152007_RFI__12_cable_barrier_spring_response.pdf
PDF 4 MB Posted
- Attached to
- Main Gate Entry Control Point Upgrade Federal contract opportunity
- Solicitation number
- W912L619R5001
- Issued by
- Department of the Army National Guard
About this file
Request for Information 12
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_0011.pdf | ||
| 152007_RFI__13_Bollard_Storage_Location.pdf | ||
| 19-R-5001-0003.pdf | ||
| RFI_0010.doc | DOC document | |
| W912L619R50010002_Amendment_0002.pdf | ||
| Front_Gate_ECP_Upgrade_Site_Visit_Sign_In_Sheet.pdf | ||
| 152007_RFI__7_removable_curbs.pdf | ||
| 152007_RFI__1_-_Barriers.pdf | ||
| 152007_RFI__6_signage_V3.pdf | ||
| 152007_RFI__3_-_Gate_Closure.pdf | ||
| 152007_RFI__9_cable_barriers_V2.pdf | ||
| 152007_RFI__4_-_E005_For_reference_only.pdf | ||
| 152007_RFI__2_-_Swing_Gate_Demo.pdf | ||
| 152007_RFI__8_UFC_requirements.pdf | ||
| 152007_RFI__5_-_signage_combined_V2_.pdf | ||
| W912L619R50010001.pdf | ||
| RFI.doc | DOC document | |
| WRANGB_COMBINED_SPECS_152007_FINAL_Upload_in_FBO.pdf | ||
| W912L6-19-R-5001.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
(RFI)
PROJECT TITLE: Entry Point Control Upgrade RFI NO: #
PROJECT NUMBER: W912L619R5001
BASE: OKC-ANG
DISTRIBUTION/ROUTING Date Initials Critical: Yes No
Contractor to Contracting 17-JULY BM
Contracting Received Date Req’d:
Contracting to COR
COR Received
COR to A & E (if necessary)
A & E Received
A & E to COR
COR Received
COR to Contractor & Contracting
SUBJECT: cable barrier
Drawing/Spec Ref: plans
Information Requested: (1)the cable barrier that is in the plans is not the same system that is at the front gate, can a system that matches be used
Attachment(s):
POC: Phone: 921-1436 Organization: Warden Const
Response:
Attachment(s):
POC: Phone: Organization:
The details shown in the plans on sheet C-305 for the cable barrier were pulled from MacArthur's design for the Main Gate when it was first constructed. A different system was actually constructed in the field. It is acceptable and preferred to match what exists in the field, for the proposed upgrades. See attached drawings for the installed system. CEC - 7/18/2019
DM 686-5310 137SOCES BCE