B720_Recirculation_Drawings.pdf
PDF 9 MB Posted
- Attached to
- Add-Repair Multiple Cooling Systems Base Wide Federal contract opportunity
- Solicitation number
- W912L7-18-B-5007
About this file
CLIN0006 B720 Recirculation Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Sigin_Sheet.pdf | ||
| 18B5007_Abstract_of_Bids_FBO.pdf | ||
| QA_Multiple_Cooling_Syst_Base_Wide.pdf | ||
| W912L7-18-B-5007-0001_Amendment_PoP.pdf | ||
| Preproposal_minutes_W912L718B5007.pdf | ||
| Base_Wide_Cooling_Systems_Site_Visit_Slides_26_July_2018.ppt | PPT presentation | |
| Signin_Sheet_W912L718B5007.pdf | ||
| W912L7-18-B-5007_Base_Wide_Cooling_Solictation.pdf | ||
| B720_Recirculation_Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W e s t E n d
A v e n u e
S u it e
N a s h v il le
T N
.3
.7
T e l
G M
C N
E T
W O
R K
.C O
M d ra w n b y
IS
S
U E
D
A T
E c h e ck e d b y sh e e t o f
G O
O D
W Y
N M
I L
L S
C A
W O
O D
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
/4
/2
:2 1:
P M
T
IT
L E
S H
E E
T
T
A u th o r
S B
R E
P A
IR
H
V A
C B
U
IL
D
IN
G B
G M
C
A
N A
S
Is su e D at e
P ro je ct
S ta tu s
B K
T Z
N A
S H
V
IL
L E
I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
B E
R R
Y F
IE
L
D ,K
N A
P P
B L
V D
N
A S
H V
IL
L
E T
.N . 3
-2
-2
5%
D C
S E
T
-0
-2
F
IN
A
L
BKTZ162007 REPAIR HVAC BUILDING B720
NASHVILLE INTERNATIONAL AIRPORT
BERRY FIELD, KNAPP BLVD. NASHVILLE, TN 37217
GOODWYN MILLS & CAWOOD, INC
EDMONDS ENGINEERING, INC.
ARCHITECTURE, INTERIORS, CIVIL, LANDSCAPE
MECHANICAL & PLUMBING ENGINEERING
INDEX OF DRAWINGS
No. Sheet Name
0. GENERAL
T1 TITLE SHEET
2. MECHANICAL
M1.00 MECHANICAL DEMO & NEW WORK ENLARGED
M5.01 MECHANICAL PIPING SCHEMATICS
M5.02 MECHANICAL CONTROLS
3. ELECTRICAL
E0.01 ELECTRICAL LEGEND & DETAILS
E1.01 ELECTRICAL NEW WORK ENLARGEMENT
APPLICABLE CODE
VICINITY MAP
A. WORK SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF THE UNIFIED FACILITIES CRITERIA 1-200-01
GENERAL BUILDING REQUIREMENTS AND INTERNATIONAL BUILDING CODE (LATEST EDITION).
B. AIR NATIONAL GUARD POLICY ANG ETL 01-1-1
C. HANDICAP ACCESSIBILITY PER ADA STANDARDS FOR ACCESSIBLE DESIGN.
D. NFPA 5th EDITION ROOFING AND WATERPROOFING MANUAL.
F. OSHA
G. PLUMBING AND GAS PIPING WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2012
INTERNATIONAL PLUMBING CODE.
H. ELECTRICAL WORK SHALL CONFORM TO:
1. NFPA 70, 2011 NATIONAL ELECTRICAL CODE.
2. NFPA 72, 2012 NATIONAL FIRE ALARM CODE.
3. NFPA 101, 2012 LIFE SAFETY CODE.
4. NFPA 780, 2012 LIGHTNING PROTECTION CODE.
5. 2011 NATIONAL ELECTRICAL SAFETY CODE
6. COMMERCIAL BUILDING TELECOMMUNICATION CABLING STANDARD, TIA/EIA0568-B. 2-1
I. HEATING, VENTILATATING AND AIR CONDITIONING WORK SHALL CONFORM TO REQUIREMENTS OF
ASHRAE 62-89 (R); VENTILATING FOR ACCEPTABLE INDOOR AIR QUALITY.
J. FIRE PROTECTION WORK SHALL CONFORM TO:
1. NFPA 72, 2012 NATIONAL FIRE ALARM CODE
2. NFPA NO. 101, 2012 LIFE SAFETY CODE.
3. IFC, 2012 INTERNATIONAL FIRE CODE.
4. NFPA 10, 2012 STANDARD FOR PORTABLE FIRE EXTINGUISHERS.
5. NFPA 13, 2012 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.
6. NFPA 24, 2012 STANDARD FOR INSTALLATION OF PRIVATE FIRE
EXTINGUISHER MAINS AND THEIR APPURTENANCES.
7. NFPA 70, 2012 NATIONAL ELECTRICAL CODE.
8. NFPA 220, 2012 STANDARD ON TYPES OF BUILDING CONSTRUCTION.
BASE MAP
GENERAL/VICINITY
SITE LOCATION
| T0.01 |
| M1.01 (1) |
| M5.01 (1) |
| M5.02 (1) |
| E0.01 (1) |
| E1.01 (1) |
File details come from the government source that posted it.