152007_RFI__9_cable_barriers_V2.pdf
PDF 56 KB Posted
- Attached to
- Main Gate Entry Control Point Upgrade Federal contract opportunity
- Solicitation number
- W912L619R5001
- Issued by
- Department of the Army National Guard
About this file
RFI 9
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_0011.pdf | ||
| 152007_RFI__13_Bollard_Storage_Location.pdf | ||
| 152007_RFI__12_cable_barrier_spring_response.pdf | ||
| 19-R-5001-0003.pdf | ||
| RFI_0010.doc | DOC document | |
| W912L619R50010002_Amendment_0002.pdf | ||
| Front_Gate_ECP_Upgrade_Site_Visit_Sign_In_Sheet.pdf | ||
| 152007_RFI__2_-_Swing_Gate_Demo.pdf | ||
| 152007_RFI__8_UFC_requirements.pdf | ||
| 152007_RFI__5_-_signage_combined_V2_.pdf | ||
| 152007_RFI__7_removable_curbs.pdf | ||
| 152007_RFI__1_-_Barriers.pdf | ||
| 152007_RFI__6_signage_V3.pdf | ||
| 152007_RFI__3_-_Gate_Closure.pdf | ||
| 152007_RFI__4_-_E005_For_reference_only.pdf | ||
| W912L619R50010001.pdf | ||
| RFI.doc | DOC document | |
| WRANGB_COMBINED_SPECS_152007_FINAL_Upload_in_FBO.pdf | ||
| W912L6-19-R-5001.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
(RFI)
PROJECT TITLE: Construct Barrier at Main Gate RFI NO: 9
PROJECT NUMBER: YZEU152007
BASE: Will Roger's Air National Guard
DISTRIBUTION/ROUTING Date Initials Critical: Yes No Contractor to Contracting Contracting Received Date Req’d: ASAP Contracting to COR COR Received COR to A & E (if necessary) A & E Received A & E to COR COR Received COR to Contractor & Contracting 8/29/18 CEC
SUBJECT: Cable barriers Drawing/Spec Ref:
Information Requested: 1. Drawing C-201 shows to construct a cable barrier on the west side of the road, but does not mention anything about the east side of the road. Is it the intent of this project to construct a cable barrier on the east side of the road as well?
2. For Access Control Point Final Denial barriers, the cable barrier is typically M50/K12 crash rated leading up to the active vehicle barriers (in your case Delta barriers). Drawing C-305 does not depict an M50/K12 cable barrier. Does this cable barrier need to be crash certified at the M50/K12 rating?
Attachment(s):
POC: Phone: Organization:
Response: 1. The east side of the road has an existing cable barrier system, and is not part of this project.
2. Build the cable barrier according the plans and drawings.
Attachment(s):
POC: CEC Phone: 405-686-5003 Organization: 137 SOCES