed in Section 00100 Notes, paragraph 4.2 in order to gain access to installation for dropping off bids. Delivery must allow for vehicle inspection time at gate. MUST BE SUBMITTED BY 6 August 2018 Wage determination TN180084, Mod 0, Dated 6/15/2018, Building is applicable

HELPFUL WEBSITES

https://www.fbo.gov
https://www.sam.gov
https://www.wdol.gov

HOW QUESTIONS WILL BE HANDLED

Questions must be submitted in writing only via email to: gregory.m.allen10.mil@mail.mil Use Format in Section 00100, Para 5.1

DO NOT CALL TECHNICAL PERSONNEL OR A&E- THIS WILL DELAY GETTING AN ANSWER

ANSWERS TO QUESTIONS

All questions, on a non-attribution basis, and the answers will be posted to the web site https://www.fbo.gov/ If necessary addendums, issued by an amendment, will also be posted Check web site regularly and don’t forget to refresh web page!!

IMPORTANT

OFFERORS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY

Questions ???

Site Visit Follows This Briefing